Removal Procedures at Sites Containing Substantial Quantities of Asbestos Waste

Similar documents
Guideline C-9. Approval of Waste Management Systems for Dust Suppression Using a Waste Material

MINISTRY OF THE ENVIRONMENT AND CLIMATE CHANGE. Water Supply Wells Requirements and Best Management Practices, Revised April 2015

Moose Management Policy June 2009

Class Environmental Assessment for Provincial Parks and Conservation Reserves. MNRF s FORMAL REQUEST for AMENDMENT April 2015

TECHNICAL STANDARDS TO MANAGE AIR POLLUTION

WATER SUPPLY WELLS - REQUIREMENTS AND BEST MANAGEMENT PRACTICES

Secondary Noise Screening Process Guide

Environmental Bill of Rights Draft Version DRAFT - For Consultation Purposes Only Ministry of the Environment

Chapter 15 Landfill Inspections

Ontario Compost Quality Standards

Review of the Detour Lake Contingency Power Project Environmental Assessment

Fish Culture Technical Bulletin Best Management Practices

REVIEW OF THE CORPORATION OF THE TOWN OF MOOSONEE LANDFILL EXPANSION ENVIRONMENTAL ASSESSMENT

Cervid Ecological Framework June 2009

Air Quality Monitoring Update

Handling, Transportation and Disposal. of Asbestos Waste in Bulk

Technical Bulletin MAINTAINING WATER MANAGEMENT PLANS. Ministry of Natural Resources and Forestry

Corporate Policy and Procedure

NOTICE TO EMPLOYEES OF APPLICATION FOR CERTIFICATION

Proposal for Cumulative Effects Assessment (CEA) in Air Approvals

Environmental Guideline for Saskatchewan Asphalt Plants

Technical Bulletin LOCATION APPROVAL FOR DAMS

Moose Population Objectives Setting Guidelines June 2009

Asbestos Management Program

NEED MORE INFORMATION?

Ministry Review for the Donald Cousens Parkway to Morningside Avenue Link Amended Environmental Assessment

Ontario Ministry of the Environment and Climate Change - Record of Site Condition #

MINISTRY OF TRANSPORTATION. Environmental Guide for Noise

TECHNICAL STANDARDS TO MANAGE AIR POLLUTION

RMM # 1202 Title: Spills to the Environment - Emergency Response & Reporting Program

SECTION ASBESTOS CONTAINING MATERIALS REMEDIATION

Species at Risk Act Policies and Guideline Series

Environmental Reference for Highway Design

MINISTRY OF TRANSPORTATION. Environmental Reference for Contract Preparation

Spills to the Environment and Reporting Policy

A Guide to Ventilation Requirements for Uranium Mines and Mills

1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work:

POLICY FOR SAFE WORKING WITH ASBESTOS AT THE CANADA SCIENCE AND TECHNOLOGY MUSEUM CORPORATION

Elk Management Plan 2010

Laurex Seeds Ltd.; "the Licencee"

SYLLABUS ASBESTOS IN SOILS AWARENESS

Greenhouse Operations in and around Leamington, Ontario

A Brief Submitted to the Royal Commission of Inquiry

STOPPING WATER POLLUTION AT ITS SOURCE PROTOCOL FOR CONDUCTING A STORM WATER CONTROL STUDY

RULE 8021 CONSTRUCTION, DEMOLITION, EXCAVATION, EXTRACTION, AND OTHER EARTHMOVING ACTIVITIES (Adopted November 15, 2001; Amended August 19, 2004)

Form C-1 LABOUR RELATIONS ACT, 1995 NOTICE TO EMPLOYER OF APPLICATION FOR CERTIFICATION BEFORE THE ONTARIO LABOUR RELATIONS BOARD.

Appendix F Asbestos Emission Control Plan (on CD-ROM)

(18 April 2011 to date) MINERAL AND PETROLEUM RESOURCES DEVELOPMENT ACT 28 OF 2002

PROCEDURE (Essex) / Linked SOP (Kent) Asbestos Management. Number: U 1005 Date Published: 22 July 2015

DUQUESNE UNIVERSITY ASBESTOS MANAGEMENT PROGRAM

All employees who perform work which requires the removal of material that exceeds a depth of 1.2 meters (4 feet).

Form C-32 LABOUR RELATIONS ACT, 1995

c: Don Labossiere/Tim PrawdziklPeter Crocker, Environmental Compliance and Enforcement Public Registries

Dam Safety Reviews. Best Management Practices. Ontario Ministry of Natural Resources. August 2011

Licence No. / Licence n. Pursuant to Sections 10(1) and 14(2) / Conformement au Paragraphes 10(1) et 14(2)

Checklist for Technical Requirements for a Complete Environmental Compliance Approval Submission

How OMNR Staff Perceive Risks Related to Climate Change and Forests

EVALUATING CONSTRUCTION ACTIVITIES IMPACTING ON WATER RESOURCES PART III A

Certification Number: NAT Lead Renovation, Repair and Painting Program

Management of Excess Soil A Guide for Best Management Practices

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

REQUEST FOR TENDER - SERVICES RFT HOUSE DEMOLITION 7958 BEAVERDAMS RD., NIAGARA FALLS, ON.

Bill 133 (2002, chapter 76) An Act to amend the Act respecting occupational health and safety and other legislative provisions

Canadian Locator Technician Standards Table of Contents

1.0 INTRODUCTION. 1.1 Development Application

Manitoba llot. May 5, Reid Persoage Facility Manager Nexeo Solutions Canada Corp Dugald Road Winnipeg, MB R2J OH3. Dear Mr.

Addressing Purpose of and Alternative Means under the Canadian Environmental Assessment Act, 2012

GUIDELINES to the MINING ACT

Forest Management Planning Manual for Ontario s Crown Forests

Operational Policy Statement

EXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

Environmental Guide for Contaminated Property Identification and Management

Forest Information Manual

Standard for demolition and renovation.

Preface. MNR # Queen s Printer for Ontario, 2012 ISBN (PRINT) ISBN (PDF)

(B) "Facility," for the purposes of this rule, means:

CANADA-NEWFOUNDLAND AND LABRADOR BENEFITS PLAN GUIDELINES (DRAFT)

Information Sheet Questions & Answers New Edinburgh Park, 193 Stanley Avenue

Form C-4 LABOUR RELATIONS ACT, 1995 NOTICE TO EMPLOYER OF APPLICATION FOR TERMINATION OF BARGAINING RIGHTS UNDER SECTION 63 OF THE ACT

Facilitating Implementation of the Canada-Ontario Agreement on Environmental Assessment Cooperation

ASBESTOS MANAGEMENT PROGRAM. Carleton University

1.1 SUMMARY.1 Comply with requirements of this Section when performing following work:

FUGITIVE DUST CONTROL PLAN

TOWNSHIP OF LANARK HIGHLANDS

TORBROOK C & D DISPOSAL AND RECOVERY SITE TORBROOK, ANNAPOLIS COUNTY, NOVA SCOTIA

Part 2 GAZETTE OFFICIELLE DU QUÉBEC, March 22, 2018, Vol. 150, No. 12A 1253A

Local Rule: Engaging External Service Providers

APPENDIX H ENVIRONMENTAL MITIGATION ACCESS2040 APPENDIX X ENVIRONMENTAL MITIGATION 1

Client File No.: October 16, Don Hodgson, Location Manager Delmar Commodities Ltd. Box 1236 Beausejour, MB ROE OCO. Dear Mr.

A. Illinois Asbestos Abatement Act, as amended through Public Act , effective July 14, 1995.

Asbestos in Grounds, Asbestos Management Plan, Sydney Secondary College Balmain Campus, Balmain, NSW 2041

GAS. Gas Distribution Systems Safety and Loss Management System Guidelines. Prepared by: Brad Wyatt, Provincial Safety Manager - Gas

NAVSEA STANDARD ITEM. 1.1 Title: Asbestos-Containing Material (ACM); control

OPTUS SUPPLIER WORK HEALTH & SAFETY POLICY

FUGITIVE DUST CONTROL PLAN FUGITIVE DUST CONTROL

Standard for notification prior to demolition or renovation.

Contents Introduction Compliance Requirements 2

General Permit No.: OHR Page 53 of 146

May 1 st, University of Toronto 255 McCaul Street, Level 4 Toronto, Ontario M5T 1W7

Transcription:

PROCEDURE C-10 Removal Procedures at Sites Containing Substantial Quantities of Asbestos Waste Legislative Authority: Environmental Protection Act, RSO 1990, Sections 6, 13,14, 15, 46 Ontario Regulation 347, Section 17 Responsible Director: Director, Central Region Last Revision Date: July 2010 PIBS 7854

TABLE OF CONTENTS TABLE OF CONTENTS... 2 SYNOPSIS... 3 1.0 INTRODUCTION... 3 2.0 PURPOSE... 3 3.0 APPLICABILITY... 3 4.0 OTHER REQUIREMENTS... 3 5.1 MINISTRY APPROVAL... 4 6.0 OPERATIONAL PROCEDURES... 5 APPENDIX A:... 6 BEST PRACTICES REMOVAL PROCEDURES AT SITES CONTAINING SUBSTANTIAL QUANTITIES OF ASBESTOS WASTE... 7 List of Tables TABLE 5.2: CONDITIONS FOR APPROVAL... 4 TABLE 6.0: OPERATIONAL PROCEDURE TOPICS... 5 Cette publication hautement spécialisée n est disponible qu en anglais en vertu du règlement 441/97, qui en exempte l application de la Loi sur les services en français. Pour obtenir de l aide en français, veuillez communiquer avec le ministère de l Environnement au <Insert the telephone number of someone who can provide information in French regarding the exempted publication 2

Synopsis The primary purpose of this procedure is the protection of the environment during the removal of asbestos waste from sites designated for redevelopment or other purposes. The procedure applies to sites containing substantial quantities of asbestos waste. It should be used in conjunction with O. Regulation 347, the Occupational Health and Safety Act, Guideline C-6: "Handling, Transportation and Disposal of Asbestos Waste in Bulk", and Guideline C-15: "Decommissioning and Clean-Up of Sites" (under revision). The procedure is intended for the use and benefit of Ministry staff, project proponents and the public when dealing with the proposed and actual removal or management of substantial quantities of asbestos wastes at sites containing such wastes. 1.0 Introduction There may be occasions when sites containing substantial quantities of asbestos waste will be redeveloped for other potential uses, and require excavation. Asbestos is hazardous when airborne, thus any excavation of buried asbestos waste is recommended to be undertaken with special care. Where possible it is recommended that every effort should be made to allow known deposits of asbestos waste to remain untouched. However, in cases where it is necessary to disturb the deposits, this procedure is provided as guidance to proponents, the public and ministry staff such that the asbestos can be removed, transported and disposed of elsewhere in a safe and proper manner. 2.0 Purpose This procedure is intended for the use and benefit of Ministry staff, project proponents and the public when dealing with the subject of the removal or management of substantial quantities of asbestos wastes at sites undergoing redevelopment for other purposes. 3.0 Applicability Sites would include landfill sites where asbestos waste has been deposited, tailings disposal areas containing asbestos and industrial or other sites where asbestos is present. 4.0 Other Requirements It is recommended that procedure be used in conjunction with O. Regulation 347, Guideline C-6: "Handling, Transportation and Disposal of Asbestos Waste in Bulk", 3

Guideline C-15: "Decommissioning and Clean-Up of Sites", and the Occupational Health and Safety Act administered by the Ministry of Labour. This procedure is intended as a complement to common sense, good judgment and past practical experience in the management of asbestos waste. Alternative or modified techniques may be used where updated technology or experience allows, and where they are consistent with the overall intent of the procedure and are acceptable to officials of the Ministry. 5.0 Regulatory Requirements and Conditions 5.1 Ministry Approval If the site to be redeveloped was used for the disposal of waste within the preceding 25 years, the proponent shall seek approval from the Minister in accordance with Section 46 of Part V of the Environmental Protection Act (EP Act). Prior to such approval being granted for any site containing asbestos, Ministry staff will evaluate the proponent's proposal. Such conditions as deemed necessary by Ministry staff shall be applied to subsequent Ministerial approval, if such is given. 5.2 Conditions for Approval As discussed in Section 5.1 conditions may be added to a proponent s certificate. Examples of conditions that may be applied to the approvals are provided in Table 5.2: Table 5.2: Conditions for Approval Item No. Condition a. The Ministry of Labour, the Municipality, and the Medical Office of Health will be informed of the project. b. The asbestos waste will be excavated and moved in accordance with O. Regulation 347 under the EP Act, and under the Occupational Health and Safety Act, particularly O. Regulation 838, entitled "Designated Substance - Asbestos on Construction Projects and in Building and Repair Operations". c. The waste removed shall be deposited in an approved disposal site in accordance with O. Regulation 347, and recorded on the site plan of the new site. d. Monitoring and analyses of collected samples shall be conducted in a manner satisfactory to Ministry staff. e. Transportation to, and reception of the excavated asbestos waste at, a landfill site shall be conducted under that site's Certificate of Approval. 4

6.0 Operational Procedures: The proponent shall retain a consultant experienced in the handling of asbestos waste. The consultant shall be experienced in the following categories listed in Table 6.0: Table 6.0: Operational Procedure Topics Item No. Task i. Project Preparation ii. Determination of Asbestos, Location and Quantity iii. Dust Suppression iv. Packaging of Waste v. Site Security vi Personnel Safety vii Ambient Air Monitoring Additional details that the proponent and consultant should follow for the above categories are discussed in the Best Management Practices for the Removal Procedures at Sites Containing Substantial Quantities of Asbestos Waste which in is provided in Appendix A. 5

Appendix A: Best Practices Removal Procedures at Sites Containing Substantial Quantities of Asbestos Waste 6

Best Practices Removal Procedures at Sites Containing Substantial Quantities of Asbestos Waste The primary purpose of this best management document is the protection of the environment during the removal of asbestos waste from sites designated for redevelopment or other purposes. The procedure applies to sites containing substantial quantities of asbestos waste. It should be used in conjunction with O. Regulation 347, the Occupational Health and Safety Act, Guideline C-6: "Handling, Transportation and Disposal of Asbestos Waste in Bulk", and Guideline C-15: "Decommissioning and Clean- Up of Sites" (under revision). The procedure is intended for the use and benefit of Ministry staff, project proponents and the public when dealing with the proposed and actual removal or management of substantial quantities of asbestos wastes at sites containing such wastes. The proponent and their consultant should consider the following information for various stages/tasks listed below when removing asbestos from a site. 1. Preparation The proponent should retain a recognized consultant who is experienced in earthmoving operations and in the handling of asbestos material or waste. The consultant shall have an understanding of all current regulations regarding asbestos and of the analytical procedures and equipment used in the monitoring of asbestos air emissions. The consultant shall supervise all aspects of the project. 2. Determination of Asbestos, Location and Quantity The presence and location of asbestos deposits in a site should be determined, as far as possible, by a search of the site deed; from Ministry records of abandoned and active waste disposal sites, from the site owner/operator; or any other sources deemed appropriate. As past site records may not be precise, the proponent's consultant should determine the quantity of asbestos to be removed by drilling a grid pattern of boreholes using appropriate safety procedures and analyzing the samples for asbestos in the area of the site identified by records or other means as containing asbestos. Excavation of the asbestos area should include the removal of approximately 30 centimetres of soil proved to be asbestos-free in all directions surrounding the asbestos 7

deposit. The total excavation quantity will then include both the asbestos deposit and surrounding earth as defined above. 3. Dust Suppression The following should be considered when planning dust suppression activities: Wetting and maintaining appropriate wetness of earth and waste asbestos at the point of excavation during all phases of the operations to eliminate visible dust emissions. Prevention of surface water run-offs. Provision to maintain wetting when work is not in progress (e.g., overnight). Wetting and maintaining appropriate wetness of all roadways and tracks on the reclamation site during the excavation operations. The use of acceptable commercially available dust suppressants on roadways The type of alternative dust suppressants and their application rate, etc., to be in keeping with the aim of eliminating visible dust emissions. The cleaning of vehicles that were near the reclamation before prior leaving the site. At minimum should consist of a thorough hosing. 4. Packaging of Waste Excavated asbestos waste shall be packaged for transportation in accordance with the provisions of Section 17 of O. Regulation 347. Vehicles used for transporting the waste shall be identified in accordance with Section 17, paragraph 6 of the Regulation, and any other applicable federal and provincial transportation regulations. 5. Site Security The proponent and the consultant should consider the tasks in Table 1 when a site(s) is in the process of excavation: Table.1: Site Security Task No. Tasks i. Provide with both passive and active security if left unattended overnight 8

ii. Install signs denoting the danger of the site(s) iii. Have security personnel frequently monitor the site(s) to eliminate intentional or unintentional trespassing iv. Asbestos excavation locations shall be completely encircled by snow fence or equivalent fencing when unattended. If sites are to be left unattended for longer periods, the asbestos excavation location should be covered with uncontaminated soil or such other material deemed appropriate to prevent migration of asbestos fibres from the location. 6. Personnel Safety The requirements of the Occupational Health and Safety Act and its regulations shall be adhered to by all personnel involved in the operations. All personnel working on the operations shall be protected by the use of respirators and clothing as necessary or as directed by the consultant or Ministry of Labour staff. 7. Ambient Air Monitoring Ambient air at the worksite should be monitored according to standard Ministry procedures, and the results evaluated against the Ministry primary criteria for ambient air of 0.04 asbestos fibres of length greater than 5 μm per cubic centimetre of air. In addition, the following tasks listed in Table 2 should be completed (if required): Table 2: Ambient Air Monitoring Task Description Additional Sampling - Samples shall be taken around the fence perimeter of the site(s). - The number of samples will be determined by the consultant and reviewed by Ministry personnel. - Results shall be evaluated in accordance with the above Ministry primary guideline 9

for asbestos in ambient air. Visible Emissions on Site - Remedial measures shall be taken. - The consultant shall maintain a log of such events that records the time, duration, location, probable cause and remedial measures applied. - Copies of the log shall be made available to the Ministry. - The log data shall be reviewed and compared with pertinent asbestos analytical data to ascertain if a relationship between the visible emission and asbestos fibre counts exists. Analytical Results - All analytical results shall be forwarded to the Ministry Regional Director as soon as possible. Post Removal Monitoring - Post-removal air monitoring of the excavation site shall be conducted in a manner and frequency as determined by the Ministry Regional Director. 10