SUSTAINABILITY ANALYSIS OF THE BERLIN GEOTHERMAL FIELD, EL SALVADOR. Manuel Monterrosa, LaGeo El Salvador

Similar documents
Sustainable Utilization of Geothermal Resources through Stepwise Development

RESOURCE ASSESSMENT II: COMPUTER MODELLING AND NUMERICAL SIMULATION

GEOTHERMAL RESOURCE ASSESSMENT CASE EXAMPLE, OLKARIA I

Sustainable Management of Geothermal Resources and Utilization for Years

PHASES OF GEOTHERMAL DEVELOPMENT

APPROPRIATE USE OF USGS VOLUMETRIC HEAT IN PLACE METHOD AND MONTE CARLO CALCULATIONS

Sustainable utilization of geothermal energy resources

REASSESSMENT OF THE THELAMÖRK LOW TEMPERATURE GEOTHERMAL SYSTEM IN N-ICELAND FOLLOWING SUCCESSFUL DEEPENING OF WELL LÞN-10

GEOTHERMAL POWER PLANTS FOR MEDIUM AND HIGH TEMPERATURE STEAM AND AN OVERVIEW OF WELLHEAD POWER PLANTS

GEOCHEMICAL CHARACTERIZATION AND INTEGRAL ANALYSIS OF DATA LAS PAILAS GEOTHERMAL FIELD, COSTA RICA

REINJECTION STRATEGY FOR GEOTHERMAL SYSTEMS

The model was developed on the TETRAD reservoir simulator.

RESPONSE OF OLKARIA EAST FIELD RESERVOIR TO PRODUCTION

Calculation of Geothermal Stored Heat from a Numerical Model for Reserve Estimation

Keywords: Geothermal, low-temperature, district heating, pressure draw-down, lumped modelling, management

Geothermal Energy in El Salvador

NOTICE CONCERNING COPYRIGHT RESTRICTIONS

Fig. 1. Well field location

Engr. Adnan Qamar Lecturer Energy Resources

ANALYSIS OF TEMPERATURE AND PRESSURE MEASUREMENTS AND PRODUCTION DATA FOR BERLÍN GEOTHERMAL FIELD, EL SALVADOR

ECONOMIC COMPARISON BETWEEN A WELL-HEAD GEOTHERMAL POWER PLANT AND A TRADITIONAL GEOTHERMAL POWER PLANT

ENVIRONMENTAL IMPACT ASSESSMENT OF GEOTHERMAL PROJECTS IN ICELAND

INCREASED PRODUCTION LOAD IN TONGONAN GEOTHERMAL FIELD, PHILIPPINES: RESERVOIR RESPONSE AND FIELD MANAGEMENT STRATEGIES

Production/Injection Optimization Using Numerical Modeling at Ribeira Grande, São Miguel, Azores, Portugal

EXERGY ANALYSIS FOR THE AHUACHAPAN AND BERLIN GEOTHERMAL FIELDS, EL SALVADOR

SIMULATION AND PERFORMANCE ANALYSIS OF THE NEW GEOTHERMAL CO-GENERATION POWER PLANT (OV-5) AT SVARTSENGI

INJECTION EXPERIMENTS IN LOW-TEMPERATURE GEOTHERMAL AREAS IN ICELAND

Geothermal Energy Future Development

Modelling of Injection into Geothermal Systems E. KAYA 1. Department of Engineering Science, University of Auckland, Auckland, NZ M.J.

NOTICE CONCERNING COPYRIGHT RESTRICTIONS

GEOTHERMAL REINJECTION IN CHINA. Jiurong LIU 1 and Kun WANG 2

Field Performance Evaluation of the Largest Geothermal Organic Rankine Cycle Plant

Methods of Early Geothermal Energy Resource Assessment A Modern Conceptual and Mathematical Model

POWER GENERATION POTENTIALS OF MAJOR GEOTHERMAL FIELDS IN TURKEY. Serpen, U., Korkmaz Basel, E.D., Satman, A.

TWENTY FIVE YEARS OF PRODUCTION HISTORY AT THE MOMOTOMBO GEOTHERMAL FIELD, NICARAGUA

Geothermal Steam Turbines for Various Purposes

Magma On the other hand, molten rock is under active volcanoes at accessible depths. The temperatures excess 650 o C.

Geothermal Resources and Development in Guatemala Francisco Alberto Asturias

The Momotombo Reservoir Performance upon 27 Years of Exploitation

PHASES OF GEOTHERMAL DEVELOPMENT IN ICELAND

Challenges in the Design and Management of a 20-MW Geothermal Field: the Maibarara Geothermal Field (Philippines) Experience

Enhanced Geothermal Systems (EGS) Using CO 2 as Working Fluid

FIRST SEVEN YEARS OF EXPLOITATION AT THE MIRAVALLES GEOTHERMAL FIELD

Experiences, Successes and Challenges in Sustaining Long-Term Production at the Tiwi Geothermal Field

Performance Improvement of Single-Flash Geothermal Power Plant Applying Three Cases Development Scenarios Using Thermodynamic Methods

WELLHEAD POWER PLANTS

ASSESSMENT OF THE ENERGY POTENTIAL OF THE BEREGOVSKY GEOTHERMAL SYSTEM, UKRAINE

MASTERING REINJECTION IN THE HELLISHEIDI FIELD, SW-ICELAND: A STORY OF SUCCESSES AND FAILURES

HYBRID POWER PLANT USING THREE ENERGY RESOURCES AT THE SAN VICENTE GEOTHERMAL FIELD, EL SALVADOR

USING A LARGE RESERVOIR MODEL IN THE PROBABILISTIC ASSESSMENT OF FIELD MANAGEMENT STRATEGIES

The Geothermal Power Plant at Hellisheiði, Iceland

RESERVOIR ENGINEERING AND GEOTHERMAL POWER PRODUCTION IN OLKARIA

COSTA RICA COUNTRY UPDATE

DIFFUSE CO 2 DEGASSING THROUGH SOIL AND GEOTHERMAL EXPLORATION

EVALUATION OF MICROGRAVITY BACKGROUND AT THE UNDISTURBED OGUNI GEOTHERMAL FIELD, JAPAN

Fundamental Investigation Of Whole-Life Power Plant Performance For Enhanced Geothermal Systems

Renewable Energy Systems 10

CLASSIFICATION OF GEOTHERMAL SYSTEMS A POSSIBLE SCHEME

STANFORD, CALIFORNIA SGP-TR-84 SG P-TR GEOTHERMAL RESERVOIR ENGINEERING. Stanford Un iver s i t y. Stanford, California

FIRST GEOTHERMAL DIPLOMA COURSE IN THE ACADEMIC SYSTEM IN EL SALVADOR AND CENTRAL AMERICA

FLOW TESTING IN INDONESIA USING ALCOHOL TRACERS

20/06/2011 Seminar on Geothermal Exploitation Santiago de Chile

Discrete Fracture Embedding to Match Injection Returns in a Single Porosity Model

Utilizing Vertical Discharge Tests as an Effective Means for Well Decision Making at the Darajat Geothermal Field, Indonesia

DIFFUSE DEGASSING TECHNIQUES APPLIED TO GEOTHERMAL PROSPECTS DURING EXPLORATION IN EL SALVADOR

NOTICE CONCERNING COPYRIGHT RESTRICTIONS

Ahmad Yani PT. Pertamina Geothermal Energy Lahendong, Jl. Raya Tomohon no. 420, North Sulawesi

GEOTHERMAL DEVELOPMENTS IN CENTRAL AMERICA

PROVED GEOTHERMAL RESERVES FRAMEWORK AND METHODOLOGY

31.3 GEOTHERMAL CYCLES

The Geysers Geothermal Field, an Injection Success Story

COST AND REVENUES OF DIRECT USE APPLICATIONS

Resource Assessment, a Review, with Reference to the Australian Code

RESOURCE ASSESSMENT I: INTRODUCTION AND VOLUMETRIC ASSESSMENT

Application of Lumped Parameter Modeling to Short-Term Pressure Monitoring Data

Jaime Jose Quinao* and Sadiq J. Zarrouk

NOTICE CONCERNING COPYRIGHT RESTRICTIONS

ORMAT Nevada, Inc. Expansion and Improvements Raise Power Production 20%

GEOTHERMAL BINARY CYCLE POWER PLANTS PRINCIPLES, OPERATION AND MAINTENANCE: A CASE STUDY FROM EL SALVADOR

ACID STIMULATION OF GEOTHERMAL RESERVOIRS

Binary Cycle Geothermal Power Systems

GEOTHERMAL POWER PLANTS

The Geysers Geothermal Field, an Injection Success Story

ASSESSMENT OF CALCITE AND AMORPHOUS SILICA SCALING POTENTIAL FROM PRODUCTION WELLS IN THE MUTNOVSKY GEOTHERMAL FIELD, KAMCHATKA, RUSSIA

Benefits from the Utilization of a Calcium Carbonate Inhibition System for Production Wells at the Miravalles Geothermal Field

THE ROLE OF WELL TESTING IN GEOTHERMAL RESOURCE ASSESSMENT

PLANNING OF GEOTHERMAL PROJECTS IN ICELAND

Synergetic CO2 Storage and gas/oil production from tight reservoirs

Integration of the CHEST-System for Power-to-Heat to-power storage in Smart District Heating IRES 2017 Henning Jockenhöfer Dan Bauer

THE DEVELOPMENT OF A COMPUTERIZED PRESSURE TRANSIENT TEST SYSTEM (PART 1)

IRON METERS FOR PRODUCTION WELLS AT THE MIRAVALLES GEOTHERMAL FIELD

GEOFAR : Innovative geothermal technologies Last modifications: BINARY PLANTS

Numerical Simulation for Natural State of Two- Phase Liquid Dominated Geothermal Reservoir with Steam Cap Underlying Brine Reservoir

GEOTHERMAL. snohomish county pud

Guidance page for practical work electricity production from geothermal energy

WP Future opportunities for geothermal and energy system integrated

Organic Rankine Cycle Configurations

Low enthalpy power generation with ORC- Turbogenerator The Altheim Project, Upper Austria

ALCOHOL TRACER TESTING AT THE MATSUKAWA VAPOR-DOMINATED GEOTHERMAL FIELD, NORTHEAST JAPAN

Experimental Performance Evaluation of a Small Scale ORC Power Unit Working with Low Temperature Energy Sources for Power Cogeneration

Transcription:

Proceedings of SIMS 2012, the 53 rd Scandinavian Simulation and Modelling Society Conference Reykjavik, Iceland, 4 6 October 2012 SUSTAINABILITY ANALYSIS OF THE BERLIN GEOTHERMAL FIELD, EL SALVADOR. ABSTRACT Manuel Monterrosa, LaGeo El Salvador Over the past 20 years, the Berlin geothermal field has been in commercial operation through step wise development, at the moment the installed capacity is 109.2 MW. The total mass extracted ranges up to 870 kg/s, which are delivered by 14 production wells with average discharge enthalpy of 1300 kj/kg and average steam flow rate of 20 kg/s. Hot brine injection (180 and 140 C) is applied in the field using 19 injection wells and cold injection (ambient temperature) through the operation of one well. A high pressure pumping station is also used manly when injection by gravity is insufficient. During long term exploitation 18 bar pressure drawdown has been observed in the field and perhaps the main process observed in production wells is boiling. There is no evidence of cooling due to injection. Since long term exploitation began sustainable development has been a very important commitment for LaGeo and during the first stages of exploitation the field management, monitoring technics and numerical modeling were soon implemented. A part of LaGeo s corporative sustainability policy is focused on defining the sustainable energy production level and monitoring performance indicators; all of which are also part of the concession contract granted by SIGET (El Salvador Electricity Regulation Authority) in year 2000. Preliminary results indicate that the sustainable energy production level of the Berlin resource is greater than the actual installed capacity. At least 5 performance indicators are defined including: energy efficiency of the utilization, resource life, recovery time, subsidence and power plant performance. Just 3 of them are discussed in this paper, the other two are being analysed. INTRODUCTION Over the past 10 years LaGeo has been working on developing a sustainability protocol which is part of its corporative sustainable policy and to comply with the regulatory framework of the national electricity law and the concession contract granted by the regulatory agency Superintendencia General de Energía y Telecomunicaciones (SIGET). The main scope of the protocol is to estimate the sustainable energy production level E 0 for each exploited geothermal resource. The general methodology is based in the work presented by Axelsson and the Orkustofnun working group (Axelsson et al., 2001) and in order to define specific performance indicators we utilize the work of Bjarnadottir (2010) where specific indicators were suggested. 1

In this paper, we present the main aspects of the protocol and how is being implemented in the Berlin geothermal field. SUSTANABILITY PROTOCOL Sustainable geothermal utilization has received ever increasing attention over the decade, but the discussion has suffered from a lack of a clear definition of what it involves and from a lack of relevant policies. The word sustainable has in addition become quite fashionable and several authors have used it at will. A considerable amount of literature dealing with the issue has been published during the last decade. Axelsson et al. (2001) propose for the term sustainable production, for each geothermal system, and for each mode of production, there exists a certain level of maximum energy production, E 0, below which it will be possible to maintain constant energy production from the system for a very long time 100-300 years (Axelsson et al., 2004). If the production rate is greater than E 0 it cannot be maintained for this length of time. Geothermal energy production below, or equal to E 0 is termed sustainable production while production greater than E 0 is termed excessive production. It is difficult to establish the sustainable production level E 0 for a given geothermal system. This is because the production capacity of the geothermal systems is usually poorly known during exploration and the initial utilization step, as is well known. Even when considerable production experience has been acquired estimating accurately the production capacity, and hence the sustainable production, can be challenging. In another hand, the sustainable production level of a particular geothermal resource can be expected to increase over time with increasing knowledge on the resource, i.e. through continuous exploration and monitoring. In addition it can be expected to increase through technological advances, e.g. in exploration methods, drilling technology and utilization efficiency. Regarding with the performance indicators which serve as a gauge on how well a system is working; they also help what direction to take if there is a problem to address. In the case of geothermal sustainability indicators should be able to measure the degree of sustainability of a given operation, the progress towards sustainability and/or whether it looks like sustainable production o utilization can be maintained as proposed. The sustainability protocol proposed by LaGeo is as follow: 1- Assess of the sustainable level Eo using volumetric stored heat assessment as was presented by Muffler & Cataldi and other authors (Muffler and Cataldi, 1978; Sarmiento and Bjornsson, 2007) which should be assess using Monte Carlo method and 50 years of commercial utilization. The level of sustainable or excessive 2

production will be estimated together with the evolution of the indicators, due to can t be established a priori at this early stage. 2- Establish at least the following indicators a. Utilization efficiency using the exergy of the whole system (field-power plant) and it should be compared with similar resource utilization. b. Productive lifetime is the time that the resource can sustain the present level of production which is dependent of the change on physical condition of the fluid in the resource mainly pressure drawdown and temperature changes. The lifetime is measured by numerical modeling taking into the account the present installed capacity hence total mass extraction and running the model for 50 years and to verify if it is possible to maintain certain level of steam delivered to the power plant. c. Recovery time or reclamation time which is the time it takes the resource in terms of pressure and temperature to recover from exploitation. It is not expected that the pressure and temperature will recover in the same timescale due to pressure and temperature diffusion behave hence the pressure will recover faster than the temperature. The recovery time is estimated through numerical modeling putting in zero the mass extraction node and running in order to recover the reservoir. d. Change in dissolved chemicals which are affected by pressure and temperature changes and also by inflow of injection or other cold fluids. e. Ground subsidence which may be a result of geothermal fluids withdrawal during the energy production. Subsidence is dependent of the pressure drawdown and geological rocks formation above the reservoir and usually is measured in specific sites by high accuracy topographic level meter. f. Primary energy efficiency which measure how much primary energy extracted is converted to electricity. g. Power plant performance indicator: Load and capacity, availability, parasitic load, vacuum pressure at the condenser and non-condensable gases. THE BERLIN GEOTHERMAL FIELD The Berlin geothermal field is located 110 km towards to the East of the El Salvador country where the Tecapa volcanic complex is located. The field went to commercial operation in 1992 with 2x5 MW back pressure units. Later on during 1999 went on line 2x28 MW condensing type units, 2006 went 1x44 MW and finally in 2007 went on line the 9.2 MW binary bottoming unit to complete the 109.2 MW present installed capacity. The Figure 1 shows the well and power plant location 3

Figure 1, The well location at the Berlin geothermal field At present, 38 wells were drilling at the Berlin field, 14 of them are producers and 20 injectors (4 are abandoned). The Figure 2 presents the total mass extracted which ranges 870 kg/s, the steam delivered to the power plant is approximately 220 kg/s and the injected brine is 650 kg/s which is partially injected using high pressure pumping system located al TR-1 site. The total pressure drawdown is approximately 18 bar however over the last 12 years is being reduced to less 10 bar, the discharging enthalpy is fairly constant in most of producer wells and no evidence of cooling due to injection has been observed into the field however some boiling is perhaps the main process affecting the reservoir. Some aspects affecting the sustainable production are related to calcite in well TR-18, steam cap declining at southern part of the steam field, high concentration of NCG at TR- 18A and silica plugging at injection wells and pipe line in special those connected to binary unit. As part of field maintenance there are undertaken several activities to reduce the impact in this issues 4

Figure 2: Pressure and mass extraction at the Berlin field SUSTAINABILITY ANALISYS. According with the methodology describe before, the first parameter to be calculated is the level of sustainable production Eo which was did by volumetric stored heat and Monte Carlo probabilistic estimation performed with Cristal Ball. The main parameters for the calculations are presented in the Table 1. Table 1: Volumetric estimation for the Berlin field The results indicate the level of sustainable production Eo for the Berlin geothermal field could be between 235-240 MW over a period of 50 years of commercial operation and considering the percentile 90% as shown in Figure 3 5

Figure 3. Estimation of sustainable energy production at the Berlin field The present installed capacity at the field is 109 MW and the level of sustainable energy production is 235 MW therefore the operational level could be considered as sustainable. The first performance indicator presented in this work is the Utilization Efficiency estimated by exergy. The Figure 4 presents a bench marking over 20 geothermal power plant efficiency around the world, as observed the Berlin plant is over the average. 6

Figure 4: Exergy efficiency of power plants around the world The second and third indicators are based in numerical modeling which is a powerful tool to estimate the Productive Lifetime and the Recovery Time: Firstly a good enough calibrated model must be available, the standard code used by LaGEO is TOUGH2 and itough2 which are running in Linux operative system, beside this, the natural state and production models are also utilized during the adjusting process and finally is utilized a coupled model (wellflow model coupled with reservoir models). For the Productive Lifetime indicators the resource is considered as source of steam delivered to power plants without any make up wells therefore it is steam declining the main issue to be considered, for this reason the well flow model is considering with constant well head pressure (as being utilized at present time). The mass delivered by the wells is decreasing until a practical limit could reach. The limit is the steam required to operate at least one unit 28 MW (50 kg/s steam which mean 200 kg/s total mass at 0.25 dryness). The results are shown in Figure 5, the mass flow rate is declining around 2.5 kg/s/year thus the simulation suggests it is possible to operate the geothermal field for at least 50 years with at least one power unit, considering this condition as productive lifetime. 7

Figure 5. Productive life time Indicator of the Berlin Geothermal Field In order to estimate the Recovery time indicator, in the numerical model, the sinks and source nodes are eliminated (mass=zero) therefore no mass and energy are delivered or injected after the thermal and hydraulic recovery began. The results are shown in the Figure 6, as observed the pressure at monitoring well is suddenly increasing until reach similar initial pressure after 33 years of recovery, therefore the utilization of the geothermal resource is recovered in short term period however it is not the case of temperature which will require more time. 8

CONCLUSIONS 1- The Berlin geothermal field has been in commercial operation for at least 20 years. During this period no evidence of irreversible conditions has been observed in the whole productive field. Yet LaGeo is focused on developing a more complete sustainable utilization to guarantee stable operating conditions for at least 50 years of operation. 2- Preliminary results indicate that it is possible to perform a sustainability analysis for the Berlin Geothermal field, which suggests that the utilization of the resource is done in a sustainable way. 3- Numerical modeling is being utilized as a powerful tool to estimate the sustainable operation indicators. ACKNOWLEDGEMENTS The author would like to acknowledge travel support to the SIMS Conference provided by the International Energy Agency s Geothermal Implementing Agreement (IEA-GIA). 9

REFERENCES Axelsson, G., Á. Gudmundsson, B. Steingrímsson, G. Pálmason, H. Ármannsson, H. Tulinus, Ó.G. Flóvenz, S. Björnsson and V. Stefánsson, 2001: Sustainable production of geothermal energy: suggested definition. IGA News, Quarterly No. 43, January-March 2001, 1-2. Axelsson, G., V. Stefánsson and G. Björnsson, 2004: Sustainable utilization of geothermal resources for 100-300 years. Proceedings 29th Workshop on Geothermal Reservoir Engineering, Stanford University, USA, 8 pp. Bjarnadóttir, R., 2010: Sustainability evaluation of geothermal systems in Iceland Indicators for sustainable production. MSc thesis, School of Engineering and Natural Sciences, University of Iceland, 87 pp. Muffler, L.P.J. and R. Cataldi, 1978: Methods for regional assessment of geothermal resources. Geothermics, 7, 53-89. Sarmiento, Z.F. and G. Björnsson, 2007: Reliability of early modelling studies for hightemperature reservoirs in Iceland and the Philippines. Proceedings of the 32nd Workshop on Geothermal Reservoir Engineering, Stanford University, California, January 2007, 12 pp. Sarmiento, Z. F., and Steingrímsson, B., 2007: Computer programme for resource assessment and risk evaluation using Monte Carlo simulation. Proceedings of the Short Course on Geothermal Development in Central America: Resource Assessment and Environmental Management, organized by UNU-GTP and LaGeo, Santa Tecla, El Salvador, 11 pp. 10