Guidelines. Checklist for Building Approval. 1. The Site

Architectural Review Checklist

MAGALIESBERG COUNTRY ESTATE M.C.E. DEVELOPMENT AND RESIDENTIAL DESIGN GUIDELINES

Architectural Design Manual

HEIDELBERG KLOOF NATURE ESTATE DEVELOPMENT & DESIGN GUIDELINES

ARCHITECTURAL GUIDELINES

DRAWING SCRUTINY. Type I : October of 8

5. ARCHITECTURAL GUIDELINES 5.1. INTRODUCTION

RedStone Private Country Estate Architectural guidelines

ANNEXURE 3. CASSIA GLADES Stage 2A DEVELOPMENT CONDITIONS AND BUILDING GUIDELINES LOT

ARCHITECTURAL DESIGN MANUAL

Bella Rosa Design Guidelines

INTRODUCTION CONTENTS. 1. Approval Procedure P2. 2. Design Guideline Checklist. 1.1 Gaining Approval P Dwelling Design and Building Application

ARCHITECTURAL DESIGN GUIDELINES KELDERHOF COUNTRY VILLAGE

Ruyteplaats Estate Design Manual (Revision 04 January 2008) Page 1 of 7 RUYTEPLAATS PRIVATE MOUNTAIN ESTATE

APPLICATION FOR APPROVAL OF BUILDING PLANS

GUIDELINES FOR WELGELEGEN RESIDENTIAL DEVELOPMENT

Architectural Guidelines

ARCHITECTURAL DESIGN GUIDELINES CONTENTS

ARCHITECTURAL DESIGN GUIDELINES CONTENTS

Stage 6 & 7 Design Guidelines

The Strand design and siting guidelines

Design and siting guidelines

Design Essentials. Call stockland.com.au/cloverton

ARCHITECTURAL GUIDELINES REGARDING AUVERGNE ESTATE of VERMONT

DE WIJNLANDEN HOME OWNERS ASSOCIATION DESIGN MANUAL. (Revised 2 March 2017)

Iluka Views Design Guidelines

Benefited Land means all the lots created when the Land is subdivided in accordance with the Deposited Plan;

Architectural Design Guidelines. Zandwyk Industrial Park

D E S I G N G U I D E L I N E S

BALUGHA RIVER ESTATE

SECTION 1 INTRODUCTION DESIGN GUIDELINES

DESIGN GUIDELINES STAGE 5

DESIGN GUIDELINES STAGE 6 +

Permitted Development for Householders: Guidance from Communities and Local Government. March 2010 Department for Communities and Local Government

Architectural Design Guidelines

siting, building and design guidelines April 2017 Newgate, Tarneit Design Guidelines

WELCOME TO THE NEWHAVEN DESIGN ESSENTIALS

Stage 6. Annexure 3. October 2015 Development Conditions and Building Guidelines

ARCHITECTURAL GUIDELINES VILLAGE ERVEN JUNE Silwerstrand Homeowners Association - Architectural Guidelines - Village Erven


DESIGN GUIDELINES INTRODUCTION TABLE OF CONTENTS

Table of Contents 1.0 Introduction Identification of Estate Covenant Use of Land Building Construction Program

Design Guidelines. 1. INTRODUCTION 2. SECTION SPECIFICATIONS 3. HOUSE DESIGN RULES

BALMORAL Glastonbury, CT

ARCHITECTURAL GUIDELINES Version

BUILDING DESIGN MANUAL

Stage 10 Design & Building Guidelines

REQUEST FOR ALTERATION REVIEW COPPERLEAF PROPERTY OWNERS ASSOCIATION, INC.

BWA ENVIRONMENTAL CONTROL BOARD (ECB) APPLICATION

Salita Estate - Masterplan. Retaining wall. Stage 4. Stage 1. 2m Estate boundary wall Feature fencing by developer BAL Rating (Refer to detail)

Overview and Project Objectives. Design Assessment and Approval. Contents. Design Guidelines

Dullstroom Ridge Architectural Guidelines

CABONNE COUNCIL DEVELOPMENT CONTROL PLAN NO. 15 RELOCATABLE AND TRANSPORTABLE HOMES

WHALE ROCK HEIGHTS HOMEOWNERS ASSOCIATION ARCHITECTURAL GUIDELINES AND RULES

WHALE ROCK HEIGHTS HOMEOWNERS ASSOCIATION ARCHITECTURAL GUIDELINES AND RULES

Architectural and Landscape Guidelines

Sovereign Pocket Design Essentials

Building Guidelines. No development is to be commenced on any lot without the plans having been approved in writing as set out above.

HENSON FARMS HOMEOWNERS ASSOCIATION BUILDER PACK

(as ratified at the 2016 AGM)

HOUSING DESIGN GUIDELINES DETACHED HOUSING

Wildwood Home Owners Association Architectural Review Board Guidelines

Design Guidelines. Standard Lots (450m 2 <2,000m 2 )

Overlay Design Guidelines. Prairie Village Overlay Design Guidelines

PROPERTY INFORMATION

BUILDING COVENANTS. Section A Design Section B Procedure

SCHEDULE OF FINISHES FOR THE AGREEMENT BETWEEN ZOTOS BROTHERS (PTY) LTD AND

Mirvac s approval process

RESIDENTIAL BUILDING PLAN APPROVAL PROCEDURE

These guidelines apply to Stage 1 at Calderwood Valley (approximately the first 200 lots) only. Future land releases may have different Calderwood

LakeRidge Subdivision Design / Architectural Standards

ARCHITECTURAL GUIDELINES

MARAMA NEIGHBOURHOOD

Design Guidelines - Amendments & Updates Stages 1, 2 & 3

DESIGN GUIDELINES FOR STONEHAVEN ESTATE

Marbella Isles Homeowners Association, Inc.

Architectural Design Standards - Character

Residential Building Design Approval Procedure

REQUEST FOR ARCHITECTURAL REVIEW RIVERSTONE at NAPLES HOMEOWNERS ASSOCIATION

HOUSING DESIGN GUIDELINES DETACHED HOUSING

Applies to lots: 6, 7, 10, 17, 18, 25, 26 Applies to lots: 1, 2, 3, 4, 8, 9, 12, 13, 14, 15, 16, 20, 21, 22, 23, 27, 28, 29, 30, 31

CAPE HAZE WINDWARD PROPERTY OWNERS ASSOCIATION, INC. Design Review Manual Guidelines for New Construction November 2016

Building Guide. Introduction. Construction Design Requirements. Revised 31-Jan-2018 Adopted 01-Mar-2018

The architecture is open to individual creative input, subject to approval by the aesthetic committee with the guidelines being:

Design Guidelines - Amendments & Updates Stages 4-6

Design your family s future. Our vision for Akuna Vista Schofields

design guidelines Golden Grove Golden Grove

Freeling. reeling is located just 60km north f Adelaide it s an easy hour s drive o one of the most charming country owns in the state.

ARCHITECTURAL DESIGN RULES Rev 16

SINGLE RESIDENTIAL DESIGN GUIDELINES

GUIDE TO THE COMPLYING DEVELOPMENT CHECKLIST

DESIGN GUIDELINES FOR STONEHAVEN ESTATE VERSION 2 (APRIL 2011)

Transcription:

TABLE OF CONTENTS 1 GENERAL 2 EXTERNAL DESIGN CRITERIA 3 AESTHETICS COMMITTEE APPROVAL PROCESS 4 ADDENDUM A: PLAN SUBMISSION CHECKLIST 5 ADDENDUM B: CLIENTS ACCEPTANCE FORM 2 Page

1. GENERAL 1.1 QTS Architects has been appointed as the controlling architect. The Lombardy Estate Homeowners Association Constitution makes it incumbent upon all owners to obtain the controlling architect s approval before commencement of construction and thereafter, before any significant changes are made to the external appearance of buildings, landscaping and external features. 1.2 The controlling architect shall at all times balance the project and individual owner s requirements with that of the estate and environment and reserves the right to withhold approval if the requirements of the guidelines are in their opinion not met. 1.3 The HOA in collaboration with the controlling architect further reserve the right to make additions and alterations to these guidelines, which in their opinion, is necessary to create and guide the continual growth of the architectural style and character that is envisaged for the entire estate and the updated guidelines are binding to all homeowners and contractors. 1.4 Clients are obliged to appoint Professional and SACAP registered Architects. 1.5 Construction supervision by the client s appointed architect is compulsory. 1.6 Plans are to be submitted to QTS Architects for HOA approval by the client s architect. 1.7 The client s plans will also require approval by the local authorities prior to any building activities. The restrictions set out in these guidelines are in addition to any restrictions imposed in terms of conditions of title, the town planning scheme and the National Building Regulations. Approval of the HOA Aesthetics committee does not imply or constitute any authority or structural approval. 1.8 Refer to section 3 aesthetics committee approval process for further detail on the submission process requirements. 3 Page

1.9 IMPORTANT NOTES RELEVANT DURING CONSTRUCTION: 1.9.1 Any deviations from the approved building plans will result in a fine of R30 000.00 payable by the contractor to the HOA. In addition to the fine, it is compulsory to repair defective work and to re-instate the construction work in line with the approved building plans. 1.9.2 Note very importantly that the onus rests with the client to notify the HOA that the inspection milestones have been reached. 1.9.3 Clients are not permitted to occupy houses until a council, client s architect s and HOA completion certificate has been issued (3 certificates) 1.9.4 Building works must commence within 1 year of purchase date of property 1.9.5 Building work must be completed in 18 months from commencement of building work. 1.9.6 A building deposit of R15 000.00 is payable at the start of construction in line with HOA contractual requirements. Of this amount, R5 000.00 will be retained as an infrastructure maintenance levy and the remaining R10 000.00 will be returned to the owner upon successful HOA occupation being granted. This includes a final QTS and HOA inspection - all building rubble MUST be removed prior to refunding the building deposit. An email request must be sent to the HOA requesting the return of the building deposit and providing bank details of the account holder, this email must be sent to admin@lombardyestate.co.za. 4 Page

2. EXTERNAL DESIGN CRITERIA 2.1 DENSITY AND COVERAGE: 2.1.1 The maximum building coverage is 50% (including covered patios and outbuildings, but excluding open patios, pools, etc.) 2.1.2 The floor area of an upper level (including any double volume) may not exceed 60%of the total floor area of the level directly below. 2.1.3 Only one residence per erf is allowed with the exception of staff accommodation or a granny flat (which is limited to 35m² for the estate). These shall not be housed in a separate building. 2.1.4 Houses are limited to a minimum size of 300m² 2.2 MAXIMUM BUILDING HEIGHT: 2.2.1 Single residential plots: Two storeys 2.3 BUILDING LINES: Building lines apply to all residential sites irrespective of erf size to the following parameters: 2.3.1 Street Boundary: 5000mm 5 Page

2.3.2 Peripheral Park Boundary (erven 403, 404,, 407, 413, 418, 420): 2000mm 2.3.3 Internal Park Boundary (erven 405, 406, 415, 416, 419, 421, 422): 3750mm 2.3.4 Side Boundaries: 2000mm for a single storey, 3750mm for those portions of the house that exceeds 4500mm in height but not exceeding 7500mm in height. Where the height exceeds 7500mm, side building lines are 4500mm for that portion. 2.3.5 Side building lines may be relaxed in regard to the positioning of garages and other portions of the house to the discretion of the committee. Standard council approval submission will apply. 2.3.6 According to Clause 12 of the 25 April 2013 City of Tshwane Town Planning Scheme Ordinance, all Southern boundary building lines are restricted to 3000mm for single storey and 4000mm for double storey. Therefore the restriction on any side or rear boundary that aligns predominantly with a South aspect, will be dictated by the City of Tshwane Town Planning Scheme. Lombardy Estate will still allow and approve the smaller Lombardy Restriction for HOA plan approval but the implication for the purposes of council plan approval will be that a building line relaxation will have to be applied for. This responsibility and cost will be borne by the owner. 2.4 ARCHITECTURAL STYLE 2.4.1 The architecture is based on the timeless and sophisticated prairie style, reflecting strong horizontal lines, low pitched tiled hip roofs with large overhangs. 2.4.2 This is contrasted and complimented by chimneys and other vertical accents and the use of rendered (plastered) brick walls in combination with natural stone and other minimalist contemporary elements. 6 Page

2.4.3 This horizontality of design must be emphasised through the architectural massing. The larger ground floor footprint area must be allocated in a manner that enhances the horizontality of the entire building. 2.4.4 The privacy of neighbours must be taken into consideration at all times. 2.4.5 ROOFS: 2.4.5.1 Roof pitch to be 17.5 degrees. 2.4.5.2 Overhangs to be 1200mm in all instances and directions (even when overhanging a flat concrete roof). 7 Page

2.4.5.3 All pitched roofs to be hip roofs with boxed in overhangs. 2.4.5.4 Pitched roofs with gable ends are allowed as special consideration. 2.4.5.5 Large roofs must be broken down into smaller geometric components to provide a more fragmented mass. 2.4.5.6 The excessive use of valleys and hips is not desirable and must be avoided. 2.4.5.7 Care must be taken with the roof truss design and contractors must be made aware of the complex nature of the roof overhang geometry. 2.4.5.8 Recommended roof tiles are flat un-profiled cement shingles, to approved colour. Marley Modern or Lafarge Elite are good examples. 2.4.5.9 Only concealed gutters gutters & downpipes are allowed 2.4.5.10 Flat concrete roofs may be used in combination with tiled roofs. 2.4.5.11 The area of flat roofs may not to exceed that of tiled roofs. 2.4.5.12 Visible waterproofing to be covered with pebbles or landscaped features. 8 Page

2.4.5.13 When used underneath pitched roof overhangs, there must be a clear gap (and practically serviceable) between the top of concrete roof / parapet and underside of roof overhang ceiling. 2.4.5.14 Vertically cut roof eaves are not allowed 2.4.5.15 Roof space may be utilised as lofts. 2.4.6 WALLS 2.4.6.1 External wall finishes: 2.4.6.2 painted plaster and paint 2.4.6.3 with some natural stone accent elements. 2.4.6.4 Paint colours to be earthy tones and must be submitted for approval 2.4.7 WINDOWS & DOORS 2.4.7.1 Windows and sliding doors may be either aluminium or timber. No cottage pane windows allowed. 2.4.7.2 Garage doors to be horizontally slatted timber or aluminium. 2.4.8 SPECIAL FEATURES & COMPONENTS 2.4.8.1 All dwellings to have style specific chimneys. Chimneys to be stone or plastered brick, prominent and rectangular in shape 9 Page

2.4.8.2 Covered patios with a built in braai are encouraged as well as timber pergolas and decks. The latter particularly on waterfront dwellings. 2.4.8.3 Horizontality may also be enhanced through the use of brick planters, or similar devices. Artificially applied horizontal banding used as the only mechanism to achieve horizontality is not what is implied. 2.4.8.4 The use of horizontally accented and clerestory windows are encouraged. 2.4.8.5 Plan forms must be rectangular or composed of rectangular or square forms. 2.4.8.6 Modern building elements may be incorporated in the design, i.e. large glass panels, simple bold walls. 2.4.8.7 Circular or freeform elements are not allowed. 2.4.8.8 Balconies to upper levels are encouraged. Usable portions of balconies must however be located within the second storey building line restriction. The portions of balconies that might then fall outside of the building line must be adequately screened from neighbouring properties 2.4.8.9 All garages and outbuildings shall be constructed to form an integral part of the main house and finished to match same. 2.4.8.10 External fixtures such as light fittings must be of a contemporary design that compliments the style. 2.4.8.11 Any special feature, be it a finish or specific architectural feature central to the proposed design, must be explained by way of a construction detail and submitted for approval 10 Page

2.4.9 SERVICES & UTILITIES 2.4.9.1 Service related items such as wash lines, air conditioning units, satellite dishes and heat pumps must be sited out of view of roadways, parks and neighbours. CARE SHOULD BE TAKEN THAT SCREEN WALLS ARE TALLER THAN THE SERVICE OBJECT REGARDLESS OF DISTANCE PLACEMENT FROM EDGE OF BUILDING. 2.4.9.2 Laundry drying areas, refuse bins and water storage tanks must be fully screened with a 2.0 meter high screen wall. 2.4.9.3 All soil pipes, waste pipes and rainwater down pipes to be enclosed in ducts or concealed 2.4.9.4 Solar heating panels may be installed: 2.4.9.4.1 on flat roofs that are lower than the geyser positions and must then be out of view of roadways, parks and neighbours. 2.4.9.4.2 If solar panels cannot be incorporated and properly hidden on flat roofs the architectural committee will consider carefully designed roofs with solar panels mounted flat on the roof slope with the tiles. 2.4.9.4.3 The hipped roofs containing solar panels are to be designed in such a way that visible solar panel surface area fits harmoniously. 2.4.9.4.4 Geyzers must be separate from solar panels 11 Page

2.4.9.4.5 Heat pump based water heating systems may be considered as an alternative to solar heated water systems, in which case, neither geyser nor condenser may be visible. 2.4.9.5 The means of rainwater disposal on balconies and flat concrete roofs, together with rain water disposal spouts to be detailed and submitted for approval. 2.4.10 VEHICULAR ACCESS Vehicular access will be permitted in the following configurations: 2.4.10.1 For 2 car garages, one access point only and not exceeding 5 meters in width. 2.4.10.2 For 3 car garages, one or two access points, to a maximum combined width of 8 meters. 2.4.10.3 For 4 car garages, two access points, each not exceeding 5 meters in width, but with a minimum of 2 meter landscaped buffer zone between them. 2.4.11 LANDSCAPING 2.4.11.1 No existing trees may be removed without the consent of the Lombardy Estate HOA. 2.4.11.2 Landscaping to follow the guidelines proposed for the total development. A list of approved plants and hard landscaping materials will be provided by the HOA on request. 2.4.11.3 Swimming pools will be allowed. Plans for swimming pools and decks to be submitted and approved. Decks pools and ancillary equipment may not extend over any property boundaries. 2.4.11.4 It remains the responsibility of the owner, to at all times, during construction and prior to actual occupation of the house, to safeguard the pool against public access in accordance with the rules and regulations of the SANS 10400 2.4.11.5 Brickwork planters are encouraged. 2.4.11.6 A 1,2 meter high brickwork wall finished with a coping, trellis and plants is suggested as dividing wall between properties. A 2 meter high brick wall may be erected as boundary wall provided that the 12 Page

length of the wall does not extend within 5 meters of street and park boundaries. Such high walls have to be a cohesive part of the main building design. 2.4.11.7 Walls on street and open space boundaries will be restricted to low 1,2 meters high stone or brick walls. Raised planters are allowed. 2.4.11.8 No pre-fabricated walling system will be allowed. 3 AESTHETICS COMMITTEE APPROVAL PROCESS: 3.1 Plan Approval Fee: R 7 410,00 (incl. VAT), payable directly to QTS Architects. QTS banking details: account holder: Quadtrisir Architects bank: STANDARD BANK (SOUTH AFRICA) account number: 011 804 181 branch BROOKLYN, 011-245 (BRANCH CODE) 3.2 This fee consists of the following (inc. VAT): Stage 1 submission: R 1 710.00 Stage 2 submission: R 3 420.00 Site inspections: R 2 280.00 R7 410.00 3.3 The review process will not commence without proof of payment upon which QTS will issue a VAT invoice to the client if required. 3.4 APPROVAL PROCEDURE: 3.4.1 SUBMISSION STAGE 1 A meeting (strictly by appointment) with QTS Architects to illustrate design concept and general planning principles in sufficient detail to discuss design style and treatment of the external design criteria. Services allocations must be evident. NO CLIENTS ARE ALLOWED AT THESE MEETINGS 3.4.2 SUBMISSION STAGE 2 Submission of one hard copy set of drawings that should be of a standard sufficient for council approval and illustrating compliance with all the guidelines as set out in this document. REFER TO THE DRAWING SUBMISSION REQUIREMENTS (7.6) BELOW. 13 Page

Once approved, additional sets may be submitted for stamping. The HOA requires two sets for record, in addition to council requirements. 3.4.3 CONSTRUCTION INSPECTIONS The site inspections will be conducted during the construction phase: The first 2 inspections must coincide with 2 milestones: surface bed level and roof installation. The third inspection takes place at completion. The aim of the inspections is to assist the HOA with their duties of ensuring that clients comply with all requirements. Inspections will be of a visual nature and QTS will issue an inspection report to the Lombardy HOA after each inspection. It remains the duty of the client s architect to ensure guideline compliance and as such, any deviations by the contractor, from the approved HOA drawings must be resolved by the client s architect. 3.5 In the event that plan approval cannot be obtained by the third submission of plans, or if alterations are made to an approved design, an additional fee of R3 420,00 (incl. VAT) will be charged for such additional submission. 3.6 MINIMUM DRAWING SUBMISSION REQUIREMENTS Site plan (scale 1:200) Ground Floor plan (scale 1:100 or 1:50) First Floor Plan (scale 1:100 or 1:50) Roof plan (scale 1:100) Sections (scale 1:100) Elevations (scale 1:100) Colour scheme proposal Completed and signed copy of the Design Guidelines Checklist (addendum A) Completed and signed copy of the Client s Signature form (addendum B) 14 Page

3.7 Plans by specialist: Landscape planting layouts, either by a landscape architect or landscape contractor. Position of existing trees should be indicated. Existing trees that are removed to be indicated and impact on environment to be assessed. The irrigation layout, extent of lawn, plant beds, structural elements and paving to be indicated. 3.8 Plan resubmission: In the case that there have been changes made to the completed house that deviates from the approved drawings updated drawings will be required. Depending on the level of changes made one of the following two instructions will be included in the inspection reports: Updated drawings required for record: In this case minor changes have been made to the house that do not adversely affect the overall look and feel of the approved design. These items include but are not limited to: Minor changes to wall finishes and colours. Minor changes to windows and openings. Minor changes to dimensions and proportions. Any change that will require council approval. The most common of these changes are: o Addition of pools. o Omission or addition of windows. o Gas installations. o Any additional structures. o Changes to sewer drainage system. The approval committee will require 2 sets of updated drawings. The submission fee as for a stage 1 submission (point 3.2 in the guidelines) will be applicable. Note that if the changes are small enough the changes may be applied to the drawings by hand. These changes need to be neatly drawn, to scale, and include the relevant notes where applicable. If hand drawn submissions are not neatly drawn and legible they will be rejected. 15 Page

Updated drawings required for approval: in this case alterations have been made to the house that alter prominent design elements, the look of the house or include elements that would not have been approved during plan submission. These items include but are not limited to: Extensive changes to the materials, finishes and colours used. Changes to prominent building elements such as feature walls & floating concrete bands etc. Changes to roof shape. Changes to the distances between prominent building elements (such as roofs). Inclusion of design elements not approved in the guidelines. The drawings will need to be resubmitted for approval. The plan approval fee as for stage 1 & 2 submissions (point 3.2 in the guidelines) will be applicable. We will then, in consultation with the HOA, make recommendations on how the design can be brought in line with the guidelines. 16 Page

4 ADDENDUM A: PLAN SUBMISSION CHECKLIST No Description Comments 1 GENERAL 1.1 Site plan received (scale 1:100/1:200) 1.1.1 o Contours indicated 1.1.2 o Orientation of the development 1.1.3 o Parking areas 1.1.4 o Layout of existing trees 1.1.5 o Stormwater management 1.1.6 o Boundary dimensions, 1.1.7 o new work is contained in building envelope 1.1.8 o Neighbouring stand numbers 1.2 Ground floor plan received (scale 1:100 including m2) 1.3 First floor plan received (scale 1:100 including m2) 1.4 Section received (scale 1:100) 1.5 All elevations received (scale 1:100) 1.5.1 o NGL indicated 1.5.2 o All finishes, 1.5.3 o Boundary wall elevations 1.6 Roof plan received (scale 1:100) 2 TOWNPLANNING 2.1 Building coverage not to exceed 50% 2.2 Outbuildings & staff accommodation to form part of house 2.3 Maximum building height: two storeys 2.4 Building lines: street & park 5m, side 2m single storey 3,75m double storey 2.5 Ratio of first to ground floor area max 60 % 2.6 Total floor area of dwelling min 300m² 3 LANDSCAPING 3.1 Max 2m high brick boundary walls, 1,2m high within 5m street building line restriction area, low walls or planters on open space boundaries 3.2 Vehicular access according to regulation: 17 Page

4 ARCHITECTURE, STYLE & EXTERNAL DESIGN CRITERIA 4.1 Area of flat roofs not to exceed that of tiled roofs 4.2 Roofs: pitch 17 degrees, overhangs 1,2m, 4.3 Roof geometry simplistic 4.4 Flat unprofiled cement shingles 4.5 All pitched roofs to be hipped roofs & overhangs boxed in 4.6 Gutters: note for no gutters or details for hidden gutters & downpipes 4.7 External walls to be painted plaster with stone elements 4.8 Windows & doors aluminium /timber 4.9 Chimneys to be stone or plastered brick and strong design feature 4.10 Horizontal lines emphasized 4.11 Plan forms rectangular 4.12 Balconies on upper levels screened or within 3,75m building line 4.13 Privacy of neighbours taken into consideration 4.14 Soil and waste pipes enclosed in ducts 4.15 Services ie: a/c, wash line, satellite dish, solar heating panels, heat pumps etc. not visible 18 Page

5 ADDENDUM B: CLIENTS SIGNATURE FORM I/WE THE UNDERSIGNED, THE REGISTERED OWNER/S OF ERF NO ACCEPT HEREWITH ALL RULES AND REGULATIONS AS SET OUT IN THESE GUIDELINES. SIGNATURE DATE 19 Page