SANITARY SEWER ELEMENT GOALS, OBJECTIVES, AND POLICIES

Similar documents
POTABLE WATER GOALS, OBJECTIVES, AND POLICIES

CHAPTER 6 SANITARY SEWER SUB-ELEMENT

Chapter Nine, Sanitary Sewer Subelement City of St. Petersburg Comprehensive Plan

INFRASTRUCTURE ELEMENT

Goals, Objectives, and Policies Infrastructure Element Introduction

Potable Water Supply, Wastewater & Reuse Element

INFRASTRUCTURE ELEMENT SANITARY SEWER SUB-ELEMENT

INFRASTRUCTURE ELEMENT Goal, Objectives and Policies

Subsequent to these early efforts, the complexities associated with potable water provision have increased significantly.

PUTNAM COUNTY COMPREHENSIVE PLAN EXHIBIT DD INFRASTRUCTURE ELEMENT

Chapter Nine, Potable Water Subelement City of St. Petersburg Comprehensive Plan

[THIS PAGE INTENTIONALLY LEFT BLANK]

EVALUATION AND APPRAISAL REPORT OF THE INDIAN RIVER COUNTY COMPREHENSIVE PLAN DRAFT SANITARY SEWER SUB-ELEMENT

Table of Contents. Chapter 4 Potable Water, Groundwater Aquifer Recharge Section

Chapter Nine, Potable Water Subelement City of St. Petersburg Comprehensive Plan

SANITARY SEWER ELEMENT

STORMWATER MANAGEMENT GOALS, OBJECTIVES, AND POLICIES

[THIS PAGE INTENTIONALLY LEFT BLANK]

Infrastructure Element

GOALS, OBJECTIVES AND POLICIES

Wakulla County Comprehensive Plan July 2013 GOALS, OBJECTIVES AND POLICIES

CHAPTER 5 INFRASTRUCTURE ELEMENT

Section Wastewater Treatment Element

[THIS PAGE INTENTIONALLY LEFT BLANK]

Memorandum #9 [11/17, DRAFT #3] 1

MARION COUNTY COMPREHENSIVE PLAN 2035

GOALS, OBJECTIVES AND POLICIES

Potable Water & Wastewater Element

Public Facilities Element (WAT) (SEW) (SOL) (STM)

M E M O R A N D U M. Workshop Discussion: Review of Results Neutral Crosswalk Methodology for Reforming the Comprehensive Plan Utility Elements

COMMUNITY FACILITIES ELEMENT

AQR Goal 1: Groundwater And Aquifer The element shall contain one or more goal Recharge. MSW Goal 3: Recycling And Waste Diversion directed.

CITY OF BOYNTON BEACH COMPREHENSIVE PLAN UTILITIES ELEMENT

UTILITIES: SOLID WASTE GOALS, OBJECTIVES AND POLICIES. Goal 1: [SW] (EFF. 7/16/90; REV. EFF. 12/24/10)

GUIDELINES FOR PREPARATION OF CAPACITY ANALYSIS REPORTS

POTABLE WATER ELEMENT

Section Water Supply Element

b) Ensure provision of sufficient potable water to meet anticipated University needs and to reuse water for irrigation purposes.

APPENDIX C ADEQ CHECKLIST FOR 208 PLAN AMENDMENTS

The current note, which was approved by the county Commission on March 20, 2018, restricts the plat as follows:

City of Valdosta Land Development Regulations

Comprehensive Plan for Unincorporated Hillsborough County Potable Water Element - DRAFT

Approved August 12, 1991 Amended June 8, 2009

Comprehensive Plan Update - Sanitary Sewer Section Planning Commission Workshop: November 10, 2014

A. POTABLE WATER AND GROUNDWATER RECHARGE WATER SUB-ELEMENT

3. PUBLIC FACILITIES ELEMENT

208 Plan Amendment Process for New Wastewater Treatment Facilities. Pima Association of Governments

FLORIDA STATE UNIVERSITY MASTER PLAN 9 General Infrastructure

This plat is restricted to 20,400 square feet of Boys and Girls Club.

RULES AND REGULATIONS FOR THE OPERATION AND MAINTENANCE OF WASTEWATER TREATMENT FACILITIES

Revised 1/20/2014 ARTICLE 9 CONSTRUCTION REQUIREMENTS PART A: GENERAL 9A-1 SERVICE LINES:

TITLE 250 DEPARTMENT OF ENVIRONMENTAL MANAGEMENT

Comprehensive Plan Update - Potable Water Section Planning Commission Workshop: November 10, 2014

MARION COUNTY COMPREHENSIVE PLAN 2035

Capital Facilities Element

STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II

D. UTILITIES ELEMENT

Recommendations for Changes to the Requirements of Section (9), Florida Statutes - Domestic Wastewater Ocean Outfalls

WHEREAS, the Board has previously so adopted a wastewater supply system comprehensive plan, and

DESOTO COUNTY COMPREHENSIVE PLAN SANITARY SEWER ELEMENT

The remainder of Area C is restricted to 120,535 square feet of office use; and an 894 bed detention facility.

SECTION 7 SANITARY SEWER, SOLID WASTE, STORMWATER DRAINAGE, POTABLE WATER AND AQUIFER RECHARGE

State of Florida Department of Community Affairs Areas of Critical State Concern Implementation Status Report Apalachicola Bay Area

10:00 a.m. Public Hearing #1

DRAINAGE AND NATURAL AQUIFER GROUNDWATER RECHARGE ELEMENT

ELEMENT 7 IMPLEMENTATION

Potable Water and Wastewater Data and Analysis Report

CHAPTER 10 NATURAL GROUNDWATER AND AQUIFER RECHARGE ELEMENT

MOUNTAIN HOUSE MASTER PLAN CHAPTER THIRTEEN WASTEWATER TREATMENT AND COLLECTION SYSTEM

Adopted January 15, 1996 Hood River County Ordinance #201

Wastewater Treatment Systems, Wastewater Issues and Permits

The current note, approved by the County Commission on August 11, 2015 (INSTR # ) reads as follows:

GOALS, OBJECTIVES, & POLICIES

Chapter 8-Sanitary Sewer

INCLUDING SUB-ELEMENTS: STORMWATERMANAGEMENT POTABLE WATER SANITARY SEWER SOLID WASTE

1.a.1. Wetlands, Including Artificial and Degraded Systems None

This application has been reviewed by Highway Construction and Engineering Division staff who has no objections to this request.

STAFF REPORT F.P. & L. Welleby Substation 059-MP-83

WEST CALN TOWNSHIP ORDINANCE INDIVIDUAL SEWAGE SYSTEM MANAGEMENT ORDINANCE

6.13 Utilities and Service Systems

SURFACE WATER MANAGEMENT ELEMENT

1006 UTILITIES, STREET LIGHTS, WATER SUPPLY, SEWAGE DISPOSAL, SURFACE WATER MANAGEMENT, AND EROSION CONTROL

Permits to Install; Procedures for Submittal of Plans for Public Sewage Treatment Systems

WASTEWATER TREATMENT PLANT UPGRADE PROJECT APPEAL NO. A-3-MRB

MEMORANDUM AGENDA ITEM #4b

AMENDED AND RESTATED ENGINEER'S REPORT FOR VERONAWALK COMMUNITY DEVELOPMENT DISTRICT BOARD OF SUPERVISORS VERONAWALK COMMUNITY DEVELOPMENT DISTRICT

Colorado Regulations Currently Impacting Impoundments

Water Recycling Facility Project

ON-SITE WASTEWATER MANAGEMENT POLICY

Chapter IV. Infrastructure Element

Chapter 21 Door County Code PRIVATE ONSITE WASTEWATER TREATMENT SYSTEMS

STAFF REPORT Dania Pointe 035-MP-15

SECTION A-4, LEGAL AUTHORITY A-4.0 LEGAL AUTHORITY A-4.1 INTRODUCTION

Mobility Management STAFF SUMMARY REPORT

Title 15 BUILDINGS AND CONSTRUCTION

*** DRAFT - NOT YET FILED ***

NOTICE OF ADOPTION OF RULES OHIO ENVIRONMENTAL PROTECTION AGENCY. Rules Governing. Water Pollution Control Loan Fund

2018 EVALUATION AND APPRAISAL REPORT

Capital Improvements

CLEAN WATER PLAN Policies, Assessments and Management Programs

Transcription:

SANITARY SEWER ELEMENT GOALS, OBJECTIVES, AND POLICIES GOAL 1: To provide for the adequate collection, treatment, and disposal of sewage to meet the needs of the customers of North Port with a specific 10-year plan through the Master Planning process through the year 2018, while taking into consideration the needs of the City at ultimate build-out. Objective 1: The City shall establish level of service standards to guide the provision of sanitary sewer service to its customers. Policy 1.1: The following level of service standards are hereby adopted to achieve the objective, and shall be used as the basis for determining facility capacity and the demand generated by a development: Treatment/Disposal 90 gallons per capita per day for residential, 0.0009 Equivalent Residential Connections (ERC)/sq. ft. for office, 0.0008 ERC/sq. ft for commercial, 0.0027 ERC/sq. ft. for restaurants, 0.0020 ERC/sq. ft. for industrial uses, and 0.0020 ERC/sq. ft. for medical facilities, with quality meeting or exceeding EPA and DEP Standards. The above level of service standards are not the design standards to be used for increasing/improving treatment, collection, or distribution facilities. The average and peak flow design capacity for sanitary sewer facilities are 3.52 mgd annual average daily flow, and 7.75 mgd maximum day flow, respectively. Collection Residential: In all currently unplatted areas, the developer, by agreement with the City, must provide all sewer infrastructure to include lift stations, extend sewer collection, and force mains as appropriate, to serve the area concurrent with the development. In addition, the developer will assure his commitment to pay capacity fees and confirm available capacity of the City s wastewater treatment plant prior to development. In all currently platted areas, the City may extend lines pursuant to the Capital Improvements Element, and the utility master plans (see Policy 2.15). The developed lots adjacent to the gravity sewer line shall connect to the line within 365 days of notification of sewer availability. Commercial: All new commercial development within the City will be served by central sanitary sewer, as determined by City of North Port. In all currently unplatted areas, the developer, by agreement with the City, must extend sewer collection and force mains as appropriate, and provide and upgrade any lift stations necessary to serve the area concurrent with the development. In addition, the developer will assure his commitment to pay capacity fees and confirm available capacity of the City s wastewater treatment plant prior to development. 4-41

Industrial: All new industrial development within the City will be served by central sanitary sewer, as determined by City of North Port staff. In all currently unplatted areas, the developer, by agreement with the City, must extend sewer collection and forcemains as appropriate, and provide and upgrade any lift stations necessary to serve the area concurrent with the development. Each industry must also provide pretreatment of any industrial discharge in accordance with the Utility Department requirements. In addition, the developer will assure his commitment to pay capacity fees and confirm available capacity of the City s wastewater treatment plant prior to development. On-site, pretreatment and treatment systems will be allowed when the City requires additional treatment complementary to the City s central sewer system consistent with rules, and regulations promulgated by State, Federal and local agencies. Objective 2: The City will continue to implement procedures to ensure that at the time a development permit is issued, adequate sewage collection, treatment and disposal capacity is available, or will be available, concurrent with the impacts of development. Such procedures will be implemented as defined in the Concurrency Management System Ordinance 90-28, 1990 and through the use of utility master planning. Sanitary sewer facilities shall be in place prior to the issuance of a Certificate of Occupancy, and available to serve new development. Policy 2.1: For the proper planning, design, and construction of upgrades and expansions to the City's wastewater collection, treatment, and disposal facilities, the following factors shall be considered but not be limited to: 1. Raw wastewater characteristics and flows. 2. Effluent disposal requirements for the Deep Injection Well and golf course and other irrigation systems. 3. Sensitivity to changes in wastewater characteristics and flow, and their effect(s) on operations. 4. Operational requirements. 5. Flexibility in dealing with changing state and federal regulations regarding the treatment and disposal of wastewater and sludge. 6. Available space for upgrading and expanding the existing facilities. 7. Reliability of process equipment. 8. Capital and operating costs. 9. Appropriate minimum level of service. 10. Planning of extension of reuse system if required by the City. 11. Developer s Agreements. 12. Relationship to land development patterns. Commercial or industrial uses may require pretreatment as determined by the Utility Department on a case by case basis and pursuant to applicable federal, state and local requirements, and shall be consistent with the utility master plans (see Policy 2.15). Policy 2.2: To develop a tract or a number of contiguous lots, the City will determine: 4-42

1. how a developer will expand and/or extend the treatment, collection and distribution system to serve the properties, 2. what on-site and off-site treatment, collection, and distribution systems are necessary, with the understanding that all systems are subject to City approval and applicable federal, state and City standards, 3. a combination of 1 and 2 above, or other appropriate technique(s). The above shall be implemented by a Developer s Agreement. Policy 2.3: All improvements for replacement, expansion or increase in capacity of facilities shall be compatible with the adopted level of service standards for the facilities. Policy 2.4 The City shall update facility demand and capacity information as development orders or permits are issued. Policy 2.5: The City will continue to operate and maintain its sludge treatment and disposal systems in accordance with Chapter 62-640, F.A.C., and Title 40 CFR, Part 503. Policy 2.6: Sludge disposal sites utilized by the City shall meet the requirements specified by Chapter 62-640, F.A.C. Policy 2.7: Sludge disposal sites utilized by the City shall comply with the restrictions specified by Rule 62-640.400, F.A.C., pertaining to disposal near waterbodies, groundwater recharge areas, and the discharge of air pollutants. Policy 2.8: The City shall continue to analyze regional and new sludge removal technologies as they become available. Policy 2.9: For all projects including WVID (Thomas Ranch), Kelce Ranch developments, and the Panacea DRI, the City will require the developer to evaluate and develop the sanitary sewer facilities and infrastructure needed to support their development. Policy 2.10: For all developments along waterways, the City will require a higher level of review for developments bordering areas of potential potable water resources, such as the Cocoplum Waterway, the Myakkahatchee Creek, and all drainage canals which feed these water supplies, so as to keep potential potable water resources from becoming contaminated by the overuse of septic systems and their potential environmental impacts. Policy 2.11: The City will continue to enforce procedures to ensure that at the time a development permit is issued, adequate sanitary sewer collection, treatment, and disposal facilities are available, or will be available, concurrent with the impacts of development. Such procedures will be implemented as defined in the Concurrency Management System Ordinance 90-28, 1990. The extension of sanitary sewer lines to serve residential, commercial, industrial, and other uses shall be financed/funded pursuant to the utility master plans (see Policy 2.15). Sanitary sewer facilities shall be in place prior to the issuance of a Certificate of Occupancy, and available to serve new development. 4-43

Policy 2.12: The City shall utilize utility master plans to guide the provision of sanitary sewer service to its customers. Utility Master Plans (see Policy 2.15) shall be updated at least every five (5) years. Policy 2.13: Utility master plans, shall include a hydraulic modeling component. Policy 2.14: All projects shall be undertaken consistently and complementary with the utility master plans (see Policy 2.15). Policy 2.15: When referring to utility master plans, the City will adhere to the following three accepted plans. The City shall amend this comprehensive Plan when any of these master plans are updated and new master plans are developed and accepted by the City Commission. 1) 2004 Utilities Master Plan: Adopted by Commission on June 13, 2005. 2) Water Reuse Master Plan: Accepted by City Commission on April 28, 2008. 3) 2007 Water Utilities Master Plan: Accepted by City Commission on April 28, 2008. Objective 3: The City shall require that each developer enter into a Utility Agreement which outlines the needs of the developer, and addresses the availability of adequate sanitary sewer infrastructure and capacity. In addition the developer will be required to plan, design, permit, construct, and dedicate all infrastructure improvements necessary for their development pursuant to the developer agreement. Policy 3.1: The developer will be responsible for evaluating and mitigating impacts systemwide. This will include increasing pumping capacity, replacing motors, and anything else that the impact from the development may require. The developer will also be responsible for all hydraulic modeling to evaluate impacts due to the development. Policy 3.2: All developers within areas annexed after 1997 will be responsible for coordinating and expanding existing City sanitary sewer services to assure that the sanitary sewer treatment and capacity will be available to serve their developments. Developers who develop in areas annexed after 1997 will be required to implement improvements, including, but not limited to, water and sewer lines, lift stations, and treatment facilities, at the time of their development solely at their cost. Objective 4: The City will maintain a five-year schedule of capital improvement needs, as identified in the Capital Improvements Element, for sewer collection, treatment and disposal facilities, and the utility master plans (see Policy 2.15). The schedule will be updated annually in conformance with the review process for the Capital Improvements Element of this plan, the City's annual budget process, and per state statute. Policy 4.1: The City shall monitor federal and state requirements and grant funding sources for the construction of wastewater facilities, and, where applicable and practical, shall encourage wastewater planning consistent with the eligibility requirements of the funding program(s). 4-44

Policy 4.2: Proposed capital improvement projects will be evaluated and ranked according to the following priority level guidelines in conjunction with those enumerated in the Utilities Master Plans (see Policy 2.15): a. whether the project is needed to protect public health and safety, b. provide facilities and services to preserve or achieve full use of existing facilities and increase efficiency, c. prevents or reduces future improvement costs, d. promotes in-fill, economic development or educational facilities (excluding Sarasota Board of Education support facilities such as bus repair garages, etc.), e. provides service to developed areas lacking full service. Policy 4.3: The City shall seek to eliminate unauthorized connections and discharges to the City's wastewater system. Policy 4.4: All Developers within areas annexed after 1997 will be responsible for coordinating and expanding existing City sanitary sewer services to assure that sewer capacity will be available to serve their developments. Developers who develop in areas annexed after 1997 will be required to implement improvements, including, but not limited to, water and sewer lines, lift stations, and treatment facilities, at the time of their development solely at their cost. Objective 5: Existing deficiencies which have been identified in the Utilities Master Plans (see Policy 2.15), or other pertinent documents, will be addressed by the City. Policy 5.1: All projects shall be undertaken in accordance with the utility master plans (see Policy 2.15). Policy 5.2: Projects needed to correct existing deficiencies, as identified in the Capital Improvements Element or other appropriate documents, shall be given priority, in accordance with Policy 2.4 of this element. Objective 6: The City shall accommodate, where and when financially feasible, the projected development and the accompanying demands for sewage collection, treatment, and disposal facilities through the year 2018, while taking into consideration the needs of the City at ultimate build-out. Policy 6.1: The City shall discourage the use of individual septic systems. When it is determined that an on-site septic system is necessary for interim service prior to the availability of central sewer service, such individual septic tanks and on-site systems will be installed in accordance with applicable Federal, State, and Local regulations. Policy 6.2: The City shall continue to identify and evaluate alternative treatment, disposal and collection methods. Policy 6.3: The City will continue to coordinate with regional utilities to assess common needs and opportunities. 4-45

Policy 6.4: The City will continue to evaluate the amount of inflow/infiltration and options to reduce infiltration to defer treatment and effluent disposal facility expansions. The cost/benefit between reducing infiltration and expanding plant capacity for treatment and effluent disposal shall be addressed so as to minimize costs to sewer customers. Policy 6.5: The City shall continue to promote sewage flow reduction and organic load reductions through greater public education and will develop a pretreatment ordinance and grease trap ordinance which will provide requirements for all commercial and industrial properties. Policy 6.6: The City shall continue to develop and implement wastewater line extension policies which will include funding, and timing of line extensions to individual users. Policy 6.7: The City shall continue to pursue reuse options including, but not limited to, residential gray water systems, irrigation of school sites, parks, golf courses, residential commercial, and other public lands, and export to appropriate sites for spray irrigation. Reuse of wastewater is the effluent disposal method of first choice. Objective 7: In an effort to encourage efficiency in the provision of utility services, the City shall seek input, as applicable, from various local, state, regional, and federal authorities, as well as the citizens of the City of North Port. Policy 7.1: The City of North Port Public Utility Advisory Board, task force, or any other Committee designated by the City Commission, shall make recommendation to the City Commission regarding utility issues as described in Ordinance No. 93-R-13, including Capital Improvement Projects. Policy 7.2: The City, in its discretion, when considering utility initiatives, shall seek input as appropriate through mechanisms which include, but are not limited to, the following: (a.) City advisory boards. (b.) Neighborhood meetings. (c.) Coordination with regional agencies. (d.) Coordination with nearby utility providers, including but not limited to Sarasota County, Charlotte County, Desoto County, Venice, Punta Gorda and the Englewood Water District. (e.) Participation and coordination with the Peace River/Manasota Regional Water Supply Authority, Southwest Florida Water Management District, or any other regional entity. (f.) Participation and coordination with special areas within and abutting the City s border, including, but not limited to, the West Villages Improvement District. (g.) Participation and coordination with Emergency Management providers. (h.) All annexed areas property owners. Policy 7.3: The City shall encourage efficiency in the provision of services through the regional sharing of ideas and technology. 4-46

Objective 8: The City will maximize the use of existing sanitary sewer facilities as development occurs. Policy 8.1: Recognizing the platted lands nature of the City, the City, through utility master planning, will continue to expand sanitary sewer service to the neighborhoods as those neighborhoods satisfy the proposed criteria identified in the master plans (see Policy 2.15), and consistent with the Unified Land Development Code. Policy 8.2: Consistent with the Future Land Use Element, no sanitary sewer service will be provided to areas designated as Agriculture/Estates on the Future Land Use Map. Objective 9: The City will evaluate the extension of sanitary sewer lines for the purposes of Economic Development. Policy 9.1: The City will evaluate extending sanitary sewer lines to current and proposed Activity Centers not currently serviced by sanitary sewer service for the purpose of Economic Development. 4-47