Erosion Control Blankets

Similar documents
Organic Filter Tubes. Fe= (Depends on soil type)

Diversion Dikes. Fe=0.95

Depressed Grade (Curb Cut-Back) Sediment Trap

METROPOLITAN UTILITIES DISTRICT No Page: 1 of 10

Inlet Protection. Fe= (Depends on soil type)

BMP-5. A temporary sediment barrier consisting of a synthetic filter fabric stretched across and attached to supporting posts and entrenched.

Single Family Residential Construction Erosion/Sediment Control Standards

ROLLED EROSION CONTROL PRODUCTS (RECP)

CITY OF URBANA CLASS 2 EROSION CONTROL PERMIT STANDARD DETAILS

SECTION EROSION AND SEDIMENTATION CONTROLS

IN T R A / M IN T R A M

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1

ACTIVITY: Silt Fence ES 14

SE-6 GRAVEL BAG BERM. Objectives. Potential Alternatives

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY

Common Construction-Site BMPs Quick Reference Guide

Table 1: Minimum Perimeter Control Performance Requirements. Physical Property* Test Method Required Value

EC-04 ROLLED EROSION CONTROL PRODUCTS (RECP)

Straw Bale Barrier. - Along the face and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow

Figure Inlet protection (Source: Minnesota DOT)

Specifications for the Selection and Application of Erosion Control Blanket on Slopes or Channels

Turbidity Barrier. Fe= (Depends on soil type)

Straw Bale Barrier. Parallel to a roadway to keep sediment off paved areas

902 TEMPORARY EROSION AND SEDIMENT CONTROL SECTION 902 TEMPORARY EROSION AND SEDIMENT CONTROL

Rock Sock (RS) Rock Sock height.

SECTION 806 WATER COURSE AND SLOPE EROSION PROTECTION

Sediment Control Practices

The Construction General Permit and Erosion Prevention and Sedimentation Control

ITEM 750 ROCK FILTER DAMS

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Curlex Enforcer EROSION CONTROL BLANKET SPECIFICATION

STANDARD CONSTRUCTION DETAILS EROSION CONTROL REVISED - JANUARY 2018

Recyclex TRM TURF REINFORCEMENT MAT SPECIFICATION

This silt fence system is composed of geotextile filter fabric and steel posts.

Sediment Retention Fiber Roll (SRFR) General Usage and Installation Guidelines

PART 1 GENERAL REQUIREMENTS

This silt fence system is composed of geotextile filter fabric and steel posts.

STORM WATER POLLUTION PREVENTION PLAN TEMPLATE

APPENDIX H. Stabilization Measure Fact Sheets

SECTION 603 SEEDING I. GENERAL 1.1 DESCRIPTION OF WORK

TriNet Coconut EROSION CONTROL BLANKET SPECIFICATION

TriNet Coconut EROSION CONTROL BLANKET SPECIFICATION

City of Doral 8401 NW 53 rd Ter. Doral, FL 33166

AEC Premier Straw Double Net Quick Mow EROSION CONTROL BLANKET SPECIFICATION

[1] Level spreaders can release sheet flow down steep slopes, but the level spreader itself must be constructed across a level gradient.

SECTION EROSION CONTROL PART 1 GENERAL. A. Work covered by this Section includes the control of erosion, siltation and sedimentation.

Best Management Practice (BMP) Guidance Manual

Curlex II EROSION CONTROL BLANKET SPECIFICATION

Flexamat Erosion Control Mat

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 800 EROSION AND SEDIMENT CONTROL

Sediment Basin. Fe= (Depends on soil type)

Flexamat Tied Concrete Block Mats

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 836 SEEDING AND EROSION CONTROL WITH TURF REINFORCING MAT January 18, 2013

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

APPENDIX C DURING CONSTRUCTION BMP TABLES

EC-7 GEOTEXTILES AND MATS. Objectives. Potential Alternatives

SECTION EROSION CONTROLS

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES

Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Sediment Management Practices (SMPs) Activity: Temporary Inlet Protection (TIP)

EROSION CONTROL GENERAL NOTES EC JAN 2017 C.B.

INLET STRUCTURE FILTERS

SECTION 903 EROSION CONTROL

C. This project shall be designed to meet LEED Silver design criteria. Construction activity pollution prevention is a mandatory requirement.

INSPECTION, MAINTENANCE AND HOUSEKEEPING PLAN

Curlex High Velocity EROSION CONTROL BLANKET SPECIFICATION

PHASE 1 UPDATES TO DESIGN AND CONSTRUCTION STANDARDS INITIAL DRAFT FOR. Chapter 6 EROSION PREVENTION AND SEDIMENT CONTROL

INLET STRUCTURE FILTERS

ITEM 706 PIPE SLOPE DRAIN

GRADING, EROSION AND SEDIMENTATION CONTROL

Construction Site Inspections

STANDARD SPECIFICATIONS FOR CONSTRUCTING UTILITY FACILITIES DIVISION III - CONSTRUCTION SPECIFICATIONS SECTION 11

Construction Stormwater Best Management Practices

STANDARD SPECIFICATIONS FOR CONSTRUCTING UTILITY FACILITIES DIVISION III - CONSTRUCTION SPECIFICATIONS

Stormwater Management Permit Application LESS Than One Acre. Public Works Department st Ave East Kalispell, Montana (406)

D EROSION AND SEDIMENT CONTROL. Table of Contents

TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

Building Better Storm Water Quality

SC-07 STORM DRAIN INLET PROTECTION

Appendix K: Soil Erosion and Sedimentation Control Plan Check List

Earth Dikes and Drainage Swales

Description. Installation and Implementation Requirements

SECTION B. Prevention of sedimentation of waterways, open drainage ways, and storm and sanitary sewers due to construction activities.

SECTION EROSION CONTROL MATTINGS AND COMPONENTS

Construction Phasing Bad

EROSION AND SEDIMENT CONTROL STANDARDS CITY OF OVERLAND PARK DRAFT

Soil Erosion and Sedimentation Control Application Packet 2011

Erosion Prevention and Sediment Control (EPSC) Plan Technical Guidance Handbook

Installation and Maintenance of Erosion Control BMPs

Slash Water Bar Video

SECTION EROSION AND SEDIMENTATION CONTROL

SECTION EROSION AND SEDIMENTATION CONTROL

SWPPP Cut Sheet: Filtrexx Vegetated Retaining Walls

Index. outlet protection Rev. 12/93

Division of Water Quality (701)

Appendix B Construction SWPPP Short Form

Storm Drain Inlet Protection

Transcription:

2.3 Erosion Control Description: An erosion control blanket (ECB) is a temporary, degradable, rolled erosion control product that reduces soil erosion and assists in the establishment and growth of vegetation. ECBs, also known as soil retention blankets, are manufactured by many companies and are composed primarily of processed, natural, organic materials that are woven, glued, or structurally bound together with natural fiber netting or mesh on one or both sides. DESIGN CRITERIA: KEY CONSIDERATIONS ECB selected based on slope, flow rate and length of service Specify preparation of soil surface to ensure uniform contact with blanket Installation and anchoring according to manufacturer s recommendations ADVANTAGES / BENEFITS: Holds seed and soil in place until vegetation is established Effective for slopes, embankments and small channels DISADVANTAGES / LIMITATIONS: Not for use on slopes greater than 2:1 or in channels with shear stresses greater than 2.0 pounds per square foot MAINTENANCE REQUIREMENTS: Replace or re-anchor loosened blankets Remove sediment deposited on blankets TARGETED POLLUTANTS Sediment Nutrients & Toxic Materials Oil & Grease Floatable Materials Other Construction Waste APPLICATIONS Perimeter Control Slope Protection Sediment Barrier Channel Protection Temporary Stabilization Final Stabilization Waste Management Housekeeping Practices Fe=0.90 (Ground cover) Fe=0.65 (Perimeter w/o vegetation) IMPLEMENTATION CONSIDERATIONS Capital Costs Maintenance Training Suitability for Slopes > 5% Other Considerations: Life expectancy, partial degradation, and mowing/ maintenance issues for ECBs left in place as part of final stabilization CC-25

2.3.1 Primary Use Erosion control blankets (ECBs) are used to hold seed and soil in place until vegetation is established on disturbed areas. They can be used on many types of disturbed areas, but are particularly effective for slopes and embankments and in small drainage swales. ECBs seeded for vegetation may be used as a perimeter control. When used in combination with other sediment barriers, such as silt fence or organic filter tubes, blankets may be used as a perimeter control with or without vegetation. 2.3.2 Applications ECBs may be used on many types of disturbed areas but are most applicable on gradual to steep (2:1) cut/fill slopes and in swales and channels with low to moderate flow velocities. In these applications they may provide temporary stabilization by themselves or may be used with seeding to provide final stabilization. ECBs are also used to establish vegetation in channels where velocities are less than 6.0 feet per second. When seeded for establishment of vegetation, ECBs can be an effective perimeter along the down slope side of linear construction projects (roads and utilities). ECBs with vegetation are also used as perimeter controls for new development, particularly at the front on residential lots in new subdivisions. ECBs are an effective aid in establishing vegetated filter strips. 2.3.3 Design Criteria The designer shall specify the manufacturer, type of erosion control blanket to be used, and dimensioned limits of installation based on the site topography and drainage. The type and class of erosion control blanket must be specified in accordance with the manufacturer s guidance for the slope of the area to be protected, the flow rate (sheet flow on cut/fill slopes) or velocity (concentrated flow in swales) of stormwater runoff in contact in with the ECB, and the anticipated length of service. ECBs should meet the applicable Minimum Performance Standards for TxDOT as published by TxDOT in its Erosion Control Report and/or be listed on the most current annual Approved Products List for TxDOT applicable to TxDOT Item 169 Soil Retention Blanket and its Special Provisions. ECBs shall be installed vertically down slope (across contours) on cut/fill slopes and embankments and along the contours (parallel to flow) in swales and drainage ditches. ECBs designed to remain onsite as part of final stabilization shall have netting or mesh only on one side (the exposed side) of the ECB. The ECB shall be installed with the side that does not have netting or mesh in contact with the soil surface. All materials in the ECB, including anchors, should be 100 percent biodegradable within three years. On cut/fill slopes and drainage ditches or swales designed to receive erosion control blankets for temporary or final stabilization, installation of the ECBs shall be initiated immediately after completing grading of the slope or drainage way, and in no case later than 14 days after completion of grading these features. Do not delay installation of ECBs on these highly-erodible areas until completion of construction activities and stabilization of the remainder of the site. Unless the ECB is seeded to establish vegetation, perimeter control applications shall be limited to thirty foot wide drainage areas (i.e. linear construction projects) for an 8 foot width of ECB. When seeded for vegetation, use of ECBs for perimeter control shall follow the criteria in the Section 3.15 Vegetated Filter Strips and Buffers. Prior to the installation of the ECB, all rocks, dirt clods, stumps, roots, trash and any other obstructions that would prevent the ECB from lying in direct contact with the soil shall be removed. CC-26

Anchor trenching shall be located along the top of slope of the installation area, except for small areas with less than 2 percent slope. Installation and anchoring shall conform to the recommendations shown within the manufacturer's published literature for the erosion control blanket. Anchors (staples) shall be a minimum of 6 inches in length and 1 inch wide. They shall be made of 11-gauge wire, or equivalent, unless the ECB is intended to remain in place with final stabilization and biodegrade. Particular attention must be paid to joints and overlapping material. Overlap along the sides and at the ends of ECBs should be per the manufacturer s recommendations for site conditions and the type of ECB being installed. At a minimum, the end of each roll of ECB shall overlap the next roll by 3 feet and the sides of rolls shall overlap 4 inches. After installation, the blankets should be checked for uniform contact with the soil, security of the lap joints, and flushness of the staples with the ground. When ECBs are installed to assist with establishing vegetation, seeding shall be completed before installation of the ECB. Criteria for seeding are provided in Section 2.9 Vegetation. Turf Reinforcement Mats should be used instead of ECBs for permanent erosion control and for stabilizing slopes greater than 2:1. ECBs are limited to use in swales and channels that have shear stresses of less than 2.0 pounds per square foot. Turf reinforcement mats shall be used in open channels with higher shear stresses. 2.3.4 Design Guidance and Specifications Specifications for construction of this item may be found in the Standard Specifications for Public Works Construction North Central Texas Council of Governments, Section 201.15 and in Item 169 of the Standard Specifications for Construction and Maintenance of Highways, Streets, and Bridges (TxDOT, 2004). 2.3.5 Inspection and Maintenance Requirements Erosion control blankets should be inspected regularly (at least as often as required by the TPDES Construction General Permit) for bare spots caused by weather or other events. Missing or loosened blankets must be replaced or re-anchored. Check for excess sediment deposited from runoff. Remove sediment and/or replace blanket as necessary. In addition, determine the source of excess sediment and implement appropriate measures to control the erosion. Also check for rill erosion developing under the blankets. If found, repair the eroded area. Determine the source of water causing the erosion and add controls to prevent its reoccurrence. 2.3.6 Example Schematics The following schematics are example applications of the construction control. They are intended to assist in understanding the control s design and function. The schematics are not for construction. The designer is responsible for working with ECB manufacturers to ensure the proper ECB is specified based on the site topography and drainage. Installation measures should be dictated by the ECB manufacturer and are dependent on the type of ECB installed. Manufacturer s recommendations for overlap, anchoring, and stapling shall always be followed. Criteria shown here are applicable only when they are more stringent than those provided by the manufacturer. CC-27

Figure 2.7 Schematics of CC-28

Figure 2.8 Anchor Examples for (Sources: American Excelsior Company and Western Excelsior Corporation) CC-29