Alternative Solutions

Similar documents
Building Height and Cellars, Basements and Crawl Spaces

BULLETIN 34: BUILDING ENVELOPE SERVICES APPROPRIATE PROFESSIONAL PRACTICE

Application for Certificate of Occupancy Procedure for Existing Commercial & Residential 4 (+) Family Buildings

Change of Coordinating Registered Professional (CRP) or Registered Professional (RP)

1. INTRODUCTION 1.1 Contents of Engineering Specifications The Engineering Specifications contains the following sections:

TABLE OF CONTENTS LIST OF APPENDICES ABBREVIATIONS 1.0 DEFINITIONS PURPOSE AND SCOPE GUIDELINES FOR PRACTICE 5

Building Standards Review Process Changes for Designs beyond the Scope of Part 9 (Rev: Feb. 26, 2018)

VERSION 2.0. FOR COMMERCIAL PROJECTS New Construction and Additions

SPECIAL INSPECTION PROCEDURE IBC CHAPTER 17

TABLE OF CONTENTS ABBREVIATIONS 1.0 DEFINITIONS PURPOSE AND SCOPE GUIDELINES FOR PRACTICE REFERENCES AND RELATED DOCUMENTS 12

Small Business Permit Service

GENERAL AND SPECIFIC OBJECTIVES

Student Services & Classroom Addition

EARLY START PERMITS. Site cleaning, including removal of any existing asphalt, and/or concrete slab, Excavation work under the building footprint,

BUILDING INSPECTOR. The City of Campbell River is seeking a full-time Building Inspector I or II.

Fenestration Energy Performance:

A. This Section includes administrative and procedural requirements for quality assurance and quality control.

Qualification of Local Government Building Officials: Response to Consultation

Town of Poughkeepsie BUILDING DEPARTMENT 1 OVEROCKER ROAD POUGHKEEPSIE, NY12603 (845)

ENERGY EFFICIENCY STANDARDS REGULATION

BRITISH COLUMBIA CERTIFIED PROFESSIONAL PROGRAM PRACTICE AND PROCEDURE MANUAL

REGISTRAR OF PASSENGER TRANSPORTATION MINISTRY OF TRANSPORTATION

DEVELOPMENT SERVICES PO Box 1110 Tampa, FL Date: May 12, Interested Parties. John L. Barrios, CBO, Building Official

ENERGY PERFORMANCE PROTOCOL QUALITY ASSURANCE SPECIFICATION

Best Practices for all Elevators and Escalators in British Columbia

Licensed Science Officer Benchmark

CONSTRUCTION SPECIFICATION FOR MODULAR BRIDGE STRUCTURES FOR TEMPORARY INSTALLATIONS

BC Energy Efficiency Act - Regulatory Proposal for Window and Door Products

Guidelines. Facility Permit

How to modify a tested fire-rated wall to improve its STC sound rating, while maintaining its official fire-rated qualification

(*Trek 2000 has since been superceded by Place and Promise: The UBC Plan.)

HALIFAX REGIONAL MUNICIPALITY BY-LAW NUMBER B-201 RESPECTING THE BUILDING CODE

ARCHITECTS (LANDSCAPE) ACT

Q&A on Application for Certification as a Steel Detailer (RSD, CSD or ASD)

130A Alternative process for wastewater system approvals. (a) Engineered Option Permit Authorized. A professional engineer licensed under

NC Department of Insurance Office of the State Fire Marshal - Engineering Division 1202 Mail Service Center, Raleigh, NC

Use of NFRC Standards in Canada

QUALITY REQUIREMENTS

ONTARIO PROVINCIAL STANDARD SPECIFICATION

aster Requirement SPE 105

Practice Note 16: Professional Design and Field Review By Supporting Registered Professionals

2639 North Monroe Street, Suite B-112 Tallahassee, FL Application for Special Inspector Certification. Rule 61G Form FBPE/006 12/17

AUXILIARY BUILDING INSPECTOR/ DEVELOPMENT OFFICER

Water Services Guidelines

This brochure outlines zoning information for single-family and two-family dwellings in the R1 to R5 and R9 to R10 Districts.

Guide to the Letters of Assurance in the B.C. Building Code 2006 December, 2010 Edition 5

DESIGNATED STRUCTURAL ENGINEER APPLICATION GUIDE

The Home Depot U.S.A., Inc. Instructions to Bidders

GENERAL AND SPECIFIC OBJECTIVES

Submission, Review and Approval of Construction Documents Submission and Review of a Completed Application for Permit

INFORMATION BULLETIN

DIVISION 9 - SECTION ECOSilence Recycled Rubber Sound Underlayment US Patent No. RE 41,945

Building Officials' Association of BC 2014 to 2019 Business Plan

DIRECTIVE Use of ASME Code Case 2596 in Alberta

An Urgent Bulletin from CSA Group

SOLE AND PRIVATE PRACTITIONER INTERPRETIVE GUIDE

BUILDING CODE COMMISSION

DATE: 02/05/2018. REQUEST FOR PROPOSAL: No. RFP/2018/UNHCR/PSP/MENA/002 FOR THE ESTABLISHMENT OF A FRAME AGREEMENT FOR THE PROVISION OF

REQUEST FOR OFFER No Supply and Deliver One (1) New Special Service Vehicle for Nanaimo Fire & Rescue

CORPORATION OF THE CITY OF NEW WESTMINSTER BYLAW NO. 7660, A bylaw for the management of waste and recyclable materials from demolition work

Addition to Section 4 - Special Use Regulations

2012 VIRGINIA INDUSTRIALIZED BUILDING SAFETY REGULATIONS

SECTION QUALITY REQUIREMENTS

Pro-Demnity Insurance Company

STATEMENT OF QUALIFICATIONS. Pre-qualification Submissions For. Environmental Consulting Services On. Alberta Transportation Projects

Dealing with Substitutions to Your Design

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act,1992

CONSTRUCTION SPECIFICATION FOR TEMPORARY PROTECTION SYSTEMS

Procedure for Uncovered Deck Dock, or Shoreline Storage Building:- Shed, Boathouse, Dryland Boathouse or Boatport

Guidance on the Application. of ISO / IEC Accreditation International Association for Certifying Bodies

SECTION 2XXX TITLE OF SECTION

ELEVATORS AND LIFTS ACT REGULATIONS

KITSAULT MINE PROJECT ENVIRONMENTAL ASSESSMENT. Section Compliance Reporting

PUBLIC NOTICE MARYLAND DEPARTMENT OF TRANSPORTATION NOTICE ARCHITECTS & ENGINEERS TRANSPORTATION PROFESSIONAL SERVICES SELECTION BOARD

CITY OF BURNABY BYLAW NO *******

Township of Otonabee-South Monaghan

CITY OF SURREY. Surrey Waterworks Cross Connection Control By-law, 2013, No

City of Vancouver Land Use and Development Policies and Guidelines

BUILDING CONSULTANTS WEDNESDAY NOVEMBER 20, 2013 THURSDAY NOVEMBER

Inspection and Quality Assurance Requirements for Metal Plate Connected Wood Trusses. Educational Overview

MAYOR or COUNCILLOR CANDIDATE NOMINATION INFORMATION PACKAGE. SUBMISSION DEADLINE: Friday, September 14, :00 p.m.

OWNER S AFFIDAVIT. I, certify that I am the owner of the property described as: ADDRESS: LOT: BLOCK: SUBDIVISION:

B Contractor Licensing GUIDE FOR APPLICANTS

British Columbia What You Need to Know

HARRIS COUNTY UTILITY DISTRICT NO Jones Rd, Suite 120, Houston, Texas Phone Number (281)

SPECIAL INSPECTION & TESTING AGREEMENT CITY OF NORTON SHORES BUILDING DEPARTMENT Michigan Building Code 2015

CITY OF COLUMBIA. MENTOR PROTÉGÉ PROGRAM Professional Services. Mentor and Protégé Annual Business Plan. Annual Report Year:

Engineer, Pipelines BC Oil & Gas Commission, Kelowna. Engineering Division - Pipelines

SCHEDULE C COMMUNICATIONS PROTOCOL

BURNABY BUILDING DEPARTMENT

NYC Technical Bulletin

Seismic Resistance Special Inspector Registration

Appendix D University of Maine System. Supplementary Requirements to AIA Document B Standard Form of Architect s Services

Bylaw 3847, 2016 Adopted Mar 21, 2016 SCHEDULE G - REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE INSTALLATION OF STREET LIGHTING

ENHANCED LICENSING SYSTEM FOR BC RESIDENTIAL BUILDERS

GREEN BUILDING IMPLEMENTATION GUIDELINES

Proposed - For Interim Use and Comment

Special Inspections Program Procedures - IBC Section 1704 Special Inspections - Index:

Transcription:

Planning and Building Department INFORMATIONAL GUIDE Revised: 2017 October 27 Alternative Solutions The purpose of this brochure is to explain the City of Burnaby's requirements and procedures relating to submission for Alternative Solutions. This information is provided for convenience only and is not in substitution of applicable City Bylaws or Provincial or Federal Codes or laws. You must satisfy yourself that any existing or proposed construction or other works complies with such Bylaws, Codes or other laws." What is an Alternative Solution? Article 1.2.1.1., Part 1, Division A of the British Columbia Building Code states that compliance with the code shall be achieved by complying with applicable acceptable solutions in Division B or using alternative solutions that will achieve at least the minimum level of performance required by Division B in the areas defined by the objectives and function statements attributed to the applicable acceptable solutions. How to apply for an Alternative Solution? Applications for alternative solutions shall be submitted to: Chief Building Inspector, Building Department, City of Burnaby, 4949 Canada Way, Burnaby, B.C., V5G 1M2 Submission of alternative solution in advance of the building permit application may not be reviewed immediately. The City s final response to the submission may be withheld until building permit application has been reviewed. Fees for Alternative Solutions An application fee is charged for each proposed alternative solution in accordance with the current fee schedule. It should be noted that many projects have more than one alternative solution submitted in a single report. As each alternative solution is site specific and must be reviewed and responded to on an individual basis, the fee will be levied for each alternative solution referred to in a report. There is no charge for revising the Alternative Solution(s) prior to City acceptance. A revision fee will be charged to revise an already accepted alternative solution of a project or apply an already accepted alternative solution of a project to a different location within the same project.

Submission Requirements Applications must include the following submissions for each proposed Alternative Solution: - 1 completed Alternative Solution Application Form (the applicant must be the registered professional responsible for the proposed alternative solutions). - payment of the appropriate fee - 1 original copy of an alternative solution(s) report complete with all supporting documentation - 1 electronic copy (PDF) emailed to Building@burnaby.ca - 1 Alternative Solution Submission and Sign Off Form (see attached) for each alternative solution signed and sealed by the registered professional and initialed by the project s Coordinating Registered Professional (CRP) Alternative Solutions Reports Alternative solutions reports must be prepared, sealed, signed and dated by a professional engineer or architect licensed to practice in British Columbia and experienced in the preparation of alternative solutions. The code report shall include a high level code analysis of the building to provide context for the Alternative Solutions. Alternative solutions reports shall limit detailed Code review and analysis to only those aspects of Code compliance that have a direct bearing on the alternative solutions being proposed. Reports that provide an approach to Code compliance or that constitute a summary of Code requirements for the purpose of providing guidance to the development team are not acceptable. A single submission may contain multiple alternative solutions but each alternative solution must be documented separately. For each proposed alternative solution provide: Compliance Baseline - specification of a Code compliant solution using acceptable solutions (should an alternative solution not be accepted this is the compliant solution that must be implemented) - the objectives, functional statements applicable to the acceptable solutions - a specification of the level of performance required by the acceptable solutions Proposal - the proposed alternative solution Demonstration - the analytical methods and rationales used to demonstrate that the proposed alternative solution will achieve at least the level of performance required by the acceptable solution - an explanation of all assumptions, limiting or restricting factors, application of testing procedures, test data, engineering studies, modeling, and building performance parameters that support the Code compliance assessment cross referenced to any supporting material provided in the report - specification of any special maintenance or operational requirements, including any 2

building component commissioning requirements, that are necessary for the alternative solution to achieve compliance with the Code after the building is constructed Credentials - information about the qualifications, experience and background of the person or persons taking responsibility for the design, and Supporting Materials - reduced floor plans, sections, and / or details highlighting and identifying the locations and scope of the proposed alternative solution (sufficient drawings must be provided for the report to be read without reference to the permit drawings) - reference materials Upon an initial screening of the alternative solution report additional copies may be requested to facilitate review. Compliance Letter If the alternative solution(s) are accepted, a specific Letter of Compliance signed and sealed by the registered professional responsible and initialed by the project s Coordinating Registered Professional must be submitted to the building inspector upon completion of the project and prior to the final inspection by the building inspector. Engineering Judgements There may be occasions when specific conditions do not lend themselves to the direct application of a listed assembly or system. This may arise, for instance, during design or installation of listed fire assemblies or fire stop systems. In these cases, the designer or installer may propose installing the listed assembly with modifications. These alternative solutions are often referred to as engineering judgements. An engineering judgement shall be submitted and will be processed as an alternative solution; it requires a demonstration that a particular assembly or detail not strictly conforming to the listing will nevertheless provide the same level of performance as that of the listing. Engineering judgements on fire stop systems for non-rated curtain wall shall be based on the Best Practice Guide on Fire Stops and Fire Blocks and Their Impact on Sound Transmission published by NRC dated June 2007. The following provide general guidance to those preparing engineering judgements: 1. All submissions shall be prepared by a knowledgeable registered professional in fire stop systems and is independent of the manufacturer. 2. Engineering judgement shall include: a. the details of the listed assembly or system and the proposed variations to the listed assembly or system signed and sealed by a registered professional, b. the reason for the variations, c. test data or equivalent documentation to demonstrate how the Alternative Solution provides the same level of performance as the listed assembly or system, and 3

d. detailed instructions on the installation and any special instructions related to long term performance. 3. Engineering judgements are not substitutes for available listed assemblies or systems. They should not be used to avoid having a new assembly or system to be tested and listed. 4. Engineering judgements shall be based upon extrapolation from tested systems that are sufficiently similar in nature to the condition under consideration. All aspect of the tested assembly that are germane to its performance must be addressed and reflected in the proposed solution. 5. An engineering judgement shall be accepted only for a specified location within the subject building of a project and cannot be transferred to other locations within the same building or any other jobs without an accepted revision or new submission respectively. Further information Please call the Building Department at 604-294-7130. Q:\Brochures-Bulletins & Zoning Information\Brochures\Current\Alternative Solutions\Alternative REV 2017 October 27.docx 4

5

6