HAZOP Checklist for Sewage Treatment Plant

Similar documents
CHECKLIST ANALYSIS OF SEWAGE TREATMENT PLANT IN AN EDUCATIONAL INSTITUITION

SETTLING REVIEW CHECKLIST

Wastewater treatment for single houses. D. O Dowd

ATTACHMENT 1 GENERAL FACILITY INFORMATION. BOD5 mg/l mg/l TSS mg/l mg/l NH3-N mg/l mg/l

COMMERCIAL PROJECT PLAN REVIEW PROCESS

AERATED POND REVIEW CHECKLIST

RISK BULLETIN. Walking & Work Surfaces: Floors, Stairs and Elevated Workstations Checklist DATE / / NAME SIGNATURE WALKWAYS YES NO ACTION ASSIGNED

INFRASTRUCTURE & OPERATION

SECTION MECHANICAL SPECIFICATION GRIT COLLECTION EQUIPMENT

SECTION COOLING TOWER

Progressive Design Build Services for the th Street, 6217 Wilson Blvd., 7703 Blanding Blvd. and Robitzsch Ln. Wastewater Pump Station

Providing Infrastructure Redundancy at the Rocky River WWTP. Timothy McCann AECOM Keith Bovard Rocky River WWTP

Natural Gas Service Installation and Meter Clearance Requirements

CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist

Design Specifications & Requirements Manual

Wastewater Plant Tour. There Is Gold In Them There Plants

Read Only Copy Not For Distribution. Chapter 17. Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.2 QUANTITY OF WATER REQUIRED

South West Water s amendments & requirements for Sewers For Adoption 6 th Edition

REGISTRATION EXAMINATION, JUNE 2009 DRAINLAYING ANSWER SCHEDULE

This unofficial translation of. Ministerial Decision No 421/1998. was downloaded from METS is not the copyright owner.

Sawmill Safety & Health. Presented By: John Boysen Safety Consultant OHSA Consultation Program

This section applies to service areas and loading docks for new construction and major renovations.

REQUIREMENTS FOR INDOOR INSTALLATION OF PADMOUNTED TRANSFORMERS

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building...

The System Professionals. Conveyor. Solutions. - The right Solution. A Total Material Handling Solutions Supplier

Attachment N o F Control & Monitoring

INTER PLANT STANDARD STEEL INDUSTRY

Workplaces must be kept clean, orderly, and sanitary. Workroom floors must be maintained as clean and dry as possible.

Liquid Stream Fundamentals: Grit Removal

FAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY

Meadowbrook-Limestone (MBLS) Wastewater Treatment Plant. Wet Weather Operating Plan

DEPARTMENT OF PUBLIC SAFETY AND CORRECTIONS. Public Safety Services ADA-ABA COMMENT ASSISTANCE GUIDE

Sump Pumps Office procedures for the Drainage & Grading section

TYPES OF SEWAGE PUMPS. Solids Handling Pumps: Grinder Pumps: Effluent Pumps:

PERMIT TO OPERATE SILVER CLOUD CT., MONTEREY, CA TELEPHONE (831) FAX (831)

TABLE OF CONTENTS SCHEDULE 18 (TECHNICAL REQUIREMENTS) DBFO AGREEMENT SECTION 2 - WATER AND WASTEWATER SYSTEMS EXECUTION VERSION

INSTALLATION OF A STEP-SCREEN & VORTEX GRIT REMOVAL SYSTEM AT THE GRIFFITH SEWAGE TREATMENT PLANT. Peter Shanahan. Griffith City Council

WASTE WATER TREATMENT SYSTEM

OPERATI LATRINES. Standard Range Types

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

Elevators and Lifts

BUILDING/FACILITY ACCESSIBILITY CHECKLIST. Lessee. Lessor

PROGRAM OVERVIEW WALKING/WORKING SURFACE INDUSTRIAL SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W

Oak Orchard Wastewater Treatment Plant. Wet Weather Operating Plan

County of Yolo Development Services Building Inspection Division

ENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan

Description of the Work

Issued for Bid West Alexandria, OH 05/2018 WWTP Improvements Contract 2 TABLE OF CONTENTS

Model Safety Program

DESIGN CHECKLIST PROJECT NAME DISCIPLINE DATE TYPE REVIEW REVIEWER DRAWINGS REVIEWED

DEPARTMENT OF ARCHITECTURE ABUBAKAR TAFAWA BALEWA UNIVERSITY, BAUCHI ARC 624: ADVANCED BUILDING SERVICES LESSON 2: CONVEYANCE SYSTEMS IN BUILDINGS

FXV. Closed Circuit Cooling Towers. Closed Circuit Cooling Towers. Product Detail FXV - C 1. Engineering Data FXV Models... C2

Your defined goals and objectives:

WASTEWATER TREATMENT (1)

Exploration of Utulei Clarigester #1 for Facility Upgrade

Southerly First Stage Final Settling Improvements (SFSS-1)

ELEVATORS & SERVICE LIFTS FREIGHT HOIST MAST LIFTS FREIGHT HOIST SCISSOR LIFTS ELEVATING DOCK SCISSOR LIFTS DOCK LEVELLERS

High Performance. Uniform Distribution

IECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST

A/E Design Deliverable Checklist

SEPTIC TANK CONSTRUCTION GUIDELINES

TABLE OF CONTENTS Catalogue of FARMA, FARMA PREMIUM and KARMA corrugated sheet silos. Release date: August 2016

DUKE UNIVERSITY CONSTRUCTION & DESIGN STANDARDS

Certificate of Occupancy Inspection Checklist Change of Use Group or Occupancy

PRICE BID FOR. Processing zone of Special Economic Zone, MAHINDRA WORLD CITY (JAIPUR) LIMITED, JAIPUR MWCJL/HR/INFRA/HC ZONE/STP/ /T-32

Screening, Definition: The unit involved is called a screen.

1 Construction The sewage treatment plant (STP) is to be an Icon-Septech Pty Ltd Turbojet 5000 as described below and as shown on the drawings.

SITE ACCESSIBILITY AND PARKING

1 Construction The sewage treatment plant (STP) is to be an Icon-Septech Pty Ltd Turbojet 4000 as described below and as shown on the drawings.

NEWS LETTER. May 9, 2011

Universal Design Standards

Sanitary and Environmental Engineering I (4 th Year Civil)

NC State University Design and Construction Guidelines Division 00 Planning & Design Space Planning

Saraswathi. Floor Plans

CITY OF DANA POINT SITE ACCESSIBILITY AND PARKING B103 SITE INTRODUCTION

Definition separation of unstable and destabilized suspended solids from a suspension by the force of gravity

When confronted with increasing peaking. Managing the deluge

Prepared by Mr. Ronald KWONG

HOUSING CONVERSION Guidelines for the conversion of a house to commercial use.

TOWN OF HAGUE GUIDELINES FOR PERMIT APPLICATION

VPL-3200B Residential Vertical Platform Lift Technical Specifications

BILFINGER WATER TECHNOLOGIES SOLUTIONS FOR INLET WORKS / HEADWORKS OUR BRANDS FOR RELIABLE TECHNOLOGIES: PASSAVANT JOHNSON SCREENS NOGGERATH GEIGER

1 Construction The sewage treatment plant (STP) is to be an Icon-Septech Pty Ltd Turbojet 2000 as described below and as shown on the drawings.

Hazard Identification and Risk Assessment Form. Risk Assessment

LAKESIDE Water Purification Since Bulletin #1218 Revised June Spiravac Clarifier. Peripheral Feed Center Takeoff Suction Sludge Removal

From manual to automatic at Spring Creek

BUILDING CODE VARIANCE

PUMP STATION CHECK LIST

Project Name: Central WWTP Capacity Improvements and CSO Reduction Project. MWS Project Number: 14-SC-0153 Last Updated: 12/19/14

CITY OF DANA POINT. COMMUNITY DEVELOPMENT, BUILDING AND SAFETY Golden Lantern, Suite 209 Dana Point, CA

SPIROLIFT VERTICAL CONVEYING TECHNOLOGY, HORIZONTAL AND INCLINED CONVEYOR SYSTEMS

Sorbtive Vault Operations & Maintenance Manual

ARKANSAS & LOUISIANA LEVEE AND DRAINAGE DISTRICTS MEETINGS

Appendix B-1. Design Calculations for Sewage Treatment Plant

Norwalk, CT Water Pollution Control Facility (WPCF) CSO Capacity and Treatment Evaluation. Subject: Task 3 Existing Grit Removal System Assessment

Septic Tank Guidelines

Americans with Disabilities Act Accessibility Survey

EPA Waste Water Discharge Licence Application

Savard Labor & Marine Staffing, Inc. Fall Prevention Program Rev3/14

Transcription:

HAZOP Checklist for Sewage Treatment Plant CHECKLIST 1.0 Overall Layout of Treatment Plant 1.1 General Layout Property are fenced and gated and the fence height. State where these problems/impacts occur and give a description of the method employed in controlling these impacts. a. Odor Control b. Noise Level c. Visual (Landscape) Are all tanks and chambers above the safe flood level and the highest flood level of the nearby rivers/drain and design to what flood return period. Are there any buried pipelines or cables under buildings within the treatment facility and is it clearly indicated on the layout drawings. The layout of temporary diversion and location of temporary treatment facilities. Where is the location of the screening bins and what the basis of sizing the bins area is? Are lifting devices provided and state what type and their location and capacity. 1.2 Access Road Is the facility located near to a public road to allow immediate access to the plant/facility? If not, state where its access route is. Are the ingress and egress routes to and from the plant suitable for desludging tankers? Are the entrance and exit gate nearby the public road Road access should be provided adjacent to the equipment or crane extended to the nearest road. If fixed crane beam extends over the road, the minimum vertical clearance shall be 5.5m. Adequate signage provided Head clearance for tanker trucks entering the gate provided and what is the clearance height.\

CHECKLIST Sufficient turning radius on the roads to enable access and maneuverability for tankers and heavy vehicles. Location of sludge desludging area is suitable for tankers to access and empty the sludge into the chamber. 1.3 Handrails/Guardrails and Access Ladders Have safety handrails or grating been installed at walkways and around open holes at the plant? Toe plates and kick plates shall be fitted along the outer edges of all walkways or ladders and shall be part of the structure and not the floor panels. Toe plates shall extends 100mm above the top level of the floor panels. Floor panels shall be sized so that each panel does not weight more than 50 kg. Handrailing provided at all places where there is potential of falling around al tanks and other places where falling height is greater than 1.5m. Is staircases provided where height is greater than 300 mm. Fixed ladder to access working areas for purposes of servicing, maintenance or normal operation works. 1.4 Precaution Against Damp All wall mounted equipment is fitted with spacers to provide minimum gap of 5 mm. All holes in equipment is sealed against the ingress of water Any items exposed to weather or water shall be free of water traps and drain holes shall be provided where necessary. Electrical equipment which is not sealed against free movement of air shall be protected from condensation with anti-condensation heaters and thermostatically controlled. 1.5 Substation / Electricity Meter/ Lamp Post Location of electricity meter or the substation

Is adequate street lighting provided around the plant and what is the number of lamp post provided

CHECKLIST Are all buildings and major process units at the treatment facility lighted adequately 1.6 Buffer Zone The following buffer zone requirements satisfied? 30 m minimum from fence to nearest habitable building property line within residential and commercial development 20 m minimum from the fence of treatment plant to the nearest property line within industrial development 10 m minimum from the fence of the treatment plant to the nearest habitable building property line if the proposed treatment plant is fully enclosed. 1.7 Effluent Discharge Point Where is the location of effluent discharge point for the facility and is it clearly indicated on the layout drawings with relation to existing receiving water bodies. 1.8 Water Supply If tankers and desludging activities take place, is there provision for stand pipes for cleaning purposes. Where is the location of the stand pipe and location for toilets for operators to change and clean themselves after work. 2.0 Screen Chamber (Fine And Coarse Screens) 2.1 Bar Screens Dewatering or perforated plate or trough, provided for ease of maintenance of the screens 2.2 Mechanically Raked Screens Automatic conveyor to transfer screenings to skips. Screen motor located above the high water level and access provided for maintenance. Provision of explosion proof floodlights.

Provision of emergency stop button at a convenient and visible location

CHECKLIST A working platform for ease of operations and maintenance. Provision of hand rail or guard (Refer to item 1.3) Location of screening bins must be near the screen area. Bins provided should have adequate capacity and must be equipped with leachate collection tray and covers to prevent odour release. Bins should be provided with rollers. 2.3 General Provision of staircase access with sufficient width (Refer to item 1.3) All screen chamber sumps to be fully open at the top for good ventilation Inlet penstock provided to isolate the inlet works for maintenance purposes. All drive units shall be weatherproof 3.0 Pump Sump Emergency overflow pipe to by-pass the influent sewage during power failure (away from residents) and location of overflow pipe discharge. Provision of crane for maintenance purposes Sufficient access to the pump station either from the top surface or via entry from the screen chamber Is dry well provided with force ventilation and air outlet shall be located adjacent to pump motors to assist cooling Lighting systems shall be interconnected with ventilation Provision of handrails and MS grating (Refer to item 1.3) If the valve chamber is located in the sump, the opening of the valve chamber shall be enclosed with MS grating

Provision of working space or platform for ease of operation in both wet well and valve chamber

CHECKLIST Dry well adequately lit and it should be weather proof, vapour proof and explosion proof. Miscellaneous Issue 4.0 Grit Chamber Provision of working platform along the grit channel. Provision of handrails or guardrail at exposed sumps or elevated working areas (Refer to item 1.3). Provision of grit storage bin or skip with rollers, perforated tray and covers Easy access to the grit removal facility by dump trucks and sufficient maneuver space (Refer item 1.2). To provide a chute to remove the grit into the skips. To provide sufficiently big grit chamber for ease of maintenance. To provide a drain pipe to drain water into the pump sump to avoid ponding. Provide steps into the chamber (pump). Misc Issues 5.0 Grease Chamber

Provision of working platform along the grease chamber Provision of hopper to collect scum and grease Provision of handrails or guardrail at exposed sumps or elevated working areas. (Refer to item 1.3) Provision of grease storage tank with rollers and with drain pipes and valves at the bottom of the tank for removal of settled solids Easy access to the grease removal facility by dump trucks and sufficient maneuver space. (Refer to item 1.2) Staircases must not be beneath the walkway (staircase need to be away from walkway) Miscellaneous Issue

CHECKLIST 6.0 Blower Room/Control Panel Or Room Provision of acoustic enclosures for blowers including acoustic door Provision of exhaust fan with silencer to circulate air around the blower room. Toilet facilities to be isolated from the blower room due to heat and noise hazards. Provision of lifting davit for maintenance of the blowers. Provision of rotating strobe light at the control room to indicate malfunction of blower or other equipment. Provision of adequate space for blower removal or installation during maintenance. Water storage tank to be located in such a way that water will not splash on the control panels. Control panels in the Blower/Control Panel room is to be isolated from the blower room Allow at least 900 mm access space even when cabinet doors and the like are open. Miscellaneous Issue 7.0 Balancing Tanks Sufficient walking or working space along the tanks Provision of handrails or guards if the tanks are elevated. (Refer to item 1.1 on handrail and guard rail) Miscellaneous Issue 8.0 Primary / Secondary Clarifier 9.0 Biological Treatment System

CHECKLIST 10.0 Sludge Thickener Provision of adequate walking or working space Provision of potable/clean water for regular cleaning of the overflow weir Provision of force main type of pipe from the thickener to the sludge holding tank Desludging pipe provided to be situated above ground All sludge holding tanks to be on sloped flooring 11.0 Sludge Holding Tank Adequate access for desludging tanker. (Refer to item 1.2 on access road) Provision of desludging pipe (if the sludge holding tank is elevated) appropriately positioned. Sufficient walking or working space along the sludge holding tank. (Refer to item 1.3). Provision of handrails or guards if the sludge holding tank is elevated. (Refer to item 1.1 on handrail and guard rail) Provision of desludging pipe either by force main or gravity flow All sludge holding tanks to have isolating facilities. Each sludge holding tank to have separate feeding pipes with individual isolating valves. The top level of holding tanks to be approximately 6 inches above ground should the tank be below ground level. Overflow pipe from sludge holding tank to the aeration tank to be of sufficient diameter to prevent possibility of the pipe choking. Miscellaneous Issues