Second Avenue Subway Draft Programmatic Agreement WHEREAS WHEREAS WHEREAS WHEREAS WHEREAS WHEREAS WHEREAS

Similar documents
EXHIBIT H SECOND AVENUE SUBWAY PROJECT SITE PRIORITIZATION AND ADDITIONAL DOCUMENTARY RESEARCH PROTOCOL

WHEREAS, the Boston Landmarks Commission (BLC) has participated in the consultation and has been invited to concur in the Agreement; and

STATUS REPORT On the

Appendix G Draft Memorandum of Agreement

Unanticipated Discoveries Plan EXHIBIT J UNANTICIPATED DISCOVERIES PLAN FOR ARCHAEOLOGICAL PROPERTIES INCLUDING HUMAN REMAINS

New Jersey Pennsylvania Lackawanna Cut-Off Passenger Rail Service Restoration Environmental Assessment. Appendix B

DRAFT. WHEREAS, FHWA, USMC, NPS, DDOT, DPR, DCSHPO and CSX are hereafter referred to as the Signatories to this MOA; and

PROGRAMMATIC AGREEMENT AMONG GRAND PORTAGE BAND OF CHIPPEWA INDIANS AND MINNESOTA DIVISION OF THE FEDERAL HIGHWAY ADMINISTRATION, WITH CONCURRENCE BY

Appendix B Section 106 Memorandum of Agreement

6. The following paragraphs provide further interim guidance where the ACHP regulations are not specific to the Corps Regulatory Program:

APPENDIX M PROGRAMMATIC AGREEMENT

Environmental Analysis, Chapter 4 Consequences, and Mitigation

PROGRAMMATIC AGREEMENT

H. R (a) IN GENERAL. Subchapter I of chapter 1 of title 23, United States Code, is amended by inserting after section 138 the following:

CHAPTER 21: COMMITMENT OF RESOURCES

Indirect and Cumulative Effects

Definitions 3/3/2010. Choosing the Select: The Results of the Indiana Historic Bridge Inventory. Road School 2010

V. MITIGATION MONITORING PLAN

Draft. WHEREAS, the MDT participated in the consultation and has been invited to concur in this Programmatic Agreement; and

WHEREAS, the VDOT anticipates receiving Federal financial assistance for the Project from the Federal Highway Administration (FHWA); and

A. INTRODUCTION B. LAND USE, ZONING, AND PUBLIC POLICY C. SOCIAL CONDITIONS

FINDING OF NO SIGNIFICANT IMPACT (FONSI) FOR ENVIRONMENTAL ASSESSMENT (EA) OF MV-22 FACILITIES PROJECT RELOCATION

5.D.1 HISTORIC, ARCHITECTURAL, ARCHEOLOGICAL, AND CULTURAL RESOURCES

Orange County Central Utility Facility Upgrade IP

ATTACHMENT C MEASURES TO MINIMIZE HARM

8.0 MITIGATION MONITORING AND REPORTING PROGRAM

Table of Contents. Project Agreement Schedule 14

2012 VIRGINIA INDUSTRIALIZED BUILDING SAFETY REGULATIONS

Open Access Transmission Tariff ATTACHMENT K

Decision Memo. Programmatic Forest Plan Amendment for Cultural Resource Protection Standards and Guidelines. United States Department of Agriculture

Preliminary Project Assessment

ADMINISTRATIVE DIRECTIVE #CS-04

Phoenix Building Construction Code Updated Amendments to the Administrative Provisions

Notice of Proposed Draft Program Comment to Exempt Effects. of Transportation-Related Undertakings within Rail Rightsof-Way.

4.11 CULTURAL RESOURCES

EXHIBIT A SCOPE OF SERVICES FOR DISTRICT WIDE CULTURAL RESOURCE ASSESSMENT (CRA) & NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) COMPLIANCE SERVICES

Attachment 1 Findings and Conditions

Exhibit C: Design Review & Document Approval Procedures

FEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION

Second Avenue Subway Phase 2. NEPA Supplemental Environmental Assessment. Public Meeting. July 31, 2018

6.6 Cultural Resources

Better Preservation Solutions through Early Coordination of Section 106, Section 4(f) and NEPA

Oklahoma Underground Facilities Damage Prevention Act

Appendix K Section 106 of the National Historic Preservation Act, Programmatic Agreement Regarding the Sterling Highway Milepost 45 to 60 Project

CHINA EASTERN AIRLINES CORPORATION LIMITED

AVOIDANCE & MINIMIZATION MEASURES: NO ADVERSE EFFECT

James & Nanci Dobbins (PLN030106)

INTERGOVERNMENTAL COOPERATION AGREEMENT FOR IMPLEMENTING GROWING TOGETHER: A COMPREHENSIVE PLAN FOR CENTRAL LANCASTER COUNTY, PENNSYLVANIA

Quil Ceda Creek Casino Project Archaeological Monitoring and Treatment Plan

Better Preservation Solutions through Early Coordination of Section 106, Section 4(f) and NEPA

CHAPTER 5: PUBLIC OUTREACH

Document Compilation and Approval

REQUEST FOR QUALIFICATIONS PROFESSIONAL AIRPORT ENGINEERING SERVICES RUNWAY 16R-34L IMPROVEMENTS PROGRAM RENO-TAHOE INTERNATIONAL AIRPORT

Oklahoma Underground Damage Prevention Act

Amendments to Municipal Code Chapter 363: Vibration Control

Work Breakdown Structure Element Dictionary Preliminary Engineering

North Spring Street Viaduct Widening and Rehabilitation Project Los Angeles, California State Clearinghouse No Bridge No.

(B) "Facility," for the purposes of this rule, means:

University Corridor Draft Environmental Impact Statement (DEIS)

Final Environmental Impact Statement Addendum: Agreement for the Central Corridor Light Rail Transit Project through the University of Minnesota,

Subject: Statement of Qualifications for Public Safety Building Design

INTERIM CONSULTATION PROCEDURE WITH TREATY 8 FIRST NATIONS September 2011

NYU CORE Construction Presentation

RESOLUTION NO.15- The Planning Commission of the City of La Habra does hereby resolve as follows:

2017 Archaeology Audit Program Procedure Manual. April 2017

NYU CORE Construction Presentation

ISO New England - ISO New England Inc. Transmission, Markets and Services Tariff

Figure Preferred Alternative Modified Alternative 2 Means of Egress

Welcome to Metro s Environmental Construction Awareness Program module on cultural resources.

B. DESCRIPTION OF CONSTRUCTION ACTIVITIES

ANAHEIM FIVE COVES (NORTHERN EXTENSION) PARK PROJECT MITIGATION MONITORING PLAN NO. 341

Attachment 1 Architectural Services

Implementation of this Special Provision requires a complete understanding of the following documents:

2016 SAN FRANCISCO EXISTING BUILDING CODE AB-110 ADMINISTRATIVE BULLETIN. Building Façade Inspection and Maintenance

Environmental Assessment Environmental Review Agreement Template September 2013

World Trade Center Memorial and Redevelopment Plan Historic Resources Report July 2010

RESOLUTION NO Adopted by the Sacramento City Council. July 14, 2015

VALLEY LATERAL PROJECT. RESOURCE REPORT 4 Cultural Resources. FERC Docket No. CP

Government to Government Policy

CHAPTER SURFACE MINING AND RECLAMATION PLAN REGULATIONS

CANADIAN AVIATION REGULATION ADVISORY COUNCIL (CARAC) NOTICE OF PROPOSED AMENDMENT (NPA): RESPONSIBLE AERODROME DEVELOPMENT

Programmatic Categorical Exclusions

A. Federally-Enforceable: All limitations and conditions which are directly enforceable by U.S. EPA, including:

MMRP for Metro Red/Purple Line Core Capacity Improvements Project

Corporate Policy and Procedure

NEPA THE NATIONAL ENVIRONMENTAL PROTECTION ACT CEQA THE CALIFORNIA ENVIRONMENTAL QUALITY ACT

El Dorado Avenue

Document B Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition

THIS PAGE INTENTIONALLY LEFT BLANK.

EXHIBIT 6 Preconstruction Work

Mary Morse Shaw TR et el. (PLN020567

Human Research Protection Program Compliance Plan

Subpart C_Roadway Worker Protection

3.4 HISTORIC, ARCHEOLOGICAL, AND CULTURAL RESOURCES

Chapter 21 Stormwater Management Bylaw

Departmental Manual Part 516

BioAmber Inc. Audit Committee Charter

Request for Proposal W

2. Creating and monitoring the overall program milestone plan and cross-functional dependencies and issues.

THE CITY OF EDMONTON PROJECT AGREEMENT VALLEY LINE LRT STAGE 1. Schedule 11. Project Safety Requirements

Transcription:

DRAFT PROGRAMMATIC AGREEMENT AMONG THE FEDERAL TRANSIT ADMINISTRATION, THE METROPOLITAN TRANSPORTATION AUTHORITY NEW YORK CITY TRANSIT, AND THE NEW YORK STATE HISTORIC PRESERVATION OFFICER REGARDING THE SECOND AVENUE SUBWAY PROJECT IN NEW YORK CITY, NEW YORK WHEREAS, the New York City Transit Authority, an affiliated agency of the Metropolitan Transportation Authority of the State of New York ( MTA NYCT ) is proposing to construct the Second Avenue Subway Project (the Project ), a new 8.5-mile-long subway line located on the east side of Manhattan that will improve transit services, transportation and access to the east side of Manhattan and includes new or improved rail yards in Manhattan and Brooklyn and subway car maintenance facilities in Manhattan and the Bronx; WHEREAS, MTA NYCT has applied to the Federal Transit Administration ( FTA ) for monies to assist MTA NYCT in constructing the Project. Accordingly, FTA is the Project s lead federal agency pursuant to the National Environmental Policy Act (NEPA, codified at 42 USC 4321 et seq.) and is the federal agency responsible for compliance with Section 106 of the National Historic Preservation Act (codified at 16 USC 470f, and herein Section 106 ); WHEREAS, due to the length and complexity of the Project and the potential for exigent circumstances to arise during construction of the Project, MTA NYCT will provide funding, subject to final MTA/MTA NYCT approvals, to the New York State Historic Preservation Office (SHPO) for expedited review services. Such review services will be fulfilled by an on-call, full-time SHPO designee stationed in New York City with full SHPO-delegated review and decision-making authority; WHEREAS, FTA and MTA NYCT, along with SHPO and the New York City Landmarks Preservation Commission ( LPC ) as consulting parties, as the result of a consultative process in accordance with Section 106, have determined that it is appropriate to enter into this Programmatic Agreement, pursuant to Section 800.14(b) of the regulations implementing Section 106 (codified at 36 CFR Part 800, and herein the Section 106 Regulations ), which will govern the implementation of the Project and satisfy FTA s compliance with Section 106; [THE FINAL VERSION OF THIS AGREEMENT WILL BE SIGNED PRIOR TO THE PUBLISHING OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT (FEIS)] WHEREAS, FTA has invited the Advisory Council on Historic Preservation ( ACHP ) to participate in the Section 106 process for this Project and ACHP has declined; Parentheticals have been provided for the Whereas clauses to indicate the timing of the Section 106 processes in relation to the execution of the Programmatic Agreement. Parentheticals will not appear in the Final Programmatic Agreement. PA-1

WHEREAS, FTA has coordinated its compliance with Section 106 and NEPA, pursuant to 36 CFR 800.8 through its preparation of an Environmental Impact Statement ( EIS ) for the Project; [THE EIS WILL BE FINALIZED AFTER THE FINAL VERSION OF THIS PROGRAMMATIC AGREEMENT IS SIGNED SO THAT THE FINAL VERSION OF THIS PROGRAMMATIC AGREEMENT CAN BE INCLUDED IN THE FINAL EIS] WHEREAS, through the process conducted in preparing the EIS, FTA has determined that the Project may have an effect on properties qualifying for protection under Section 106, consisting of those properties listed or eligible for listing on the State and National Registers of Historic Places ( Historic Properties ); WHEREAS, pursuant to the Section 106 Regulations, FTA and MTA NYCT, in consultation with SHPO, identified the Project s areas of potential effect ( APEs ) for Historic Properties and determined that the APEs are the areas where potential effects on Historic Properties caused by the Project may occur; WHEREAS, generally, Historic Properties can be categorized as archaeological or built (see 36 CFR 800.16(l)); and this Programmatic Agreement specifies the appropriate approaches for Archaeological and Built Properties in the Project s APEs separately, due to the different issues presented by each category; WHEREAS, the identification and evaluation of Historic Properties within the Project s APEs was conducted by MTA NYCT, in consultation with FTA and SHPO, as documented in the EIS. As part of this process, FTA and MTA NYCT identified properties that appeared to meet the criteria for listing on the State and National Registers of Historic Places provided at 36 CRF Part 63 (herein Historic Properties criteria ) and therefore to qualify for Section 106 protection, but for which SHPO had not yet made determinations of eligibility. FTA in consultation with SHPO, subsequently determined whether these properties constitute Historic Properties and qualify for Section 106 protection; WHEREAS, as documented in the EIS, FTA and MTA NYCT, in consultation with SHPO and LPC, identified two Built Properties in the Project s APEs the Daily News Building at 42nd Street and the Brooklyn Bridge that are National Historic Landmarks, and a total of 77 Built Properties that qualify for Section 106 protection. These Built Properties are identified in Table 9-1 of the EIS, Known Historic Resources Within the APEs and Potential Project Effects annexed hereto as Exhibit A. Additionally, Figures 9-1 through 9-9 of the SDEIS, annexed hereto as Exhibit B, depict the approximate locations of these Built Properties; [BEFORE EXECUTION OF THIS PROGRAMMATIC AGREEMENT, THE FEIS WILL BE PUBLISHED AND THESE REFERENCES WILL BE CHANGED AS NECESSARY TO REFLECT THE TABLES AND FIGURES IN THE FEIS] WHEREAS, as documented by the EIS, FTA and MTA NYCT, in consultation with SHPO and LPC, identified areas with the potential to contain Archaeological Properties in the Project s APEs ( archaeologically sensitive areas ) and identified archaeologically sensitive areas in which construction might occur, including six areas that are potentially sensitive for human remains, and these resources are identified in Tables 10-1, 10-2, and 10-3 of the EIS, annexed hereto as Exhibit C. Additionally, Figures 10-1 through 10-6 of the EIS, annexed hereto as Exhibit D, depict the approximate locations and depths of the areas identified in Exhibit C; [[BEFORE EXECUTION OF THIS PROGRAMMATIC AGREEMENT, THE FEIS WILL BE PUBLISHED AND THESE REFERENCES WILL BE CHANGED AS NECESSARY TO REFLECT THE TABLES AND FIGURES IN THE FEIS ] PA-2

WHEREAS, it is possible that as the Project evolves or as a result of the addition of new Project elements beyond the boundaries of the current APEs, FTA and MTA NYCT, in consultation with SHPO [and LPC], may identify additional, previously unidentified Built Properties or archaeologically sensitive areas, which may be affected by the Project; WHEREAS, this Programmatic Agreement sets forth measures that will be implemented for all Built Properties or archaeologically sensitive areas within the Project s current or future APEs; WHEREAS, the length and complexity of the Project necessitate that the design and construction of the Project be phased over a 12- to 16- year period and a phasing schedule has not yet been developed; WHEREAS, more detailed information on historic and archaeological resources will become available during the Preliminary Engineering, Final Design, and Construction stages of the Project. Preliminary Engineering is currently ongoing, Final Design will follow Preliminary Engineering, and Construction will commence after completion or concurrent with Final Design; WHEREAS, a Cultural Resources Management Plan that includes measures to protect Built Properties and Archaeological Properties prior to and during construction of the Project has been developed for the Project and contains separate plan components that are annexed hereto as Exhibits E through M of this Programmatic Agreement; WHEREAS, FTA has made a reasonable and good faith effort to identify and contact by letter the appropriate Native American tribes and groups (the Tribes ) that could attach religious or cultural significance to sites within the APEs upon which the Project could have an effect; WHEREAS, FTA and MTA NYCT have made a reasonable and good faith effort to identify and contact and seek the involvement of any descendant groups or communities associated with the areas potentially sensitive for human remains that may be affected by the Project; [THIS REASONABLE AND GOOD FAITH EFFORT HAS BEGUN AND WILL HAVE BEEN COMPLETED PRIOR TO THE EXECUTION OF THE FINAL VERSION OF THIS PROGRAMMATIC AGREEMENT] WHEREAS, this Programmatic Agreement was developed with appropriate public participation during the NEPA public comment period pursuant to Subpart A of the Section 106 Regulations and a draft copy of this agreement was included and distributed with the Supplemental Draft EIS. The public will be duly notified as to the execution and effective dates of this Programmatic Agreement through either the Final EIS and/or FTA s Record of Decision for the Project; [THIS PROGRAMMATIC AGREEMENT WILL HAVE BEEN DEVELOPED WITH APPROPRIATE PUBLIC PARTICIPATION; SO, AT THE TIME OF THE EXECUTION OF THE FINAL VERSION, THIS CLAUSE IS ACCURATE.] NOW, THEREFORE, FTA, MTA NYCT, and SHPO agree that the Project shall be implemented in accordance with the following stipulations to ensure that potential effects on Historic Properties are taken into account. PA-3

STIPULATIONS FTA, MTA NYCT, AND SHPO AGREE THAT THE FOLLOWING STEPS WILL BE UNDERTAKEN IN CONNECTION WITH THE PROJECT AND THAT FTA WILL INCLUDE THE OBLIGATIONS SET FORTH IN THIS AGREEMENT AS PART OF ITS RECORD OF DECISION AND AS A CONDITION OF FTA S APPROVAL OF ANY GRANT ISSUED FOR CONSTRUCTION OF THE PROJECT, TO ENSURE THAT THESE MEASURES ARE IMPLEMENTED AS PART OF THE COMPLIANCE WITH THE SECTION 106 PROCESS AND THE SUBSEQUENT PLANNING, DESIGN, AND CONSTRUCTION OF ANY APPROVED PROJECT ALTERNATIVE. I. BUILT PROPERTIES A. Construction Protection Plan 1. The EIS demonstrated that the Project could have potential adverse effects on certain Built Properties, primarily due to the proximity of the resources to proposed construction activities, including tunnel and station construction, shaft sites and/or staging areas, and building underpinning activities. The EIS also demonstrated that it is possible that additional, previously unidentified Built Properties may be identified within the Project s APEs in the future or in the area of any new project elements (see I.C. below) and that these previously unidentified properties may be affected by the Project. Accordingly, this Programmatic Agreement sets forth the following measure that will be implemented for all Built Properties within the Project s APEs. 2. To avoid Project-related construction damage to any Built Property and any additional Built Property that may not have been previously identified, as set forth below in I.C., MTA NYCT, in consultation with FTA and SHPO and all other appropriate New York City agencies, will develop Construction Protection Plans for Built Properties. Annexed hereto as Exhibit E is a list of procedures that will be included in Construction Protection Plans, which will be developed prior to construction of the Project. MTA NYCT shall ensure that any Built Property that could be adversely affected by Project construction will be included in a Construction Protection Plan, and MTA NYCT shall implement such plans as appropriate. B. Design Specifications Governing Potential Permanent Contextual Effects 1. FTA and MTA NYCT have determined, through the EIS, that the Project has the potential to result in permanent visual effects and changes to the historic setting (herein contextual effects ) to MTA Metro-North s Harlem-125th Street Station and Comfort Station, which have been determined eligible for listing on the National Register of Historic Places. MTA NYCT, in consultation with SHPO, will develop design specifications to ensure that projectrelated construction activities in and around MTA Metro-North s Harlem-125th Street Station are compatible with the station s historic and architectural qualities. Annexed hereto as Exhibit F is a description of the components of the design specifications plan for MTA Metro-North s Harlem-125th Street Station and Comfort Station, which will be developed beginning with Final Design of the Project. 2. MTA NYCT, in consultation with SHPO, will develop design specifications to ensure that any permanent Project elements that may affect the visual context or historic setting of a Built Property in the Project s APEs, including Project construction within an existing Built PA-4

Property, are compatible with the historic and architectural qualities of that property. Examples of such potentially visible project elements may include subway entrances and exits and ventilating structures. Annexed hereto also as Exhibit F is a description of the components for the design specifications plan for visible project elements, which will be developed beginning in Final Design of the Project. C. Identification of Additional Built Properties and Assessment of Project Effects 1. If additional Built Properties not previously identified as Built Properties in the EIS are identified in the Project s APEs during Preliminary Engineering, Final Design, or Construction of the Project or if new project elements are added to the Project in areas that were not previously assessed for Built Properties in the EIS, it is possible that potential effects on Built Properties, in addition to those described in the EIS, may occur. For any such new project elements, the potential effects on Built Properties will be assessed prior to construction by FTA and MTA NYCT, in consultation with SHPO [and LPC], in accordance with the Section 106 process. 2. MTA NYCT will consult with FTA, SHPO and LPC annually to ensure the FTA and MTA NYCT maintain up-to-date lists of properties that are determined to be Historic Properties as construction of the Project proceeds, and to assess potential effects on any such properties in the Project s APEs. D. Consultation with SHPO Regarding Built Properties MTA NYCT shall submit any plans developed pursuant to design specifications governing potential permanent contextual effects described in I.B. to FTA, SHPO [and LPC] in advance of any construction that may result in any such effects. FTA s and SHPO s review and comment on such submissions shall be governed by the process set forth in III.A-B. II. ARCHAEOLOGICAL PROPERTIES A. Additional Evaluation for Archaeologically Sensitive Areas The EIS first identified archaeologically sensitive areas in the Project s APEs and then identified those areas in which construction might occur. The following stipulations describe the processes that will be followed in conducting further research to determine the potential for Archaeological Properties to be affected by the Project. 1. Soil Borings Program During Preliminary Engineering of the Project, MTA NYCT established a soil borings program to establish geotechnical and environmental subsurface conditions along the subway corridor. MTA NYCT has consulted with SHPO and LPC regarding the establishment of a protocol for the borings to be used for archaeological purposes to reassess the potential for archaeological resources, or lack thereof; and a protocol for the taking of borings in areas potentially sensitive for human remains. MTA NYCT will implement and follow the procedures set forth in the Soil Borings Plan, annexed hereto as Exhibit G. 2. Protocol to Prioritize Archaeologically Sensitive Areas for Field Testing and Field Testing Plan PA-5

a. At all sites where the potential for archaeological resources is confirmed to exist by soil borings conducted under II.A.1. above, MTA NYCT shall: (i) Prioritize archaeologically sensitive areas for testing. MTA NYCT will commence this work during Preliminary Engineering of the Project. It will include an assessment of site access and testing feasibility for all archaeologically sensitive areas that would be affected by the Project. For areas sensitive for historic-period resources, MTA NYCT shall undertake additional documentary research to document historic disturbance, refine archaeological sensitivity, and evaluate research potential so as to prioritize the sites for testing based on the site s potential to yield significant information and address meaningful research issues according to the Historic Properties criteria. The work will be undertaken as per the procedures set forth in the Site Prioritization and Additional Documentary Research Protocol, which was developed in consultation with SHPO and LPC, and annexed hereto as Exhibit H; and/or (ii) Undertake field testing to identify the presence or absence of potential Archaeological Properties. b. Prior to commencing any field testing, MTA NYCT shall submit a Field Testing Plan outlining the proposed methodology for SHPO s [and LPC s] concurrence that the field evaluation and testing program would be conducted at a level sufficient to determine if the potential resource meets the Historic Properties criteria. Annexed hereto as Exhibit I is a description of the components of the Field Testing Plan that will be developed beginning with Preliminary Engineering of the Project. SHPO s [and LPC s] review and comment on such submissions shall be governed by the process set forth in III.A-B. c. In areas identified as potentially sensitive for human remains, field testing will proceed in accordance with the requirements for testing in areas potentially sensitive for human remains established in the Field Testing Protocol. Subsurface work will only be undertaken in areas potentially sensitive for human remains following the prior notification of and opportunity for consultation with the appropriate descendant community (if such appropriate descendant community can be reasonably identified and located) as outlined below in II.A.3. d. For all field tested sites, MTA NYCT shall provide a report to FTA, SHPO [and LPC] in which the Historic Properties criteria have been applied to reach one of the following conclusions: (i) The site does not meet the Historic Properties criteria; in which case no further action is required. (ii) The site does meet the Historic Properties criteria, in which case the site will be treated in accordance with II.A.4 below. e. SHPO s [and LPC s] review and comment on such reports shall be governed by the process set forth in III.A-B. PA-6

3. Protocol for Work in Areas Potentially Sensitive for Human Remains a. Consultation with Descendant Community(s) Associated with Areas Potentially Sensitive for Human Remains At all sites sensitive for human remains where subsurface work is required for borings and/or field testing as described in II.A.1.d. and II.A.2.c. above, MTA NYCT shall: (i) Make a reasonable and good faith effort, prior to any excavation, to locate and contact the appropriate descendant community(s). In the event that an appropriate descendant community(s) has been identified and located, MTA NYCT shall seek the involvement of the descendant community(s) during Preliminary Engineering of the Project and prior to any excavation. (ii) Follow the protocol set forth in II.A.3.b below that outlines the appropriate notification procedures and treatment of human remains in the event that human remains are encountered. Such protocol will be in place prior to any excavation. b. Notification Procedures and Treatment of Human Remains If any human remains are encountered during subsurface work for borings, field testing, or Project construction the following will occur: (i) MTA NYCT shall stop work and secure the site. (ii) MTA NYCT shall notify the New York City Medical Examiner and Police Department. MTA NYCT s Cultural Resources Manager, a professional archaeologist, shall notify SHPO [and LPC]. (iii) The appropriate descendant community(s) shall be notified, so that the remains may exhumed and treated in an appropriate manner as previously agreed upon by the descendant community(s) and MTA NYCT. (iv) Once Cultural Resources Manager, in consultation with SHPO, indicates that all remains have been properly exhumed, construction may proceed. 4. Mitigation, Data Recovery, Curation, and Public Interpretation a. For all sites identified as meeting the Historic Properties criteria, MTA NYCT, in consultation with SHPO [and LPC], shall consider measures, such as design modification, for avoidance of Archaeological Properties. b. For those sites identified as meeting the Historic Properties criteria where FTA and MTA NYCT determine, in consultation with SHPO [and LPC], that avoidance is not practicable, MTA NYCT, in consultation with SHPO [and LPC], shall develop and implement a Data Recovery Plan. The Data Recovery Plan will be designed to recover data sufficient to address significant research issues and test assumptions, and thus substantially preserve the archaeological value of Section 106 protected sites. SHPO s review and comment on such plan shall be governed by the process set forth in III.A-B. MTA NYCT shall be responsible for the implementation of such a plan, as appropriate. PA-7

Annexed hereto as Exhibit K is a description of the components of the Data Recovery Plan, which will be developed beginning with the Final Design of the Project. c. In advance of any mitigation or data recovery efforts undertaken pursuant to II.4.a and b above, MTA NYCT, in consultation with SHPO [and LPC], will develop in accordance with 36 CFR Part 79, an Analysis and Curation of Material and Records Plan for any archaeological excavations. SHPO s [and LPC s] review and comment on such plans shall be governed by the process set forth in III.A-B. MTA NYCT shall be responsible for the implementation of such a plan, as appropriate. Annexed hereto as Exhibit L is a description of the components of the Analysis and Curation of Material and Records Plan, which will be developed during Final Design and Construction of the Project. d. During and/or following mitigation or data recovery efforts, MTA NYCT will make a reasonable and good faith effort to provide interpretative materials to the public. Such materials could take the form of a brochure, information kiosk, or web page to provide information on the data recovery program and any archaeological resources uncovered as a result of that program. B. Identification of Additional Archaeologically Sensitive Areas and Assessment of Potential Project Effects 1. For any new project elements that would involve subsurface construction and for which the effects of such construction have not yet been analyzed as part of the EIS process, potential effects on archaeologically sensitive areas within the APEs (as adjusted in light of such new Project elements) will be assessed following the consultation requirements set forth in the Section 106 Regulations. 2. FTA and MTA NYCT will consult with SHPO [and LPC] in identifying archaeologically sensitive areas not previously identified and to assess potential project effects not previously assessed. 3. If any archaeologically sensitive areas are identified as a result of the research conducted as described in II.B.1 and II.B.2, MTA NYCT shall adhere to the steps described in II.A in conducting its activities within such areas. C. Unanticipated Discoveries Plan 1. MTA NYCT shall follow the requirements set forth in the Unanticipated Discoveries Plan for non-human archaeological resources in the event that any unanticipated archaeological resources are encountered during construction of the Project. This plan, which was developed in consultation with FTA, SHPO and LPC, is annexed hereto as Exhibit J. 2. MTA NYCT shall follow the requirements set forth in the Unanticipated Discoveries Plan for human remains in the event that any unanticipated human remains not previously identified in the Phase 1A Archaeological Assessment are encountered during construction of the Project. The Plan includes the protocols for the notification of appropriate parties and the proper treatment of human remains. This plan, which was developed in consultation with FTA, SHPO and LPC, is annexed hereto as Exhibit J. PA-8

3. SHPO s and LPC s review and comment on such plans shall be governed by the process set forth in III.A-B. 4. FTA, MTA NYCT, SHPO, and LPC acknowledge that extraordinary costs would be incurred if construction were to be halted or delayed once underway. Accordingly, the parties shall make every effort to implement the approved Unanticipated Discoveries Plan expeditiously in circumstances requiring its use. 5. Construction and Archaeology Phasing Plan MTA NYCT will take all practical steps to initiate and complete archaeological field analysis and data recovery (depending on site access and testing feasibility) prior to construction activities in the vicinity of affected resources. MTA NYCT, in consultation with SHPO [and LPC], will develop a plan to appropriately phase the archaeological field analysis and data recovery with construction activities. SHPO s [and LPC s] review and comment on such plans shall be governed by the process set forth in III.A-B. Annexed hereto as Exhibit M is a description of the components of the Construction and Archaeology Phasing Plan, which will be developed beginning with Preliminary Engineering of the Project. D. Professional Standards MTA NYCT shall ensure that all archaeological research, testing, analysis, and plans conducted pursuant to this Agreement are carried out by or under the direct supervision of a person or persons meeting at a minimum the Secretary of Interior s Professional Qualifications Standards. MTA NYCT shall ensure that all final archaeological reports are consistent with the New York Archaeological Council s Standards for Cultural Resource Investigations and the Curation of Archaeological Collections in New York State and to the Department of the Interior s Format Standards for Final Reports of Data Recovery Program. III. DOCUMENT REVIEW A. Under normal circumstances (ie. when exigent circumstance do not exist), SHPO [and LPC] shall provide comments on documents provided for their review as set forth below: 1. SHPO [and LPC] shall provide comments regarding amendments to any plans annexed to this Programmatic Agreement pursuant to II.A.1, II.A.2.a.i, and II.C, as promptly as possible but not to exceed 30 calendar days of its receipt of such revisions. 2. Unless otherwise stated within this Programmatic Agreement, SHPO [and LPC] shall provide comments regarding any future plans and/or amendments to such plans submitted pursuant to I.A, I.B, II.A.2.b, II.A.4.b, II.A.4.c, and II.D, or reports submitted pursuant to Exhibit H, as promptly as possible but not to exceed 30 calendar days of its receipt of such plans or reports. 3. If SHPO [and LPC] do not submit comments in writing to FTA and MTA NYCT within 30 calendar days of receipt of any such submissions, it is understood that SHPO [and LPC] have concurred with the proposed plans. PA-9

4. If SHPO and /or LPC objects within 30 calendar days of its receipt of any submissions, then FTA, MTA NYCT, SHPO [and LPC] shall consult expeditiously in an effort to resolve the objection. 5. If FTA and MTA NYCT cannot resolve SHPO s [and/or LPC s] objection and if further consultation with SHPO [and/or LPC] is deemed unproductive by any party, then the parties shall adhere to the dispute resolution procedures detailed under V. below. B. FTA, MTA NYCT, SHPO, [and LPC] acknowledge that the timeframes set forth in III.A. above are the maximum time periods allowable under normal circumstances. In exigent circumstances (such as where construction activities have been suspended or delayed pending resolution of the matter) all parties agree to make every effort to expedite their respective document review and dispute resolution obligations. In particular, SHPO shall provide comments on any submission within one business day after SHPO s receipt thereof. IV. REPORTING AND OVERSIGHT A. Final Reports. MTA NYCT shall ensure that all final historic reports and all final archaeological resources reports resulting from this Programmatic Agreement shall be provided to SHPO, FTA, [and LPC]. B. Annual Reports. Commencing one year from the date this Agreement is fully executed and every year thereafter until the Project is completed or terminated by MTA NYCT, annual reports will be submitted by MTA NYCT to SHPO, FTA, [and LPC], providing information concerning the implementation of this Agreement and the effect of the Project on Historic Properties. C. Annual Review of Programmatic Agreement. The signatories to this Programmatic Agreement, or their successors, will review the implementation of this Programmatic Agreement and determine whether revisions are needed at the time the annual reports are submitted. D. Revisions to the Programmatic Agreement. After review of the annual reports, if FTA, MTA NYCT, and SHPO, or their successors in interest all agree that revisions to this Programmatic Agreement are necessary, such revisions will be considered and implemented pursuant to a consultative process involving all the parties to this Programmatic Agreement. V. DISPUTE RESOLUTION A. In the event SHPO [and/or LPC] objects to any plan or report proposed pursuant to this Programmatic Agreement within 30 calendar days of its receipt of such plan or report, FTA and MTA NYCT shall meet with SHPO [and/or LPC] to resolve the objection. B. Following such further consultation, FTA shall determine as promptly as possible whether such objection has been satisfactorily resolved. If FTA determines that the objection has not been satisfactorily resolved, within 15 calendar days of its determination in this regard FTA shall forward all documentation relevant to the dispute, including FTA s proposed resolution of the dispute, to ACHP. C. Except in exigent circumstances as provided in V.E., when there is a dispute ACHP will provide FTA with recommendations or comments within 30 calendar days after receipt of all pertinent PA-10

documentation. FTA will take such recommendations or comments into account in reaching a final decision regarding the dispute. D. Except in exigent circumstances as provided in V.E, in the event ACHP fails to respond to FTA s request for recommendations or comments within 30 calendar days of receiving all pertinent documents, FTA may resolve the dispute. E. In the case of disputes arising under exigent circumstances, (such as where construction activities have been suspended or delayed pending resolution of the matter) all parties shall endeavor to resolve any dispute within seven calendar days. In particular, ACHP agrees to respond to FTA s request for recommendations or comments within five business days of its receipt thereof. VI. OTHER A. SHPO [and LPC] may monitor activities carried out pursuant to this Programmatic Agreement, and will review such activities if so requested. MTA NYCT will cooperate with FTA, SHPO, [and LPC] in carrying out SHPO s [and LPC s] monitoring and reviewing responsibilities. B. Notwithstanding any other provision in this Agreement, any party may propose an amendment hereto whereupon the parties will consult to consider such amendments. C. For purposes of notices and consulting pursuant to this Agreement, the following addresses and contact information should be used for the following agencies: MTA NYCT Hollie Wells Administrative Project Manager MTA NYCT Capital Program Management 2 Broadway, 6th floor New York, NY 10004 Tel.: 646-252-4268 Fax: 646-252-4612 FTA Irwin B. Kessman Director, Office of Planning and Program Development Federal Transit Administration One Bowling Green, Rm. 429 New York, NY 10004-1415 Tel.: 212-668-2177 Fax: 212-668-2136 PA-11

SHPO Robert D. Kuhn Assistant Director New York State Office of Parks, Recreation, and Historic Preservation Historic Preservation Field Services Bureau Peebles Island P.O. Box 189 Waterford, NY 12188-0189 Tel.: 518-237-8643, ext. 3255 Fax: 518-233-9049 ACHP Laura Henley Dean Advisory Council on Historic Preservation 1100 Pennsylvania Avenue, NW Suite 803 Washington, D.C. 20004 Tel.: 202-606-8503 Fax: 202 606-8647 LPC Amanda Sutphin Director of Archaeology New York City Landmarks Preservation Commission 1 Centre Street, 9N New York, NY 10007 Tel.: 212-669-7823 Fax: 212-669-7818 D. This agreement shall terminate upon completion of construction or at such time as MTA NYCT notifies the other parties in writing that the project has been terminated. EXECUTION AND IMPLEMENTATION OF THIS PROGRAMMATIC AGREEMENT EVIDENCES THAT FTA HAS SATISFIED ITS SECTION 106 RESPONSIBILITIES FOR ALL INDIVIDUAL UNDERTAKINGS OF THE PROJECT. PA-12

APPROVAL AND SIGNATURE PAGE FOR PROGRAMMATIC AGREEMENT AMONG THE FEDERAL TRANSIT ADMINISTRATION, THE METROPOLITAN TRANSPORTATION AUTHORITY NEW YORK CITY TRANSIT, AND THE NEW YORK STATE HISTORIC PRESERVATION OFFICER REGARDING THE SECOND AVENUE SUBWAY PROJECT EXECUTION AND IMPLEMENTATION OF THIS PROGRAMMATIC AGREEMENT EVIDENCES THAT FTA HAS SATISFIED ITS SECTION 106 RESPONSIBILITIES FOR ALL INDIVIDUAL UNDERTAKINGS OF THE PROJECT. FEDERAL TRANSIT ADMINISTRATION By: Name Title Date: METROPOLITAN TRANSPORTATION AUTHORITY NEW YORK CITY TRANSIT By: Name Title Date: NEW YORK STATE HISTORIC PRESERVATION OFFICER By: Name Title Date: PA-13

LIST OF EXHIBITS EXHIBIT A TITLE SDEIS Table 9-1: Known Historic Resources Within the APEs and Potential Project Effects B SDEIS Figures 9-1 through 9-9 C SDIES Tables 10-1, 10-2 and 10-3: Areas of Potential Archaeological Sensitivity and Potential Project Effects D SDEIS Figures 10-1 through 10-6 E F G H I J K L M Construction Protection Plan Design Specifications for Contextual Effects Soil Borings Program and Archaeological Resources Protocol Site Prioritization and Additional Documentary Research Protocol Field Testing Plan Unanticipated Discoveries Plan for Archaeological Resources Including Human Remains Data Recovery Plan Analysis and Curation of Material and Records Plan Construction and Archaeology Phasing Plan PA-14

Exhibit A SDEIS Table 9-1 EXHIBIT A SDEIS TABLE 9-1 KNOWN HISTORIC RESOURCES WITHIN THE SECOND AVENUE SUBWAY APES AND POTENTIAL PROJECT EFFECTS [THE FINAL PROGRAMMATIC AGREEMENT WILL INCLUDE COPIES OF THESE TABLES, WHICH ARE INCLUDED IN CHAPTER 9 OF THIS SDEIS] PA.A-1

Exhibit B SDEIS Figures 9-1 through 9-9 EXHIBIT B FIGURES 9-1 THROUGH 9-9 OF THE SUPPLEMENTAL DRAFT EIS [THE FINAL PROGRAMMATIC AGREEMENT WILL INCLUDE COPIES OF THESE FIGURES, WHICH ARE INCLUDED IN CHAPTER 9 OF THIS SDEIS] PA.B-1

Exhibit C SDEIS Table 10-1 and 10-2 EXHIBIT C SDEIS TABLES 10-1 AND 10-2 AREAS OF POTENTIAL ARCHAEOLOGICAL SENSITIVITY AND POTENTIAL PROJECT EFFECTS [THE FINAL PROGRAMMATIC AGREEMENT WILL INCLUDE COPIES OF THESE TABLES, WHICH ARE INCLUDED IN CHAPTER 10 OF THIS SDEIS] PA.C-1

Exhibit D SDEIS Figures 10-1 through 10-6 EXHIBIT D FIGURES 10-1 THROUGH 10-6 OF THE SUPPLEMENTAL DRAFT EIS [THE FINAL PROGRAMMATIC AGREEMENT WILL INCLUDE COPIES OF THESE FIGURES, WHICH ARE INCLUDED IN CHAPTER 10 OF THIS SDEIS] PA.D-1

Exhibit E Construction Protection Plan EXHIBIT E CONSTRUCTION PROTECTION PLANS The primary objective of the Section 106 process is to identify Historic Properties and to protect them from adverse effects, including damage or destruction due to a project s construction. The Second Avenue Subway Project Construction Protection Plans (CPPs) will provide protocols and stipulations for protecting identified Historic Properties located within the Project s Areas of Potential Effect (APEs) during the demolition, excavation, and construction phases of the project. In practice, the CPPs will provide guidance for those designing as well as those constructing the project. At this time, the Project is undergoing Preliminary Engineering, and potential project effects on Historic Properties have not yet been fully determined. Prior to the commencement of any project demolition, excavation, or construction, detailed CPPs will be developed in consultation with the SHPO, FTA, and all other relevant City agencies. The CPPs will be based on the requirements stipulated in SHPO documents concerning blasting and vibration and other relevant guidance. Given the length of time over which the project will be undertaken, and the use of a phased method of construction, it is anticipated that individual CPPs within a comprehensive CPP will be drafted specifically for each major construction segment. The CPPs will first detail the precise descriptions, locations, and dispositions of all known Historic Properties within the APEs. All Historic Properties within the APEs will be plotted on the project s geographic information system (GIS), along with the construction alignment to provide a basic awareness to all involved in the project s construction. It is expected that the individual CPPs will consist of common protection measures for all Historic Properties. These measures will be described in detail, and would be expected to include the following measures: A preconstruction inspection of the potentially affected Historic Property(s) will be undertaken by professional engineers licensed to practice in the State of New York, to ascertain any pre-existing damage, existing structural distress, and/or other weaknesses and instability. A written report will be prepared documenting any potential weakness or structural distress, and assessing the stability of any applied ornament, together with a protocol addressing any recommended remediation and outlining steps to be taken to secure problem areas prior to the commencement of any construction activities. Where required, the written report will be supplemented with photographic documentation keyed to a map or plan in order to provide a clear record of existing conditions and any problem areas. Controls on vibration will be required as per SHPO [and LPC] guidelines. The construction contractor will thereafter ensure that the appropriate vibration limits and any other criteria deemed appropriate by the project design consultants are incorporated into the sub-contracts for the work. The construction contractor will be responsible for monitoring these controls with periodic inspection by an MTA NYCT representative. A general plan will be prepared for the protection of Historic Properties from heavy machinery, including the installation of construction barriers, sensitive Historic Property signage, and the development of machinery operating protocols. In addition, specific protection measures will be developed based on Historic Property type and tailored to many other different characteristics such as the type of construction and potential construction effects, PA.E-1

Exhibit E Construction Protection Plan integrity and condition of the site or structure, and its proximity to the impact area, which would vary from site to site. The tailored protection measures will be described in detail. Specialists from a variety of disciplines, such as seismology, may be required for their input and expertise. In such cases, the responsibilities of each specialist will also be detailed. Site specific protection measures may include the following: Pre-, mid-, and post-construction photography and videography On-site monitoring during phases of demolition, excavation, and construction The provision of vibratory monitors/sensors and continuous seismic monitoring, pursuant to the design protocol during demolition, excavation, and construction operations. (Seismographs may need to be installed on the interiors and exteriors of potentially affected Historic Properties. Such units would be located so that they would be away from the general public but accessible to the technicians who must monitor them. The seismographs would measure vibration levels during demolition, excavation, and construction. Prior to the commencement of demolition and excavation operations, the seismographs would be installed and tested to ensure that they are in working order and to enable taking baseline readings. Daily logs of the seismic monitoring would be maintained and submitted to the SHPO upon request.) A provision for stopping work if any damage or excess vibration (that which meets or exceeds the peak velocity level) to a Historic Property is detected. (In such a case, the Inspecting Engineer will stop the work causing the damage or excessive vibration. If excessive vibration is detected, the affected Historic Property(s) would be inspected for any structural degredation that may have occurred. If any damage to the Historic Property(s) was sustained, the Historic Property(s) would be secured, and the work that caused any damage would be altered to reduce the vibration levels to within acceptable limits. If any cracking to a Historic Property should occur during demolition, excavation, or construction, crack monitors would be installed over each crack and monitored on a weekly basis until the Inspecting Engineer deems the cracks to be stable.) PA.E-2

Exhibit F Design Specifications for Contextual Effects EXHIBIT F DESIGN SPECIFICATIONS FOR CONTEXTUAL EFFECTS Built Properties can be affected by visual impacts as well as physical impacts. The Second Avenue Subway project Design Specifications for Visible Project Elements will be developed to ensure that: 1) project elements which physically affect Built Properties (e.g., interior modifications to MTA s Metro-North 125 th Street-Harlem Station and Comfort Station) and 2) aboveground visible project elements (e.g., station entrances and ventilation structures) are designed in a manner consistent with the Built Properties near them. In addition to any physical modification to Built Properties, the view shed to and from Built Properties will be considered and addressed by these specifications. They will address not only how such facilities can be designed, but also the process by which their design is to be coordinated with the signatories to the Programmatic Agreement. The development of these specifications will occur during the preliminary engineering phase, once the location of project facilities is defined. The specifications will be prepared pursuant to the Secretary of the Interior s Standards for the Treatment of Historic Properties. PA.F-1

Exhibit G Soil Borings Program/Archaeological Resources Protocol EXHIBIT G SECOND AVENUE SUBWAY PROJECT SOIL BORINGS PROGRAM AND ARCHAEOLOGICAL RESOURCES PROTOCOL MTA NYCT has established a Soil Borings Program to determine geotechnical and environmental subsurface conditions along the alignment. In conjunction with the Soil Borings Program, MTA NYCT shall adhere to the following procedures with regard to soil borings and archaeological resources. I. Retain Professional Archaeologist(s) MTA NYCT agrees to retain the services of a professional archaeologist(s) who will provide archaeological expertise during the Soil Borings Program as described below. The professional archaeologist(s) will meet at minimum the Secretary of the Interior s Professional Qualification Standards. II. Review of Boring Logs by the Professional Archaeologist(s) A. MTA NYCT agrees that any borings logs prepared as a result of geotechnical borings taken by MTA NYCT to determine construction-related subsurface soil conditions will be done in a manner so as to provide information useful to a professional archaeologist(s). Such boring logs will be provided to the professional archaeologist for review to allow an assessment of subsurface conditions, such as previous disturbance including filling and grading, and/or the presence of original soils to refine the EIS conclusions about the potential presence or absence of archaeological resources in areas identified as archaeologically sensitive in Project Phase 1A Archaeological Assessment dated June 2002 ( Phase IA ), prepared as part of the EIS, and/or any subsequent studies. B. For each archaeologically sensitive area, the professional archaeologist(s) will make one of the following determinations: a) potential sensitivity b) lack of sensitivity c) inconclusive findings C. Any sites that are determined to contain no archaeological sensitivity will be eliminated from further archaeological consideration. Sites that retain potential archaeological sensitivity or for which potential sensitivity remains undetermined will be carried forward for additional archaeological evaluation, including additional documentary research and/or field testing. III. Request for Additional Soil Borings by the Professional Archaeologist(s) If the professional archaeologist(s) determines that a boring is needed in an area/location of likely significance that has not been investigated previously, and MTA NYCT deems that such a request is appropriate, then such boring will be undertaken. PA.G-1

Exhibit G Soil Borings Program/Archaeological Resources Protocol IV. Borings in Potential Burial Ground Sites A. At any locations identified as sensitive for human remains, borings will be avoided wherever practicable.test borings will instead be performed in nearby areas not identified as sensitive for human remains. B. Where borings cannot be practicably avoided in the areas that have been identified as potentially sensitive for human remains, borings will be performed in a manner to avoid any insensitive disturbance to human remains as set forth below: 1. Hand augering will be performed in the sensitive area to a depth of at least 6 feet to exceed the depth of any utilities. Beyond that depth, hand augering will be undertaken based on engineering and safety constraints. At the point where hand augering is no longer feasible, the soil boring will be undertaken. 2. The professional archaeologist(s) will be present on-site during hand augering and the execution of the boring to identify any skeletal material, if encountered. If any skeletal material is encountered, the archaeologist will contact a physical anthropologist/forensic archaeologist, who will be on-call as described below in IV.B.3. 3. A physical anthropologist/forensic archaeologist will be on-call in the event that skeletal material is encountered, to properly identify if the skeletal material is human. The physical anthropologist/forensic archaeologist will be located in the New York City metropolitan area so that he/she may have prompt access to the site. If the remains are identified as human, the protocol for the notification of appropriate parties and treatment of human remains set forth in Section II.A.3 of the Programmatic Agreement will be followed. 4. Subsurface work will only be undertaken in areas potentially sensitive for human remains following the prior notification of and opportunity for consultation with the appropriate descendant community(s). V. Reporting to SHPO, FTA [and LPC] Following completion of any borings, MTA NYCT shall prepare a report summarizing the results of the archeological evaluations and shall submit this report(s) as addenda to the Phase 1A to SHPO, FTA, [and LPC]. PA.G-2

Exhibit H Site Prioritization/Additional Documentary Research Protocol I. Purpose and Need EXHIBIT H SECOND AVENUE SUBWAY PROJECT SITE PRIORITIZATION AND ADDITIONAL DOCUMENTARY RESEARCH PROTOCOL The Second Avenue Phase 1A Archaeological Assessment, dated June 2002 (herein Phase 1A ) identified areas of potential archaeological sensitivity (herein archaeologically sensitive areas ) within the Areas of Potential Effect (APEs) for archaeological resources. The archaeologically sensitive areas contain a wide range of potential archaeological resource categories, including precontact resources and historical resources. Examples of historical resources include, but are not limited to, residential, commercial, industrial, and military sites. In addition, six areas were identified as potentially sensitive due to potential for human burials. Through the review of boring logs undertaken by a professional archaeologist retained in conjunction with MTA NYCT s Soil Borings Program (see Exhibit G, Second Avenue Subway Project: Soil Borings Program and Archaeological Resources Protocol, for further details), archaeologically sensitive areas identified in the Phase 1A will be further assessed and refined using indicators of subsurface conditions, such as the presence of fill and/or original historic soil layers. Areas that the boring logs identify as exhibiting archaeological sensitivity or for which findings were inconclusive will be carried forward for additional documentary analysis, as described below. The purpose of the additional documentary analysis program is to gather more information on the archaeologically sensitive areas, including previous disturbance and historic occupation and use, to: 1) establish a list of sites that will be field tested, and 2) prioritize those sites based on their potential to yield significant information and address meaningful research issues according to Historic Properties criteria. This will be accomplished by: 1. Refining the geographic boundaries of archaeologically sensitive areas; 2. Evaluating the potential research value of each site; and 3. Assessing the feasibility of field testing archaeologically sensitive areas. This will include prioritizing sites based on site accessibility and traffic, pedestrian, and safety constraints, and identifying sites that may be tested in advance of construction and could contain a public educational component. To accomplish the additional documentary research analysis, MTA NYCT shall adhere to the procedures of the Protocol set forth below. It is anticipated that the research described in this Protocol will be accomplished primarily during the Preliminary Engineering phase of the project, though certain activities may continue into the Final Design phase due to further refinements to the project, the addition of new project elements, and/or changes to the project. PA.H-1

Exhibit H Site Prioritization/Additional Documentary Research Protocol II. Site Prioritization and Additional Documentary Research Protocol A. Establish Archaeological Resource Categories for Additional Archaeological Analysis For the purposes of the additional analyses to be undertaken as part of this Protocol, the types of potential archaeological resources identified in the Phase 1A have been grouped into the following four categories: 1. Precontact Resources; 2. Historical Resources (all resource categories except 19th Century Residential and Cemeteries); 3. 19th Century Residential Resources; and 4. Cemeteries. Distinct procedures will be employed for each of these four categories. The steps for the evaluation of each archaeological resource category are provided below. B. Protocol for Precontact Resources See also Flowchart A, Precontact Resources annexed to this Protocol. 1. Assess project effects. For each site, assess potential project effects. For sites where the project will have no effects, no further analysis will be undertaken. For sites where disturbance could occur, MTA NYCT will follow the procedures for precontact resources set forth below in II.B.2-6. 2. Evaluate the potential research value of each site. 3. Assess testing feasibility with assistance from appropriate technical experts and government agencies. For each site, assess the feasibility of gaining access to the site by considering potential testing constraints, such as traffic, pedestrians, and safety. The potential for testing with a public education component in advance of construction will also be evaluated. 4. Based on information obtained in Steps II.B.2 and II.B.3, establish a list of sites to be field tested. 5. Prioritize sites within list based on the potential of each site to yield significant information and address meaningful research issues according to Historic Properties criteria. 6. Prepare a report for submission to the New York State Historic Preservation Officer (SHPO), the Federal Transit Administration (FTA), [and New York City Landmarks Preservation Commission (LPC)] summarizing the results of the analyses for precontact resources. PA.H-2