Ron Stefik, Eng.L. Supervisor, Reservoir Engineering Oil and Gas Commission Attachment COMMISSION. T F

Similar documents
Should you have any questions, please contact Michelle Harding at (250) or the undersigned at (250) Sincerely,

Re: Consideration of cancellation of well permit for WA#22031 (the Well Permit) pursuant to section 26 of the Oil and Gas Activities Act

DEPARTMENT OF ENVIRONMENTAL QUALITY OIL, GAS, AND MINERALS DIVISION OIL AND GAS OPERATIONS. Filed with the Secretary of State on

Available online at Energy Procedia 1 (2009) (2008) GHGT-9

OPPORTUNITIES FOR FREE BASELINE WATER QUALITY TESTING

GENERAL ORDER Amendment 1 Section 49 Oil and Gas Activities Act. Attention: Cory Beliveau, Manager, Health, Safety, Environment& Regulatory

Requirements for Surveillance, Sampling, and Analysis of Water Production in Hydrocarbon Wells Completed Above the Base of Groundwater Protection

Draft Directive 051. Wellbore Injection Requirements. Contents. Revised edition August 14, Replaces previous edition issued March 1994.

Responsible Environmental Management of Oil and Gas Activities in New Brunswick Case Studies and Lessons Learned

ERCB and Groundwater Protection Water Technologies Symposium 2011 April 14, 2011

2012 Pipeline Performance and Activity Report. BC Oil and Gas Commission

ORDER Kiskatinaw Seismic Monitoring and Mitigation Area Special Project Order

GAS WELL/WATER WELL SUBSURFACE CONTAMINATION

COGCC OPERATOR GUIDANCE RULE 318A.f GROUNDWATER BASELINE SAMPLING AND MONITORING. Draft

Hydraulic Fracturing & Public Health: What we know, what we can infer and how we can move forward

Report Date:April 03, 2018 Report Number: File: C-13 RR#3 Dickson Road Powell River, BC V8A 5C1

Engineer, Pipelines BC Oil & Gas Commission, Kelowna. Engineering Division - Pipelines

6 th Well Bore Integrity Network Meeting

Water Service Wells Summary Information. October 2017 Version 2.6

PROTOCOL NO. 5: Petroleum Hydrocarbon Analytical Methods and Standards

Water Resource Management for Shale Energy Development

Soil Treatment Facility Design and Operation for Bioremediation of Hydrocarbon Contaminated Soil. Version 1.0

(NOTE: Unless specifically identified, the changes outlined below apply to BOTH Chapter 78 and Chapter 78a.)

INDUSTRY BULLETIN

California Well Stimulation Treatment Regulations

OGC 3: Bachelor s degree in Hydrology, Hydrogeology, Physical Geography, Earth Science, Engineering,

Wayne Farms Ozark Feedmill

BRITISH COLUMBIA REGISTERED MAIL. File: PE Date: FEB

INDUSTRY BULLETIN

Frequently Asked Questions

Colorado Oil and Gas Conservation Commission

Alberta Oil and Gas Regulations The Key to Wellbore Integrity

Groundwater and Surface Water Overview of the Lochend Area, Alberta

Code of Practice for Land Treatment of Soil Containing Hydrocarbons

Greymouth Petroleum Limited Deep Well Injection Monitoring Programme Annual Report Technical Report

Holcim (Australia) Pty Limited. Lynwood Quarry Groundwater Monitoring Program Revision 2

Developing a Municipal Source Water Protection Plan: A Guide for Water Utilities and Municipalities

Hydraulic Fracturing Emerging Issues in North America

Reference: OTCD B 17 September Soil Sampling Program th Line Road, Metcalfe, ON

Oil and Gas Monitoring. November 2, 2016 GRA Meeting John Borkovich, P.G. Groundwater Monitoring Section Chief

Rule 326: Mechanical Integrity Guidance

TEXAS COMMISSION ON ENVIRONMENTAL QUALITY Protecting Texas by Reducing and Preventing Pollution. April 2, 2014

No An act relating to hydraulic fracturing wells for natural gas and oil production. (H.464)

T F Airport Road Fort St John BC V1J 4M6

Regulatory Developments in Baseline Water Quality Testing and Monitoring. Presentation to Groundwater Protection Council

California s Proposed Natural Gas Storage Regulations

Alternative water supplies for sustainable oilfield operations Cotulla, Texas November 15, 2013

Information Requirements Table for Liquid Waste

Proposed New 18 CFR Part Hydraulic Fracturing in Shale and Other Formations:

Risks of Shale Gas Exploration and Hydraulic Fracturing to Water Resources in the United States

TECHNICAL MEMORANDUM

COMMISSION RECOMMENDATION. of XXX

USGS Groundwater Quality Assessment in the Williston Basin

SHELL ONSHORE OPERATING PRINCIPLES IN ACTION: WATER FACT SHEET

COMMISSION RECOMMENDATION

Setting the Stage for Successful Reclamation Strategies. Session Number 19 Sponsored by: CAPLA Presented by: Paul Kelly

October Published by. Energy Resources Conservation Board Avenue SW Calgary, Alberta T2P 3G4

OVERVIEW OF MITIGATION AND REMEDIATION OPTIONS FOR GEOLOGICAL STORAGE OF CO2

For personal use only

Groundwater Monitoring Statistical Methods Certification City of Grand Island, Nebraska Platte Generating Station Fossil Fuel Combustion Ash Landfill

Disposal and Injection Well Requirements

Santos Gas Field Development Project (GFD Project)

AGL UPSTREAM INVESTMENTS PTY LTD GLOUCESTER GAS PROJECT

Remediation Certificate Application for Upstream Oil and Gas Sites

Quarterly Monitoring Report

Summary of Findings: Understanding Health Impacts from Hydraulic Fracturing

Ambient Air Quality Monitoring Baseline Report, Kirby Misperton A Wellsite, KM8 Production Well

Submission on Proposed Gisborne Regional Freshwater Plan

Under Section 113 of the Environmental Protection and Enhancement Act

New York State Regulatory/Permitting Process and Practical Considerations for Publicly Owned Treatment Works (POTWs) to Treat Flowback Water

Ordinance No. AN ORDINANCE OF THE COUNTY OF BUTTE AMENDING CHAPTER 24, ENTITLED ZONING, TO PROHIBIT THE STORAGE OR DISPOSAL OF

Energy Advisory Board Meeting Rifle County Fairgrounds Thursday, November 5, 2009

Environmental Protection and Marcellus Shale Well Development. Scott Perry Director Bureau of Oil and Gas Management

POWERWAVE - WATERFLOOD Case History, ALBERTA, CANADA. Les Garner & John Warren

Proposed East Manson Unit No. 5 Application for Enhanced Oil Recovery Waterflood Project Middle Bakken East Manson, Manitoba

Cenovus EnCAID approval #10440J Performance presentation

Draft Directive 065 (released December 2012) Stakeholder Feedback and AER Response

Hydraulic Fracturing Principles and Operating Practices

Effective June 17, 2013, the Energy Resources Conservation Board (ERCB) has been succeeded by the Alberta Energy Regulator (AER).

Scope of Work for Water Sampling

What are we going to talk about?

Greymouth Petroleum Limited Kowhai-B Hydraulic Fracturing Monitoring Programme Annual Report Technical Report

Understanding The Class II Underground Injection Control Application Process In Colorado To Comply Cost-Effectively

Identification. Module 4 Water Well Drilling Agreements

Hydraulic Fracturing Test Site (HFTS)

What New Brunswick Needs to Safely Manage Wastewaters from Oil & Natural Gas Development: Smarter Regulations and Better Communication

Pennsylvania Hydraulic Fracturing State Review September, 2010

January 13, Mr. Mike Zamiarski New York State Department of Environmental Conservation, Region East Avon Lima Road Avon, New York 14454

Notice of Public Tender

BLM/CA-ES ,

Everything You Always Wanted to Know About Class I Injection Wells in Texas

The Dirt on Excess Soil Across Canada How Will Brownfields Be Affected?

Rick Henderson, Field Operations Supervisor DEQ Office of Oil, Gas, and Minerals

Shale Fracking What are the Risks? Control of Well Coverage Issues

least two (2) being taken during "flush events", with the final baseline sampling to culminate in approximately October Any analyte detected

Pelican Lake SAGD Pilot

ORDER OF THE MINISTER OF ENVIRONMENT ENVIRONMENTAL MANAGEMENT ACT SECTION 79 AMENDED SPILL PREVENTION ORDER: MO1701

ORDER OF THE MINISTER OF ENVIRONMENT ENVIRONMENTAL MANAGEMENT ACT SECTION 79 AMENDED SPILL PREVENTION ORDER: MO1701

SHELL ONSHORE OPERATING PRINCIPLES IN ACTION: WATER FACT SHEET

The Effluent Permitting Process under the Environmental Management Act. An Overview for Mine Project Applicants

Transcription:

COMMISSION June 10, 2016 3600-2800/2850-32640-02 Nicholas Haddow, Regulatory Specialist Aqua Terra Water Management Inc. #108, 32 Burnt Lake Crescent Red Deer, AB T4S 0K6 Dear Mr. Haddow: RE: PRODUCED WATER AND NON-HAZARDOUS WASTE DISPOSAL SPECIAL PROJECT APPROVAL; AMENDMENT #2 AQTWM FT ST JOHN 6-24-084-19 W6M; WA# 3060 FORT ST JOHN FIELD - CADOMIN AND NIKANASSIN FORMATIONS Approval for produced water and non-hazardous waste disposal into the Cadomin formation of the subject well was issued February 3, 2010, under Order 10-02-001. Disposal occurred between January 2010 and August 2011, at which point the well was shut in. On December 5, 2014, Order 10-02-001 Amendment #1 was issued to bring the well up to current standards prior to restarting disposal. Due to a number of identified risk factors, a groundwater monitoring program was included as part of the Order, with a requirement for monthly sampling once disposal activities resumed. In a letter dated April 28, 2016, Aqua Terra requested monitoring well sampling frequency be altered from monthly to quarterly. Based on groundwater reports provided for the first four months of 2016, the Commission is in agreement that the water chemistry has remained consistent and quarterly sampling will provide appropriate monitoring. During a re-examination of the disposal formation, it was determined that the perforated interval actually extends over both the Cadomin and Nikanassin formations. Because of this, historical monthly disposal volumes have been split over the two formations, 40% to the Cadomin and 60% to the Nikanassin, based on formation parameters and temperature log results. Going forward, report monthly S-18 form volumes on the basis of Cadomin 40% and Nikanassin 60%. Attached please find Order 10-02-001 Amendment #2, designating an area in the Fort St John field - Cadomin and Nikanassin formations as a Special Project under section 75 of the Oil and Gas Activities Act, for the operation and use of a storage reservoir for the disposal of produced water and non-hazardous fluid. Additional general information regarding disposal wells is available on the Commission s website at http://www.bcoqc.ca/industrv-zone/documentation/subsurface-disdqsal. The Ministry of Environment identifies the type of effluent approved for injection in the separate Waste Discharge Permit, granted under the Environmental Management Act. In certain circumstances, disposal well operation may induce seismicity. The Commission advises that disposal well permit holders monitor seismic events in proximity to the well and be prepared to modify operations to mitigate induced seismicity. Permit holders may monitor seismic events through the Natural Resources Canada seismic monitoring network at http.y/www.earthquakescanada.nrcan.qc.ca/recent/index-enq.php Should you have any questions, please contact Michelle Harding at (250) 419-4493 or the undersigned at (250) 419-4430. Ron Stefik, Eng.L. Supervisor, Reservoir Engineering Oil and Gas Commission Attachment Reservoir Engineering Department #300-398 Harbour Rd. Victoria, BC V9A 0B7 T 250.419-4400 F 250.419-4402 www.bcogc.ca

COMMISSION ORDER 10-02-001 Amendment #2 1 Under Section 75(1 )(d) of the Oil and Gas Activities Act, the Commission designates the operation and use of a storage reservoir for the disposal of non-hazardous waste as well as produced water, including flowback from fracturing operations, into the Cadomin and Nikanassin formations - Fort Saint John field as a special project in the following area: DLS Twp 84 Rge 19 W6M Section 24 - Lsds 3, 4, 5, and 6 2 Under section 75(2) of the Oil and Gas Activities Act, the special project designation in this Order is subject to the following conditions. The Permit Holder shall: a) Inject non-hazardous waste and produced water only into the well AQTWM Ft St John 06-24-84-19; WA# 3060 Cadomin (1066.0-1102.0 mkb) and Nikanassin (1108.0-1120.0 mkb) formations. b) Hold a valid Permit under the Environmental Management Act for the disposal of non-hazardous waste. c) Not exceed an injection pressure, measured at the wellhead on the subject well, of 10,850 kpag or the pressure required to fracture the formation, whichever is lesser. d) Inject only through tubing with a packer set as near as is practical above the injection interval. e) Continually measure and record the wellhead casing and tubing pressures electronically. f) Cease injection and notify the Commission immediately if hydraulic isolation is lost in the wellbore or formation. g) Submit the annual packer isolation test report to the Commission within 30 days of the completion of the test. h) Include the disposal operating hours and the maximum injection pressure values on the monthly disposal statement. i) Report the disposal volumes on the monthly disposal statement 40% to the Cadomin formation and 60% to the Nikanassin formation. j) Cease injection upon reaching a maximum formation pressure of 11,670 kpaa. k) Maintain and manage the well head to prevent surface liquids from entering the well bore through the annulus outside or between casing and conductor strings. l) Conduct an annual reservoir pressure test on the formation in the subject well, with a shut-in period of sufficient length to provide data for calculation of the reservoir pressure, and submit a report of the test within 60 days of the end of the test. m) i) Perform a casing inspection log on the subject well and submit results to the Commission within 30 days of the completion of logging, at an interval of not more than every 10 years, commencing from the date of initial disposal operation into the Cadomin and Nikanassin zones. ii) Perform an annual hydraulic isolation log on the subject well and submit results to the Commission within 30 days of the completion of logging. n) Not conduct a hydraulic fracture stimulation on any formation in the subject well without prior Commission approval. o) Implement a groundwater monitoring program as detailed in Appendix A. Roi Supervisor, Reservoir Engineering Oil and Gas Commission DATED AT the City of Victoria, in the Province of British Columbia, this i 0^ day of June 2016.

Advisory Guidance for Order 10-02-001 Amendment #2 ORDER 10-02-001 Amendment #2 PAGE 2 I. A production packer must be set above the injection interval and the space between the tubing and casing filled with corrosion and frost inhibiting fluids, as per section 16(2) of the Drilling and Production Regulation. II. III. IV. Annual packer isolation tests are required to be submitted, as per section 16(3) of the Drilling and Production Regulation. Injected fluids must be metered and the injection pressure measured at the wellhead, as per section 74 of the Drilling and Production Regulation. A monthly disposal statement must be submitted to the Commission not later than the 25th day of the month following the reported month, as per section 75 of the Drilling and Production Regulation. V. Seismic events must be reported and disposal operations suspended as per section 21.1 of the Drilling and Production Regulation.

Appendix A - Groundwater Monitoring Requirements AQTWM Ft St John 6-24-84-19 (WA# 3060) Non-Hazardous Waste and Produced Water Disposal Groundwater Monitoring Wells were constructed and tested as per the requirements laid out in Order 10-02-001 Amendment #1 Appendix A. Ongoing monitoring requirements are as follows Groundwater sampling frequency and procedures Water quality sampling shall be conducted using standard environmental sampling protocols in accordance with the British Columbia Field Sampling Manual for Continuous Monitoring and the Collection of Air, Air-Emission, Water, Wastewater, Soil, Sediment, and Biological Samples (2003), and as follows: The groundwater sampling program shall be completed under the supervision of a qualified groundwater professional registered with APEGBC. Groundwater sampling shall be conducted from each monitoring well on a quarterly basis under this Order, unless approval is obtained from the Commission to vary this sampling schedule. The groundwater analytical program, including sampling schedule, may be revised overtime, with approval of the Commission, based on the analytical results. Groundwater sampling shall continue on a quarterly basis for a period of one year after disposal well abandonment, unless approval is obtained by the Commission to vary this sampling schedule. Groundwater sampling events shall include an appropriate quality assurance/quality control (QA/QC) program including field duplicates and field blanks. Groundwater samples shall be collected using standard environmental sampling procedures that ensure that the Sample is representative of the aquifer at the zone of sampling and the sample is not cross-contaminated during sampling. Samples shall be transferred to appropriate sampling containers and preserved in the field as necessary for each analytical parameter. Samples shall be submitted, using appropriate storage and transportation procedures, with appropriate chain of custody documentation, within 48 hours of collection, for analysis at a certified laboratory. Groundwater analytical parameters ORDER 10-02-001 Amendment #2 PAGE 3 Groundwater samples shall be analyzed for: routine water quality parameters (ph, hardness, total dissolved solids, electrical conductivity, salinity, and major cations and anions); total and dissolved metals; and dissolved hydrocarbons including dissolved gases C1-C3, benzene, ethylbenzene, toluene, and xylenes (BETX), volatile petroleum hydrocarbons (VPH) and volatile hydrocarbons (VH), and light and heavy extractable hydrocarbons (LEPH/HEPH). If dissolved methane is detected at concentrations greater than 2 mg/l, isotopic analyses shall be conducted, if possible, to differentiate between biogenic and thermogenic sources. Methane isotopic sampling shall be conducted using protocols described in: The Free Gas

B C g H O S B COMMISSION PAGE 4 Sampling Standard Operating Procedure for Baseline Water Well Testing (2009), prepared for Alberta Environment and Sustainable Resource Development. The groundwater analytical program may be revised over time, with approval of the Commission, based on the analytical results. Groundwater level monitoring Groundwater level monitoring shall be completed under the supervision of a qualified groundwater professional registered with APEGBC. Once disposal operations under this order have commenced, groundwater levels in the monitoring wells shall be measured daily using an electronic data logger or by hand measurement. The date and time of initiation of disposal operations under this order shall be recorded. Reporting Once disposal operations have commenced under this order, monitoring data shall be submitted annually to the Commission by January 31st of the following year. The dates and times of groundwater sampling, analytical results, daily water level measurements, and daily injection volumes shall be reported. Analytical results shall be presented in table format, and original laboratory analytical reports shall be retained on file by the permit holder. In addition to annual reporting requirements, the results shall be reviewed by the permit holder at the time of receipt from the laboratory and immediately reported to the Commission if results indicate significant changes in groundwater chemistry compared to previous sampling. The Commission may request copies of the sampling information on file prior to the annual due date. Additional documentation and/or further sampling or investigation to that required under this Order amendment may be required by the Commission based on review of submitted documentation. Requirements for Groundwater Monitoring Well Decommissioning Monitoring wells shall be decommissioned in accordance with the BC Groundwater Protection Regulation.