River Valley Neighbourhoods Flood Risk Study. Cloverdale Public Consultation - May 13, 2015

Similar documents
City of Edmonton Drainage Services Summary Notes of Cloverdale Flood Mitigation Meeting Held May 13, 2015 at Cloverdale Hall

City of Edmonton Drainage Services Summary Notes of Riverdale Flood Mitigation Meeting Held May 14, 2015 at Riverdale School

Drainage Services Flood Prevention Program. Lynnwood/Elmwood Community Consultation

July 2012 Flooding Update. Southwest Edmonton Communities Consultation October 11, 2012

July 2012 Flooding Update. North Millbourne Community Community Consultation September 24, 2012

Update on the July 2012 Flooding. Millbourne Community Consultation May 14, 2013

Rainfall Comparison Summary

City of Toronto s Climate Change Adaptation Strategy to Address Urban Flooding

RECOMMENDATION PREVIOUS REPORTS PERTINENT TO THIS MATTER STRATEGIC PLAN

The City of Lake Forest Stormwater Management Policy Approved by City Council on March 7, 2016

Finding the Balance Defining the Responsibilities of Utility, Insurance, Disaster Recovery Agencies and Property Owners to Address Flooding Challenges

CRYSTAL LAKE FLOODING STUDY EXECUTIVE SUMMARY

City of Toronto s Climate Change Adaptation Strategy to Mitigate Urban Flooding

GENERAL MAINTENANCE AND REPAIR

Reducing Flood Risk in Toronto. David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto

Rainfall Event of September 29, Public Works & Environmental Services

Sewer System Flood Reduction Measures in the Rockcliffe Area

Basement Backups and Flooding. Is Anyone Really in Control?

APPENDIX A Summary of Potential Factors of Basement Water Infiltration

Respecting Our Rivers Alberta s Approach to Flood Mitigation

Flood-Resilient Community Design: Disaster Mitigation, Best Practices for Building New Residential Subdivisions

Agenda Item # Page # RECOMMENDATION

Flooding - Tidal and Rainfall. Presentation to City Council Informal Session May 24, John M. Keifer PE

OWEA Annual Conference Options for Solids and Floatables Control

North Sandwich Sanitary Sewer System Flow Monitoring & Stormwater Conveyance Analysis Studies

Drainage Servicing Report - Terms of Reference

DOWNTOWN SHALL NOT FLOOD AGAIN

CONSTRUCTION PLAN CHECKLIST

The City of Edmonton Combined Sewer Overflow (CSO) Control Strategy. Implementation Plan. Prepared for: Alberta Environment.

August 2017 Rain Event Frequently Asked Questions UPDATED 10/25/17

Hackensack River Flood Reduction Study Update

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS

DRAINAGE AND FLOODING INFORMATION BOOKLET

SEWER BACKUP. The facts about. A guide to protecting what matters most. For more information, talk to your broker or insurance adjuster.

PROPOSED FIVE STOREY MIXED USE BUILDING DEVELOPMENT SITE LOT 2 R PLAN M BANK STREET CITY OF OTTAWA STORM DRAINAGE REPORT

TABLE OF CONTENTS ADOPTING ORDINANCE. SECTION 1.0 ZONING: GENERAL PROVISIONS SHORT TITLE AUTHORITY PURPOSE...

2019 Annual Review of Sewer Rates and Environmental Updates Under the Sewer & Watercourse By-law

City of Elmhurst Comprehensive Flooding Plan Task Force Meeting

Metropolitan St. Louis Sewer District Statement of Policy for Maintenance of Stormwater Sewer Systems

NEWEA Climate Adaptation Strategies for Maine Coastal Communities WWTFs

Storm Water and Sanitary Sewer

Wilmette - Background

Business Plan: Wastewater Removal and Stormwater Management

Agenda Standing Policy Committee on Infrastructure Renewal and Public Works February 1, 2011 REPORTS

Chad A. Gamble, COO, P.E. City of Lansing. Virg Bernero, Mayor. David S. Christian, P.E. DC Engineering. Basement Backup. Protection Program

Lombard s Storm, Sanitary & Combined Sewers. Unseen Networks at Work

New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario

Beaumont Lot Grading Guidelines

U.S. Army Corps of Engineers Los Angeles District. US Army Corps of Engineers BUILDING STRONG

APPENDIX E APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS

APPENDIX E ESTIMATING RUNOFF FROM SMALL WATERSHEDS

APPENDIX F: DRAINAGE AND STORMWATER MANAGEMENT

Report. Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI

Municipal Priorities for the Federal Role in Local Adaptation. Dan Casselman Senior Policy Advisor

Welcome to the Public Information Centre for: Lisgar District Basement Water Infiltration Class Environmental Assessment Study for Pumping Stations

DESIGN STANDARDS 2016 Edition

That Report PW Caledon East Flood Mitigation Study be received, and;

Village of Arlington Heights. Sewer Back-up Rebate Program

Working Partnerships with Alberta Environment and Parks/Advice and Support to Industry

Urban Stormwater Management : Challenges and Opportunities. Darryl Dormuth, Ph.D. Water Resource Specialist Associated Engineering

Illicit Discharge Detection and Elimination

Bloomingdale Neighborhood Flooding Mitigation Washington, DC

City Wide Study of Flood Vulnerability, Prioritization and Mitigation. City of Burlington Infrastructure Committee. July 6, 2015

PUBLIC INFORMATION CENTRE Class Environmental Assessment For. Black Creek Flood Management

Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Sediment Management Practices (SMPs) Activity: Temporary Inlet Protection (TIP)

Downspout Disconnection Program FAQs

Water and Waste Department

Lessons [being] learnt 2016 Flood in Cedar Rapids. Sandy Pumphrey Project Engineer II Flood Mitigation

5 Asset Management Strategy

City Of Elyria Stormwater Utility Program Frequently Asked Questions

Detention Pond Design Considering Varying Design Storms. Receiving Water Effects of Water Pollutant Discharges

QUARTERLY STORMWATER UPDATE FLOOD CONTROL PROJECTS PHIL PULLEN, P.E. CITY ENGINEER DECEMBER 11, 2018

Damaged Lines in Morro Bay s Wastewater Collection System

OLD DUNDAS ROAD SEWAGE PUMPING STATION (HC005) EMERGENCY OVERFLOW SCHEDULE C MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT (EA)

Design Specifications & Requirements Manual

San Francisco State University Site 1 Vegetated Infiltration Basin Monitoring Report: Rainy Seasons and

Understanding and Improving Your Residential Drainage

Chapter 8: Water Supply & Sanitary Systems

FLOOD RESPONSE POLICY Adopted June 26, 2017

City of Thunder Bay Stormwater Financing Study

To: From: Date: Subject: Sherwood Lakes Drainage Alternatives Analysis 1

STORM WATER MANAGEMENT REPORT

Mill Creek/Peaks Branch/ State Thomas Drainage Relief Tunnel. Parkdale / Lawnview Avenue Neighborhood April 26, 2016

3.3 Acceptable Downstream Conditions

Maximizing Your Investment

Earth Dikes and Drainage Swales

Wastewater Discharge Reduction Plan June 2016

Chapter 8: Water Supply & Sanitary Systems

OVERHEAD SEWER REIMBURSEMENT PROGRAM

STORAGE BASIN AND PUMPING PLANT DESIGN (G 500)

STORM DRAINAGE DESIGN MANUAL

Town of New Castle, New Hampshire Sewer Infrastructure Evaluation

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas.

SANITARY SEWER BACKUP

SITE GRADING (LOT GRADING) - CITY OF TORONTO In Compliance with Sentence B of the Ontario Building Code, every site is to be graded so that w

Extreme Wet Weather in Brookfield. How to Keep Your Basement Dry During Heavy Rains and Floods

Community Resilience and Mitigation Assessment

E D M O N T O N. Edmonton Wastewater Source Control Program

Action plans for hotspot locations

Homeowner s Guide Foundation Water PenetrationTips TIPS TO IDENTIFY WATER PENETRATION PROBLEMS / CRACKING BASEMENTS

Transcription:

River Valley Neighbourhoods Flood Risk Study Cloverdale Public Consultation - May 13, 2015

Today s Meeting 1. Provide results of the studies done regarding drainage issues in your neighbourhood. 2. Discuss proposed flood mitigation improvements. 3. Share Drainage Services process for moving improvements forward. 4. Outline next steps. 5. Answer questions/get your input and feedback.

After Today s Meeting 1. Summarize and share meeting input. 2. Consider community input in work ahead. 3. Report on progress and keep you informed. Please hold questions until after presentation.

Study Objectives 1. Comprehensive review and understanding of the existing drainage and sewer systems. Cloverdale Riverdale Rossdale 2. Develop flood mitigation concepts to improve the level of flood protection in the neighbourhoods.

What is a 100 Year Event? A 100 year event has a 1% chance of being exceeded in any given year. Return Period % Chance of Exceedance in any given year 100 year 1% (1/100) 50 year 2% 25 year 4% 10 year 10% 5 year 20% 2 year 50%

North Saskatchewan River Brazeau Dam (1960) City of Edmonton River flows recorded since 1911(104 years) Bighorn Dam (1971) The dams have negligible impact on extreme peak flows events.

North Saskatchewan River Water Levels 625 13 Water Elevation at Low Level Bridge (m) 624 623 622 621 620 619 618 617 616 615 614 613 Today June 2013 June 2011 July 1986 June 1915 12 11 10 9 8 7 6 5 4 3 2 1 Water Depth (m) 612 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr 200-yr 0 Return Period

Floodplain Mapping 98 Avenue 96A Street 95 Street 92 Street Note: This map shows the area on the ground surface that will be flooded due to high River water levels. It does not show properties that may experience sewer backups or underground parking floods.

Existing Drainage and Sewer System 1926: Combined sewer system in Cloverdale, discharging directly into the River.

Existing Drainage and Sewer System 1950: Combined sewer system from Strathearn, Bonnie Doon and Forest Heights discharging to River.

Existing Drainage and Sewer System 1960: All combined sewer flows diverted to new pump station. Sewer overflow to River maintained.

Existing Drainage and Sewer System 1970s: Combined sewer system from Strathcona diverted to Cloverdale pump station.

Existing Drainage and Sewer System 1970s: Storm sewer system constructed at interchange and west Cloverdale area.

Existing Drainage and Sewer System Since 1980s: Minor sewer works. Pump Station upgrades. Today, there are 6 outfalls in the area.

Manual Backflow Gates Manual gate at two outfalls in Cloverdale (installed 1990). The gates are normally open. The gates are manually closed when the River is high to prevent River water from flowing into the combined sewer system. Rafter s Landing Manual Backflow Gates 92 Street

Manual Backflow Gates City has established protocol to close gates. Outfall No. 51 (near Rafter s Landing) 256 (north of 92 Street) Gate Closure Elevation (Water Elevation at Low Level Bridge) Existing Protocol 616.30 m (1:4yr River Water Level) 616.30 m (1:4yr River Water Level) The gates were closed in June 2011 and 2013. The gates are normally closed for up to 5 days.

Manual Backflow Gates Normal River Water Level No Rainfall Manual Gate (Open) Catchbasin

Manual Backflow Gates Normal River Water Level Intense Rainfall Manual Gate (Open) Catchbasin

Manual Backflow Gates High River Water Level No Rainfall Manual Gate (Closed) Catchbasin

Manual Backflow Gates High River Water Level Intense Rainfall Manual Gate (Closed) Rare that both events coincide, but it did happen on June 20, 2011 and on June 25, 2013 Catchbasin

Main Drainage Issues Intense Rainfall 1- Too much storm runoff flowing into combined sewers (east of Cloverdale).....Risk of Sewer Backup (all) 2- Large flows from upstream neighbourhoods during rainfall events..risk of Sewer Backup (all) 3- Insufficient capacity in storm sewer system in West Cloverdale....Risk of Surface Floods (southwest)

Main Drainage Issues High River Water Level 1- River backflows into combined sewers via outfalls and interconnections... Risk of Sewer Backup (all) 2- No dedicated CSO Outfall or emergency storage at Pump Station.....Risk of Sewer Backup (all) 3- High River Water Levels flooding floodplain (>1:50 year)... Risk of Surface Floods (floodplain)

Main Drainage Issues Top 5 Concerns According to Residents 1- Sewer backups in entire neighbourhood 2- Large ponding area on 95 Street 3- Drainage from alley flowing into underground parkade 5- Backflow gate closure 4- Lots of runoff from Gallagher Park and Ski Hill flooding 95St/97Ave intersection

Improvement Concepts Main Objectives Increase the level of flood protection, and reduce flood risks throughout Cloverdale due to: Intense Rainfall High River Water Level Both at the same time Provide up to 100 year level of flood protection

Improvement Concepts Intense Rainfalls 1. Provide additional sewer separation (catchbasin reconnections, new storm sewers) 2. Control combined sewer flows from upstream neighbourhoods to the Pump Station. 3. Provide storm sewer improvements in West Cloverdale (new sewers, dry pond in Gallagher Park)

Improvement Concepts High River Water Level Sewer Backups 1. Prevent River water from entering the sewer system via the outfalls and the several interconnections (e.g. flap gates at outfalls/interconnections, remove interconnections, remove manual backflow gates) 2. Provide emergency storage and dedicated sewer overflow at the Cloverdale Pump Station.

Improvement Concepts High River Water Level Sewer Backups Manual Backflow Gate Conducted a thorough review of gate closure elevations. Outfall No. 51 (near Rafter s Landing) 256 (north of 92 Street) Gate Closure Elevation Existing Protocol 616.30 m (1:4yr) 616.30 m (1:4yr) Proposed Protocol 616.42 m (1:4yr) 618.24 m (1:12yr) Safety of City staff as gate is located near River Higher water level may cause sewer backups The City is in the process of updating the Protocol according to these recommendations.

Improvement Concepts High River Water Level Surface Floods Current Strategy: Flood proofing of homes by homeowner. City installs sand bags at most vulnerable properties. Alternative Solutions: Permanent Flood Barrier (i.e. berm, wall) along River. Temporary Flood Barrier installed days before floods and removed after flood. Flood barrier: Up to 2.2m high, 850m in length.

Improvement Concepts High River Water Level Surface Floods Alberta Government conducting Flood Study on North Saskatchewan River watershed. Expected completion in 2015. Work with the Alberta Government to identify next steps and develop a flood mitigation plan.

Improvement Concepts Enhanced Communications Provide early warning system for the residents when: High River water levels that may cause flooding is forecasted. Backflow gates may be closed, increasing sewer backup flood risks especially when it rains. Implement Communication Plan: Email List Community League Street Signage Social Media

Until improvements are in place, what can residents do to prevent flooding? Physical Improvements: 1. Install backflow valve on the sanitary service line to reduce the risk of sewer backups in basement. a) Drainage Services has a Backflow Valve Subsidy Program. 2. Ensure roof leaders discharge to ground surface. 3. Ensure lot grading is sloped away from your home. 4. Install weeping tiles, connected to a sump and sump pump. 5. Ensure sump pump discharges on ground or into storm sewer. City of Edmonton s Flood Prevention Home Check-Up * Free Inspection and Recommendations by Drainage Specialist *

Until improvements are in place, what can residents do to prevent flooding? Prior to High River Water Level / Intense Rainfall: 1. Move valuables to high ground (not basement). 2. Ensure street catchbasins are free of debris. 3. Ensure eavestroughs are clean. 4. Park vehicles at safe location: a) Not in depressions on the streets. b) Not in underground garage. c) Not in floodplain. 5. Minimize water usage.

Next Steps Planning (Study, Analysis, Concept Projects, Community Input, and Validation) Now On-going Operation and Maintenance Budgeting (Business Case, Assess Funding opportunity and Reviews) Next Step Pre-design, Design, Construction TBD

Next Steps 1. Implement immediate improvements: a. Update backflow gate operation protocols. b. Monitor water level at manholes where gates are located. c. Improve communication during a potential flooding threat from high river levels. 2. Take input, validate and prioritize recommended improvements. 3. Look at how high priority projects can be advanced as quickly as possible.

Next Steps 4. Coordinate planning and work with: a. Drainage Services programs including Neighbourhood Renewal Program, Opportunistic Sewer Separation, Flood Mitigation Program and Sewer Upgrading Strategy b. Other City departments like Transportation c. Other organizations like Community League, Edmonton Ski Club. 5. Follow up with provincial North Saskatchewan River Basin Study. 6. Support homeowners via Flood Prevention Home Check-up and subsidies.

Questions Comments