APPENDIX I (See paragraph 6) FORM 1

Similar documents
APPENDIX I. (See paragraph-6) FORM 1

APPENDIX I. (See paragraph-6) FORM 1

FORM I SUBMISSION TO STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, ANDHRA PRADESH. BY. Asst.Director of Mines and Geology, Rajamahendravaram

Annex F Scoping Checklist

M/s. Karthika Mines & Minerals Pvt.Ltd.-Colour Granite Quarry Ha. FORM - I

APPENDIX I (See paragraph 6) FORM 1

FORM 1 BASIC INFORMATION S.NO.

FORM I TERMS OF REFERENCE. For. QUARRY OF ROAD METAL (6.265 Ha) Sri K Kasi Raju. PROP: K.Kasi Raju

FORM 1 & 1 A. Palladium Grand II RESIDENTIAL & COMMERCIAL DEVELOPMENT. Palladium Grand II, S. No. 17/1A/2, Dhanori, Pune, Maharashtra

FORM-I. 13. Name of Applicant District Collector Nasik 14. Registered Address Address : Collector Office, Nasik

Form -1. [Vide Notification dated 1 st December 2009] FOR PROPOSED. COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI Precast RCC Bridges On Holding Ponds-

APPENDIX I. (See paragraph 6) FORM 1

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd &

FORM 1. APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE VIDE PARA 6 OF S.O.1533 OF MOEF NOTIFICATION DATED 14 th SEPTEMBER 2006

Submitted To State Expert Appraisal Committee (SEAC), State Environmental Impact Assessment Authority, Andhra Pradesh.

APPENDIX I (See paragraph - 6) FORM 1

UPDATED FORM I, (Submitted to State Expert Appraisal Committee, Telangana)

APPENDIX- I FORM- 1. (I) Basic Information:

FORM-I for seeking clearance for project attracting CRZ notification

FORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E))

Appendix I. Form 1 BASIC INFORMATION PAWA MASONARY STONE MINING PROJECT VILLAGE PAWA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN

Sri.T.N.Balasubramanya

APPENDIX I (See paragraph 6) FORM 1 (Application for Environment Clearance)

No 1 Name of the Project/s M/s. Velchal Laterite Mine 2 S. No in the Schedule 1(a)

UPDATED FORM I. SUBMISSION To Ministry of Environment & Forests & Climate Change, New Delhi. Prepared by. M/s. VIJAYNAGAR SUGAR PVT. LTD.

FORM 1. Gownivaripalli Village, Tehsil. Gorantla Mandal, District. Anantapur District, State

Sand, Stone & Bajri Mining Project Applicant: Shri Ashish Kumar, M/s Ashish Stone Crusher. Form-1 FORM-1 SRUSHTI SEWA, NAGPUR 1

FORM 1. No condition? If yes, please specify. 8. Does it attract the specific. No condition? If yes, please specify. 9. Location Geo Coordinates

M/s. SURYA ENTERPRISES H.No: , Sri Paradise Apartments, New Andhra Bank Colony, Anantapuramu District

FORM 1. /area/length/tonnage. No condition? If yes, please specify. 8. Does it attract the specific

FORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E))

APPENDIX - I (See paragraph 6) FORM 1

FORM 1. 8 Does it attract the specific condition? It yes, No Please specify 9 Location At Village Akurli, Akurli Road, Kandivali(E), Mumbai

(Residential cum Commercial Project) APPENDIX I (See paragraph 6) FORM 1. Plot area: 37,039 m 2 Built up area: 1,11, m 2

Project: Bhidauni Khadar Ordinary Sand Mining Project on Yamuna River FORM 1 Applicant: M/s Satyug Foods Pvt. Ltd. FORM- I

APPENDIX I (See paragraph 6) Form 1 (I) Basic Information

A 'N 'E B 'N 'E C 'N 'E D 'N 'E

.APPENDIX I (See paragraph 6) FORM 1. Sl. No. Item Details 1. Name of the project/s

Proposed Construction Multi Specialty Hospital Naruvi Hospitals 2. S. No. in the schedule 8(a)

FORM-I. Environmental Clearance (EC)

UPDATED FORM-1 EXTENSION OF VALIDITY OF ENVIRONMENTAL CLEARANCE. Sri Fakir Rohidas

FORM 1. Basic Information Sr. No. 1 Name of the project River Sand Mining Project of Shree Sabarmati Majur Kamdar Sahakari Mandali LTD.

APPENDIX I (See paragraph 6) FORM 1

Ms.Thriveni Earthmovers Private Limited HO.22/110,Greenways Roads,Fairlands,Salem,Tamilnadu

FORM-1. PROJECT: Sati & Garhi Sand Ghat,Ulai River (Area-22 Ha), Dist:-Jamui. APPLICANT: M/s Westlink Trading Pvt. Ltd. FORM- I.

FORM 1. 1 Name of the Project Pinakin Mangubhai Patel 2 S. number in schedule 8 (a)

APPENDIX I (See paragraph 6) FORM 1. Plot area: 13,114 m 2 Built up area: 81, m 2

APPENDIX I (See paragraph 6) FORM 1. Plot area: 10,439 m 2 Built up area: 50, m 2

APPENDIX I (See paragraph 6) FORM 1

Appendix I. Form 1 BASIC INFORMATION MASONARY STONE MINING PROJECT VILLAGE KOLIYA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN

M/S Overseas Min Tech Consultants, Jaipur 1

APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

(I) Basic Information:

Application for Prior Environmental Clearance (EC)

REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR

APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

Details required for submitting Fresh EC Application. (Category B2 Projects: Mining of Minor Minerals)

Proposed Ordinary Sand Mining Project at Gata No.- 8Ka/195, Village- Ratauli, Tehsil- Laharpur, District- Sitapur, U.P. FORM 1

APPENDIX I (See paragraph - 6) FORM 1

APPENDIX I (See paragraph - 6) FORM 1

FORM 1 Riverbed Sand Mining Project

FORM I. [Vide M.o.E.F & C.C Notification dated 14 th September, 2006] For Proposed Residential & Commercial Project ALCOVE. M/s.

APPENDIX I. (See paragraph 6) FORM 1

FORM 1 FOR PROPOSED CONSCTRUCTION BUILDING PROJECT ( SQ. M) ANAMOL LIFE STYLE

APPENDIX I. (See paragraph 6) FORM 1

APPENDIX I (See paragraph - 6) FORM 1

FORM 1 Riverbed Sand/Morrum / Mining Project

Form I. for. Proposed Construction of High Rise Residential Cum Commercial Building Eco Gardens

FORM I (OPENCAST LATERITE MINE ha)

Application Form for Obtaining Environmental Clearance from State Level Environment Impact Assessment Authority (SEIAA), Tamil Nadu

FORM 1 (Application for Environment Clearance)

Updated FORM I, (for extension of validity of Environmental clearance

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd &

M/S. JUMBO MINING LIMITED Surya Arcade, 4th Floor /4F & D, Near Indian Oil Petrol Pump, Begumpet,Hyderabad Telangana.

Submitted To Ministry of Environment and Forest, GOI, New Delhi. Submitted By

FORM 1. Basic Information. Sl. No.

FOR THE PROPOSED EXPANSION IN BACKWARD INTEGRATION PROJECT FOR

THE SINGARENI COLLIERIES COMPANY LIMITED (A Government Company)

Revised FORM - I & PRE-FEASIBILITY REPORT

APPENDIX I. (See paragraph-6) FORM 1

HIMALAYA MINES & MINERALS SURVEY NO. 4595, 4654, 4661 & 4662, RAMACHANDRAPURAM VILLAGE, MULUGU MANDAL, WARANGAL DISTRICT, TELANGANA STATE FORM I

APPENDIX I. (See Paragraph 6) FORM 1

Haridarshan Residency ( Row Type House & School Building )

FORM 1 Riverbed Sand Mining Project

FORM min Village. Chowgund, Tehsil. Doru District. Anantnag State

APPENDIX I FORM 1. Basic Information:

Renewal of Environmental Clearance for Commercial Complex City Square 2 S. No. in the Schedule 8 (a), Building & Construction project

Sl. No. 1. Name of the Project/s : Chudeshwar Gravel Deposit (Narmada River) 2. Sl. No. of the Schedule : Category B-2 of Activity 1(A)

UPDATED FORM I 433 TPD CALCINED PETROLEUM COKE PLANT WITH 9 MW COGENERATION OF POWER PROPOSED AT

Salai Godhani Stone Quarry of Mr. Arvind Janraoji Gajbhiye in Village Salai Godhani, Th Nagpur (Gra) & Dist Nagpur Form I APPENDIX-I FORM-1

Proposed Multiplex & Commercial Complex FORM I

FORM Name of the project/s Amendment in Existing Environmental Clearance to

JAI MAA SHARDA STONE CRUSHING

ITHC/PRJ/18-19/EIA/138 1 IND TECH HOUSE CONSULT

APPLICATION (FORM-I) FOR EXTENSION OF VALIDITY OF ENVIRONMENTAL CLEARANCE FOR UMRER OC UMRER AREA, WCL. EC Capacity 3.50 MTPA EC ML Area 944.

APPENDIX I (See paragraph - 6) FORM 1

FORM-1. Sr. No 1 Name of the Project Harbour Heights 2 S. No. in the Schedule 8(b) Townships and Area Development projects.

FORM 1 SRI LAKSHMI GAYATRI HOSPITAL (P) LTD.

FORM-I Basic Information

Transcription:

APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information: S.. Item Details 1 Name of the project/s: M/s. Sri Lakshmi Enterprises 2 S.. in the schedule 1 (a) 3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number of Wells to be drilled. Mine lease area- 9.269 Hectares, 4779 TPA Iron ore The Present proposal is for extension of validity of our existing environmental clearance. Order.SEIAA/AP/KRI-03/08-141, dated 14-05-2008 4. New/Expansion/Modernization Expansion of Validity of EC 5. Existing Capacity Area etc. 9.269 Hectares 6. Category of Project i.e.' A' or 'B' Category B 7. Does it attract the general condition? If yes, Please specify. 8. Does it attract the specific condition? If 'yes, Please specify. 9. Location Plot/Survey/Khasra. Village Tehsil District State 10. Nearest railway station/airport along with Distance in kms. 11. Nearest Town, city, District Headquarters Along with distance in kms. M/s. Sri Lakshmi Enterprises Survey :214, Gandrai Village, Jaggaiahpet Mandal, Krishna District, Andhra Pradesh Latitudes and Longitudes of the project S. LATITUDE LONGITUDE 1. 13 50' 56.1"N 79 52' 05.9"E 2. 16.9714 N, 80.1191 E 3. 16.6100 N, 80.7214 E Nagalwancha railway Station 16.3 Km. Vijayawada Airport 87.4 Kms. Nearest (1) Town: Jaggayapet 10.7 Km., Khammam 31.0 Km., (2) City: Kodad 19 Km. (2) District head quarters is Khammam 31.0 Km. 1

12. Village Panchayats, Zilla Parishad, Municipal Corporation, Local body (complete postal Address with telephone nos. to be given) M/s. Sri Lakshmi Enterprises Survey :214, Gandrai Village, Jaggaiahpet Mandal, Krishna District 521 175. Andhra Pradesh. 13. Name of the applicant M/s. Sri Lakshmi Enterprises 14. Registered Address Survey :214, Gandrai Village, Jaggaiahpet Mandal, Krishna District 521 175. Andhra Pradesh. 15. Address for correspondence: Survey :214, Gandrai Village, Jaggaiahpet Mandal, Krishna District 521 175. Andhra Pradesh. Name Designation (Owner/Partner/CEO) Address Pin Code E-mail Telephone. Fax. 16. Details of Alternative Sites examined, if any. Location of these sites should be shown on a topo sheet. 17. Interlinked Projects M/s. Sri Lakshmi Enterprises Survey :214, Gandrai Village, Jaggaiahpet Mandal, Krishna District 521 175. Andhra Pradesh. As it is a site specific project no alternative Sites are proposed. 18. Whether separate application of interlinked Project has been submitted? t Applicable 19. If yes, date of submission t Applicable 20. If no, reason t Applicable 21. Whether the proposal involves approval / clearance under: if yes, Details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, t Applicable 2

1972 (c) The C.R.Z. tification, 1991? 22. Whether there is any Government Order/ Policy relevant/ relating to the site? The mine lease was granted by the industries & Commerce (Mines) department vide G.O.Ms..43 of I&C (M.II) Dept., dated 11-02- 2008. M/s. Sri Lakshmi Enterprises was granted Environmental clearance vide Order.SEIAA/AP/KRI-03/08-141, dated 14-05-2008. 23. Forest land involved (hectares) Forest Land is involved 24. Whether there is any litigation pending against the project and /or land in which the project is propose to be set up? (a) Name of the Court (b) Case. (c) Orders/directions of the Court, if any and its relevance with the proposed project. litigation or court case is pending against the proposed project. Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.,) (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.. Information/Checklist confirmation 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes/ 9.269 hectares lease area by mechanized opencast mining method 3

1.2 Clearance of existing land, vegetation and buildings? - 1.3 Creation of new land uses? Yes Present land use will be changes with commencement of mining activities. After completion of mining activities, the land will be reused for forest growth. 1.4 Pre-construction investigations e.g. bore Yes The lessee conducted houses, soil testing? preliminary exploration work and after satisfying quality and quantity of the mineral available in the area they have applied for mining lease. 1.5 Construction works? 1.6 Demolition works? There are no existing buildings in the lease area. Hence, no demolition works involved. 1.7 Temporary sites used for construction works or housing of construction workers? major housing for construction workers is envisages at the mines 1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations 1.9 Underground works including mining or tunneling? 1.10 Reclamation works? 1.11 Dredging? 1.12 Offshore structures? 1.13 Production and manufacturing processes? 4779 TPA of Iron ore will be mined. 1.14 Facilities for storage of goods or materials? 1.15 Facilities for treatment or disposal of solid waste or liquid effluents? 1.16 Facilities for long term housing of operational workers? Yes The waste generated will be used for back filling purpose. There is no waste water generation from the mine. separate township is proposed for the mining project. 4

1.17 New road, rail or sea traffic during construction or operation? 1.18 New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? Yes Haul roads will be constructed in the lease area. new rail network or sea route is proposed for the mining project. 1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or pipelines? such diversions are envisaged. 1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? 1.23 Abstraction or transfers of water from ground or surface waters? 1.24 Changes in water bodies or the land surface affecting drainage or run-off? Yes Water required for mining activity will be sourced from ground water or through tractors from nearby villages 1.25 Transport of personnel or materials for construction, operation or decommissioning? 1.26 Long-term dismantling or decommissioning or restoration works? 1.27 Ongoing activity during decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either temporarily or permanently? 1.29 Introduction of alien species? 1.30 Loss of native species or genetic diversity? 1.31 Any other actions? 5

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are nonrenewable or in short supply): S.. Information/checklist confirmation Yes/ 2.1 Land especially undeveloped or The present land use is for agricultural land (ha) mining iron ore in an area of 9.269 of mine lease area. agriculture land involved 2.2 Water (expected source & competing users) unit: KLD Yes 2 KLD Ground water will be used as source of water. 2.3 Minerals (MT) t Applicable 2.4 Construction material stone, aggregates, sand / soil (expected source MT) 2.5 Forests and timber (source MT) 2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW) Yes 2.7 Any other natural resources (use -- appropriate standard units) Electric energy will be source from State Grid 6

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns S.. Information/Checklist confirmation Yes/ 3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) major storage of fuel oils t envisaged 3.3 Affect the welfare of people e.g. by changing living conditions? 3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes Yes The nearest habitation is Takkellapadu village at 3 km. Living standards of the surrounding, villagers will improved due to availability of better infrastructure, health care and educational facilities. about actual or perceived risks to human health. 4. Production of solid wastes during construction or operation or Decommissioning (MT/month) S.. Information/Checklist confirmation Yes/ 4.1 Spoil, overburden or mine wastes Yes 559 m3 waste will be generated per year. There are two waste dump areas at SW and rthern 4.2 Municipal waste (domestic and or commercial wastes) side. generation of municipal waste is envisaged 7

4.3 Hazardous wastes (as per Hazardous Waste Management Rules) generation of municipal waste is envisaged 4.4 Other industrial process wastes generation of hazardous waste is envisaged 4.5 Surplus product t envisaged 4.6 Sewage sludge or other sludge from effluent treatment -- 4.7 Construction or demolition wastes t envisaged 4.8 Redundant machinery or equipment t envisaged 4.9 Contaminated soils or other materials t envisaged 4.10 Agricultural wastes t envisaged 4.11 Other solid wastes t envisaged 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) S.. Information/Checklist confirmation Yes/ 5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Vehicular emissions are envisaged. Emission norms will be maintained as per standard norms 5.2 Emissions from production processes Yes Fugitive dust will only be generated from mining activities. Adequate control measures will be taken to control fugitive dust. 5.3 Emissions from materials handling Yes Fugitive dust will be generated 8

including storage or transport from material handling activities. Dust Suppression by water sprinklers will be provided to prevent the fugitive dust emissions 5.4 Emissions from construction activities including plant and equipment 5.5 Dust or odours from handling of materials including construction materials, sewage and waste 5.6 Emissions from incineration of waste t envisaged Yes major construction activities are envisaged Dust will be generated during Excavation and transportation of minerals and it will be controlled. 5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) t envisaged 5.8 Emissions from any other sources t envisaged 6. Generation of ise and Vibration, and Emissions of Light and Heat: S.. Information/Checklist confirmation 6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes/ with source of information Yes ise will be generated from vehicles and machinery activities. 6.2 From industrial or similar processes t envisaged 6.3 From construction or demolition major construction / demolitions are envisaged 9

6.4 From blasting or piling Yes ise will be generated during blasting operation, which will be instantaneous in nature. 6.5 From construction or operational traffic t envisaged 6.6 From lighting or cooling systems t envisaged 6.7 From any other sources t envisaged 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: S.. Information/Checklist confirmation Yes/ 7.1 From handling, storage, use or spillage of major storages are hazardous materials envisaged and hence, no risk of contamination of land or contamination of land or water is envisaged. 7.2 From discharge of sewage or other There will not be any effluents to water or the land (expected processing waste water mode and place of generation. Domestic waste discharge) water will generate and will treat at septic tank followed by soak pit. 7.3 By deposition of pollutants emitted to air into the land or into water t envisaged 7.4 From any other sources -- 7.5 Is there a risk of long term build up of -- 10

pollutants in the environment from these sources? 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment S.. Information/Checklist confirmation Yes/ 8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances 8.2 From any other causes -- risk of accidents is envisaged as there will be no major storage of hazardous substances. 8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, Cloudburst etc)? -- 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality S.. Information/Checklist confirmation Yes/ 9.1 Lead to development of supporting. utilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: Yes Supporting and ancillary development will take place. Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) 11

housing development extractive industries supply industries other 9.2 Lead to after-use of the site, which could major developments envisaged. t envisaged t envisaged t envisaged have an impact on the environment 9.3 Set a precedent for later developments Yes Ancillary industries will be developed as a consequence. 9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects -- (III) Environmental Sensitivity S.. Areas Name/ Identity 1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or sensitive for Water ecological reasons - Wetlands, bodies watercourses or other water bodies, coastal zone, biospheres, mountains, forests Reserved forest Aerial distance (within 15 km.) Proposed project location boundary Gandrai cheruvu 1.10 Km. Paleru river 4 km. Madaram Cheruvu 5.47 Km. Gandrai Reserve Forest 0.5 km. 3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or underground waters -- -- 5 State, National boundaries -- 6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas -- 12

7 Defence installations -- 8 Densely populated or built-up area Yes Total population of Gandrai is 5583. Males are 2798 and Females are 2,785 living in 1266 Houses. Total area of Gandrai is 1186 hectares. 9 Areas occupied by sensitive man-made Yes Small hospitals small schools land uses (hospitals, schools, places of and small temples are existing worship, community facilities) within 15 km radial distance from the mine area. 10 Areas containing important, high quality -- or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) (IV) Proposed Terms of Reference for EIA studies: N.A. -- The area is not known for these natural hazards I here by given undertaking that the and information given in the application and enclosure are true to the best of my knowledge and belief and I am aware that if any part of the and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the project will be revoked at our risk and cost. Date: 17-07-2018. Place: Krishna District. Sd/- Signature of the applicant With Name and Full Address (Project proponent / Authorised Signatory M/s. Sri Lakshmi Enterprises Survey :214, Gandrai Village, Jaggaiahpet Mandal, Krishna District. Andhra Pradesh. 13