SPECIFICATION OF REPAIRS HUD CASE NUMBER: Applicant Name: test applicant 2 Property Address: County: 1451 S. Rimpau Ave. Ste 105, Corona, CA 92879 Riverside Contact Name: Contact Phone No: Best Time to Call: 1 / 7 HUD Case No: FHA Loan No: # Inspections Requested: Est Months to Complete: 5 6 HUD Consultant Name: HUD Consultant Phone No: CHUMS ID No: Consultant Contractor Name: (if applicable) Contractor Phone No: Contractor License No: Contractor Address County: Tax ID No: HUD Assigned Appraiser Name: Appraiser Phone No: Assigned: STEP-BY-STEP PROCEEDURES 1) The HUD accepted consultant who prepares this work write-up (or an architect, engineer or home inspection service) needs to inspect the property to assure: (1) that there are no rodents, dryrot, termites and other infestation; (2) that there are no defects that will affect the health and safety of the occupants; (3) the adequacy of the existing structural, heating, plumbing, electrical and roofing systems; and (4) the upgrading of thermal protection (where necessary). The inspection report will be attached to this document. 2) Complete each item below as necessary by either filling in the information on the work to be performed and including a detailed explaination, or enter "No Repairs Listed" under the subsection heading if no work is being performed in that particular subsection. 3) The proposed work, and the materials used, should be explained in detail to assure a complete understanding of the required work by the contractor and the HUD authorized fee inspector. For major items (i.e. kitchen cabinets, appliances, heating & air conditioning, etc. ), the description of the item should include the make and model number (manufacturer's brochure can be attached) 4) Attach a copy of any proposals from all contractors and/or subcontractors. 5) Provide other drawings as necessary to assure a complete understanding of the required work by the contractor and the HUD authorized fee inspector. The following architectural exhibits are requried: a) A Plot Plan of the Site is required only if a new addition is being made to the existing structure. Show the location of the structure(s), walks, drives, streets, and other relevant detail. Include finished grade elevations at the properrty corners and building corners to assure proper drainage of water off the site. Show the requried flood elevation. b) Proposed Interior Plan of the Dwelling. Show where structural or planning changes are contemplated, including any addition to the dwelling. c) Provide kitchen cabinet elevations, deck drawings and other exhibits as necessary to properly describe the required work. Architectural exhibits for a new addition are the same as for a newly contructed home. 6) Cost estimates must include labor and materials sufficient to complete the work by a contractor. 7) A homebuyer who would like to do any of the work must submit a letter to the lender stating his/her qualification to perform the work in a timely and workmanlike manner. If approved by the lender, the homebuyer cannot eliminate the cost estimate for labor because if the homebuyer cannot complete the work there must be sufficient money in the escrow account to get a subcontractor to do the work. 8) If this is a purchase transaction and not a refinance, then attach a sales contract (the loan should be contingent upon obtaining FHA 203(k) financing). 9) Transfer costs shown on the last page to the Draw Request (HUD 9746-A, VMP-436). Abbreviations * - Required LF - Linear Feet SF - Square Feet SY - Square Yard LS - Lump Sum EA - Each PR - Pair RS - Roofing Square CF - Cubic Feet CY - Cubic Yard HR - Hour
2 / 7 Room / Location Abbreviations and Dimensions Name Abbrev Width Length Height Floor (SF) Walls (SF) Perimeter (LF) 1 Back Yard BY 0' 0" 20' 0" 10' 0" 0.0 400.0 40.0 Description: test 2 Bedroom #1 BD1 10' 0" 10' 0" 8' 0" 100.0 320.0 40.0 Description: test comment 3 Exterior (Front) EXT F 0' 0" 40' 0" 9' 0" 0.0 720.0 80.0 4 test2 tst2 20' 0" 12' 0" 8' 0" 240.0 512.0 64.0 General Comment: test 1. Masonry Materials Units Labor Units SubTotals Repair Room UOM Cost Qty UOM Cost Qty Materials Labor Total 1 Build brick wall BD1 LF $20.00 45 HR $90.00 5 $900.00 $450.00 $1350.00 Work Done By: Owner Labor Description: this is my labor description Materials Description: test materials 2 Repair Fence, wood BD1 LF $50.00 20 LF $0.00 0 $1000.00 $0.00 $1000.00 Work Done By: SubContractor List of Repairs and Fees Masonry Totals: $1900.00 $450.00 $2350.00 This section's work will be done by: X Owner Contractor X Subcontractor 2. Siding 3. Gutters & Downspouts 4. Roof 5. Shutters 6. Exterior 7. Walks
3 / 7 8. Driveways 9. Painting - Exterior * 10. Caulking 11. Fencing 12. Grading 13. Windows * 14. Weatherstripping 15. Doors - Exterior 16. Doors - Interior 17. Partition 18. Plaster/Drywall Materials Units Labor Units SubTotals Repair Room UOM Cost Qty UOM Cost Qty Materials Labor Total 1 Install new drywall BD1 LF $40.00 100 LF $0.00 0 $4000.00 $0.00 $4000.00 Work Done By: Contractor Plaster/Drywall Totals: $4000.00 $0.00 $4000.00
This section's work will be done by: Owner X Contractor Subcontractor 4 / 7 19. Decorating 20. Wood - Trim 21. Stairs 22. Closets 23. Wood Floors 24. Finish Floors 25. Ceramic Tile 26. Bath Accessories 27. Plumbing 28. Electrical 29. Heating 30. Insulation
5 / 7 31. Cabinetry 32. Appliances 33. Basements 34. Cleanup 35. Miscellaneous TOTAL COST OF REPAIRS (Sections 1-35) $ 6350.00 CONTINGENCY RESERVE 20 % $ 1270.00 36. Allowable Fees Allowable Fee Document Attached Total 1 Architechural Fee No $ 6000.00 Work Done By: Owner Allowable Fees Total: $ 6000.00 This section's work will be done by: X Owner Contractor Subcontractor 37. HUD Consultant Fees Consultant Fee Includes Mileage Mileage Charge Fee Total Total 1 1st Draw Inspection X $ 40.00 $ 175.00 $ 215.00 2 2nd Draw Inspection X $ 40.00 $ 175.00 $ 215.00 3 3rd Draw Inspection X $ 40.00 $ 175.00 $ 215.00 4 4th Draw Inspection X $ 40.00 $ 175.00 $ 215.00 5 5th Draw Inspection X $ 40.00 $ 175.00 $ 215.00 Consultant Fee Totals: $ 200.00 $ 875.00 $ 1075.00 Miles to Project: 20.00 Mileage Charge: $ 2.00 (per mile) General Comment: test
6 / 7 TOTAL COST (Sections 1-37 including Contingency) 14695.00
RECAP OF SUB-TOTALS 1. Masonry $ 2350.00 2. Siding 3. Gutters & Downspouts 4. Roof 5. Shutters 6. Exterior 7. Walks 8. Driveways 9. Painting - Exterior 10. Caulking 11. Fencing 12. Grading 13. Windows 14. Weatherstripping 15. Doors - Exterior 16. Doors - Interior 17. Partition 18. Plaster/Drywall $ 4000.00 19. Decorating 20. Wood - Trim 21. Stairs 22. Closets 23. Wood Floors 24. Finish Floors 25. Ceramic Tile 26. Bath Accessories 27. Plumbing 28. Electrical 29. Heating 30. Insulation 31. Cabinetry 32. Appliances 33. Basements 34. Cleanup 35. Miscellaneous TOTAL COST OF REPAIRS $ 6350.00 Contingency Reserve 20 % $ 1270.00 36. Allowable Fees $ 6000.00 37. HUD Consultant Fees $ 1075.00 TOTAL COST $ 14695.00 7 / 7 Applicant Signature Applicant Signature Contractor Signature HUD Consultant Signature