SECTION WASTE WATER DRAINAGE SYSTEM Excavating, Backfilling, and Compaction for Utilities Cast-in-Place Concrete.

Similar documents
***************************************************************************************************************

SECTION STORM DRAINAGE SYSTEM Excavating, Backfilling, and Compaction for Utilities Cast-in-place Concrete.

***************************************************************************************************************

SECTION SANITARY SEWER SYSTEM

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

TABLE OF CONTENTS

SECTION STORM DRAINAGE

Wastewater Capital Projects Management Standard Construction Specification

SECTION STORM SEWER COLLECTION SYSTEM

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

SECTION FACILITY SANITARY SEWERS

This type of masonry shall consist of brick laid in full beds of cement mortar.

SECTION FOUNDATION DRAINAGE

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

SECTION STORM DRAINAGE AND STORMWATER MANAGEMENT

SECTION GRAVITY WASTEWATER LINES

SECTION STORM DRAIN

SECTION SANITARY SEWERAGE PART 1 GENERAL 1.01 RELATED DOCUMENTS

SECTION STORM DRAINAGE UTILITIES. B. Section : Site Restoration and Rehabilitation

SECTION 10 - TRENCHING AND BACKFILLING

SECTION TRENCHING & BACKFILLING

A. Gravity-Flow, Nonpressure, Drainage-Piping Pressure Rating: 10-foot head of water (30 kpa).

Union County Vocational - Technical Schools Scotch Plains, New Jersey

SPECIAL SPECIFICATION 4425 Thermoplastic Pipe

SECTION EXCAVATION AND FILL

SECTION UNDERDRAINS. 1. Protection of the environment; Section Trench excavation, backfill, and compaction; Section

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

STANDARD SPECIFICATIONS SECTION 16 STORM SEWER SYSTEMS

50.20 Drainage Structure Design

SECTION LAYING AND JOINTING BURIED PIPELINES

1 Revised: 2019 Edition

Section Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers

San Antonio Water System Standard Specifications for Construction ITEM NO. 848 SANITARY SEWERS

DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA SPECIAL PROVISION. Section 550 Storm Drain Pipe, Pipe-Arch Culverts, and Side Drain Pipe

ITEM 460 REINFORCED CONCRETE PIPE Description. This Item shall govern for the furnishing of reinforced concrete pipe.

A. This Section includes subdrainage systems for foundations and underslab areas. A. Product Data: For each type of drainage panel indicated.

GWINNETT COUNTY STORM SEWER PIPE STANDARDS

A. This section includes the furnishing and installation of a foundation drainage system.

CHAPTER 6 - SANITARY SEWER

STANDARD SPECIFICATIONS JULY 2012 S-11 CULVERTS, HEADWALLS AND ROADSIDE DRAINAGE TABLE OF CONTENTS

Draft. Not Yet Approved SECTION 10.1 GENERAL SCOPE DEFINITIONS

***************************************************************************************************************

SPECIAL SPECIFICATION 4653 Polypropylene Pipe

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

SECTION POLYVINYL CHLORIDE (PVC) WATERLINE

SECTION SANITARY UTILITY SEWERAGE PIPING

SPECIAL SPECIFICATION 5925 Polyvinyl Cloride (PVC) Sewer Pipe and Fittings

1. B16.1 Cast Iron Pipe Flanges and Flanged Fittings, Class C 111 Rubber Gasket Joints for Ductile Iron Pressure Pipe and Fittings

SECTION STORM DRAIN REHABILITATION. 1. Protection of environment; Section O Trench excavation, backfill, and compaction; Section

1. C-478 Specification for Precast Reinforced Manhole Sections. 2. D-3034 Specification for Polyvinyl Chloride (PVC) Pipe.

SECTION 1 GENERAL NOTES

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

C. Foundation stabilization for pipe and utility structures.

Summary of the 2011 Changes

CHAPTER 200 STORM SEWER CONSTRUCTION STANDARDS

Hydraulic Updates. History of 603/604

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations.

SECTION HORIZONTAL DIRECTIONAL DRILLING

SECTION UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS

SECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing.

REGIONAL CONSTRUCTION STANDARDS

SUPPLEMENTARY SECTION: STANDARD SPECIFICATIONS PAGE 1 STORMWATER MAINS & CULVERTS MAY 2018

SPECIAL SPECIFICATION 3504 Septic Tank System

SECTION VI SANITARY SEWERS

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems

D. Removal of existing storm sewerage pipe and drainage structures.

SECTION A1 EXCAVATION AND BACKFILL GENERAL

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

1.01 GENERAL. l.02 PIPELINE TRENCH EXCAVATION PIPELINES AND STRUCTURES REVISION: SECTION 1 PAGE : 1-1

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

SECTION PIPE & PIPE FITTINGS PART 1 GENERAL

SECTION 300 STORM SEWER TABLE OF CONTENTS

Item 460 Corrugated Metal Pipe

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

SECTION SUBDRAINAGE

Section 401. PIPE CULVERTS

TECHNICAL SPECIFICATION

A. This Section includes gravity-flow, nonpressure storm drainage outside the building, with the following components:

STANDARD SPECIFICATIONS

SECTION PIPE INSTALLATION

207 TEMPORARY SEDIMENT AND EROSION CONTROLS

SECTION 39 - MANHOLES TABLE OF CONTENTS

A. This Section includes sanitary waste and vent piping inside the building and to locations indicated.

SECTION TRENCHING

REGIONAL CONSTRUCTION STANDARDS Proposed Revision Form

SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION POLYETHYLENE PRESSURE PIPE

Special Provision No. 421F01 April 2006

SUNY Genesee Community College JMZ Project No Implementation of Master Plan Projects - Phase 1 Site Improvements

Section 4 Service Lines

ITEM 432 TUNNEL CONSTRUCTION

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Specifications for SWC #110: Pipe, Pipe Liner, & Liner Installation

SECTION 303 CULVERTS

Special Provision for LRFD Pipe Culvert Burial Tables

VALLECITOS WATER DISTRICT SECTION POLYVINYL CHLORIDE (PVC) PRESSURE PIPE

SECTION SEWER PIPE

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

Transcription:

SECTION 02735 WASTE WATER DRAINAGE SYSTEM PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02221 - Excavating, Backfilling, and Compaction for Utilities. 2. 03300 - Cast-in-Place Concrete. 1.02 REFERENCES A. American Society for Testing and Materials (ASTM): 1. C131-96 Test Method for Resistance to Degradation of Small-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine. 2. D1557-91 Test Method for Laboratory Compaction Characteristics of Soil Using Modified Effort. 3. D2321 Practice for Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity-Flow Applications. 4. D2855-96 Practice for Making Solvent-Cemented Joints with Poly (Vinyl Chloride) (PVC) Pipe and Fittings. 5. D3034-96 Specification for Type PSM Poly (Vinyl Chloride) (PVC) Sewer Pipe and Fittings. 6. D3212-96a Specification for Joints for Drain and Sewer Plastic Pipes Using Flexible Elastomeric Seals. B. American Association of State Highway and Transportation Officials (AASHTO) Publications: 1. M-196-77 Corrugated Aluminum Alloy Culverts and Under Drains. 2. M-190-78 Bituminous Coated Corrugated Metal Culvert Pipe and Pipe Arches. C. Miami-Dade County Public Works Manual (M-DCPW), latest Edition. Project No. SPECIFICATION GUIDELINES 02735-1

D. Florida Department of Transportation (FDOT) Specification, latest Edition. 1.03 SUBMITTALS A. Submit properly identified shop drawings and manufacturer's catalog cuts, technical data, and certificates on the following before starting work: 1. Precast concrete structures or fiberglass or plastic structures. 2. Frames and covers. 3. Pipe. 4. Floor drains (vandal proof). 5. Plastic filter fabric. 6. Test reports. B. Include manufacturer's certificates of compliance or certified analysis according to applicable standards with each shipment of material. 1.04 PRODUCT STORAGE A. Keep materials, structures, equipment, and appurtenances stored on the site clean and free of foreign materials. 1. Replace damaged items at no cost to the Board. PART 2 PRODUCTS 2.01 MATERIALS AND EQUIPMENT A. Pipe: Helical Corrugated Aluminum Alloy Pipe: 1. Non-Perforated: Comply with AASHTO M-196. 2. Perforated: a. Comply with AASHTO M-196. b. Perforations: 1/4" to 3/8" diameter holes at + 2-3/4" o.c. with a minimum of 114 holes per linear foot. 3. Polyvinylchloride (PVC) Drainage Pipe and Fittings: a. Comply with ASTM D3034 for SDR35 except where indicated. Use bell and spigot type pipe. Project No. SPECIFICATION GUIDELINES 02735-2

B. Joints: b. Pipe Identification: Pipe shall be a different color from water pressure pipe and force main for in-ground identification as sewer pipe. 1. For Corrugated Pipe: Band couplers as indicated. 2. For PVC Drainage Pipe and Fittings: Elastomeric gasket joints complying with the requirements of ASTM D3212 providing a watertight seal or solvent-cemented joints complying with ASTM D2855 providing a watertight seal. C. Manhole: 24 inch diameter, helical corrugated aluminum alloy pipe or precast concrete with cast iron frame and cover as indicated. D. Concrete Slab: Provide as indicated, using 3000 psi concrete. E. French Drain Trench: 1. Ballast Rock: a. Obtain from local fresh water sources. b. When subjected to ASTM C131 tests, loss shall not exceed 40 percent. c. Ballast rock designated as 2 inches shall fall within the 3/4" to 2-1/2" range. 2. Plastic Filter Fabric: a. Poly Filter "X" by Carthage Mills. b. Mirafi 140 by Celanese Corp. c. Typar Style 3401 by Dupont. d. Propex 4545 by Amoco. e. Fibretex Grade 200 by Crown Zellerbach. F. Floor Drain: Josam or Zurn as indicated. Floor drain shall be vandalproof. G. Grease Trap: Precast concrete with cast iron frames and covers as indicated and as specified in Sections 225 and 350 of M-DCPW. Fiberglass or plastic grease trap may be used if approved by Engineer. PART 3 EXECUTION Project No. SPECIFICATION GUIDELINES 02735-3

3.01 INSPECTION A. Do not proceed with the work of this section until conditions detrimental to the proper and timely completion of the work have been corrected in an acceptable manner. 3.02 INSTALLATION A. Trenches: 1. Excavation and backfilling for trenches, manholes, and grease trap shall be as specified in Section 02221- Excavation, Backfilling, and Compaction for Utilities. B. Grease Trap: Install as indicated and according to manufacturer's recommendations. C. Placing Pipe: 1. Carefully examine each pipe before laying; do not use defective or damaged pipe. a. Lay pipelines to grades and alignment indicated. b. Provide proper facilities for lowering sections of pipe into trenches. c. Inspect pipe in place before backfilling and remove and replace those damaged during placement at no cost to the Board. 2. Corrugated Pipe: Laying shall proceed with separate sections joined firmly together, with outside lap of circumferential joints pointing upstream and with longitudinal laps on sides. 3. Waste Water Drainage Pipe: a. Shape bottom of trench by hand to give substantially uniform circumferential support to lower 1/4 of each pipe. b. Where applicable, pipe laying shall proceed upgrade with tongue or spigot ends pointing in direction of flow. c. Lay each pipe true to line and grade indicated on drawings and in such a manner to form a close concentric joint with adjoining pipe and to prevent sudden offsets of flow line. Project No. SPECIFICATION GUIDELINES 02735-4

d. As work progresses, clean interior of storm sewer of dirt and superfluous materials. 1) Where cleaning after laying is difficult because of small pipe size, a suitable swab or drag shall be kept in the pipe and pulled forward past each joint immediately after joint has been completed. 2) If maximum width of trench at top of pipe as specified is exceeded, install either concrete cradling, pipe encasement or other bedding as may be required to support added load of backfill. e. Keep trenches for sections of sewer free from water until pipe-jointing material has set and trench backfilled. 1) Do not lay pipe when condition of trench or weather is unsuitable for such work. f. Keep open end of pipes and fittings securely closed at times when work is not in progress. 1) When other conditions are such that pipe cannot be adequately supported on undisturbed earth or tamped backfill, encase pipe in concrete or support it on a concrete cradle. 2) Pipe and fittings shall be installed according to ASTM D2321. 4. Pipe Joints: D. Manhole: a. Polyvinylchloride (PVC) Pipe: Install joints according to ASTM D3212 and manufacturer's installation recommendations. b. Helical Corrugated Aluminum Pipe: Install band couplers according to manufacturer's recommendations. 1. Construction: As indicated on the drawings. 2. Frames and Covers: Set the cast iron frames and covers in a bed of mortar and carefully adjust to elevations indicated. Project No. SPECIFICATION GUIDELINES 02735-5

E. French Drain Trench: 1. Excavate trench to depth indicated. 2. Place filter fabric and ballast rock to the level of the proposed perforated aluminum pipe. 3. After pipe has been laid and accepted, continue placing ballast rock carefully to avoid displacement of pipe, and tamp carefully. 4. Continue installation of filter fabric as indicated. 5. Fill trench to level indicated with ballast rock of size or sizes indicated. 6. Backfill and compact according to requirements of Section 02221 - Trenching, Backfilling, and Compaction for Utilities. 7. Finish construction of trench as indicated. F. Grease Trap: Excavate hole for grease trap according to Section 02221 - Trenching, Backfilling, and Compaction for Utilities, except as noted in the following. 1. Perform excavating of every description and of whatever satisfactory or unsatisfactory material encountered to accommodate grease trap at depths indicated. 2. Pile materials suitable for backfilling a sufficient distance from banks of excavation to prevent slides or cave-ins. 3. Keep surface drainage of adjoining areas unobstructed. 4. Remove excavated materials not required nor suitable for backfill from site. 5. Remove water by pumping or other acceptable method and discharge at a safe distance from excavation. 6. Make hole of necessary width and depth for proper laying of grease trap, with bank nearly vertical as practical. 7. Grade bottom of excavation accurately to provide uniform bearing and support for each section of grease trap on undisturbed soil at every point along their entire length. 8. When unsatisfactory soil, incapable of properly supporting the grease trap, is encountered at the bottom of the excavation, remove such soil to a minimum depth of 12 inches and substitute this unsuitable material by a minimum of 12 inches of compacted ballast rock at no cost to the Board. 9. Over-depths in unstable soil excavation and unauthorized over-depths shall be at the expense of the Contractor. G. Excavation of Unclassified Material: Materials encountered Project No. SPECIFICATION GUIDELINES 02735-6

during the excavating to the depth and extent specified and indicated on drawings may include rock, concrete, masonry, debris, garbage, silt, rubble, or other materials. 1. No adjustment will be made in the Contract Price because of the presence (or absence) of these or other materials. H. Protection or Removal of Utility Lines: 1. Protect existing utility lines indicated on drawings (or the locations of which are made known to Contractor before excavating and trenching) specified to remain, including utility lines constructed during excavation operations, from damage during excavation, backfilling, and compacting operations. a. If such new or existing utility lines are damaged during excavation, backfilling, and compacting operations, repair or replace at no cost to the Board. 2. When utility lines specified to be removed or replaced are encountered within the area of operations, issue notices in ample time for measures to be taken to coordinate necessary interruption of services. 3. Location of existing underground utilities shown are approximate. Excavations shall be done using extreme care to avoid damage to any existing underground utilities. Any damage occurring shall be repaired immediately at the Contractor's expense to the complete satisfaction of the A/E. 4. Repair of Damage to Unknown Existing Utility Lines: Existing utility lines not shown on drawings and are damaged during excavation operations shall be repaired by Contractor and an adjustment to the Contract Price will be made according to Instructions to Bidders and General Conditions. I. Backfilling: 1. General: a. Coordinate backfilling with testing of utilities. b. Leave sheeting in place where damage is likely to result from withdrawal. Project No. SPECIFICATION GUIDELINES 02735-7

c. Carefully backfill excavation with satisfactory materials specified. d. Bring backfill up evenly in all sides in 9 inch maximum layers, loose depth, and thoroughly and carefully compact with mechanical or hand tampers. e. Take care not to damage the grease trap or manhole by excessive tamping. f. Excavation pits improperly backfilled or where settlement occurs shall be reopened to the depth required for proper compaction, refilled and compacted, with the surface restored to the specified grade and compaction at the Contractor's expense. g. Materials and density shall be as previously specified for trenches depending upon location of the structure. 2. Compaction: a. Material may be compacted by a hand tamper, a powered hand tamper, or mechanized power tamper provided such compaction meets the required density as specified. b. Backfilling and compacting by means of hydraulic methods will not be allowed except as accepted by A/E. 1) Compact each layer to not less than the percentage of maximum density specified below, determined according to ASTM D1557, Method D: Fill and Backfill Cohesionless Soil Under grass areas 85% Under pavements 95% 3.03 TESTING A. See Section 02221, paragraph related to Testing, two tests minimum at location chosen by A/E. B. Abrasion tests for each size and type of ballast rock. Material will be rejected if not in compliance with requirements. END OF SECTION Project No. SPECIFICATION GUIDELINES 02735-8