VelociRFTA BRT. Roaring Fork Transportation Authority. Webinar: Transit Planning with a Land Use Lens. August 23, 2011

Similar documents
EXECUTIVE SUMMARY A. INTRODUCTION. 1. What is the CIS and how will it be used by RFTA? 2. How does the CIS relate to the Entrance to Aspen?

TRANSPORTATION RELATIONSHIP TO OTHER ELEMENTS OF THE PLAN AND COUNTY REGULATIONS VISION FOR TRANSPORTATION PLANNING ROAD NETWORK SECTION 7

Transportation and Utilities

Orange County Transit

2018 Comprehensive Guide Plan Steering Committee. Wednesday, October 11, Minnehaha Room, Minnetonka City Hall. 6:00 8:00 p.m.

Contents i Contents Page 1 A New Transportation Plan Community Involvement Goals and Objectives... 11

2040 STRATEGIC PLAN. January we move people

Nashville Southeast Corridor High-Performance Transit Alternatives Study. Final Report

SOUTHWEST LRT (METRO GREEN LINE EXTENSION)

Appendix F 2008 Travel Demand Modeling

Transit Service Guidelines

Welcome. Public Meeting. August 2, :00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m.

Executive Summary and Staff Recommendation

12 Evaluation of Alternatives

ARLINGTON COUNTY TRANSIT DEVELOPMENT PLAN

APPENDIX A - PLANS AND POLICY REVIEW FEBRUARY 2017

FUTURE BUS RAPID TRANSIT PLANS

MEMORANDUM #4. DATE: November 4, Warrenton TSP Project Management Team. Ray Delahanty, AICP, DKS Associates Kate Petak, EIT, DKS Associates

Washington Metropolitan Area Transit Authority Board Action/Information Summary

APPENDIX B - GLOSSARY FEBRUARY 2017

Locally Preferred Alternative. Work In Progress; Subject To Change Without Notice 1

POLK COUNTY TPO Polk County 2060 Transportation Vision Plan Final Report. ADOPTED June 18, 2009

S-09: Auburn Station Access Improvements

EXECUTIVE SUMMARY REGIONAL TRANSPORTATION PLAN 2050

I-20 East Transit Initiative

Transit Investment Direction and Plan Introduction. Transportation Advisory Board TPP Workshop August 16, 2017

Alternatives Analysis, New Starts

Sustainable Transportation & Land Use Integration Study

Goals, Objectives, and Factors for Consideration. February 23, 2017

Master Plan. Summary

Fairfax Transportation Committee I-66 Multimodal Improvements Inside the Beltway. January 20, 2015

MOBILITY AND ALTERNATIVES ANALYSIS

Bow Concord I-93 Improvements City of Concord Transportation Policy Advisory Committee

Sound Transit Transit-Oriented Development (TOD) Policy

Fairfax County Countywide Transit Network Study

1560 Broadway, Suite 700, Denver, CO phone

I-66 Corridor Improvements Outside the Capital Beltway in Northern Virginia, USA

Public Meeting. January 26, 2012 Fulton County North Service Center

Wheaton PRELIMINARY RECOMMENDATIONS

41 st & Fox Station Area Property Owner Meeting August 16, 2018

Chapter 3 Stakeholder Interviews and Summary of Needs

2040 Transportation Policy Plan Conversion to Performance Based Planning Basis. 25 th Annual CTS Transportation Research Conference May 21, 2014

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives.

Summary of transportation-related goals and objectives from existing regional plans

Moving Forward 2040 Long Range Transportation Plan Bicycle Mobility Master Plan Transit Master Plan

TSM/TDM (Transit and Roadway Efficiency) Concept - Analysis and Results

Transit Market and Travel Demand Regional Service Councils June 2018

VDOT and DRPT MPO and PDC Winter Meeting Amy Inman Planning & Mobility Programs Administrator Virginia Department of Rail and Public Transportation

Transit Market and Travel Demand Citizens Advisory Council

Downtown Estes Loop Project Frequently Asked Questions

Evaluation of Alternatives

MOBILITICS. Scenario Planning and Modeling Connected & Automated Vehicles. June 12, 2018

Transit Investment Direction and Plan Introduction. Transportation Advisory Board October 18, 2017

City of Charlottesville MEMO

Town of Tecumseh. Town of Tecumseh Council Chambers June 26, Town of Tecumseh.

Appendix O Level of Service Standard and Measurements

Peninsula Corridor Study November 2 nd, #PeninsulaTransit

Ottawa Transportation Master Plan 2013

Pinal County Transit Feasibility Study. Briefing Book

Transit Oriented Development Study

BUS RAPID TRANSIT CORRIDOR

Chapter 4: Transportation and Land Use

VRE Gainesville-Haymarket Extension (GHX) Study. December 16, 2016

I-26 Fixed Guideway Alternatives Analysis. Transit Talk: ULI Executive Round Table Discussion. Thursday, April 30, :30 AM 1:00 PM

Dear Board of County Commissioners, Mayor Flitner, and Town Councilors,

Fresno County Measure C Transit Oriented Development (TOD) Program Policies and Guidelines

2030 Transportation Policy Plan SUMMARY PRESENTATION. Land Use Advisory Committee November 15, 2012

ARLINGTON COUNTY, VIRGINIA

Connecting the Nation's Capital Transportation System

Regional Transit System Plan

INTEGRATED MOBILITY PLAN

3. STATION SPACING AND SITING GUIDELINES

Category 3, BART Capacity, Access and Parking Improvements. Contra Costa Transportation Authority STAFF REPORT Page 2 of 5 The Authority directed staf

South Fulton Parkway Transit Feasibility Study Stakeholder Committee Meeting #2

MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: PHONE: Recommend to Board. Final Action

Los Angeles County Sustainability Summit Your Community: Smart Growth and Community Development

VISION STATEMENT, MISSION STATEMENT, AND GOALS AND OBJECTIVES

Final Environmental Impact Statement and Section 4(f) Evaluation

CHAPTER 2: Goals, Objectives & Standards

BUS RAPID TRANSIT. El Camino Real Bus Rapid Transit Project. Environmental Scoping Meetings February 21 and 28

Chapter 4. Recommendations

2016 Subdivision Staging Policy TISTWG 6/7/16. Draft Review of Worksession #1 on 6/9/16

Future Build Alternative Traffic Forecasts and Level of Service Analysis

VIA Long Range Plan Glossary

Transportation Master Plan Introduction

Task 6 Technical Memorandum Define Project Purpose and Jurisdiction Dialog Draft

TIGER VIII Grant Application Glenwood Springs Maintenance Facility Renovation and Expansion

Purpose of Fares FARES FED/STATE GRANTS ACCESS-A-RIDE SALES TAX FACILITIES RAIL SERVICE BUS SERVICE

Chapter 1: Overview. page 1. Figure 2-1: Road congestion is expected to continue to grow

The Future of Transit in Colorado

SH 7 BRT Concept Evaluation: Modeling: Ridership and Ridership Evaluation: Travel Time Evaluation: Station Usage:...

2004 FEASIBILITY STUDY UPDATE

10. PROJECT DEVELOPMENT, LEADERSHIP, AND OVERSIGHT GUIDELINES

SCS Scenario Planning

EVALUATION OF ALTERNATIVES CARRIED FORWARD

Priorities are for AG comment at today's meeting. Four time frames proposed for implementation

MOBILITY 2025: THE METROPOLITAN TRANSPORTATION PLAN

I-20 East Transit Initiative

TRANSIT SYSTEM SUMMARY REPORT

Alternatives Analysis

Transcription:

VelociRFTA BRT Roaring Fork Transportation Authority Webinar: Transit Planning with a Land Use Lens August 23, 2011 David Johnson, AICP RFTA Director of Planning

RFTA Service Summary 70-Mile Corridor 75,000 service area population Peak 4.8 million trips in 2008 (2 nd largest transit agency in Colorado) 3.5 million Miles of Service 225 employees during peak winter season 34 Mile Rail Corridor

Principles Reasons for RFTA s Success Geographic Constraints (Mountains, Federal Lands) Limited parking availability Aggressive TDM Programs in Aspen General Support for Regional Transit

30-year Ridership History

Geography is the Major Driver Aspen Glenwood Springs

Stereotypical Ridership Actual Ridership

Aspen AM and PM Congestion BRT makes transit competitive regionally but regional efforts tied to Aspen

Station and Transit Priority Locations

Station Design 8

Implementation Process 1. Corridor Investment Study 2003 Current needs Future needs Project goals 2. Alterna:ves Analysis 2007-2008 Design goals Service and func;onality goals Preferred Alterna;ve (BRT) 3. Very Small Starts Applica:on 2008 Received FTA Approval Begin Project Development 4. Voter Support 2008 Sales Tax for BRT Bonding Approval We are here! 5. Project Development 2009-2011 Program Management Consultant Issue Bonds Complete Advanced Planning Program Defini;on Branding Community Outreach Jurisdic;on Coordina;on 6. Project Construc:on Grant Agreement 2 nd quarter 2011 Planning Approvals Final Design Vehicle Procurement ITS Procurement Service Plan Refinement 7. Construc:on 2011-2013 Final document prepared Tes;ng of System 8. Begin Revenue Service An:cipated July- September 2013 5 Planning Approvals NEPA- FONSI Received

Why Bus Rapid Transit? Improved transit travel times, reliability and convenience Increased transit capacity Improved transit visibility and image Improved ease of use Improved transit comfort and convenience Opportunities for transit-oriented development More cost effective than rail

RFTA s Goals for Transit Success Reduce congestion and related traffic impacts Serve multiple key destinations along the corridor Increase access to jobs from affordable housing Reduce environmental/climate impacts of travel Reduce dependence on foreign/fossil fuels Support community goals and objectives Address current operational issues Provide flexibility in implementation Increase affordability and cost-effectiveness

Selection Criteria Pedestrian Accessibility Safe and efficient Adjacent to and nearby residential connections Adjacent to and nearby goods and services connections Rio Grande Trail connections Adjacent to signalized intersection with pedestrian crossing Americans with Disability Act accommodations 16

Selection Criteria Market Area Number of residents living within a walkable distance 15

Basalt Station Downtown Basalt

Brush Creek Station Pitkin County Location and Extent/Scenic Review 200-ps park and ride+ Grade-separated crossing

Brush Creek Station Plan 16

Aspen Airport Station 9

Land Use is the Next Frontier 2006 Vision Statement: Focus is creating a great transit system By 2017, our region will significantly reduce dependence on oil through a resource-efficient, climate-friendly, multimodal transportation system with a regional express line unimpeded by traffic and weather, competitive with the private vehicle in terms of convenience, travel time, and quality. 2011 Vision Statement: Focus is creating great communities RFTA provides preferred transportation choices that connect and support vibrant communities.

Next Steps 2011 RFTA Strategic Plan (Focus is on Connecting and Supporting Vibrant Communities) Rifle TOD Strategic Plan RFTA TOD Strategic Plan Rosslyn Ballston Land Use Plan