Interchange Design. Nick Hoernke, Bill Roth and Eric Sorensen

Similar documents
CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310

Chapter GRADE SEPARATIONS & INTERCHANGES

500 Interchange Design

Conclusions & Lessons Learned

FINAL REPORT GUIDELINES FOR PRELIMINARY SELECTION OF THE OPTIMUM INTERCHANGE TYPE FOR A SPECIFIC LOCATION

I-64 Peninsula Shoulder Usage Evaluation. Eric Stringfield VDOT Hampton Roads Transportation Planning April 3, 2013

PROCEDURES FOR NEW OR REVISED FREEWAY ACCESS IN ARKANSAS

US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison

INTERACTIVE HIGHWAY SAFETY DESIGN MODEL (IHSDM)

500 Interchange Design

NCHRP Report 687 Guidelines for Ramp and Interchange Spacing

APPENDIX B. Excerpts from the October 2002 Conceptual Alternatives Report

Breaking the Diamond: DDIs, CFIs, and SPUIs

Project Prioritization for Urban and Rural Projects TEAM CONFERENCE March 7, 2018

NCHRP 3-88 Guidelines for Ramp and Interchange Spacing

DRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0

INTERCHANGE MODIFICATION REPORT

DESIGN SOLUTIONS FOR THE SOUTH TRI-STATE TOLL HIGHWAY (M.P. 0 TO M.P. 3.6) AUGUST 13-16, 2006

Transportation Connectivity, Accessibility and Economic Opportunity Study

A three-stage process was implemented in order to develop and evaluate the project concepts and provide recommendations for the project.

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS

Ramp Reversal Research. Roy Parikh, P.E. TxDOT Fort Worth District

Diverging Diamond Interchanges in Michigan

b. Include an evaluation of maintenance of traffic for ramps, local roads and cross streets.

Community Advisory Committee Meeting No. 2. June 22, 2006

1000 Performance Based Project Development (PBPD)

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance

Chapter URBAN & RURAL FREEWAY DESIGN

Appendix D Functional Classification Criteria and Characteristics, and MnDOT Access Guidance

I-35/I-80/Iowa 141 Interchange IJR and NEPA A Practical Approach to Resolving a Decades-Old Traffic Operations Challenge

Summary. Preliminary Alternative Development and Screening. DEIS July 23, 2018

Exit 73 I-29 Interchange Modification Justification Study

FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT

Congestion Management Safety Plan Phase 4

PROPOSED AMENDMENT OF THE I 76 INTEGRATED CORRIDOR MANAGEMENT PROJECT TO THE CONNECTIONS 2040 PLAN FOR GREATER PHILADELPHIA

Transportation Problems and Issues Excerpts from WWW Links

Military Highway Interchange

CHAPTER 5 PARALLEL PARKWAY CORRIDOR IMPROVEMENTS

Consideration of a Diverging Diamond Interchange in Saskatchewan. Paul H. A. Steel, Project Manager, M. Eng., P.Eng., Tetra Tech EBA Inc.

LOCATION AND DESIGN DIVISION

Review of Plans and Specs from a Constructability Perspective

I-35/80 Operations Study: Douglas Avenue to NW 86 th Street FOR

INTERCHANGE SAFETY. Steve Allen. Houston Daugherty. Director, Strategic Transportation Investments Division (TDOT)

CHAPTER 8: I-71 ACCESS IMPROVEMNETS

PROJECT STUDY REPORT. Cal Poly Pomona Senior Project

I-64 Capacity Improvements Segment I Financial Plan Annual Update

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017

CHAPTER 3 SCOPE SUMMARY

6.0 CONGESTION HOT SPOT PROBLEM AND IMPROVEMENT TRAVEL DEMAND MODEL ANALYSIS

5.0 PRELIMINARY ENVIRONMENTAL REVIEW

Conceptual Design Report

APPENDIX A TIER 1 ANALYSIS

Performance Based Practical Design (PBPD)

LOCATION AND DESIGN DIVISION

On behalf of the Carolina Crossroads project team we thank you for taking the time to attend this meeting.

M D 355 [FR E D E R IC K R O A D] OVER

Appendix B Highway 407 Interchange Review - Cochrane Street Area

CHAPTER 2: MODELING METHODOLOGY

Informational Brochure. Proposed Interchange. Interstate Route 295 (I-295) AT Greenville Avenue (State Route 5) Town of Johnston, Rhode Island

.JABATAN KER.JA RAVA

49-2A Clear-Zone Width for New Construction or Reconstruction B Clear-Zone Adjustment Factor, K cz, for Horizontal Curve...

DDI s Can Move More Than Cars. Alex Ariniello. Presentation for the ITE Western District Annual Meeting. July, 2016 in Albuquerque, New Mexico

TRANSPORTATION PROJECT REPORT DRAFT CONCEPTUAL ACCESS MODIFICATION PROPOSAL OCTOBER 2002

Environmental Consequences and Mitigation

Exploring Performance-Based Solutions & Design Flexibility. Scott Bradley & Greg Ous - MN Dept of Transportation - April 21, 2011

I-64 Capacity Improvements Segment II Financial Plan Annual Update October 30, 2017

Section 3-01 General Concepts, Design Standards and Design Exceptions TABLE OF CONTENTS

I-10 CORRIDOR IMPROVEMENTS STAGE 0 FEASIBILITY STUDY STATE PROJECT NUMBER H FEDERAL AID PROJECT NUMBER H004100

S.R. 0070, Section T20. Engineering District ASHE National Project of the Year Award

RECOMMENDED RAMP DESIGN PROCEDURES FOR FACILITIES WITHOUT FRONTAGE ROADS

The New Highway Capacity Manual 6 th Edition It s Not Your Father s HCM

Draft Environmental Impact Statement. Appendix E Congestion Management Process Technical Memo

Appendix F: Noise Report

WELCOME IL 47. Community Advisory Group Meeting #4 Waubonsee Community College Tuesday, November 15, 2016

Community Conversations for the I-35 Ramp Metering Project Begin This Month

I 95 EXPRESS LANES SOUTHERN TERMINUS EXTENSION TRAFFIC OPERATIONS AND SAFETY ANALYSIS REPORT

FINAL PROJECT PRIORITIZATION PLAN FOR THE NM 599 CORRIDOR

Chapter 10. Intelligent Transportation Systems. Ohio Kentucky Indiana Regional Council of Governments Regional Transportation Plan

Nevada Department of Transportation. Road Design Guide Edition

EXECUTIVE SUMMARY. The IP developed the following purpose and need statement for the Part B I-71 Access Improvement Study.

Beltline Interchange Range of Alternatives Screening Summary Memo

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

Section 13. Guidelines for the Design of Ground Mounted Sign Supports

IH 30/IH 35E Reconstruction Project Pegasus Final Technical Memorandum - Evaluation of Conceptual Alternatives Task 7.5

Benefit-and-Cost Analysis of Strategic Acquisition of Limited Access Right-of-Way near Interchanges

Appendix C - Highway 400 Widening and Interchange Evaluation Summary Tables

INSIDE THIS ISSUE. mctrans.ce.ufl.edu VOLUME 64 \\ OCTOBER Streets Heat Map Freeways Animation HSM Supplement

35 Moving Forward. O p t i m i z a t i o n P l a n E x e c u t i v e S u m m a r y. Project # KA Johnson and Wyandotte Counties

Automating Variable Speeds and Traveler Information with Real-Time Traffic and Weather

Active Traffic Management in Michigan. Patrick Johnson, P.E. HNTB Michigan Inc.

I-55 Manage Lane Study. Veterans Memorial Tollway (I-355) to Dan Ryan Expressway (I-90/94) PROJECT REPORT P

Standard Performance Attributes for Transportation Projects

I-880 ICM Systems Engineering Management Plan TAC Meeting

C-TEP is pleased to present a short course; Innovative Intersections & Interchanges, March 14-16, 2016 in Calgary, Alberta.

2 Purpose and Need. 2.1 Study Area. I-81 Corridor Improvement Study Tier 1 Draft Environmental Impact Statement

Traffic Management Guide to Concrete Overlay Solutions. Dale S. Harrington P.E. Representing CP Tech Center

This page intentionally left blank.

Transcription:

Interchange Design Nick Hoernke, Bill Roth and Eric Sorensen

Presentation Overview Interchange Characteristics Process for Interchange Type Selection Service Interchange System Interchange New Type of Interchange Design Process and Details Interchange Attributes to Consider

Interchange Characteristics Two main types of interchanges Service Interchange between a freeway or controlled access facility and a lower class roadway such as an arterial or collector (i.e. diamond) System Interchange between two or more freeways or controlled access facilities (i.e. cloverleaf)

Interchange Characteristics Attributes of interchange type varies Traffic operations Safety Physical impacts (R/W) Construction cost Constructability

Process for Interchange Type Selection Process for interchange type selection Data Collection Planning Framework Identify and Develop Concepts Evaluate and Screen Alternatives Select Preferred Alternative

Process for Interchange Type Selection Additional items to consider Identify and understand key project issues Design creativity and context sensitivity o required to develop feasible solutions Maintain fiscal feasibility Maintain/enhance local access in reconstructing urban system ramp interchanges Incorporating exclusive HOV lanes or ramps o Complicates the design and increases cost Constructability o Reconstruction typically requires maintaining all movements

Service Interchange Urban and suburban areas (tight R/W constraints) Single point design creativity and context sensitivity o One intersection vs. two along local roadway o Expensive Compressed or tight diamond o Intersections spaced 250-400 apart o Similar footprint to SPDI Operational characteristics Determine number of lanes Traffic operations are key to success

Service Interchange Single point diamond interchange (SPDI)

Service Interchange Urban and suburban areas (tight R/W constraints) Single point design creativity and context sensitivity o One intersection vs. two along local roadway o Expensive Compressed or tight diamond o Intersections spaced 250-400 apart o Similar footprint to SPDI Operational characteristics Determine number of lanes Traffic operations are key to success

Service Interchange Compressed or tight diamond interchange

Service Interchange Urban and suburban areas (tight R/W constraints) Implement selection process 12 points for the design of system interchanges o Maintain route continuity o Maintain basic number of lanes o Provide lane balance and continuity o Maintain appropriate ramp spacing o Design ramps for freeway speeds o Select appropriate interchange types o Employ only right-hand entrances and exits o Provide single exit at interchanges o Provide exits in advance of crossroad o Provide decision sight distance in advance of exits o Eliminate weaving within interchanges along the mainline o Provide designs that can be simply signed

New Type of Interchange Diverging diamond

Design Process and Details Stakeholders Maintaining authority Traveling public Impacted public Landowners Environment Politics Federal funding Be honest!

Design Process and Details Geometrics Iterative process Provide desirables DSD, SSD, etc Avoid flat spots and crown transitions Rollovers Nearby interchanges Lane balance Barrier concept Adequate signing Structures - construction restrictions to traffic

Design Process and Details Traffic Large trucks Avoid off-ramp queueing onto freeway Analysis for staging and permanent conditions Milwaukee area Congestion map

Design Process and Details Staging Finding the optimal balance Impacts of staging Tie-ins and project length, ROW, utilities Justify expenditure to provide desirable features Over the top first Traffic considerations Seasonal peaks Concurrent projects along corridor

Design Process and Details Staging continued Structures Lateral and vertical clearance Construction joints Future fill/cut at footings Settlement of embankments Design drainage for winter maintenance Early project to eliminate complications Lessons learned

Interchange Attributes to Consider Design Type, size: o Single point, trumpet, three leg, one quadrant, diamond, cloverleaf, etc o Based on typically 6 warrants o Determine # lanes, heavy movements, crash locations

Interchange Attributes to Consider Design continued Utilities o Existing? Proposed? Space or R/W constraints Real estate Safety, safety, safety o AASHTO Green Book, FDM, AASHTO RDG, MUTCD. How do these affect the design?

Interchange Attributes to Consider Users Local facilities Economics Travel times Utilities - NIMBY Multimodal Environmental/recreation

Future Considerations Future considerations Additional lanes / interchange capacity o Future development in the immediate area Overhead utilities and constructability of structures o OSHA requirement for cranes o Address in utility coordination Temporary traffic shifts for maintenance and rehab o Leave in crossovers used for construction o Wider, beefed up shoulders necessary?

Future Considerations Future considerations continued Profile gradient should be steep enough to accommodate future barrier wall when highway expanded. Ramp metering Ramp spacing between terminals o Congestion o Queue spillback o Stop and go travels o Heavy weaving o Poor traffic signal progression

Questions????