B36XTCE Gas Fireplace

Similar documents
B41XTCE Gas Fireplace

Regency Horizon HZ30E Gas Fireplace

Gas Fireplaces. B41XTE-10 Gas Fireplace. Framing Dimensions: Unit Dimensions: Non-Combustible 1012mm Requirements: V Opening for gas connection

P36-10 / P36E-10 Gas Fireplace. 11 W.C. (2.74 kpa) 10 W.C. (2.49 kpa) 6.4 W.C. (1.59 kpa) 22,000 BTU/h (6.44 kw) 28,500 BTU/h (8.

P36 / P36E Gas Fireplace. 11 W.C. (2.74 kpa) 10 W.C. (2.49 kpa) 6.4 W.C. (1.59 kpa) 22,000 BTU/h (6.44 kw) 28,500 BTU/h (8.35 kw)

Gas Fireplaces. B36XTE Gas Fireplace. Unit Dimensions with Vignette: Model B36XTE-NG10 B36XTE-LP10 M O S S. V Opening for gas connection

Gas Fireplaces. P33-10/P33E-10 Gas Fireplace P33 DIMENSIONS WITH VIGNETTE FACEPLATE CLEARANCES WITH VIGNETTE FACEPLATE

Gas Fireplaces. P36D-10 Gas Fireplace. Unit Dimensions With Vignette Faceplate. *** Important: Framing height requires consideration of the hearth

Contemporary Collection

Gas Fireplaces. P33 Zero Clearance Direct Vent Gas Fireplace. *** Important: Framing height requires consideration of the hearth

P36 - P36D Zero Clearance Direct Vent Gas Fireplace. 12 W.C. (3.00 kpa) 11 W.C. (2.74 kpa) 2.9 W.C. (0.72 kpa) 15,000 BTU/h (3.

FIREPLACE INSERT ENCLOSURE INSTALLATION INSTRUCTIONS

Please consult the manufacturer s installation manual for all details and requirements before making a final design layout decision.

TC54. for architects & designers. Dimensions Clearances Venting

Builder's Manual for Ortal Fireplaces

Architect & Builder s Guide. ORTAL Heating Systems Ltd.

CHIMNEYS AND FIREPLACES

Installation Manual Installation and Appliance Setup

Installation and Operation Manual. Safety tested according to ULC-S610 and UL 127 Standards by an accredited laboratory.

TCWS54 FOR ARCHITECTS & DESIGNERS SERIES D2. Dimensions Clearances Venting

FEATURES AND SPECIFICATIONS...2 Installation Choices...2

Wood Designer Series Woodburning Fireplaces

Installation Manual Installation and Appliance Setup

SAFETY PRECAUTIONS. Do not operate your stove if you smell smoke coming from it. Turn it off, monitor it, and call your dealer.

Vent Termination Chart. horizontal Termination Kit A. horizontal Termination Kit C. Chimney Liner Termination Kit. DirectVent Pro Direct Vent

CHIMNEYS AND FIREPLACES

Installation Manual Installation and Appliance Setup


for architects & designers

GENERAL MECHANICAL SYSTEM REQUIREMENTS

Installation Manual Installation and Fireplace Setup

Installation Manual Installation and Appliance Setup

Installation Manual Installation and Appliance Setup

APPLICATION FOR FINISHED BASEMENT PERMIT

PORTRAIT WARNING HOT GLASS WILL CAUSE BURNS. DO NOT TOUCH GLASS UNTIL COOLED. NEVER ALLOW CHILDREN TO TOUCH GLASS. 569 Ledge Front

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

Installation Instructions

Outer Skin Kit & Flue: IB600, IB850, IB1100 Installation Manual

Installation Manual Installation and Fireplace Setup

TC36 FOR ARCHITECTS & DESIGNERS SERIES D2. Dimensions Clearances Venting

Owner's Manual Residential Factory Built Fireplace. Operation Maintenance Installation PEARL

MASPORT I5000 INSERT FIRE, AUSTRALIAN MODEL

TC42 FOR ARCHITECTS & DESIGNERS SERIES D2. Dimensions Clearances Venting

Installation Manual Installation and Fireplace Setup

APPLICATION AND LISTING

Installation Manual Installation and Fireplace Setup

In addition to performing as an interior vapor retarder, MemBrain the Smart Vapor Retarder may be installed as a continuous, interior

Installation and Operation Manual

DuraFlex. Flexible stainless steel relining for masonry chimney. UL 1777 and ULC S635.

Nouveau BBQ Single Flue

INSTALLERS GUIDE For 1-1/2 Thickness

Installation Manual Installation and Fireplace Setup

SECTION GYPSUM BOARD & SHEATHING SYSTEMS

SI T T FST

SECTION GYPSUM BOARD ASSEMBLIES

DIRECT-TEMP SELKIRK DIRECT VENT SYSTEM

Traditional Open Fire

Installation Instructions. Venting System For Direct Vent Gas Stoves and Fireplaces. DirectVent Pro

Table Air Barrier and Insulation Inspection Component Criteria

Installation Instructions. Venting System For Direct Vent Gas Stoves and Fireplaces. DirectVent Pro

Residential Building Plans

Chimney Lining Systems

FREEWILL BARRIER FREE ACRYLIC BATH AND SHOWER MODULES

Union County Vocational - Technical Schools Scotch Plains, New Jersey

DirectVent Pro. Simpson Dura-Vent Engineered Excellence

Installation Manual Installation and Fireplace Setup

SKAMOTEC 225 INSTALLERS GUIDE For 1-1/2 Thickness

Sept 30, 2004 Page 1

Block-In Fireplace Masonry Fireplace 36 ELITE-BI INSTALLATION MANUAL. Listed Tested to: U.L. 127 and portions of U.L & November,

Dur aflex stainless steel

Fireplaces and Chimneys

Installation Manual Installation and Fireplace Setup

Owner's Manual Residential Factory Built Fireplace. Operation Maintenance Installation PEARL

TC30 FOR ARCHITECTS & DESIGNERS SERIES D. Dimensions Clearances Venting

Installation Manual Installation and Fireplace Setup

SECTION GYPSUM BOARD ASSEMBLIES

DuraFlex. Flexible stainless steel relining for masonry chimney. UL 1777 and ULC S635.

Installation Manual Installation and Fireplace Setup

Primo Brick Cube Build Manual

KAZAN: MODEL SPECIFICATIONS 1. TECHNICAL DATA 2 2. PRE-INSTALLATION 3 3. INSTALLATION 6 4. OPERATION TESTING 11. Keep for future use

A. Environmental Limitations: Comply with ASTM C 840 requirements or gypsum board manufacturer's written instructions, whichever are more stringent.

A. Flat corner wall-to-wall See page 8. C. Outside corner wall-to-wall See page 8. B. Inside corner kit wall-to-wall See page 7

SECTION GYPSUM BOARD

DIVISION: SPECIALTIES SECTION: MANUFACTURED FIREPLACES REPORT HOLDER: FIRE ROCK PRODUCTS LLC

INSTALLATION INSTRUCTIONS OPERATION AND MAINTENANCE MANUAL Models event SD, event, Event Plus, and event Plus2 (Condensing Boiler Systems)

GCI60 Hampton Cast Iron Pellet Insert

BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018)

tipi: model specifications 1. Technical Data 2 2. PRE-Installation 3 4. Operation 9 Keep for future use

Multi-Piece EasyStep Product Installation Instructions

Chimney and Fireplace Inspection Report

for architects & designers

Owner's Manual Residential Factory Built Fireplace. Operation Maintenance Installation FOCUS 250

Installation Manual Installation and Fireplace Setup

DuraLiner. Insulated, double-wall masonry relining. UL 1777, ULC S635, and ULC S640.

SPECIFICATION: CLASSIC PROGRESSIVE MOVABLE WALL SYSTEM DEMOUNTABLE STEEL STUD AND GYPSUM BOARD PARTITIONS

Light Stainless Flexible Liner

TC42 FOR ARCHITECTS & DESIGNERS SERIES D. Dimensions Clearances Venting

Transcription:

Model B3XTCE-NG1 B3XTCE-LP1 Fuel Type Natural Gas Propane Minimum Supply Pressure 5 W.C./C.E. (1.5 kpa) 11 W.C./C.E. (.7 kpa) Manifold Pressure - High 3.5 W.C./C.E. (.7 kpa) 1 W.C./C.E. (.9 kpa) Manifold Pressure - Low 1. W.C./C.E. (. kpa). W.C./C.E. (1. kpa) Orifice Size -Altitude -5 ft. #35 DMS #51 DMS Minimum Input Altitude -5 ft. (-137m) Maximum Input Altitude -5 ft. (-137m) 1,5 BTU/h (.3 kw) 31, BTU/h (9.9 kw) 5, BTU/h (7.33 kw) 31, BTU/h (9.9 kw) Approved Venting Systems Flex Vent Systems: FPI AstroCap Flex Vent Rigid Pipe Vent Systems: Simpson Direct Vent Pro Selkirk Direct-Temp Metal-Fab Sure Seal American Metal Products Security-Secure Vent -5 x approved - x -5/ approved R Non-combustible Header (steel stud on edge) Drywall (or other facing) W Non-Combustible Header (steel stud) on edge Non-Combustible Facing N 11"(79mm) dia. Hole through wall Vent. L M O S S P T Q U V Opening for gas connection Framing Dimensions Description B3XTCE L Framing rise from floor " (when not using a surround) 1" min (when using Mantel) M Framing Width 1-1/"(1mm) N Framing Height 7-3/" (113mm) O (Rear Vent) Framing Depth - Rear Vent 3-7/" (mm) O (Top Vent) Framing Depth - Top Vent 3-7/" (mm) P (Top Vent) Corner Facing Wall Width 53-1/" (1353mm) P (Rear Vent) Corner Facing Wall Width 57-7/" (17mm) AstroCapXL -1/" (17mm) - other approved caps Q (Top Vent) Corner Facing Wall Width 75-1/" (1911mm) Q (Rear Vent) Corner Facing Wall Width 1-1/" (7mm) AstroCapXL 93-1/" (375mm) - other approved caps R (Rear Vent) Framed Chase Ceiling - Rear 7-3/" (113mm) R (Top Vent) Framed Chase Ceiling - Top 5-1/" (13mm) S (Rear Vent) Vent Centerline Height - Rear -1/" (73mm) S (Top Vent) (5" x ") Vent Centerline Height - Top -1/" (17mm) Flex -1/" (113mm) Rigid S (Top Vent) (" x -5/") Vent Centerline Height - Top - 9" (15mm) Rigid T Gas Connection Height 1-1/" (3mm) U Gas Connection Inset 7-3/" (17mm) V Gas Connection Width 3-1/" (mm) W Non-combustible Height 9-1/"" (35mm) ** Important: Framing height requires consideration of the hearth depth. Dimension N = N + the thickness of the installed hearth.

CLEARANCES B3XTCE-1 Gas Fireplace The clearances listed below are Minimum distances unless otherwise stated: A major cause of chimney related fires is failure to maintain required clearances (air space) to combustible materials. It is of the greatest importance that this fireplace and vent system be installed only in accordance with these instructions. Clearance: Dimension Measured From: A: Mantel Height (min.) 1-1/" (5mm) Top of Fireplace Opening B: Sidewall 1" (3mm) one side Side of Fireplace Opening only C: Ceiling 39" (991mm) Top of Fireplace Opening D: Mantel Depth (max.) 1" (3mm) 9-1/ " (73mm) from Top of Fireplace Opening E: Alcove Width " (13mm) Wall to Wall (Minimum) F: Alcove Depth 3" (91mm) Front to Back Wall (Maximum) Notes: " No Hearth Required WARNING Fire hazard is an extreme risk if these clearances (air space) to combustible materials are not adhered to. It is of greatest importance that this fireplace and vent system be installed only in accordance with these instructions. Caution Requirements The top, back and sides of the fireplace are defined by standoffs. The metal ends of the standoff may NOT be recessed into combustible construction. C C D F F A E E Close to Ceiling E Minimum Vent Clearances to Combustibles F Alcove Horizontal Top Horizontal Side Horizontal Bottom Vertical Vent " (51mm) 1-1/ " (3mm) 1-1/" (3mm) 1-1/" (3mm)

Due to the extreme heat this fireplace emits, the mantel clearances are critical. Combustible mantel clearances from top of front facing are shown in the diagram on the right. MANTEL CLEARANCES Note: A non-combustible mantel may be installed at a lower height if the framing is made of metal studs covered with a non-combustible board. Note: Ensure the paint that is used on the mantel and the facing is "heat resistant" or the paint may discolour. Mantel Clearances B3XTCE From Top of Fireplace Opening A B C D 9-11/1" (75mm) 9-1/" (73mm) 5-3/" (1mm) 1-1/" (5mm) MANTEL LEG CLEARANCES Top View Side opening of fireplace 3.5 Mantel leg 1-1/" Mantel leg 3".5" Allowable mantel leg projection. 1"

5-5/" [51mm] 1. Frame in the enclosure for the unit with framing material. FRAMING & FINISHING Note: When constructing the framed opening, please ensure there is access to install the gas lines when the unit is installed.. For exterior walls, insulate the enclosure to the same degree as the rest of the house; apply vapour barrier and drywall, as per local installation codes. (Do not insulate the fireplace itself.) WARNING: Failure to insulate and add vapor barriers to the inside of the exterior wall will result in operational and performance problems including, but not limited to: excessive condensation on glass doors, poor flame package, carbon, blue flames etc. These are not product related issues. 3. The unit does not have to be completely enclosed in a chase. You must maintain clearances from the vent to combustible materials: See "Clearances" section. Combustible materials can be laid against the side and back standoffs and the stove base.. Tile Finish Option 1: Drywall may be installed onto the unit as shown below to create a surface to apply finishing materials such as tile, slate, etc. Drywall cannot extend beyond the metal surface of the unit. 5. Tile Finish Option : If applying a non-combustible finishing material (tile,slate,etc) the material can be installed directly onto the metal surface (clean front) of the unit in the area shown below. TILE FINISH CLEAN FINISH 3-7/" 35mm. If applying a non-combustible facing it may be installed over the metal surface (clean front) of the unit in the area shown below. Combustible and Non-combustible Facing and Finishing Materials around unit. NOTE: The 9-1/" x -5/" non combustible material supplied with this unit can be replaced if trying to achieve a clean finish. A large piece of non combustible material (ie. ' x ' x 1/") can be used to eliminate taped seams on or near unit.

5-5/" [51mm] 7-3/" [13mm] 5-5/" [51mm] CLEAN FINISH 7. Non-combustible material (ie. tile, slate, etc) may be brought up to the edge of the glass door of the unit. Minimum clearances must be adhered to, this will assure ease of glass door removal and access to the lower panel. NOTE: Non-combustible finishing materials may be of any thickness desired. -5/" [13mm] Non combustible - supplied w/unit 9-1/" [35mm] No Combustible Materials in this Area No Combustible Materials in this Area -3/" [13mm] NO FACING OR FINISHING MATERIAL IN THIS AREA J Style trim or metal corner bead may be used to finish edges 3-7/" [9mm] 3-7/" 35mm -1/" [15mm] Combustible and Non-combustible Facing and Finishing Materials around unit. Trim materials 3-7/" 35mm IMPORTANT FINISHING DETAIL NOTE: Before placing unit into final position - it is important to know the total thickness / height of finished hearth (tile, carpet, etc.) The base of the fireplace, sided faceplate or mantel should be level or higher than the finished hearth height. Note: All non-combustible facing material should butt up cleanly to the flanges around the firebox opening. Rough edges may be visible from an angle. To maintain a clean finished edge - facing material edges may be finished with a J-style trim or metal cornerbead (both materials available at your local building or hardware store). IMPORTANT: Materials used must be NON-COMBUSTIBLE.

VENTING ARRANGEMENTS FOR HORIZONTAL TERMINATIONS FLEX VENT OR RIGID PIPE 5" X " The Diagrams show all allowable combinations of vent runs with 5" x " venting using the Regency direct vent system or rigid vent system. A vent guard should be used whenever the termination is lower than the specified minimum or as per local codes. For horizontal terminations the Regency Direct Vent Flex System may be used for installations with a maximum continuous vent maximum horizontal length of 3ft (.9m). Note: Must use optional rigid pipe adaptor (Part # 77-99) when using Rigid Pipe vent systems. Maintain clearance to combustibles. Horizontal vent must be supported every 3 feet. Firestops are required at each floor level and whenever passing through a wall. Horizontal (Feet) 1 1 Vertical Height (Feet) Max. 3 (.9m) Rigid -1/"(1.1m) Flex -1/"(1.m) Factory Setting - No Restrictor Required Designed for a minimum vent configuration when using a rear vent application with a horizontal termination in a corner installation. Factory Setting - No Restrictor Required HORIZONTAL TERMINATIONS ASTROCAP XL & RIGID REAR VENT KIT FOR CORNER INSTALLATIONS RIGID PIPE 5" X " Kit 9-1 Includes 1 AstroCap XL 9-3/P 57-7/" 1 Rigid Pipe Adaptor 77-99 1 Vinyl Siding Standoff (Optional) 9-5 1 Wall Thimble 5DVA-WT 1 " galvanized rigid pipe 5DVA- 1-1/" galvanized pipe extension 5DVA-A 1 5º galvanized elbow 5DVA-E5 1 9 ml MillPac 9-1 1-1/" Standoff (Optional) Astrocap XL Wall Thimble Pipe Length 5 elbow Rigid Pipe Adaptor -1/ (73mm)

VENTING ARRANGEMENTS FOR HORIZONTAL TERMINATIONS RIGID PIPE " X -5/" (MUST USE REDUCER PART # 9- & 77-99 RIGID PIPE ADAPTOR) The diagram shows all allowable combinations of vertical runs with horizontal terminations, using one 9 o two 5 o elbows equal one 9 o elbow). VENTING ARRANGEMENTS FOR VERTICAL TERMINATIONS RIGID PIPE " X -5/" (MUST USE REDUCER PART # 9- & 77-99 RIGID PIPE ADAPTOR) The shaded area in the diagram shows all allowable combinations of straight vertical and offset to vertical terminations, using two 9 o elbows, with Rigid Pipe Venting Systems for Propane and Natural Gas. Two 5 o elbows equal to one 9 o elbow. Maximum of four 5 o elbows allowed. Horizontal (Feet) 1 1 Horizontal (Feet) 1 1 1 1 3 Vertical Height (Feet) 1 1 1 1 Restrictor -1/ Open Set 1 9" (15mm) Minimum Height Requirement No Vent Restrictor Maintain clearances to combustibles as listed in "Clearances" section Horizontal vent must be supported every 3 feet. Firestops are required at each floor level and whenever passing through a wall. A wall thimble is mandatory for all horizontal terminations due to high temperatures. Vertical Height (Feet) 3 3 3 3 1 1 1 1 1 Restrictor 1-1/1 Open Set 3 Restrictor 1-5/ Open Set Min. 9 (1.m) Minimum (.m) Maximum: 35.5 ft. (1. m) No Restrictor Maximum 1 Centerline to Centerline Maximum Centerline to Centerline Restrictor -1/ Open Set 1 Maximum: 5 ft. (7.m) Vent must be supported at offsets. Firestops are required at each floor level and whenever passing through a wall. Maintain clearances to combustibles as listed in the "Clearances" section. Refer to the "Vent Restrictor Position" section for details on how to change the vent restrictor from the factory setting to -1/" opening,1-5/"opening and to 1-1/1" opening. Note: Must use optional flue adapter when using Rigid Pipe (Part # 77-99..