Abu Dhabi Ports Operating Company Abu Dhabi Terminals PJSC

Similar documents
Abu Dhabi Ports Operating Company Abu Dhabi Terminals PJSC

Gulftainer Group GULFTAINER SCHEDULE OF CHARGES SHARJAH CONTAINER TERMINALS. (WEF 1 st December 2013)

Gulftainer Group GULFTAINER SCHEDULE OF CHARGES SHARJAH CONTAINER TERMINALS. (WEF 1 st February 2018)

ADDENDUM No. 1B TO TERMS AND TARIFFS OF BMF PORT BURGAS EAD. ACT Burgas Tariff

ADDENDUM No. 1B TO TERMS AND TARIFFS OF BMF PORT BURGAS EAD. ACT Burgas Tariff. In force from

Prices in Euros. Pricing for all services and cargo not specified in general tariff is available upon request. Code Description Price

AQABA CONATINER TERMINAL CONTAINER SERVCIE CHARGERS Notification BY THE AQABA SPECIAL ECONOMIC ZONE AUTHORITY THE HASHEMITE KINGDOM OF JORDAN

North Sea Terminal Bremerhaven GmbH & Co. Reference tarif

SOUTH PACIFIC INTERNATIONAL CONTAINER TERMINAL LIMITED (SPICTL)

Point Lisas Industrial Port Development Corporation Limited

Point Lisas Industrial Port Development Corporation Limited

MUNDRA INTERNATIONAL CONTAINER TERMINAL PVT. LTD. TARIFF BOOKLET

Port Tariff. updated March 14 th Services to the. Shipping Lines & Agents. Head Office, Dock Road. Tel: /5

Berth 20. Stevedoring and Terminal Standard Tariff

Containerized Cargo Consignee Standard Tariff

-65- INDIA GATEWAY TERMINAL PRIVATE LIMITED SCALE OF RATES FOR INTERNATIONAL CONTAINER TRANSHIPMENT TERMINAL Jan-Dec

-65- INDIA GATEWAY TERMINAL PRIVATE LIMITED SCALE OF RATES FOR INTERNATIONAL CONTAINER TRANSHIPMENT TERMINAL Jan-Dec

Gdański Terminal Kontenerowy SA

POINT LISAS INDUSTRIAL PORT DEVELOPMENT CORPORATION LIMITED

CONSIGNEE TARIFF ICT/IPT, IRAQ (WEF

Gulftainer Group CONSIGNEE TARIFF ICT/IPT/IST, IRAQ. (WEF 1 st November 2018)

Gdański Terminal Kontenerowy SA

POINT LISAS INDUSTRIAL PORT DEVELOPMENT CORPORATION LIMITED

Gulftainer Group CONSIGNEE TARIFF ICT/IPT, IRAQ. (WEF 1 st January 2014)

CMA-CGM LOGISTICS PARK, PVT. LTD. (DADRI) TARIFF (w.e.f. 16th February, 2015)

EUROGATE Container Terminal Limassol Limited

EUROGATE Container Terminal Limassol Limited

CHENNAI INTERNATIONAL TERMINALS PRIVATE LIMITED. 1 Preface / Definitions 2 2 General Charges For Container Operations 5 3.1

Tariff of General Cargo Charges Main Ports 2018

Tariff of General Cargo Charges Main Ports 2018

INDIA GATEWAY TERMINAL PRIVATE LIMITED. Scale of Rate Gazette No.408 Dated

Tariff of General Cargo Charges Main Ports Khalifa Port, Musaffah Port, Zayed Port

Annex - III SCALE OF RATES NHAVA SHEVA INTERNATIONAL CONTAINER TERMINAL PRIVATE LIMITED

NATIONAL CUSTOMER INTERACTION CENTRE:

STANDARD TARIFF. Bharat CFS Zone-1, Mundra Port & SEZ Ltd. Mundra, Dist: Kutch , Gujarat,

EUROGATE Container Terminal Limassol Limited

SERVICE CHARGES AT TAN CANG - CAT LAI TERMINAL

TARIFF BOOKLET. Contents

A. EXPORTS. Composite Charges for Stuffing 20' 40'

Tariff for Star Track Terminals Operations. (Revised with Effect From 09 th May 2018 )

BHARAT CFS ZONE- 1, ADANI PORTS & SEZ, MUNDRA , KUTCH, GUJARAT.

PART 2: DOMESTIC TARIFF - CONTAINER YARD (For Account SHIPPER/CONSIGNEE)

MAXIMUM TARIFFS TERMINAL CONTAINERS

LIMAKPORT ISKENDERUN CURRENT CONTAINER TARIFF

OFFICIAL TARIFF. 20 th and 21 st November 2017, Dubai, UAE. Presented by

Mundra International Container Terminal Private Limited. Tariff Amended on and valid from 01 August 2018 TARIFF BOOKLET- CFS. Key Contact Details:

STANDARD TARIFF DCT GDANSK CONTAINER OPERATIONS

USD per cubic meter (CBM) USD per consignment, per waybill

TARIFF FOR SERVICES. BCT - Bałtycki Terminal Kontenerowy Sp. z o.o. The Tariff is valid from 1st January 2018

Port Tariff Iraq Port Authority

Halterm International Container Terminal Schedule of Rates and Charges

Penang Port Sdn. Bhd. ( D) Headquarters : No.1. Pesara King Edward, Georgetown, Penang, Malaysia Postal : P.O. Box 1204, Penang,

LIST OF PRICES AND SERVICES

Key To Abbreviations

OFFICIAL TARIFF. Presented by

No Kind Collection unit Service Charges JD Fils 1 Live Animals (sheep) Other live animals. Each Each

CONTAINER TERMINAL OPERATIONAL GUIDELINES

LIST OF PRICES AND SERVICES

terminal Tariff VISAKHA CONTAINER TERMINAL PRIVATE LIMITED SCALE OF RATES Annex - IV

Prices and Conditions for. EUROGATE Container Terminal Hamburg GmbH

SEABIRD MARINE SERVICES PRIVATE LIMITED : DRONAGIRI

OFFICIAL TARIFF. 10 th 12 th October 2018, Lagos. Presented by

POINT LISAS INDUSTRIAL PORT DEVELOPMENT CORPORATION LIMITED PORT POINT LISAS TARIFF GLOSSARY & NOTICES

Section 6 - Loading/Unloading Rules, Regulations & Charges

OFFICIAL TARIFF. 10 th 12 th September 2018, Riyadh, KSA. Presented by

10-12 DECEMBER 2018 DWC, AIRSHOW SITE

IGTPL will release container only after verifying following documents.

3752 (Khalifa Port and approaches) 3176 (Ajman to Sir Abu Nu'ayr) 2889 (Dubai to Jebel Al Az Zannah & Jazirat Das)

OFFICIAL TARIFF. 2 nd to 4 th October 2018, Barcelona, Spain. Presented by

Changes Effective 9/1/17

MARITIME AUTHORITY OF JAMAICA. DRAFT Guidelines on the Verification of Gross Mass of a Packed Export Container

BAHRAIN PORTS TARIFF 2016 (MILITARY)

CONCOR MMLP-CMLK KATHUWAS. No. CON/NR/PUBLIC TARIFF/01 Dated: 19/02/2016

Ashutosh Container Services Pvt.ltd. TARIFF BOOKLET

EXPORT OPERATIONS. 1. Container Handling & Transportation Charges. 2. Reworking Charges. 3. Ground Rent of Loaded Dry Container (per day)

Effective: 1st September 2018

TARIFFS PRINCIPAL TARIFF: EFFECTIVE 1 JULY JUNE 2019 TERMS. Marine. Unless otherwise stated

Port of Liverpool. Schedule of Common User Charges Liverpool Container Terminals. For further information contact:

ON CARGO DELIVERED AT CONTAINER FREIGHT STATION (CFS) AT DESTINATION, THE FOLLOWING TERMINAL HANDLING CHARGE SHALL BE ASSESSED AGAINST THE CARGO:

Public Services Libra Terminais Santos. (effectiveness as of January 16th, 2016 Expressed in Reais)

CONTAINER FREIGHT STATION KOLKATA TARRIF

TI1.0 Imports: TARIFF. LCL Cargo:

Services and Rates of The Moin Container Terminal 2018

OFFICIAL TARIFF. Presented by

GENERAL PORT OPERATING CONDITIONS IN FINLAND 2006

TARIFF EFFECTIVE FROM S.No. Job Description 20 Container 40 Container Rs. Rs.

EXPORT OPERATIONS. 1. Container Handling & Transportation Charges. 2. Reworking Charges. 3. Ground Rent of Loaded Dry Container (per day)

All transactions are handled in accordance with Standard Trading Conditions of the Co.

PORT OF PORT OF SPAIN

Djibouti Ports Tariff Book

OFFICIAL TARIFF. Presented by

SCHEDULE OF CHARGES FOR USE OF ROLL-ON/ROLL-OFF BERTHS PURSUANT TO SECTIONS 26 AND 27 OF THE HARBOURS ACT 1964

ACT Burgas Terms of Business

Services For Import Containers Services For Stripped Import Cargo Services For Export Containers Services For Empty Containers...

SOLAS. Verified Gross Mass Shipper Guide. nagel.com

Page 1. Allcargo CFS TARIFF 56

A Guide for Exporters FOR THE EXPORT OF CONTAINERS AT PORT OF TOWNSVILLE

STEVEDORING TARIFF. The Port of Helsingborg

Section 4 Vessel Charges/Cargo Charges

Transcription:

Abu Dhabi Ports Operating Company Abu Dhabi Terminals PJSC Khalifa Port Container Terminal Terms and Conditions of Use and Tariffs Schedule Tariff Effective from 1 st January, 2018 1 P age

INDEX Item Subject Page No. A GENERAL SECTION 3 1 Application 3 2 Documentation 3 3 Waste Disposal 3 B CONTAINER HANDLING SECTION 4 101 Loading and Discharging of Containers 4 102 Volume Discounts 4 103 Conditions and Services 4 104 Hazardous Containers 5 105 Restows 6 106 Other Equipment 6 107 Shifting of Containers 6 108 Out of Gauge Containers 6 109 Containers Loaded in Excess of d Capacity 7 110 Container Storage 7 111 Monitoring of Refrigerated Containers 8 112 Delays to Crane 9 113 Cancelled or Postponed Berthing 9 114 Overtime on Public Holidays 9 115 Knocking Down Flats 9 116 Fitting and/or Removing Tarpaulins 9 117 Removing/Applying Placards 9 118 Administrative Charges and Operational Requirements 10 119 Undelivered Containers Auction/Disposal 11 120 RoRo Vessels at the Terminal 11 121 Storage of RoRo Trailers and Flats 11 122 Bundling of Empty Flats or Mafis 11 123 Processing Charges 11 124 RFID Tags for Transport Vehicles Entering the Terminal 11 125 Weighing of Containers inside the Terminal 12 C EQUIPMENT HIRE SECTION 13 201 Equipment Hire 13 D GEAR HIRE SECTION 15 301 Gear Hire 15 E BREAK BULK SECTION 16 401 Break Bulk on Container Vessels 16 2 P age

A GENERAL SECTION 1 Application The following Tariffs shall be applicable at the Terminal. All rates are in Arab Emirates Dirhams (AED) unless otherwise stated. 2 Documentation Documentation shall be delivered to ADT at least 48 hour prior to Vessel s arrival. The documentation shall include, but not be limited to: Discharging vessels: Cargo stowage plan Cargo manifest Hazardous cargo declaration (in the absence of hazardous cargo a NIL declaration must be made) MSDS list for shipments Loading vessels: Customs endorsed export declaration (for each consignment) Cargo stowage plan Cargo loading list Hazardous cargo declaration (in the absence of hazardous cargo a NIL declaration must be made) MSDS list for shipments Late submission of each file: Item Text 2.1 Per document 700.00 3 Waste Disposal 3.1 The usage of garbage skips for garbage disposal is mandatory for all the Vessels in the Terminal. 3.2 Charges for the use of skips and disposal of garbage per vessel call AED 130 per skip 3.3 Should Vessels require additional skips, charges for skip and for each move associated with the transportation for positioning and/or emptying the skip will apply. 3.3.1.a Additional charges per skip 260.00 3.3.1.b Transportation for additional skip 200.00 3 P age

B CONTAINER HANDLING SECTION 101 Loading and Discharging of Containers 101.1 The rates in this Item 101 include all overtime with the exception of declared Public Holidays. Up to 20 Discharging Loading Full 412.00 412.00 Full transshipment 363.00 Empty 250.00 250.00 Empty transshipment 254.00 Over 20 Discharging Loading Full 650.00 650.00 Full transshipment 484.00 Empty 335.00 335.00 Empty transshipment 330.00 102 Volume Discounts 102.1 Volume discounts may be available upon request from Terminals Users. 102.2 To qualify for Volume s, Terminal Users must submit a letter of guarantee before discount rates can be applied. 102.3 When a Terminal User fails to achieve the number of moves to which it has committed, ADT reserves the right to render a supplementary invoice to adjust the rates accordingly. 103 Conditions and Services 103.1 The above rates (items 101 & 102) are based on the conditions and services listed below. Where these are not met, ADT reserves the right to render additional invoices. Item 103.1.a 103.1.b 103.1.c 103.1.d 103.1.e 103.1.f 103.1.g 103.1.h That the Vessel is constructed in a manner that permits ADT to load and discharge Containers by the use of a gantry type Container crane. That the loading or discharging is not delayed or interrupted by Cargo not ready for handling. That reporting and documentation is in accordance with Legal Requirements. Volume discount figures do not include restows or shifting onboard. Transshipment Containers loaded or empty count as one move only. Direct delivery is not allowed except under special circumstances, with the prior approval of ADT. Discharging one Container move from stowed position in Vessel to point of rest in the Container yard. Loading one Container move from point of rest in the Container yard to stowed position in Vessel. 4 P age

103.1.i 103.1.j 103.1.k Transshipment one move from stowed position in Vessel to point of rest in the Container yard, and one move from point of rest in the Container yard to stow position in Vessel. Lashing and unlashing, provided that all lashings are of the quick release type and are supplied by the Vessel and excessive under deck lashing is not required. Cranage, horizontal transportation, stacking equipment and labor as required. 104 Hazardous Containers 104.1 Containers loaded with Hazardous Cargo will be charged the following additional to the rate listed in Items 101 and/or 102: Container size All sizes Additional 50% THC as per items 101 and/or 102 104.2 Containers with undeclared, poorly stowed or incorrectly packaged or labeled dangerous goods will receive penal charges per incident, depending on the severity of the incident, the extent of the safety violation, and the repetitive nature. Penal charge for all IMDG class except class 1, 7, 5.2 2,400.00 Penal charge for IMDG class 1, 7, 5.2 22,000.00 104.3 Any Container found leaking shall be shifted to Leaking Container Area (LCA) and kept under supervision. After inspection, if necessary, Hazmat Operation shall be carried out. The charges will be as follows: 104.3.a Inspection of Container, including shifting 295.00 104.3.b Hazmat operation, if required. Cost for materials, labor and equipment 950.00 will be charged additionally. 104.3.c Leaking Container monitoring, per day 195.00 104.4 Containers containing Motor Fuel Anti Knock Mixtures, IMO Class 6.1, UN No. 1649, IMDG Code Page 6199 (Octel Tanks) will be subject to a daily storage charges after the free time: Item Free time 104.4.a Import or Export: 2 days 600.00 104.4.b Transshipment: 10 days 600.00 104.5 Gas Lighter Containers of IMO class 2.1, upon discharge from Vessel, will be opened for ventilation and re sealed. The following charges shall apply: Item Free time 104.5.a Opening Container, per unit 72.00 104.5.b Apply new seal, per seal 17.00 104.5.c Storage As per Tariff 5 P age

105 Restows 105.1 Restows, which will not count for volume discount purposes, are charged as follows: 6 P age Item Container Size 105.1.a Any size Within hatch 150.00 105.1.b Any size Via quay 248.00 106 Other Equipment 106.1 Pontoons, hatch covers and stacking frames, gearbox and lashing bin which will not count for volume discount purposes, are charged as follows: Any size 259.00 107 Shifting of Containers 107.1 Where a Container shift is required, which is not included in the rate as described in item 101, the following charges apply: Item Container Size 107.1.a 20 Roundtrip within Terminal, including grounding 158.00 107.1.b Over 20 Roundtrip within Terminal, including grounding 198.00 107.1.c 20 One way between Terminal and CFS. CFS 125.00 grounding is not invoiced by ADT 107.1.d Over 20 One way between Terminal and CFS. CFS 155.00 grounding is not invoiced by ADT 107.1.e Any size Grounding of Containers, and any other moves between the ground and trailer or chassis 150.00 Note: Terminal includes the warehouse area located within Khalifa Port Container Terminal operated by ADT 107.2 Transport Vehicle loading and unloading charges (TLUC) applies to all Containers, regardless of size, that are delivered and/or received at the Terminal gate: Container Size Any size Loading: one container move from point of rest in the Container 120.00 yard to the Transport Vehicle Any size Unloading: one container move from the Transport vehicle to point of rest in the Container yard 120.00 108 Out of Gauge Containers 108.1 The out of gauge handling frame and emergency lift charges will be charged in addition to the applicable Container handling rate: Item Container size 108.1.a 20 Out of gauge handling frame 504.00

108.1.b Over 20 Out of gauge handling frame 604.00 108.1.c Not applicable Emergency lift 630.00 109 Containers Loaded in Excess of d Capacity 109.1 Containers tendered to ADT, and loaded in excess of the Container s rated capacity will be rejected and a penal charge per incident, depending on the severity of the incident, the extent of the safety violation and the repetitive nature. ADT may strip the overweight Container(s) or return them to the Terminal User at the sole discretion of ADT. Minimum penal charge 1,300.00 110 Container Storage 110.1 Full import Containers, storage rates apply per day from and including the discharge date. 20 Over 20 First 14 days Nil Nil Next 5 days 80.00 160.00 Thereafter 150.00 300.00 110.2 Full export Containers, storage rates apply per day from and including the gate in date. 20 Over 20 First 10 days Nil Nil Next 20 days 30.00 60.00 Next 30 days 40.00 80.00 Thereafter 80.00 160.00 110.3 Full transshipment Containers, storage rates apply per day from and including the discharge date. 20 Over 20 First 10 days Nil Nil Next 30 days 12.00 24.00 Thereafter 19.00 32.00 110.4 Empty Containers are segmented in four categories, storage rates apply per day from and including the discharge date/ gate in. Import Empty 20 Over 20 First 14 days Nil Nil Next 30 days 12.00 24.00 Thereafter 19.00 32.00 Note: Import empty refers to empty container discharged from vessel in KPCT. 7 P age

Export Empty 20 Over 20 First 14 days Nil Nil Next 30 days 12.00 24.00 Thereafter 19.00 32.00 Note: Export empty refers to empty container loaded from KPCT on vessel. Transshipment Empty 20 Over 20 First 14 days Nil Nil Next 30 days 12.00 24.00 Thereafter 19.00 32.00 Note: Transshipment empty refers to empty container discharged/loaded as transshipment from/to vessel in KPCT. Storage Empty 20 Over 20 First 14 days Nil Nil Next 30 days 12.00 24.00 Thereafter 19.00 32.00 Note: Storage empty refers to empty container being accepted in KPCT through gate unless specified as export empty. 110.5 Out of gauge Containers, a storage surcharge applies: Container size All sizes Additional 50% surcharge over and above storage charges as per 110.1 110.3 110.6 Refrigerated Containers, usual dry Container storage rates apply. 110.7 If port trailer is used for storage of container / break bulk AED 500/ per 24 hours or part thereof will be applicable for trailer hire in addition to the storage. 111 Monitoring of Refrigerated Containers 111.1 Where ADT has agreed to monitor a refrigerated Container, the following charge is applicable in addition to other applicable handling and storage charges. This charge covers extra work such as plugging, unplugging and monitoring of the temperature. No maintenance will be performed on malfunctioning reefers. ADT will notify the Agent and report malfunctions as soon as discovered. ADT will not assume responsibility for power failure. ADT will arrange reefer repairs to the machinery on request at an additional cost. 8 P age

Reefer monitoring, per 24 hours or part thereof 150.00 112 Delays to Crane 112.1 If loading or unloading is delayed, after the first 30 (thirty) minutes of the vessel being alongside, the following charge will apply: Delays per crane, per hour or part thereof 1,500.00 113 Cancelled or Postponed Berthing 113.1 If the Terminal User desires to cancel or postpone berthing, it must give ADT advance notice of 24 (twenty four) hours, otherwise ADT reserves the right to invoke item 112 against the Terminal User. 114 Overtime on Public Holidays 114.1 Normal overtime is included in the handling rates listed in the Tariff, but overtime will be charged for work on declared public holidays as follows: Hours worked on declared public holidays, per gang hour or part thereof 282.00 115 Knocking Down Flats 115.1 The following charge will apply: Knocking down flats, per unit 66.00 116 Fitting and/or Removing Tarpaulins 116.1 The following charges will apply: Container size 20 Fitting or removing tarpaulin, per unit 114.00 Over 20 Fitting or removing tarpaulin, per unit 204.00 117 Removing/Applying Placards 117.1 The following charges will apply: 117.1.a Removing placards, per Container 36.00 117.1.b Applying placards, per Container 36.00 117.1.c Cost of each placard 48.00 9 P age

118 Administrative Charges and Operational Requirements 118.1 The following charges exclude any necessary shiftings, which are separately invoiced as per item 107: 118.1.a Category change (from import to Empty / Export / 78.00 Transshipment or vice versa), per Container 118.1.b Change in weight of container (±5 Mt), per Container 78.00 118.1.c Equipment class change (from 20 to 40 / 45 or vice versa), 78.00 per Container 118.1.d Hazardous to non Hazardous declaration or vice versa, per 78.00 Container 118.1.e Mis declaration or change in port of discharge 78.00 118.1.f Status Change (FCL to LCL and vice versa), per Container 78.00 118.1.g Status Change (FCL or LCL to empty and vice versa), per 78.00 Container 118.1.h Change in outbound carrier (export and/or transshipment), per 78.00 Container 118.1.i Non or mis declaration of outbound carrier (export and/or 80.00 transshipment), per Container 118.1.j Change in outward carrier (export and/or transshipment) if full 80.00 list transferred from one Vessel to another 118.1.k Non or mis declaration of Out of Gauge Containers 80.00 118.1.l Shut outs at shipside or already moved. 170.00 118.1.m Interchange between lines 107.00 118.1.n Computer data amendment at Terminal User request 37.00 118.1.o Computer prints: Discharge / Load lists with plan, one per 66.00 Vessel 118.1.p Further computer prints: Yard inventory reports and other 30.00 prints, per enquiry 118.1.q Further computer prints: Yard inventory reports and other 10.00 prints, per sheet printed 118.1.r Load list inclusions after cut off (when possible and agreed to by ADT), per Container 50% additional over the usual handling charge 118.1.s Retrieving and email photos, per Container per location 50.00 118.1.t Removing of Container from load list once ship is alongside, 78.00 per container 118.1.u Port receiving charge (PRC) per container:_ 1. Full/Empty Containers staying outside port facility for more than 20 days or Empty containers staying in M&R for more than 15 days from the day of offload. 2. Full/Empty Containers for which the logical container cycle is not complete(full Out Empty In or Empty Out Full In) 50.00 10 P age

119 Undelivered Containers Auction/Disposal 119.1 Containers containing goods destined for Auction/Disposal as per Section C of the Terms and Conditions will only be released after all shifting, un stuffing and storage charges have been received by ADT. 11 P age From the time a Container is marked for auction/disposal, the daily storage charges will reduce as follows: Container size and type Any size and type Storage charge after being marked for 13.00 auction/disposal, per day These charges will be to the respective Terminal User s account. Note: If for any reason, auction/disposal does not take place, ADT will apply charges as per tariff item 110. 120 RoRo Vessels at the Terminal 120.1 All Containers will be charged at the Container Tariff rates. 120.2 s for General Cargo and Stevedoring are available on request. 120.3 s for utilization of Terminal resources to effect delivery of inbound Ro Ro items from Point of Rest, or receive to Point of Rest for outbound items, are available on request. 121 Storage of RoRo Trailers and Flats 121.1 Ro Ro Trailers and Flats will be billed at the appropriate Container storage rate as set out in item 110. 122 Bundling of Empty Flat Racks or Mafis 122.1 The bundling of empty flat racks is done in the Terminal upon official request from Terminal User. The rate below includes shifting, stacking and lashing. Bundling of empty flat racks or mafis, per unit 240.00 Note: For all units loaded as bundles, THC will be charged per unit 123 Processing Charges 123.1 Processing charges are invoiced as follows: 123.1.a Document processing charge, per document 55.00 123.1.b Document processing charge per container for CFS/ICR* 25.00 123.1.c Truck visit appointment fee, per online appointment 27.00 123.1.d Truck visit appointment fee, per appointment over counter 54.00 *CFS Containers moving in to Container Freight Station (CFS).

ICR Containers moving in to Customs Inspection due to Inspection Container Request (ICR). 124 RFID Tags for Transport Vehicles Entering the Terminal 124.1 Charges related to RFID tags for Transport Vehicles entering the Terminal are as follows: 124.1.a Permanently fixed tags, per tag incl. installation 420.00 124.1.b Temporary tags, per tag incl. installation per visit. A refundable 60.00 deposit of 420.00 must be paid 124.1.c Removing and/or replacing tags, per occurrence 78.00 124.1.d Tag inspection without repair, per occurrence 42.00 125 Weighing of Containers inside the Terminal 125.1 Where ADT provides a service to weigh containers inside the terminal and record the verified gross mass (VGM), following charge will apply in addition to other applicable charges. VGM will be recorded by using automated stacking cranes. Container weighing inside the Terminal/ per Container 40.00 Note: If the mis declaration of VGM weight exceeds 1 Ton (1000Kg), ADT will override the container weight and apply VGM charge AED 40. If it exceeds 5 Ton (5000Kg), ADT will apply VGM charge AED 40 and weight mis declaration charge as per tariff item 118.1.b. 12 P age

C EQUIPMENT HIRE SECTION 201 Equipment Hire 201.1 Equipment may be hired at the following rates, which include driver or operator during regular time but not overtime, and insurance which is the responsibility of the party hiring the equipment. 201.1 Driver or operator hire per hour or part thereof 150 201.2 Driver or operator during overtime period, per hour or part thereof 216.00 201.2 Container crane for non cargo use, rate per hour or part thereof: 201.2 Container crane (for non cargo use) 1,475.00 201.3 Container crane for general cargo lifts with spreader, rates per hour or part thereof: 201.3.a 0 15 ton 1,512.00 201.3.b 16 24 ton (GC w/spreader) 1,954.00 201.3.c 25 34 ton (GC w/spreader) 2,520.00 201.3.d 35 41 ton (GC w/spreader) 3,150.00 201.3.e 42 tons & above (GC w/spreader) 3,906.00 201.4 Container crane for general cargo lifts with heavy lift beam, rates per hour or part thereof: 201.4.a 0 15 ton 1,764.00 201.4.b 16 24 ton 2,206.00 201.4.c 25 34 ton 2,772.00 201.4.d 35 41 ton 3,528.00 201.4.e 42 tons & above 4,157.00 201.5 Top lift Container handler, rate per hour or part thereof: 201.5 Top lift Container handler 535.00 201.6 Terminal tractor and trailer, rates per hour or part thereof: 201.6.a Terminal trailer 43.00 201.6.b Terminal tractor 316.00 201.6.c Terminal tractor for Ro Ro 479.00 13 P age

201.7 Forklift, rates per hour or part thereof: 201.7.a Up to 4 ton 114.00 201.7.b 5 15 ton 347.00 201.7.c 16 33 ton 473.00 201.8 Cherry picker, rates per hour or part thereof: 201.8.a Cherry picker 264.00 201.9 Labour Hire rates per hour or part thereof: 201.9.a Labour Hire 100.00 201.9.b Labour Hire during overtime period, per hour or part thereof 166.00 201.10 Technician Hire rates per hour or part thereof: 201.9.a Technician Hire per hour or part thereof 250.00 201.9.b Technician Hire during overtime period, per hour or part thereof 316.00 201.11 Reach Stacker, rates per hour or part thereof: 201.8.a Reach Stacker 473.00 14 P age

D GEAR HIRE SECTION 301 Gear Hire 301.1 Gear can be hired at the following rates, per 24 hours or part thereof: 301.1.a Nylon / Rope slings 42.00 301.1.b Wire slings 2.5 ton 72.00 301.1.c Wire slings 4.5 ton 90.00 301.1.d Wire slings 6.0 ton 120.00 301.1.e Wire slings 10.0 ton 150.00 301.1.f Wire slings >10.0 ton 210.00 301.1.g Chain slings single 210.00 301.1.h Chain slings double/quadruple 300.00 301.1.i Pallet bars, assembly 120.00 301.1.j Shackles, up to 5.0 ton 8.00 301.1.k Shackles, up to 10.0 ton 14.00 301.1.l Shackles, up to 20.0 ton 54.00 301.1.m Shackles, >20.0 ton 72.00 301.1.n Dock plates 72.00 301.1.o Steel plates, large 72.00 301.1.p H/L Spreader beam 400.00 301.1.q Chain/Cargo hook 450.00 15 P age

E BREAK BULK SECTION 401 Break bulk on Container Vessels 401.1 When ADT agrees to handle break bulk to or from Container Vessels, the following handling rates apply per freight ton: 401.1.a General cargo 18.00 401.1.b Hazardous cargo 30.00 401.2 When ADT agrees to handle break bulk to or from Container Vessels, the following stevedoring rates apply per freight ton: 401.2.a General cargo 24.00 401.2.b Hazardous cargo 36.00 401.3 Storage for break bulk to or from Container Vessels may be available on request. 16 P age