EXISTING EID WATER SUPPLY SOURCES

Similar documents
2013 WATER RESOURCES SERVICE RELIABILITY REPORT AND. El Dorado Irrigation District 2890 Mosquito Road Placerville, California 95667

EID declares Stage 2 drought emergency

Integrated Water Resources Master Plan

2016 WATER RESOURCES SERVICE RELIABILITY REPORT AND. El Dorado Irrigation District 2890 Mosquito Road Placerville, California 95667

Project 184 Streamflow and Lake Level Information Plan

El Dorado Water & Power Authority. El Dorado Water Reliability Project

2015 El Dorado Irrigation District to Westlands Water District Temporary Water Transfer Project

Subject: Technical Memorandum Number 2 Noxious Weed Surveys

Glades Reservoir Environmental Impact Statement (EIS)

APPENDIX E PROJECT EVALUATION SUMMARY TABLE

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Sacramento Municipal ) Project No Utility District )

El Dorado Forebay Dam Modification Project

SACRAMENTO MUNICIPAL UTILITY DISTRICT UPPER AMERICAN RIVER PROJECT (FERC Project No. 2101) and

9:00 A.M. Welcome and Introductions Dan Corcoran, EID Environmental Manager. Brian Deason, EID Hydroelectric Compliance Analyst

Case Study: Camp Far West Reservoir Spill as an indicator of water supply availability in the Bear River system for Centennial Reservoir

WATER 101. Chris Treese. May 26, 2015 Grand County State of the River

Amendment to EBMUD Retirement System Ordinance (No. 40) - Section 21 First Reading. Board of Directors March 10, 2015

today and offer the Department's views on S a measure to authorize tae construction of the Cibolo Project. The 'feasibility report has

Hydrologic Characteristics of the Owens River Basin below the Upper Owens River

Meeting Agenda. 6:00 P.M. Welcome and Introductions Dan Corcoran, EID Environmental Manager

Subject: Notice of Preparation of a Draft Environmental Impact Report for the El Dorado Water Reliability Project

Option 11. Divert Water from Miocene and Hendricks Canal to Supply the Ridge

2009 Water Temperature Monitoring

SOUTH FORK AMERICAN RIVER (CHILI BAR), CALIFORNIA

Lower Cherry Aqueduct Emergency Rehabilitation (44896) Scoping Package

A Case Study: Imperial Valley, California

APPENDIX A NOTICE OF PREPARATION/ NOTICE OF INTENT. Proposed Lower Yuba River Accord June 2007 Draft EIR/EIS

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

3.0 Proposed Action and Alternatives Proposed Action License Term Project Facilities to be Licensed...

CITY OF ROSEBURG LONG-RANGE WATER SUPPLY PLAN

Committee on Water. Desalination as a Water Source

Staff contact: Mr. Bob Holden, Principal Engineer Phone: (831) Fax: (831)

UPPER AMERICAN RIVER, CALIFORNIA

7 Management of Existing Supplies

Investigation Highlights

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

2. Alternatives Analysis

Raw water sources, facilities, and infrastructure

Chabot Dam Seismic Upgrade Spec Board of Directors March 8, 2016

Jose Gutierrez - Chief Operating Officer. Water Education Foundation, April 4,2019

SLIDES: Status of Southern Nevada Water Authority (SNWA): Third Intake into Lake Mead and Groundwater Project

Southeastern Colorado Water Conservancy District. Leadership Pueblo, May 11, 2017 Jim Broderick Executive Director, SECWCD

Water Supply Board Briefing. Water Operations Department January 10, 2017

9/24/2013. PRESENTED BY: the Tule River Tribe; Tom Rodgers; the Native American Rights Fund; GEI; and NRCE

2015 Update DROUGHT ACTION PLAN

Interlake Tunnel Project 10/22/14

3. AFFECTED ENVIRONMENT

Takatz Lake Project - Alaska

9 CEQA Alternatives. Alternatives

Camp Far West Hydroelectric Project Relicensing

Metropolitan Water District. July 25, 2013

Raw Water Supply Yield Analysis Update City of Loveland

The Colorado River Cooperative Agreement 1

This chapter describes the development of the NODOS/Sites Reservoir Project alternatives.

A Tale of Two Dams and a dry river. November 1, 2011 Planning, Resources and Technology Committee Mojave Water Agency

Santa Barbara County Region

Water Infrastructure Needs in the Columbia River Basin Legislative Council on River Governance

M E M O R A N D U M S E P T E M B E R 2 8,

Regional Water Authority REGIONAL DROUGHT CONTINGENCY PLAN AND REGIONAL WATER RELIABILITY PLAN JOINT MEETING

CHAPTER 3 Water Supply

Managing Idaho Power Company s Hydro Projects During Drought Conditions The Benefits of Communication and Collaboration

El Dorado County COMMUNITY WILDFIRE PROTECTION PLAN Sub-Section for POLLOCK PINES FIRE SAFE COUNCIL ACTIVITIES

Prepared by: PacifiCorp 825 NE Multnomah Street Portland, OR 97232

C I R P A C P R E S E N T A T I O N B Y R O N T H O M P S O N J U N E 1 6,

BAWSCA-EBMUD Short-Term Pilot Water Transfer Plan. September 2013

Los Angeles 3 rd Regional

Freeport Regional Water Authority. c/o Gregg Ellis 2600 V Street Sacramento, CA 95818

SACRAMENTO SUPPLEMENTAL PROJECTS OVERVIEW

Executive Summary INTRODUCTION COOPERATING AGENCIES PUBLIC AND AGENCY PARTICIPATION

REQUEST FOR QUALIFICATIONS FOR CARSON RIVER WATERSHED WATER MARKET (EXCHANGE/TRANSFER) PROGRAM

Section 2. Mono Basin Operations

2014 Update DROUGHT ACTION PLAN

El Dorado County COMMUNITY WILDFIRE PROTECTION PLAN Community Tab for ROYAL EQUESTRIAN ESTATES FIRE SAFE COUNCIL ACTIVITIES

PHASE II UPPER COLORADO RIVER STUDY EXECUTIVE SUMMARY

ADOPT A RESOLUTION OF THE CITY COUNCIL IN SUPPORT OF THE CALIFORNIA WATERFIX AND CALIFORNIA ECO RESTORE

The Path to 2060: Dallas Water Plan Update Reuse Partnership with North Texas Municipal Water District

SACRAMENTO MUNICIPAL UTILITY DISTRICT S UPPER AMERICAN RIVER PROJECT (FERC NO. 2101)

Cadiz Inc. Corporate Presentation November 2017

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

4.15 UTILITIES AND SERVICE SYSTEMS

Imported Water Committee Special Meeting September 14, 2017

Water and Power Policy Group

Dry Creek Flood Control Improvement Project

Supplemental Supply Option: Desalination DEEP WATER DESAL PROJECT

El Dorado Hydroelectric Project FERC Project No Water Quality Monitoring Report

Sacramento Municipal Utility District. Upper American River Project (UARP) FERC Project No Scoping Document 1 and Notice of Preparation

UPDATE: SNWA Groundwater Development Project Activities. August 20, 2009

Water Resource Planning in Washington County, Utah and the Lake Powell Pipeline

Facts and Figures. Greater Victoria Water Supply Area. May 2015

Battle Creek Salmon and Steelhead Restoration Project January 2017

CHAPTER 7 POWER PRODUCTION AND ENERGY CONSUMPTION

The Colorado River Cooperative Agreement 1. May 15, 2012

Yale Hydroelectric Project FERC Project No APPLICATION FOR NEW LICENSE FOR MAJOR PROJECT Volume I

Friant Dam and Millerton Reservoir

Notice of Preparation of Environmental Impact Report

RPU WATER SUPPLY PLAN UPDATE October 7, 2011

Palouse Groundwater Basin Water Supply Alternatives Analysis Report

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

Report to the House and Senate Committees on Appropriations

Low Impact Hydropower Institute AMENDED Application for Low Impact Hydropower Certification: Island Park Hydroelectric Project

Transcription:

EXISTING EID WATER SUPPLY SOURCES FOLSOM RESERVOIR Folsom Reservoir is located at the west end of El Dorado County, at the confluence of the North and South Forks of the American River. EID treats water from Folsom Reservoir at the El Dorado Hills water treatment plant. The plant underwent extensive improvements in 1993-1994 to increase the treatment capacity from 5.7 million gallons per day (mgd) to 12.0 mgd. The plant was expanded again in 2001 to 14.0 mgd. The plant is designed for expansion to an ultimate capacity of 20.0 mgd. The capacity of the raw-water conveyance and pumping facilities, which convey water from Folsom Reservoir to the treatment plant, is currently 16.0 mgd. FOREBAY RESERVOIR EID takes consumptive water at the Main Ditch intake, which is located at the El Dorado Forebay Reservoir. Water is conveyed to the forebay in the 24-mile-long El Dorado Canal, which originates at a diversion dam on the South Fork American River near the community of Kyburz. Diversions of water can also be made from Alder Creek, approximately 3.4 miles downstream. The El Dorado Canal water constitutes approximately 35% of EID s total existing supply of water. It is the only means of supply to the northern portion of EID s service area and also contributes greatly to supplying the central portion of the service area by gravity. The communities of Pollock Pines, Cedar Grove, and Camino are exclusively served by water from the El Dorado Canal. The Apple Hill and Gold Hill agricultural areas, the city of Placerville, and communities west of Placerville to Cameron Park are served jointly by water from the El Dorado Canal and Jenkinson Lake (or Sly Park Reservoir). JENKINSON LAKE Jenkinson Lake (Sly Park Reservoir) is EID s largest water supply, providing 20,450 acre-feet per year (afy) to EID s system firm yield. It was constructed by the U.S. Bureau of Reclamation (USBR) in 1954-1955. Although EID operates and maintains the Jenkinson Lake and Sly Park Dam facilities, including the recreational features, USBR maintains ownership of the dams and surrounding lands and holds the water rights. The reservoir is located south of Pollock Pines, in the Cosumnes River basin. Water is supplied to Sly Park Reservoir from Sly Park Creek and Hazel Creek, which are natural tributaries to the North Fork of the Cosumnes River. Water is also diverted into Sly Park Creek from Camp Creek via the Camp Creek diversion dam and tunnel. Under average inflow conditions, Jenkinson Lake is operated to maintain 14,000-18,000 acre-feet (af) carryover storage each year. At it normal high-water elevation of 3,471 feet, the reservoir is capable of supplying up to 125 cubic feet per second (cfs) of water through the dam outlet work and Main Conduit to the Reservoir A water treatment plant. Under the current permit issued by the California Department of Health Services, the Reservoir A water treatment plant has a capacity of 82 cfs. The Jenkinson Lake water supply is used in the contiguous EID water system. 1

CRAWFORD DITCH The Crawford Ditch is a conveyance system of pipes, siphons, and a lined and unlined canal. The ditch diverts water from North Fork Cosumnes River (North Fork Ditch) and is also supplied water released from the Jenkinson Lake by rediversion from Clear Creek. The diversion is based on a pre-1914 water right acquired by EID. Generally, diversions from the North Fork Cosumnes River into Crawford Ditch can commence on April 1 and continue through October 31 each year. Approximately 5,560 af of water is available annually for diversion into Crawford Ditch. However, because of conveyance losses, not all the water diverted is fully used. EID has an ongoing maintenance program to replace much of the open ditch portions with buried pipe and/or lined ditch to reduce these losses. OTHER WATER RESOURCES EID has additional water entitlements from other sources; however, these are not included as part of its existing system firm yield. Some of the water from these sources is used for nonconsumptive purposes, such as irrigation and recreation. 2

NEW WATER SUPPLY PROJECTS UNDER CONSIDERATION BY EID The following projects are under consideration by EID as part of the ongoing, countywide El Dorado County Water Agency (EDCWA) water planning process. FEDERAL ENERGY REGULATORY COMMISSION PROJECT 184 The EDCWA and EID applied to the State Water Resources Control Board (SWRCB) to obtain water rights to make consumptive use of waters previously stored and released for power generation from Caples Lake, Silver Lake, and Lake Aloha, as well as certain direct diversions from the South Fork of the American River (South Fork), all of which have been used by Pacific Gas and Electric Company s Project No. 184 for hydroelectric power generation or instream flows. EID s acquisition and exercise of the water right would not result in changes to Project No. 184 s historic operating patterns. In Decision 1635 (1996) (D-1635), the SWRCB granted to EDCWA and EID the right to appropriate 17,000 af of water. D-1635 allows EID to make direct diversions from the South Fork at Folsom Reservoir; to store water in Caples, Silver, and Aloha Lakes; and to redivert the water released from storage. The sole approved point of rediversion is at Folsom Reservoir. The maximum amount approved in D-1635 is 17,000 afy, including both direct diversion and rediversion. D-1635 conditioned the new rights on certain standard permit terms and 26 special conditions. In Water Rights Order 96-06, the SWRCB ordered reconsideration of D-1635, and SWRCB has not yet ruled on the merits of the reconsideration. As part of the Federal Energy Regulatory Commission (FERC) licensing process for this project, FERC is preparing an environmental impact statement (EIS) that is assessing potential operational alternatives and protection, mitigation, and enhancement measures for the project. EID also will need to prepare an environmental impact report (EIR) for this project to comply with the California Environmental Quality Act and to assist the SWRCB with its permitting process. PUBLIC LAW 101-515 (CENTRAL VALLEY PROJECT SUPPLY) EID and Georgetown Divide Public Utility District (GDPUD), with assistance from EDCWA, may be able to obtain new water supplies under Public Law 101-514, enacted by Congress in 1990. This statute requires USBR to enter into a municipal and industrial water supply contract with the El Dorado County Water Agency, not to exceed 15,000 acre-feet annually. The 15,000 afy is meant to serve future needs in both EID and GDPUD. Although no formal distribution has been made, for planning purposes it has been assumed that a 50/50 distribution will occur (i.e., 7,500 afy for each district). This 7,500-afy allocation would be subject to the USBR Shortage Policy for Municipal and Industrial Contractors wherein allocations can be reduced by up to 25% of the previous 3 years of normal water deliveries, adjusted for growth. The new water service contract could be combined with the existing USBR contract with EID. EDCWA and USBR started to prepare a joint EIR/EIS on the water supply project contemplated by Public Law 101-514. This EIR/EIS has been placed on hold and will not be completed until after the El Dorado County General Plan EIR is completed and the EDCWA Water Plan confirms that this project is a preferred project for EID to continue pursuing. 3

REDIVERSION OF EXISTING PRE-1914 AND RESERVOIR STORAGE WATER RIGHTS EID has several existing water rights that could be rediverted to provide supplemental potable water supplies. In the past, the diversions have been limited to the irrigation season, typically April/May through October/November, subject to water availability at the source. Two diversions are being considered by EID: the Folsom Reservoir Diversion and Bray Reservoir Diversion. TEXAS HILL RESERVOIR PROJECT The proposed Texas Hill Reservoir Project, located approximately 1.5 miles south of Placerville, would include a dam and reservoir on Weber Creek. Texas Hill Dam was initially studied in 1963 by USBR as part of the Central Valley Project, American River Diversion Placerville Ridge Unit. In January 1991, a reconnaissance-level study was performed and titled The Texas Hill Dam and Reservoir. Two stages of dam construction were proposed. The first stage would include a dam that would impound 11,000 af. The second stage of construction would raise the dam to impound a total of 22,000 af. Water from the Texas Hill Reservoir would be piped by gravity and during periods with low reservoir levels, pumped, treated, and then distributed to the western region of the EID service area. Currently, EID owns approximately 75% of the land needed for the Texas Hill Reservoir, having purchased it from EDCWA in 1995. ALDER RESERVOIR PROJECT The potential Alder Reservoir Project, which would be located in the Eldorado National Forest near White Hall, consists of a dam and reservoir on Alder Creek with potential for power generation. Originally, Alder Dam was a component of the South Fork American River Hydroelectric and Water Project, having a gross storage of 185,000 af. After EID decided not to proceed with this project, a smaller dam was evaluated with a storage capacity of 31,000 af. Water stored in the reservoir would be released into Alder Creek and rediverted into EID s El Dorado Canal to supplement canal flows originating in the South Fork American River and its tributaries. Two alternative conveyance routes have been studied to deliver the Alder Project water to the potential Bray Reservoir site for treatment and distribution: the Hazel Creek Tunnel conveyance and the Weber Creek conveyance. SQUAW HOLLOW RESERVOIR PROJECT In 1988, EID identified a possible dam and reservoir site across Squaw Hollow Creek as a terminus for the Crawford Ditch system. The reservoir would have a capacity of about 4,200 af. The water stored in Squaw Hollow Reservoir would be pumped up to Ringold Creek near Reservoir 7 and would be conveyed in Weber Creek to the potential Bray Water Treatment Plant. EXPANDED WEBER RESERVOIR PROJECT 4

Weber Dam and Reservoir is an existing facility, constructed in the 1920s with a capacity of 1,200 af. Typically, the reservoir has been used to meet irrigation demands during the summer months. However, the irrigation demands have diminished, making the water available for potable use. Water from Weber Reservoir would be released for delivery at the potential Bray Water Treatment Plant or rediverted to Folsom Reservoir. BRAY RESERVOIR PROJECT Bray Reservoir is located east of Missouri Flat Road and south of Forni Road, near Diamond Springs. Bray Reservoir is owned by EID and has been in existence since 1947. For some time, the 57-acre Bray Reservoir site has been considered as a potential treatment plant site. The reservoir could be used for storage from other sources and therefore would not produce additional water supply. These sources could consist of direct diversions from the Crawford Ditch and Weber Creek and releases from Weber Reservoir and the potential Texas Hill Reservoir. Additional water supply could be available through releases from Alder Reservoir. Water from the Bray facility could serve portions of the western region (east of Reservoir 9), which includes the eastern portion of the Diamond Springs/El Dorado service zone, and the Shingle Springs and Cameron Park service zones. OTHER EL DORADO IRRIGATION DISTRICT PROJECTS The potential projects summarized above are the primary sources of supply that have been considered by EID as part of the EDCWA water planning process. However, other potential projects and programs can supplement or enhance future water supplies and are being considered. These projects include:! lining the main canal from the El Dorado Forebay to the Reservoir 1 water treatment plant,! installing 2-foot flashboards at Jenkinson Lake to increase storage by 1,280 af,! conducting leak detection studies,! constructing a Capps Crossing Dam and Reservoir, and! adding water from the Marble Valley limestone mine quarry to supplement the EID s recycled water supply. Source: EID 2001a and Alessandri, pers. comm., 2003 5