Installation Instructions Wood Frame & Foam Rail

Similar documents
Manufacturer of Coolers, Freezers, Step-Ins, Refrigeration Trailers and Sliding Doors COOLER AND FREEZER INSTALLATION MANUAL

IMPORTANT: Levelness of the walk-in floor is critical. If the floor is not level, vertical panels cannot be aligned properly.

INSTALLATION INSTRUCTIONS

Pre-Engineered Walk-In Coolers and Freezers. Installation Manual

Walk-ins. Installation, Use & Care Manual

Walk-In Unit Installation & Operation Manual

Modular Buildings. Installation Manual

Kolpak Walk-In Unit Installation & Operation Manual

Installation Guidelines for all Quaker products with nail fins New construction nail fin installation with a drainable weather resistant barrier.

INSULFRAME SPECIFICATIONS FOR

SECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

210 Series UL Listed Modular Vault Panel Installation Procedures January 15, 2009

INSTALLATION MANUAL KOCH

St. Monica Food Pantry Walk-In Cooler Freezer System SBA-13105

BASIC LOUVER INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS

INSTALLATION/MAINTENANCE MANUAL FOR WALK-IN COOLERS/FREEZERS

WOOD FRAME SPECIFICATIONS FOR WALK-IN COOLERS AND FREEZERS

SECTION TOILET PARTITIONS. A. Section Structural Steel: Supports for ceiling hung compartments.

Kolpak Walk-In Installation & Operation Manual

INSTALLATION GUIDE GUIDE TO ASC ISO-WALL CONSTRUCTION SYSTEM APPLICATION ISO-WALL SYSTEM. ASC Iso-Wall System Includes: Materials Required:

Prime Shower Enclosure & Base

Installation Guidelines for Sealing PTAC Sleeves

Bi-Folding Door Installation Guide

FROST TOP - WF SERIES

Prime Shower Enclosure & Base Kit

6x5. Assembly Manual CAUTION. Sharp Edges PATENTS ARE PENDING. Building Dimensions. Approximate Size. Storage Area. Interior Dimensions

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

Installation Guide Single-Hung, Picture & Shapes Non-Impact & Impact Resistant Florida Flange Windows

Rytec Corporation One Cedar Parkway Jackson, WI GO-RYTEC (262)

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

Walk-in Coolers and Freezers. Installation and Maintenance. Imperial Manufacturing, Inc.

INSTALLATION MANUAL SURFACE-MOUNTED HEADWALL

MARLIN WINDOWS, INC 3500 HC SERIES 3 3 8" SLIDING WINDOW PAGE 1

DETAIL INSTRUCTION No. 1

International, Inc Evans Ave. Phone: Akron, OH Fax: SPECIFICATIONS

YOW 250 T Window System

Cornerview Shower Enclosure & Base

Container Installation Guide

Guardian Wall Panel Installation Manual

C.R. LAURENCE CO., INC. Intelli-Track SPS. Phase One - Installation Instructions

PREMIER V Bucko Cast In Place

PANEL FINISH Metal finish of the panels shall be as follows. (Specify finish desired, combinations may be used)

RULON LINEAR OPEN SUSPENDED WOOD CEILING SYSTEMS ARCHITECTURAL SPECIFICATIONS

SECTION OVERHEAD COILING FIRE DOORS MODEL 662 OVERHEAD COILING COUNTER FIRE DOORS WITH INTEGRAL FRAME

Nortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1

Series Silicone structural glazed. Installation Instructions

Aqua Swing Tub Door & EX/RT Panel

KS SERIES - VERTICAL INSTALLATION

Impression Graphic panels

Standard Model Coolers, Freezers and Combination Cooler/Freezers In Stock for SAME DAY SHIPMENT

TABLE OF CONTENTS. 1.0 INTRODUCTION 1.1 Greenstone Structural Engineered Panels 1.2 Drawing and Element Numbers

Privacy Plus Partitions

ASC ACOUSTIC. ASC IsoDamp Guide to High Performance Soundproofing. Table of Contents SCIENCES CORPORATION. Introduction Page 2

SPECIFICATION GUIDE BALLY

SECTION MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS

Window Installation Instructions Hung Window Systems with Receptor Pan

Glass Care. Frame Cleaning

ALBERGO STP-SC -MOUNTING INSTRUCTIONS

Weep Valves Stucco Wire Mesh Reinforcement Weather Resistive Barrier Sheathing Insulation Framing

Duracast Pressure Plate Installation Instructions

PLYWOOD FLOATING FLOOR

SECTION ALUMINUM WINDOWS

SECTION ALUMINUM WALKWAY COVERS. A. The requirements of Division 1 specifications shall apply to work specified in the section.

METALWorkS. RH200 Custom Hook-on Panels. General Installation Instructions. Ceiling 1.0 GENERAL Site Conditions Product Description

Garage/Accessory Structures

OmniFlex 300 Plus Installation Instructions

Container Installation Guide

Series Outside glazed curtain wall. Installation instructions

SINGLE SWING DOOR PAIRED SWING DOOR

QUADLUX SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

FINEGAN INSPECTION SERVICES, INC. 76 WEST FOSTER MAINEVILLE ROAD MAINEVILLE, OHIO PHONE FAX

ThermaSteel Corporation ASSEMBLY MANUAL

Window Installation Instructions Series 1000 Steel Replica Window

SECTION FOLDING DOORS AMSTEL AS900CC DIVIDER SOUND

Multi-Piece Shower with Trench Drain

B. Polyethylene samples shall be submitted for Owner approval of color and quality.

RULON ACOUSTICAL CEILING SYSTEM ALURATONE 100 ARCHITECTURAL SPECIFICATIONS

SECTION SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS. Display hidden notes to specifier. (Don't know how?

HEMCOR. Other HEMCO Products. Installation, Operation, Maintenance Manual. InsMed Inc. UniMax Ventilated Hood Enclosure. Lab Planning Solutions

SlimLine Neo-Angle Base & Q-Wall-2

SECTION ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

Multi-Piece Shower with Trench Drain

SECTION SECURITY GRILLES 679 SERIES SUPERGARD SIDE FOLDING GRILLE

OWNER S MANUAL SERIES MDS-96-BK, SM, DR

The better way to build TM. Installation Manual NAILBASE PANELS

DuraLife Capped Composite Decking Installation Instructions

MPG Series 2250T Thermally Broken Aluminum Window

COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100

SECTION SECTIONAL OVERHEAD DOORS 511 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

MODULAR COLD STORAGE SPACE. USS John Stennis DESIGN CONSTRUCTION HARDWARE FEATURES OPTIONS

SECTION SECTIONAL OVERHEAD DOORS

OWNER S MANUAL SERIES MDS-96-BK, SM, DR

NATIONAL GYPSUM COMPANY Wood Frame Walls And Ceilings Single- And Double-Layer Construction

HouseWrap Applications System R-Value: R-4.17 Horizontal Heat Flow Only

SECTION FIBERGLASS REINFORCED POLYESTER (FRP) DOORS AND ALUMINUM FRAMES

SECTIONAL OVERHEAD DOORS SECTION SECTIONAL OVERHEAD DOORS PART 1 GENERAL

Multi-Piece Shower with Trench Drain

Porcher Solutions Wall Mount, Pedestal and Above Counter Lavatories

.2 Section Waste Management and Disposal.

Project No: Pakenham Branch Library, Pakenham, Ontario Section DECEMBER, 2016 Page 1 of 6

Transcription:

Installation Instructions Wood Frame & Foam Rail CrownTonka Walk-ins A division of Crown Fixtures Incorporated Corporate -15600 37 th Ave N Plymouth, MN 55446 Phone: 800-523-7337 Fax: 763-541-1563 Manufacturing Ontario CA, Winnebago, MN, and Greeneville, TN, Olive Branch, MS

INDEX 1. SAFETY Page 3 2. RECEIVING INSTRUCTIONS Page 3 3. UNLOADING PRODUCT Page 4 4. PANEL DESCRIPTION Page 4 5. JOB PREPARATION Page 5 6. JOB LAYOUT Page 5-6 7. INSTALLATION Page 7-14 A) COMPARMENT PANELS Page 7-10 B) DOORS / JAMBS Page 11 C) FINISH WORK Page 12 D) FINAL INSPECTION Page 13 E) OPERATIONAL MAINTENANCE Page 14 1. SAFETY Fax: 763.541.1563-2 -

Safety is the condition of being safe from undergoing or causing hurt, injury, or loss. The concept of safety awareness is being conscious of your surroundings and making changes to the workplace to assure that injuries and property damage do not occur. Please follow these safety guidelines when installing walk-ins: The following Personal Protective Equipment (PPE) is required when installing walk-ins: Hard Hats Safety shoes per OSHA guidelines. Safety Glasses Protective Clothing- long pants and long sleeve shirts should be worn. Safety Harnesses must be worn when working on elevated surfaces. Protective Gloves A certified electrician must do all electrical wiring. Keep work-site free and clear of debris. Use proper lifting techniques and ASK for HELP when needed! USE COMMON SENSE; BE AWARE OF YOUR SURROUNDINGS. Each job site is different, there may be other safety items required by the General Contractor. Always check with the General Contractor to make sure that you comply with all job-site rules. 2. RECEIVING INSTRUCTIONS Upon receipt of shipment: 1. Examine shipment for obvious damage. a. The carrier and receiver must report the product damage on the delivery receipt and both parties must sign. 2. For missing or replacement parts, contact CrownTonka immediately 3. Fax a copy of delivery receipt to CrownTonka (507) 893-3739 Attention: Freight Claims. Receiver must notify CrownTonka of any concealed product damage within 10 days of receipt of shipment. Original packaging material from the damaged item must be retained pending disposition of the damaged item. 3. PRODUCT UNLOADING / PREPARATION Each pallet will contain a packing list for all panels included on that pallet. A quick review of the panel layout will serve as guide for unloading panels. The hardware box contains the panel layout drawing. Select corner, t-walls, jambs, headers, sills, etc. and separate from standard wall panels such as 47 and 23. This will reduce handling, save labor and reduce damage. 4. PANEL DESCRIPTION Fax: 763.541.1563-3 -

Panel Installer shall review each drawing (provided in the hardware box) to familiarize with the symbols and panel layout for each compartment. (SEE KEY BELOW) Panels are tongue and groove construction, with urethane foamed in place insulation. Each panel joint has double gaskets to provide maximum sealing efficiency. Cams operate from the interior of walk-in (in most cases); the cam (tongue) will be on the right of the panel and rotate clockwise to lock. Some conditions require the cam (tongue) to be on the left side of the panel for those cases the cam will rotate counterclockwise to lock. 4. JOB PREPARATION Check the stability of the floor. o All walk-ins must be placed on a stable foundation. Movement of the floor under the walk-in because of soil conditions, freezing / thawing, or other reasons can cause damage to the walk-in. Such damage is not covered by our warranty. Check to see if floor is level. A LEVEL FLOOR IS CRITICAL. o If the floor is not level, shims (not supplied) must be used as required under the alignment strip or panel floor to make the walls level. In some cases, sand leveling may be required, particularly for larger installations with uneven building floors. Check overhead area where walk-in is to be installed for any obstructions. o Any obstruction should be corrected prior to starting. For indoor applications, it is the responsibility of the installer and the owner to make sure the walk-in has proper ventilation and humidity control. Maintaining a minimum space of 1 for Coolers and 2 for Freezers for air movement is critical for wall and ceiling surfaces. If inside conditions reach the dew point on outside surfaces of the walk-in, condensation will occur and the resulting damage would NOT be covered under panel warranty. 6. JOB LAYOUT Check with the general contractor or building plan to establish an airspace between cooler and building wall (Ideal space is 3, Minimum 1 for cooler application and 2 for freezer). Make a chalk line at this point. If cooler is in corner of building, start there. Make chalk mark on base wall first (see diagram below). Make perpendicular line using measurements from diagram below. Fax: 763.541.1563-4 -

Once perpendicular lines are established: o Floor Recessed in Building Slab (fig.2) Make a parallel line. The parallel lines represent compartment outline. Measure corner to corner to make sure layout is square (measurements should be equal). If not, make all necessary adjustments. CrownTonka recommends beginning at the high point of the building floor. If compartment has a modular panel floor simply set floor on outline and level as you go. o Floor directly on Slab (fig.1) Fax: 763.541.1563-5 -

Wall to Modular Panel Floor Fax: 763.541.1563-6 -

STANDARD ALIGNMENT STRIP/SCREED o Center alignment strip based off the panel thickness from the compartment outline. 3.5 1 11/16 4 2 5 2 ½ o Wooden strip (fig.3); apply 3/8 bead of sealant as shown, drive pins or equivalent @ 24 O.C. o PVC extruded strip (fig.4); apply 3/8 bead of sealant as shown, drive pins or equivalent @ 24 O.C. o PVC U-shaped screed (Optional) (fig.5); apply 3/8 bead of sealant as shown, drive pins or equivalent @ 24 O.C. Wall to Concrete Floors Fax: 763.541.1563 7

7. INSTALLATION A. COMPARTMENT PANELS This sketch is a general section plan and does not necessarily depict your recently purchased product. Floorless (fig.6) Modular Floor (fig.7) Panel numbers are found on the rails and correspond with number on the installation drawing. Position a corner panel and a perpendicular wall panel next to the building wall or the most inaccessible location. Each panel connects with cam-lock fasteners. Before activating cam-lock, move panels as close together as possible, line up tops of panels so they are flush, and must be level to one another. A hex wrench will be located in hardware box. For larger jobs Set three wall sides of compartment. Positioning ceiling panels towards the open end. Temporarily place the last ceiling panel on top of the ceiling panel adjacent to it. Complete the final wall of the compartment finishing with a corner panel. Finally position the last ceiling and lock into place. Fax: 763.541.1563 8

Wall to Ceiling Connections Lag Down 3/8 Lag bolt w/ washer @ 24 on center to connect to wall perimeter (supplied in hardware box). Trim cap, to be field installed with hex head screws (supplied in hardware box). (fig.8 & fig.11) (Fig.8) Wood Frame and Foam Rail applications (Fig.9) - Concealed (fascia) tops Wood Frame ONLY) (Optional) (Fig.11) Foam Rail application ONLY Cam Down (Fig.10) Wood Frame and Foam Rail applications Fax: 763.541.1563 9

SUSPENDED CEILING SUPPORT REQUIREMENTS Single unsupported span ceiling: 3 ½ to 4 thickness 14-0 5 thickness 16-0 Suspended support brackets required Multiple spans of ceiling panels, CrownTonka supplies one bracket (fig.12) for each panel intersection. 3 ½ to 4 > 14-0 CrownTonka supplies one bracket for each panel joint 5 > 16-0 CrownTonka supplies one bracket for each panel joint CrownTonka will supply 1 case-hardened nails per bracket Upon request CrownTonka can supply the 3/8 all thread rods (12-0 ) CrownTonka Foam Rail ceiling panel brackets are slotted to fit over the locking pin so that cam-lock locks through bracket. Slot must be installed to line up with cam-locks per figure below. Fax: 763.541.1563 10

BULKHEAD BRACING Header panels at bulkhead openings are to get additional support brackets (fig.13) attached at header panel and fastened to framing member in ceiling panel. *****CAULKING AND SEALING REQUIREMENTS***** All Freezer panel joints MUST be caulked with 3/8 cylindrical bead of butyl caulk at all wall to wall joints, ceiling to ceiling joints, wall to floor joints and wall to ceiling joints. Apply butyl caulk on the interior of the joint on the warm side. (fig.14) When it applies, ALL voids between ceilings and the walls with concealed tops (fascia) MUST be foam packed with spray foam (not provided) or it will void the manufacturer s warranty. OUTDOOR COOLERS AND FREEZERS All compartments installed outdoors (both Coolers and Freezers) MUST have all joints between panels caulked on both the inside of the joint (on the warm side) and the exterior to prevent moisture from penetrating the joint. THE INTERIOR SEAM SHOULD NOT BE CAULKED! The caulk used on the exterior seam should be a silicone caulk with a rated life of at least 25 years. The caulk on the inside of the joint should be a low or no VOC butyl caulk. Be sure it is safe for your application. The cylindrical bead of caulk on both the inside of the joint and the exterior seam must be complete (NO GAPS) for the entire length of the joint and Minimum of 3/8 high to fill in the joint and to adhere to both sides of the joint when the panels are locked together. An annual inspection for gaps in the sealant is required for the life of the warranty; fill any gaps or breaks for it to remain in effect. (fig.15) Fax: 763.541.1563 11

B. DOORS AND JAMBS FREEZER JAMBS - (fig 17, fig 18) Jambs are 120v pre-wired with an anti-condensation heater and ready for hook up by a certified electrician. To avoid damaging the heater wire, position the threshold properly before securing to the floor. WARNING!!!DO NOT TURN ON HEAT WIRE UNTIL REFRIGERATION IS RUNNING, AS THE HEAT WIRE WILL SHORT OUT FROM GETTING TO HOT. Install threshold before hanging the door. Fax: 763.541.1563 12

HINGED DOOR Installing CrownTonka hinged door The doorjamb must be level and plumb for proper door operation and seal. After carefully positioning the jamb, use a level and make any necessary adjustments. Hang door and check for fit and seal, prior to attaching ceiling panel to door wall. Please Note: if the door is for a floorless compartment adjust the bottom door gasket accordingly. STABILITY BRACKETS (fig.16) Install jamb stability bracket to building floor Anchor the galvanized angle on each interior side of the opening (3/8 X 2 ½ Kwik bolt) Then lag bolt angle each jamb (1-3/8 X 2 ) Fax: 763.541.1563 13

C. FINISH WORK Install vinyl plugs in each Cam Lock access hole. Push in plug with thumb and gently tap in with hammer. Ceilings should have a bead of silicone caulk on interior where wall and ceiling panels meet for both coolers and freezers. CEILING CAP TRIM METAL Ceiling cap trim metal will be the standard on all overlap or cam-lock ceilings (see diagram). Drawings will indicate whether ceiling cap trim metal or ceiling caps are to be used. If trim metal is to be used, attach trim metal using ¾ #8 self-tapping hex head screws, which you will find in your hardware box. D. FINAL INSPECTION All locks are engaged and wrench ports closed with cap buttons. Entrance door operated smoothly, closes, and seal properly. Thermometer indicates correct reading. All excess sealant is removed and residue wiped up with appropriate cleaner. Installation should be as NEC or as local codes dictate, for door and jamb wiring. E. OPERATIONAL MAINTENANCE For years of trouble free service, the following steps should be taken: 1. Wipe up spills with warm water and mild soap, DO NOT USE HARSH DETERGENTS SOLVENTS OR ABRASIVE CLEANERS. Dry thoroughly to prevent ice formation. 2. Use same procedure (as above) to remove dirt or fingerprints from wall surfaces. NOTE: If finish is stainless steel, wipe in direction of grain. Dry thoroughly to prevent ice formation. 3. Clean magnetic gasket (if applicable) regularly using a damp cloth. 4. Lubricate door hinge bearings with petroleum jelly when needed. 5. Periodically check all hardware fasteners to insure they are firmly anchored. If any part malfunctions, call CrownTonka for advice or, if necessary, replacement. 6. Do not store items on top of walk-in(s). This may result in condensation, which may damage walk-in panels. Any such damage will not be covered under warranty. 7. Periodically check the operation of the doorframe heater wire and heated vents. Ice forming around either of these openings may indicate that replacement is required. BE SURE ELECTRICAL POWER TO HEATED VENTS and/or DOOR PERIMETER HEATER IS OFF PRIOR TO REPLACEMENT. All electrical work must be done be a certified electrician 8. If door is not sealing properly, adjust the strike accordingly. Also, check to see that the door sweep gasket is adjusted properly. 9. The evaporator coil and condensing unit should be cleaned periodically with a soft brush and vacuum cleaner. Inspect the evaporator condensate pan and remove any debris. 10. BE SURE THAT ELECTRICAL POWER TO THE REFRIGERATION SYSTEM IS OFF PRIOR TO INSPECTION AND CLEANING. Fax: 763.541.1563 14

Fax: 763.541.1563 15