BUREAU OF INDIAN STANDARDS. Draft Indian Standard

Similar documents
HOT ROLLED STEEL FLAT PRODUCTS FOR STRUCTURAL FORMING AND FLANGING PURPOSES SPECIFICATION (Third Revision of IS 5986)

CONSTRUCTION SPECIFICATION FOR STRUCTURAL STEEL

C. Miscellaneous Metal Fabricators are specified elsewhere in Division 5.

BUREAU OF INDIAN STANDARDS Draft Indian Standard

SECTION STRUCTURAL METAL FRAMING

PART 5 WELDING. 5.1 General 5.2 Preparation 5.3 Dimensions of welds 5.4 Materials 5.5 Aluminium alloys 5.6 Welding details 5.

PRESTON HEALTH SERVICES ARCHITECT'S NO MITCHELL-HOLLINGSWORTH NURSING & REHAB ADPH #B

DIVISION 5 METALS SECTION STRUCTURAL STEEL

BIS or used as Amendment to STANDARD comments is 15 Nov. 2008

Insulating Cellular Concrete Steel Joists Painting. A. America Society for Testing and Materials (ASTM):

SECTION ALUMINUM GATES

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION WELDED STEEL PICKET FENCE. 1. Fusion welded and rackable ornamental steel picket fence system.

EEMUA Publication Construction specification for fixed offshore structures

MATERIAL SPECIFICATION FOR SECTIONAL STEEL HIGH MAST LIGHTING POLES

Mezzanines By Design Page 1

Special Provision No. 915S03 December References, Materials, Construction, and Quality Assurance for Sign Support Structures

1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns.

AMENDMENTS TO OPSS 1802 (JAN 95) MATERIAL SPECIFICATION FOR SMOOTH WALLED STEEL PIPE SUPPLY, STORAGE, AND DELIVERY OF WELDED STEEL PIPE

JONES AIRWAY, LLC CLEVELAND REGIONAL JETPORT SECTION STRUCTURAL STEEL

PART UF REQUIREMENTS FOR PRESSURE VESSELS FABRICATED BY FORGINGS

SECTION ROLLER GATES

Item 442 Metal for Structures

SECTION COLD-FORMED METAL TRUSSES

2. TEST RECORDS: All records of tests and analysis shall be kept in suitable forms approved by the Bureau.

SECTION STEEL JOIST FRAMING

1.15 Chemical Tanker Longitudinal corrugated bulkhead (vertical type).

BUREAU OF INDIAN STANDAD. Draft Indian Standard FREE CUTTING COPPER BARS, RODS AND SECTIONS SPECIFICATION (First Revision of IS 8328) ICS

1. Temperature Change: 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces.

Facility Repairs - MCAS Cherry Point - Tank Farm A SECTION STRUCTURAL STEEL 05/14

CHAPTER 16 - GANTRIES

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011.

Cast Steel Propellers W27. (May 2000) (Rev.1 May 2004)

BUREAU OF INDIAN STANDARDS. Preliminary Draft Indian Standard

SECTION Temperature Change: 120 deg F, ambient; 180 deg F, material surfaces.

Draft Indian Standard. GENERAL REQUIREMENTS FOR THE SUPPLY OF METALLURGICAL MATERIALS AND METALS INCLUDING STEEL (Third Revision of IS 1387)

STRUCTURAL STEEL FRAMING

METAL FABRICATION..1 General Conditions and Division 1 shall govern Work of this section.

SECTION STRUCTURAL STEEL

SUNY GENESEO RED JACKET DINING HALL RENOVATION SECTION STRUCTURAL STEEL FRAMING

INSPECTION AND TEST. PROCEDURE Total Page 13

OVERSHOT GATE TECHNICAL DATA SHEET

SECTION STRUCTURAL STEEL

Contents EN 14015:2004 (E) page

A. Types of lightgauge metal framing units include the following: 1. C-shaped structural steel studs Uniform Building Code.

SECTION ORNAMENTAL ALUMINUM RAILING

Student Services & Classroom Addition

SECTION COLD-FORMED METAL FRAMING

Plain bearings Metallic multilayer plain bearings. Part 1: Non-destructive ultrasonic testing of bond of thickness greater than or equal to 0,5 mm

SECTION STRUCTURAL STEEL

1. Cast-in-place concrete is specified in Section

SECTION MANUAL FOUR FOLD DOORS MODEL 38 DECORATIVE PANEL DESIGN

AASHTO/AWS D1.5M/D1.5:2008. Table of Contents

ITEM 442 METAL FOR STRUCTURES

1. Include plans, elevations, sections, details, and attachments to other work.

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

Specification for the Fabrication of Tower Structures

SECTION COMPOSITE METAL DECKING

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 REVISION 7 ITEM 516 INSTALLATION OF FLEX BEAM GUARDRAIL

Ontario ENGINEERING STANDARD GUIDELINE 1.0 PURPOSE 2.0 THERMITE WELDING 2.1 WELD PROCEDURE

SECTION TIMBER FLOATS

SECTION STRUCTURAL STEEL

FORMAT FOR SENDING COMMENTS ON BIS DOCUMENTS

MATERIAL SPECIFICATION FOR SECTIONAL STEEL HIGH MAST LIGHTING POLES

(G) DOORS & WINDOWS LIST OF BUREAW OF INDIAN STANDARD CODE OF PRACTICE (ISI)

BUREAU OF INDIAN STANDARDS PRELIMINARY DRAFT

Superior Aluminum Guide Specification 10/4/2016 Non-Welded Aluminum Pipe Railing

Guidelines for the Construction of Pressure Vessel Type Tanks Intended for the Transportation of Anhydrous Ammonia at Ambient Temperatures

SPECIFICATIONS - DETAILED PROVISIONS Section Stainless Steel Sluice Gates C O N T E N T S

FMB15678 Steel Deck Cargo Barge

Preassembled steel stairs with concrete-filled treads.

BUREAU OF INDIAN STANDARDS Draft Standard Hot dip 55% Aluminium- Zinc Alloy metallic coated steel strip & sheet (plain)

SPECIAL PROVISION FOR STRUCTURAL STEEL AND ALUMINUM CONSTRUCTION. C&T:SJC 1 of 10 C&T:APPR:DAJ:DBP: FHWA:APPR:

Aluminum Component Pipe Railings

JAMISON SOUND DOOR SPECIFICATIONS VERTICAL SLIDING SOUND REDUCTION DOOR - STC 53 POWERED OPERATION

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

SECTION SHEET PILES. A. This section covers the contract item Sheet Piles. This work includes:

Steel bridge quality management and weathering steel application technologies in Japan

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

SECTION ORNAMENTAL ALUMINUM RAILING

Part 2 GASKET DIMENSIONS, MATERIAL AND TEST PROCEDURES - ASSEMBLY TO THE CASE BY ADHESIVE OR USING A GASKET SPECIFICATION

KENYA STANDARD KS 574:2017. Steel fabric for reinforcement of concrete Specification

CONCRETE FORMWORK. .2 CSA , Supplement No.1 to CAN/CSA , Engineering Design in Wood. .4 CSA O151, Canadian Softwood Plywood.

SECTION CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017

SECTION 716 SIGN MATERIALS SCOPE

SECTION STRUCTURAL STEEL

ISO INTERNATIONAL STANDARD. Non-destructive testing of welds Visual testing of fusion-welded joints

Tnemec 394 Proprietary Long Form Coatings Schedule

HOTEL SPECIFICATION SECTION 08100

SECTION COLD-FORMED METAL FRAMING

MATERIAL SPECIFICATION FOR FRAMES, GRATES, COVERS, AND GRATINGS

SECTION METAL FLOOR PLATE STAIRS

B. Shop Drawings: Include plans, elevations, sections, details, and attachments to other work.

ISO INTERNATIONAL STANDARD. Non-destructive testing of welds Ultrasonic testing Techniques, testing levels, and assessment

Sport Systems Canada Inc. Section Angle Framed Bleachers Page 1

SECTION UNIT MASONRY

STRUCTURAL STEEL FRAMING Section

Pier (TYP) Tainter Gate (TYP) Chapter 2 Applications General

Transcription:

For official use only BUREAU OF INDIAN STANDARDS Draft Indian Standard DOC: WRD 12(575)C November 2011 RECOMMENDATIONS FOR INSPECTION, TESTING AND MAINTENANCE OF RADIAL GATES AND ROPE DRUM HOISTS PART I INSPECTION, TESTING AND ASSEMBLY AT THE MANUFACTURING STAGE SECTION 1 GATES [FIRST REVISION TO IS 10096 (PART 1/SEC 1)] ICS 93.160 (Not to be reproduced without the permission of BIS or used as standard) ----------------------------------------------------------------------------------------------------------------------------------- Last date for receipt of comments is 20-01-2012 ----------------------------------------------------------------------------------------------------------------------------------- FOREWORD (Formal clauses to be added later) The gates are used not only to pass large floods but also to regulate the reservoir level during minor variations in flow. The radial gate is a structural steel frame consisting of vertical stiffeners/ girders with properly spaced horizontal girders between them. The spacing depends on the design water pressure and on dimensions of the gate. The frame is held apiece by secure welding or riveting. This standard was first published in 1983; however, the Committee responsible for the formulation of this standard decided to revise it based on the experience gained since then as well as considering technological development in the field. Reference to the following Indian Standards will be found useful in implementation of this standard: IS 210: 1993 IS 306: 1983 IS 318: 1981 IS 1030: 1998 IS 2004:1991 IS 2062:2006 IS 2595: 2008 Grey iron castings Specification (fourth revision) Specification for tin bronze ingots and castings (third revision) Specification for leaded tin bronze ingots and castings (second revision) Carbon steel castings for general engineering purposes - Specification (fifth revision) Carbon steel forgings for general engineering purposes - Specification (third revision) Hot Rolled Low, Medium and High Tensile Structural Steel (sixth revision) Industrial radiographic testing - Code of practice (second revision) IS 3640: 1982 Specification for Hexagon Fit Bolts ( first revision ) IS 3658: 1999 IS 3664: 1981 IS 3703: 2004 IS 7307 (Part 1): 1974 Code of practice for liquid penetrant flaw detection (second revision) Code of practice for ultrasonic pulse echo testing by contact and immersion methods ( first revision ) Recommended practice for magnetic particle flaw detection (second revision) Approval tests for welding procedures, Part 1 Fusion welding of steel 1

IS 7310 (Part 1): 1974 Approval testing for welders working to approved welding procedures : Part 1 Fusion welding of steel IS 7318 (Part 1): 1974 Approval tests for welders when welding procedure approval is not required : Part 1 Fusion welding of steel This standard is being published in three parts. Part 1 deals with inspection, testing and assembly at manufacturing stage, Part 2 deals with inspection and testing at the time of erection, with inspection and testing at the time of erection, and Part 3 deals with inspection, testing and maintenance after erection. Part 1 is being published in two sections. Other section of this part covers the rope drum hoists. For the purpose of deciding whether a particular requirement of this standard is complied with, the final value, observed or calculated, expressing the result of a test or analysis, shall be rounded off in accordance with IS 2 : 1960 Rules for rounding off numerical values (revised). The number of significant places retained in the rounded off value should be the same as that of the specified value in this standard. 1. SCOPE 1.1 This standard (Part 1/Sec 1) lays down the recommendations for inspection, testing and assembly of radial gates at the manufacturing stage. It does not cover hoisting equipment. 2. REFERENCES 2.1 The standards listed below contain provisions which through reference in this text constitute provisions of this standard. At the time of publication, the edition indicated was valid. All standards are subject to revision and parties to agreements based on these standards are encouraged to investigate the possibility of applying the most recent edition of the standard indicated below: IS No. Title 2825:1969 Code for unfired pressure vessels 14177:1994 Guidelines for painting system for hydraulic gates and hoists 3. GENERAL 3.1 All materials and components used for the work shall be new and free from defects and subject to the tolerances specified under this standard. 3.2 Complete inspection shall be made at the place of manufacture prior to despatch. 4. MATERIALS 4.1 All materials and components supplied by the manufacturer shall conform to the requirements of the latest relevant Indian Standards. In the absence of Indian Standard for any particular material or component, other specification mutually agreed to between the purchaser and the supplier may be used. 4.2 All materials used shall be of tested quality. Original manufacturer s test certificates for bought out items such as castings, forgings and seals, shall be furnished by the gate manufacturer to the purchaser on demand. 2

4.3 Castings 4.3.1 All castings shall conform to the relevant Indian Standards. 4.3.2 Visual examination shall be done to find out the general soundness of the castings and if required, non-destructive tests, such as ultrasonic test, shall be conducted on the castings. 4.3.3 Repairs of major defects in castings by welding shall not generally be allowed, but if the strength and machinability of the casting can be ensured, the repairing may be undertaken with the approval of the purchaser. 4.3.4 Defective castings as permitted under 4.3.3 shall be heat-treated after repairs by welding, here deemed essential. 4.4 Forgings 4.4.1 All forgings shall conform to the latest relevant Indian Standards. 4.4.2 All forgings shall be suitably heat-treated according to relevant Indian Standards. 4.4.3 Visual inspection of forgings shall be done and the finished surface shall be smooth and free from defects. If required, non-destructive tests, such as ultrasonic test, shall be conducted on the forgings. 5. WELDING 5.1 All weldings shall conform to the relevant Indian Standards and approved electrodes shall be used. 5.2 Welding procedure for all major welds shall be drawn-up and carried out and if required by the purchaser, test pieces may be made to ensure the soundness of the welding. 5.3 Only tested welders shall be employed for the welding work. 5.4 Visual examination shall be carried out of all welded joints to ensure that welding is free from: a) cracks on the surfaces of the joints or parent metals located near the heat affected zones, b) undercuts in the parent metals, c) non-uniform width of fillet joints, d) misalignment and distortion of the welded member, and e) irregular reinforcing beads of welds. 5.4.1 Welds found to be defective shall be subjected to non-destructive tests to ensure soundness of welding. 5.5 Proper sequence of welding shall be followed for welding of heavy structural parts in order to minimize distortion. 5.6 Defective welds after testing shall be removed and rewelded. 5.7 All major stress carrying welded joints shall be subjected to suitable non-destructive testing, as specified by the purchaser. 3

5.8 Any item or part may be stress-relieved according to the requirements and procedure laid down in IS 2825. Generally following items require stress-relieving. a) Yoke/trunnion girders, anchor girders and trunnion brackets where heavy welding is involved; and b) Trunnion hub if part of the arm (structural portion) is welded to the casting. 6. MANUFACTURING TOLERANCES 6.1 The gates and embedded parts shall be manufactured to such accuracy and tolerances as are required for the safe and efficient operation of the gates. Unless otherwise specified, the tolerances given in 6.2 and 6.3 may be used as a general guide. 6.2 Embedded Parts 6.2.1 Deviation of any point on the face of seal seat from 2 m machined straight edge held against it shall not exceed 0.5 mm. 6.2.2 Deviation from straightness of the wall plate shall not be more than 2 mm in 2 metre length. 6.2.3 Offsets and gaps at any adjoining joints between seal seats, guides, etc, shall not exceed 0.5 mm. 6.3 Gates 6.3.1 The gate leaves with stiffeners shall generally be manufactured on a jig and fixture. The tolerance on the radius of gate leaf shall be of radius or ± 10 mm whichever is less. 6.3.2 The distance between the side guide roller/guide shoes on one side of the gate to the corresponding guide roller/guide shoes on the other side shall not vary from dimension shown in the drawings by more than + 0.00 mm to 2.00 mm. 6.3.3 Parallel distance of centre line of both the trunnion bearings from bottom edge of skin plate shall not vary more than ± 3.0 mm. 6.3.4 The horizontal distance between the centre to centre of trunnions shall not vary from the dimension shown in the drawings by more than ± 3.0 mm. 6.4 Connections At all splices, the holes shall be match drilled. If fit bolts are provided, holes shall be reamed during assembly. 7. SHOP ASSEMBLY AND TESTING 7.1 Gates and Embedded Parts The anchor girder together with the tie bars of convenient length for testing and yoke girder shall be load-tested equivalent to 1.5 times the design load before erection. The load shall be applied gradually by means of hydraulic jacks and the assembly shall remain under load to enable all the observations required by the test procedure to be made. 7.1.1 Assembly of wall plates and sill beams shall be done at shop. 7.1.2 Gates shall be assembled complete with guide rollers and trunnions for proper alignment and inspection. However, gates with height more than 10m, assembly can be done in phases. All the dimensions specified in 6.2 and 6.3 and other central dimensions shall be checked on assembly. 4

7.1.3 Side guide rollers may be shimmed, if necessary, to maintain the required tolerances as specified in 6.3.2. 7.2 Seals Seals may be assembled either at shop or during erection according to the convenience of the manufacturer. The holes in seals shall be match drilled with seals base and clamps. 7.3 Ballast Ballast if required, can be provided either at shop or at site. 7.4 Marking 7.4.1 All erection marks shall be hard-punched. 7.4.2 All the components shall be match-marked before dismantling. 8. CLEANING AND PAINTING 8.1 Surface shall be cleaned thoroughly, preferably by sand/shot blasting. 8.2 Painting should be done as per IS 14177. 5