3Bureau of Construction and Maintenance

Similar documents
3Bureau of Construction and Maintenance

3Bureau of Construction and Maintenance

3Bureau of Construction and Maintenance

3Bureau of Construction and Maintenance

3Bureau of Construction and Maintenance

3Bureau of Construction and Maintenance

IT BACK TO KDOT, EVEN IF NOT BIDDING.

3Bureau of Construction and Maintenance

3Bureau of Construction and Maintenance

3Bureau of Construction and Maintenance

3Bureau of Construction and Maintenance

3Bureau of Construction and Maintenance

Kansas Department of Transportation Bureau of Construction and Maintenance Estimating Section

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

3Bureau of Construction and Maintenance

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

Kansas Department of Transportation DISTRICT 5. Project(s): Min: Max:

KANSAS TURNPIKE AUTHORITY KTA CONTRACT NO Mill and Superpave overlay I-35 (KTA) from MM 13 to MM 26.8 ADDENDUM NO. 1

Kansas Department of Transportation Bureau of Construction and Maintenance Estimating Section

3Bureau of Construction and Maintenance

ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM

3Bureau of Construction and Maintenance

ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM

ITEM QUANTITY UNITS UNIT PRICE AMOUNT. Contractor Construction Staking 1.0 Lump Sum

REQUEST FOR PROPOSAL Asphalt & Concrete Repair

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

Contractor Construction Staking 1.0 Lump Sum. Granular Backfill (Wingwalls) (Set Price) 1.0 Cu.Yds $50.00 $ Mobilization 1.

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

KANSAS WORK ZONE SAFETY AND MOBILITY PROCESSES AND PROCEDURES

295 Project Showing Meeting Minutes

SECTION BID FORM. Garfield Street Drainage Improvements

Kansas Department of Transportation DISTRICT TE / TA-T045 (501) Project(s): Min: Max:

KANE COUNTY DIVISION of TRANSPORTATION

MISCELLANEOUS PAVING PROJECTS & SIGNAL INSTALLATION

PROSEPECTIVE BIDDER S INQUIRIES

I. General Information. A. Project Team & Contacts: Role Company Name Phone City of Johnson City Jeff Owner Water & Sewer Harmon, PE Department

Page 3 of 14

Kansas Department of Transportation DISTRICT 1. Project(s): 089 U / HSIP-U231(701) Min: Max:

Please note the requirement for alternate bids as described in Section 3 of the Instructions to Bidders portion of the contract specifications.

Oklahoma s Use of Fabric in Overlays and Full Depth Concrete Pavements

ADDENDUM NO Fraternaland Road Bridge Replacement. Essex County, NY. January 19, 2018

JOB CA0608 BAPTIST HOSPITAL UNIVERSITY AVE. (WIDENING) (F) APRIL 4, 2018

ADDENDUM NO. 1. March 3, 2017

New Jersey Department of Transportation DATE : 05/17/12 PAGE : TABULATION OF BIDS

Addendum No. 2. Pre-Bid Meeting Notes and Scope of Work Clarifications

ROAD COMMISSION FOR IONIA COUNTY

ERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2015

JOB BB0113 SHELL LAKE STR. & APPRS. (S) MARCH 10, 2015 LETTING QUESTIONS PREVIOUSLY ASKED UNDER JOB BB0106.

STEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS. 3 East Pulteney Square Bath, New York 14810

EXCAVATION PERMIT CHECKLIST


KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2007

Sanitary Sewer Backup Prevention Procedures

General Info Number: PROJECT NO Description: REPAIRS AND RESURFACING INTERCHANGE 209 MILEPOST TRUMBULL COUNTY, OHIO

COUNCIL ROCK SCHOOL DISTRICT ADMINISTRATION & BUSINESS OFFICES The Chancellor Center 30 North Chancellor Street Newtown, PA ADDENDA No.

CONTRACTOR'S ESTIMATE PACKAGE

Kansas Department of Transportation DISTRICT 5. Project(s): Min: Max:

Kalkaska County Road Commission 1049 Island Lake Road Kalkaska, MI Telephone: Facsimile:

Maps are enclosed of the larger areas to be included in the projects. The area in yellow are the proposed areas.

DEPARTMENT OF TRANSPORTATION 1401 EAST BROAD STREET RICHMOND, VIRGINIA

CONTRACT PROPOSAL/CONTRACT ACCEPTANCE HIGDON LOOP ROAD BRIDGE

Department of Transportation Rapid City Region Office 2300 Eglin Street P.O. Box 1970 Rapid City, SD Phone: 605/ FAX: 605/

PROPOSAL OF, a corporation. an individual doing business as

500 Rigid Pavement. 502 Portland Cement Concrete Pavement (Non-QC/QA) Concrete Pavement (**)(**)(**) 501-1

Ohio Department of Transportation - Prebid Questions

ERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2007

!"#$ % 1( =4+0(1*0)4 A)*.(.)44)4 8(: 4 0, 2(3*05. Page 1A of 10 11

SANBORN COUNTY

DBE TOTALS March 23, 2016 LETTING FEDERAL AID JOBS

CHAPTER 2 - TRAVEL DEMAND MODEL DEVELOPMENT

Kansas Department of Transportation DISTRICT 1. Project(s): Min: Max:

September 2007 Thomas Bohuslav Texas Department of Transportation

DIVISION 2500 MISCELLANEOUS METHODS OF TEST

CITY OF VENICE PROCUREMENT- FINANCE DEPARTMENT 401 W. VENICE AVE. - ROOM # 204 VENICE, FL (941) FAX (941) ADDENDUM NO.

Department of Transportation Mitchell Region Office

BRIDGE REPAIR BARBER COUNTY R 12 W R 11 W R 11 W DEPARTM ENT OF TRANSPORTATION. Page 1 of 12 BRIDGE NO (030)

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

Subject: Late Season/Cold Weather Temporary Pavement Markings

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

Riverside County Transportation Department Summary of Bids

SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION ABSTRACT OF BIDS RECEIVED 06/06/2018 LETTING CONTENTS

New Jersey Department of Transportation DATE : 10/21/10 PAGE : TABULATION OF BIDS

ADDENDUM NO. 1. September 12, 2017 ST. CHARLES COUNTY HEPPERMAN ROAD RECONSTRUCTION

SAN ANTONIO WATER SYSTEM PRE-CONSTRUCTION MINUTES

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

SUBJECT: ADDENDUM #1 IFB # Taxiway A Rehabilitation - Bid Package 1 at Myrtle Beach International Airport (MYR) NOTICE of REVISIONS:

To: Plan Holder Project: O Neill Ranch Well and Treatment Plant Project

TRAFFIC ENGINEERING DIVISION

MERCED COUNTY CAMPUS PARKWAY SEGMENT 2

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990

Public Utilities PELICAN MARSH ELEMENTARY SCHOOL WATER SERVICE REPLACEMENT

CITY OF TACOMA Department of Public Utilities Tacoma Power

ADDENDUM NO.1. Ray Stoyer Water Recycling Facility Access Road and Site Paving Repair (IN )

Design and Construction of Concrete Overlays. By: James K. Cable, P.E. Cable Concrete Consultation

SMMUSD LINCOLN MIDDLE SCHOOL ATHLETIC FIELD PROJECT

SECTION B1 BITUMINOUS CONCRETE PAVING GENERAL

CITY OF LAWRENCE RESIDENTIAL DRIVEWAY PERMIT CHAPTER 16, ARTICLE 3, ADOPTED BY THE CITY COMMISSION ON JULY 10, 1996.

The following question received from plan holder and the response to the question. George Harms Construction Co, Inc.

SPRR TUPELO ST. R UNION CITY BLVD. ZON PADRE PASEO DEEP CREEK ROAD ARDENWOOD COYOTE HILLS REGIONAL PARK PROJECT LIMITS PATTERSON RANCH ROAD BLVD. COMM

Transcription:

Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still FAX IT TO the Estimating Section at (785) 296-0999. Any instructions not followed will result in your bid being declared irregular. If these changes affect any of your subcontractors or suppliers, IT IS YOUR RESPONSIBILITY to inform them. These changes are part of the contract for this project(s). Please contact me at (785) 296-3576, if there are questions. Thank you for your cooperation. 1BTo: 2BFrom: 4BKansas Department of Transportation 3Bureau of Construction and Maintenance 0BEstimating Section Prime Contractor Bid Holders Shane Houser, P.E. - Estimating Engineer 5BDate: March 9, 2018 Proposal/Contract No.: 518032151 Subject: Project Notice for the March 21, 2018 Letting 435-105 KA-4691-01 WYANDOTTE COUNTY OVERLAY, BR APPS, PCCP PVT, PATCHING Included are the prebid meeting notes, attendance list and some additional information. Two files containing Bridge Approach slab information/plan sheets and traffic control layout information are posted on our website at the link Exploratory and Project Reports. To view this document, choose Addendum #1 from our website (https://kdotapp.ksdot.org/proposal/proposal.aspx). We also recommend that you check the Bid Express Questions and Answers (https://www.bidx.com/ks/lettings) to review any questions that may have been posted for this project. (Company Name) (Signature) (Date) C: District 1 & Bonner Springs Office KA4691.doc

Pre-Bid 435-105 KA 4691-01 March 7, 2018, 10:30 am Traffic Control No patches will be left open without proper traffic control (GN #5). This means a type III barricade 50-100 prior to the patch and channelizers the entire width of the patch. Locations planned to have the split traffic set up o South Bound Woodend Rd o North Bound 98 th St o North Bound State Ave o South Bound State Ave o North Bound France Family Dr o South Bound France Family Dr o North Bound Parallel Pkwy o South Bound Parallel Pkwy o North Bound Georgia Ave o South Bound Georgia Ave o North Bound Leavenworth Rd o South Bound Leavenworth Rd o North Bound Donahoo Rd o South Bound Donahoo Rd o North Bound Connor Creek o South Bound Connor Creek o North Bound K-5 o South Bound Wolcott Dr Locations that have planned weekend work o South Bound Woodend Rd o North Bound State Ave o South Bound State Ave o North Bound France Family Dr o South Bound France Family Dr o North Bound Parallel Pkwy o South Bound Parallel Pkwy o North Bound Georgia Ave o South Bound Georgia Ave o North Bound Leavenworth Rd o South Bound Leavenworth Rd Traffic Control layout sketches provided TMP Newer provision for projects, asked contractors if there were questions.

Pre-Bid 435-105 KA 4691-01 March 7, 2018, 10:30 am Work Schedule NTP will not be issued until April 30, 2018. No work will be allowed until message boards have been placed for 5 days. Additional known restricted days for Kansas Speedway, June 2 for Rockfest, September 13-16 for the American Royal BBQ. Sporting Kansas City Home Schedule o Saturday May 5, 2018 o Sunday May 27, 2018 o Sunday June 3, 2018 o Saturday June 23, 2018 o Saturday July 7, 2018 o Saturday July 28, 2018 o Saturday August 18, 2018 o Saturday September 8, 2018 o Sunday September 30, 2018 o Saturday October 6, 2018 o Additional dates could be added A question was asked about the traffic control being in place for only 3 days. Were told that it is what was expected as they cannot be in place longer without temporary tape. Were asked if breakdown by location could be provided for rock and common ex, CTB and pavement. Were told KDOT would provide what they had. There was question about whether full depth concrete could be place in lieu of CTB. Were told that KDOT had to review further. It has been determined that KDOT will add an alternate bid for HMA base but concrete cannot be placed full depth. There was a question about whether wire mesh could be used in the 13 section of replacement approach pavement. Were told that KDOT needed to review and would provide answers. KDOT has determined that typical reinforcement must be used in these areas. Original plan sheets for these locations are being provided for information. No full depth patches or pavement replacement shall be left unattended once pavement is removed until the concrete is replaced see revised general notes.

Quantity Breakdown by Location 3/9/2018 Page 1 of 5 Project No. 435-105 KA 4691-01 Bridge # 194 Kansas River Bridge South Bound Rock Excavation 21 CuYd Common Excavation (Urban) 6 CuYd Cement Treated Base 53 SqYd Concrete Pavement (12 ) (AE) (Bridge Approach) 53 SqYd Bridge # 197 Woodend Rd North Bound Rock Excavation 115 CuYd Common Excavation (Urban) 33 CuYd Cement Treated Base 295 SqYd Concrete Pavement (12 ) (AE) (Bridge Approach) 252 SqYd Concrete Pavement (12 ) (AE) (NRDJ) 43 SqYd Bridge # 196 Woodend Rd South Bound Rock Excavation 121 CuYd Common Excavation (Urban) 35 CuYd Cement Treated Base 312 SqYd Concrete Pavement (12 ) (AE) (Bridge Approach) 266 SqYd Concrete Pavement (12 ) (AE) (NRDJ) 45 SqYd Bridge # 237 S 98 th St North Bound Rock Excavation 183 CuYd Common Excavation (Urban) 52 CuYd Cement Treated Base 472 SqYd Concrete Pavement (12 ) (AE) (Bridge Approach) 434 SqYd Concrete Pavement (12 ) (AE) (NRDJ) 38 SqYd Bridge # 236 S 98 th St South Bound Rock Excavation 7 CuYd Common Excavation (Urban) 2 CuYd Cement Treated Base 17 SqYd Concrete Pavement (12 ) (AE) (Bridge Approach) 17 SqYd

Quantity Breakdown by Location 3/9/2018 Page 2 of 5 Project No. 435-105 KA 4691-01 Bridge # 218 State Ave North Bound Rock Excavation 264 CuYD Common Excavation (Urban) 75 CuYD Cement Treated Base 678 SqYD Concrete Pavement (12 ) (AE) (Bridge Approach) 576 SqYd Concrete Pavement (12 ) (AE) (NRDJ) 102 SqYd Bridge # 219 State Ave South Bound Rock Excavation 221 CuYd Common Excavation (Urban) 63 CuYd Cement Treated Base 569 SqYd Concrete Pavement (12 ) (AE) (Bridge Approach) 484 SqYd Concrete Pavement (12 ) (AE) (NRDJ) 85 SqYd Bridge # 251 France Family Dr North Bound Rock Excavation 249 CuYd Common Excavation (Urban) 71 CuYd Cement Treated Base 640 SqYd Concrete Pavement (12 ) (AE) (Bridge Approach) 548 SqYd Concrete Pavement (12 ) (AE) (NRDJ) 92 SqYd Bridge # 252 France Family Dr South Bound Rock Excavation 71 CuYd Common Excavation (Urban) 20 CuYd Cement Treated Base 182 SqYd Concrete Pavement (12 ) (AE) (Bridge Approach) 142 SqYd Concrete Pavement (12 ) (AE) (NRDJ) 40 SqYd Bridge # 220 Parallel Parkway North Bound Rock Excavation 160 CuYd Common Excavation (Urban) 46 CuYd Cement Treated Base 412 SqYd Concrete Pavement (12 ) (AE) (Bridge Approach) 368 SqYd Concrete Pavement (12 ) (AE) (NRDJ) 43 SqYd

Quantity Breakdown by Location 3/9/2018 Page 3 of 5 Project No. 435-105 KA 4691-01 Bridge # 221 Parallel Parkway South Bound Rock Excavation 155 CuYd Common Excavation (Urban) 44 CuYd Cement Treated Base 397 SqYd Concrete Pavement (12 ) (AE) (Bridge Approach) 355 SqYd Concrete Pavement (12 ) (AE) (NRDJ) 43 SqYd Bridge # 253 Georgia Ave North Bound Rock Excavation 118 CuYd Common Excavation (Urban) 34 CuYd Cement Treated Base 304 SqYd Concrete Pavement (12 ) (AE) (Bridge Approach) 259 SqYd Concrete Pavement (12 ) (AE) (NRDJ) 46 SqYd Bridge # 254 Georgia Ave South Bound Rock Excavation 129 CuYd Common Excavation (Urban) 37 CuYd Cement Treated Base 331 SqYd Concrete Pavement (12 ) (AE) (Bridge Approach) 285 SqYd Concrete Pavement (12 ) (AE) (NRDJ) 45 SqYd Bridge # 222 Leavenworth Rd North Bound Rock Excavation 13 CuYd Common Excavation (Urban) 4 CuYd Cement Treated Base 35 SqYd Concrete Pavement (12 ) (AE) (Bridge Approach) 35 SqYd Bridge # 223 Leavenworth Rd South Bound Rock Excavation 231 CuYd Common Excavation (Urban) 66 CuYd Cement Treated Base 594 SqYd Concrete Pavement (12 ) (AE) (Bridge Approach) 508 SqYd Concrete Pavement (12 ) (AE) (NRDJ) 85 SqYd

Quantity Breakdown by Location 3/9/2018 Page 4 of 5 Project No. 435-105 KA 4691-01 Bridge # 226 Donahoo Rd North Bound Rock Excavation 258 CuYD Common Excavation (Urban) 74 CuYd Cement Treated Base 663 SqYd Concrete Pavement (12 ) (AE) (Bridge Approach) 588 SqYd Concrete Pavement (12 ) (AE) (NRDJ) 75 SqYd Bridge # 225 Donahoo Rd South Bound Rock Excavation 163 CuYd Common Excavation (Urban) 47 CuYd Cement Treated Base 420 SqYd Concrete Pavement (12 ) (AE) (Bridge Approach) 377 SqYd Concrete Pavement (12 ) (AE) (NRDJ) 43 SqYd Bridge # 227 Conner Creek North Bound Rock Excavation 204 CuYd Common Excavation (Urban) 58 CuYd Cement Treated Base 525 SqYD Concrete Pavement (12 ) (AE) (Bridge Approach) 487 SqYd Concrete Pavement (12 ) (AE) (NRDJ) 39 SqYd Bridge # 228 Conner Creek South Bound Rock Excavation 39 CuYd Common Excavation (Urban) 11 CuYd Cement Treated Base 101 SqYd Concrete Pavement (12 ) (AE) (Bridge Approach) 101 SqYd Bridge # 231 K-5 Hwy North Bound Rock Excavation 27 CuYd Common Excavation (Urban) 8 CuYd Cement Treated Base 69 SqYd Concrete Pavement (12 ) (AE) (Bridge Approach) 69 SqYd

Quantity Breakdown by Location 3/9/2018 Page 5 of 5 Project No. 435-105 KA 4691-01 Bridge # 230 K-5 Hwy South Bound Rock Excavation 27 CuYd Common Excavation (Urban) 8 CuYd Cement Treated Base 69 SqYd Concrete Pavement (12 ) (AE) (Bridge Approach) 69 SqYd