Building a New Ash Repository Over a Former Coal Mine 2013 World of Coal Ash Conference

Similar documents
Relevant legislation (Administering Authority Commonwealth legislation

Pond Closure - Case Study[TP1]

Delta Electricity Western Region. Construction Environmental Management Plan. December 2011

14. Environmental management

2017 Annual Inspection Report

INITIAL RUN-ON AND RUN-OFF CONTROL SYSTEM PLAN Sibley CCR Landfill Sibley Generating Station East Johnson Rd Sibley, Missouri

Environmental Impact Assessment of Lake Menindee Shallow Aquifer Test Bores

Anglesea Mine Revegetation Strategy Technical Study

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

VISUAL SITE INSPECTION REPORT

Lorena Mine Project. Preliminary Mine Plan - Water Supply

Practical Considerations for CCR Facility Design, Operations, and Maintenance

Advice to decision maker on coal mining project

Fountain Lake Restoration Project

TABLE OF CONTENTS LEGAL NOTICE

Annual Landfill Inspection 2015

1. Introduction Site Information Site Characteristics Hydrogeologic Setting... 2

NRG BRANDYWINE ASH STORAGE SITE BRANDYWINE, MARYLAND 2015 ANNUAL CCR INSPECTION REPORT

Hunter Valley Operations South

Environmental Impact Statement. Avoca Tank Project

Appendix 11. Erosion and Sediment Control Management Plan. Appendix 11

REPORT. Review of Application TE KUHA MINE. 22 December Submitted to: Department of Conservation 10 Sewell St Hokitika 7810

Nonmetallic Mining Reclamation & Operation Plan. Amendment No. 1 (Includes modifications for Wash Plant construction) DRAFT

Natural Resources. Presented by Victor Tibane

NEWNES JUNCTION SAND AND KAOLIN EXTRACTION PROJECT

Drayton Management System Standard. Final Void Management Plan

Anglesea Mine Hydrology and Hydrogeotechnical Study

Moolarben Coal Complex UG1 Optimisation Modification. Environmental Assessment APPENDIX F SURFACE WATER ASSESSMENT REVIEW

Straw Bale Barrier. - Along the face and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow

Newstan Colliery S75W Modification Project Briefing Paper

Lansing Generating Station Project No Closure Plan for Existing CCR Revision: 1 TABLE OF CONTENTS

Anglo Operations (Pty) Ltd Hydrological Assessment

TABLE OF CONTENTS LIST OF FIGURES. Mt Arthur Coal Open Cut Modification Environmental Assessment

INITIAL INSPECTION REPORT ASH LANDFILL AREA SPRINGERVILLE GENERATING STATION SPRINGERVILLE, ARIZONA

Dewatering Fly Ash for Remediation: Two Approaches

Straw Bale Barrier. Parallel to a roadway to keep sediment off paved areas

MINE DESIGN AND PLANNING

In Situ Solidification and Stabilization of Coal Combustion Residuals: Potential Applications and Cost Analysis

CLOSING UP SHOP AT THE WATTS BAR FOSSIL PLANT LESSONS IN COAL ASH POND CLOSURE 2015 WORLD OF COAL ASH CONFERENCE. Presenters: Jimmy Mullins (TVA)

Yeelirrie Uranium Project. Environmental Management

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

CCP Annual Inspection Report

Innovative design and solutions for mine water management on an alluvial floodplain

TVA Colbert Fossil Facility Ash Disposal Pond 4

A Comparison of Actual vs. Predicted Leachate Generation

Environmental Assessment Chapter 8 Surface Water

Brickhaven No.2 Mine Tract A Structural Fill

LANDFILL CLOSURE PLAN. Submitted To: Dominion Chesapeake Energy Center 2701 Vepco Street Chesapeake, Virginia 23323

Centennial Airly Coal Pty Ltd. Airly Mine Reject Management Options Feasibility Analysis

Kookaburra Gully Graphite Mine Tumby Bay District Community Consultation Group. Mine design, environmental assessment & PEPR progress 7 March 2017

Executive Summary INTRODUCTION THE APPLICANT

RE: Modified commencing end of LW103 and proposed 103A workings Figure 1 Layout of LW103 and the proposed 103A workings

Suggested Stormwater Management Practices For Individual House Lots

Closure Plan Limited Purpose Landfill TransAlta Centralia Mine

BIG BEND POWER STATION NORTH AND SOUTH ECONOMIZER ASH PONDS CLOSURE PLAN. Prepared for

MINISTRY STAFF SUMMARY REVIEW

The Use of Minewater to meet Future Urban Water Requirements in the Witbank Dam Catchment

CCP Annual Inspection Report

Borrow Pit and Quarry Management Procedure Environmental

Acceptance guideline 16: Stormwater contamination/first flush collection and stormwater bypass

WI-ENV-PER-0013 GROUND DISTURBANCE PERMIT

SPECIFICATIONS FOR STRUCTURAL EXCAVATION

Beneficial Re-use of CCR for Site Closures using Mining Reclamation Technologies

Environmental Resource Inventories. What are ERIs? Significance of information How to use them

Nina Ruiz. Tim, If either you or Nina have any further questions please feel free to contact me. Thank you.

SUSTAINABLE MINE REHABILITATION: RESOLVING THE TECHNICAL ISSUES

APRIL 2015 CONTINGENCY PLANS

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA

Section SNOW DISPOSAL SITE DESIGN CRITERIA

RECLAMATION OF COAL MINE VOID

Infiltration Guidelines

NICO Tailings and Mine Rock Co-disposal Facility (CDF) Design Concept

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GORGAS GYPSUM POND 40 CFR (c)(1)(i) (xii)

24. Closure and Rehabilitation

Mineral Identified: Hybrid Climax Style Porphyry Molybdenum with copper / silver overprint Mineralisation Age: 418Ma

85M102006D. The Shaw Group Inc.

Inspection Report. David Burton, Facility Manager (NRG Indian River Generating Station)

ET COVER SYSTEM IN ARID ENVIRONMENTS

August 13, Settler's Hill RDF Proposed End-Use Redevelopment Plan. Dear Tim:

DEVELOPMENT CONSENT MODIFICATION Statement of Environmental Effects

Mine Operation Plan. Angus Place Colliery

3 PROJECT ALTERNATIVES

4 PROJECT ALTERNATIVES

C-1. Infiltration System

F3. Final Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report

Environmental Planning and Assessment Act 1979

MC2191 Rissington Bund and Pond Construction and Export of Excess Soils. Victory Field, Upper Rissington Report

Environmental Management Plan Outline Yarranlea Solar

F3. Draft Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report

Rainwater harvesting for Aquifer Storage and Recovery - Case Studies in Goa

Details of the Proposed Action

DALE OPEN CUT COAL MINE

Base Metal and Iron Ore Mining

1. Executive Summary. 1.1 Project Overview

LEBANON WATER SUPPLY AUGMENTATION PROJECT ENVIRONMENT AND SOCIAL IMPACT ASSESSMENT

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 1 SANFORD, FLORIDA

Ottumwa Generating Station Project No Closure Plan for Existing CCR Revision: 0 Surface Impoundments TABLE OF CONTENTS

Technical Memorandum

Rolleston Coal Expansion Project

Hunter Power Plant Coal Combustion Residuals Annual Inspection. Hunter CCR Landfill

Transcription:

Building a New Ash Repository Over a Former Coal Mine 2013 World of Coal Ash Conference Steve Whiteside Steve Marshall Michael Starkey Dave Murray Michelle Cook April 23, 2013

Co-authors Steve Marshall Delta Electricity Michael Starkey Delta Electricity Dave Murray CDM Smith Michelle Cooke CDM Smith

Outline Site and project description Site investigation and evaluation Design Environmental plans Construction

Project Site and Vicinity 2013 World of Coal Ash (WOCA) Conference - April 22-25, 2013 in Lexington, KY (http://www.flyash.info/)

Site Description Lamberts North immediately east of existing Mount Piper Ash Repository (Area 1) Delta owns entire Lamberts North property However, Centennial Coal will work southern portion until November 2015 Lithgow and Lidsdale coal seams Shallow bord and pillar mining since 1940 s Subsequent open-cut mining via roof-lifting to remove Lithgow pillar remnants and mine Lidsdale Seam

Area 1 Ash Repository

Dirty Water Pond

Huon Gully

Overview of Lamberts North

Open-cut Areas

Scope of Work Hydrogeological and geotechnical investigation Groundwater modeling Design drawings and specifications Construction Environmental Management Plan (CEMP) Operational Environmental Management Plan (OEMP)

Expedited Schedule CDM Smith awarded contract May 2012 Design complete September 2012 Bids received November 2012 Construction started December 2012 Construction to be completed May 2013 Ash placement to begin June 2013

Geotechnical Evaluation Review of previous mining activities Field investigation 3 geotechnical borings 5 groundwater monitoring wells 5 test pits in mining spoils in Lamberts North Collection of bulk fly ash and bottom ash samples from Area 1 Geotechnical laboratory testing of spoils and ash Stability analyses 4H:1V ash side slopes 10-meter-wide berms every 10 m of height Crest at El. 460 m

Geotechnical Evaluation Results No voids encountered in borings performed within Lamberts North footprint 2-meter voids found in some borings outside of footprint Stability analyses showed adequate factors of safety Site considered suitable for ash placement Site meets the requirements of the Conditions of Approval

Groundwater Evaluation Groundwater monitoring wells installed and sampled Groundwater model developed for shallow and deep aquifers Maximum groundwater level (MGL)at El. 912.5 Bottom of ash to be at least 4 m above MGL Sediment pond and ash pond to be lined and kept at least 1 m above MGL

Project Components Regrade site by cut-and-fill using existing spoil from open-cut mining operations Place fill to at least 4 m above maximum groundwater level Construct lined sediment pond and ash pond Construct perimeter bund on north and east sides of ash placement area Construct haul road using bottom ash Develop water management system to keep and re-use dirty water on site Divert clean, off-site stormwater away from the placement area

Original Design Layout 2013 World of Coal Ash (WOCA) Conference - April 22-25, 2013 in Lexington, KY (http://www.flyash.info/)

CEMP Components Noise management Groundwater management Soil and surface management Air quality management Flora and fauna management Aboriginal heritage management Ash placement plan

Sensitive Receivers for Noise 2013 World of Coal Ash (WOCA) Conference - April 22-25, 2013 in Lexington, KY (http://www.flyash.info/)

Land Use 2013 World of Coal Ash (WOCA) Conference - April 22-25, 2013 in Lexington, KY (http://www.flyash.info/)

Groundwater Monitoring Locations 2013 World of Coal Ash (WOCA) Conference - April 22-25, 2013 in Lexington, KY (http://www.flyash.info/)

Catchment Areas 2013 World of Coal Ash (WOCA) Conference - April 22-25, 2013 in Lexington, KY (http://www.flyash.info/)

Surface Water Quality Monitoring Sites 2013 World of Coal Ash (WOCA) Conference - April 22-25, 2013 in Lexington, KY (http://www.flyash.info/)

Air Quality Sensitive Receivers and Monitoring Locations 2013 World of Coal Ash (WOCA) Conference - April 22-25, 2013 in Lexington, KY (http://www.flyash.info/)

Vegetation and Threatened Flora Species 2013 World of Coal Ash (WOCA) Conference - April 22-25, 2013 in Lexington, KY (http://www.flyash.info/)

Aboriginal Heritage Sites 2013 World of Coal Ash (WOCA) Conference - April 22-25, 2013 in Lexington, KY (http://www.flyash.info/)

Ash Transportation Route Options 2013 World of Coal Ash (WOCA) Conference - April 22-25, 2013 in Lexington, KY (http://www.flyash.info/)

Proposed Haul Road 2013 World of Coal Ash (WOCA) Conference - April 22-25, 2013 in Lexington, KY (http://www.flyash.info/)

Construction in Huon Gully

Huon Gully

Huon Gully

Stormwater Diversion Channel

Cut and Fill Activity

Cut and Fill Activity

Final Grading

Ash Pond and Sediment Pond

Ash Pond and Sediment Pond

Questions?