FIRST-HALF 2016 RESULTS. 26 July 2016 Paris

Similar documents
2017 annual results. 07 March 2018

2015 ANNUAL RESULTS. 2 March Paris

Albioma AT A G L A N C E. Energy: it s time to switch!

FIRST INVESTMENT IN BRAZIL 2013 ANNUAL RESULTS. March 5, 2014 Paris

FIRST-HALF 2014 RESULTS

SECOND INVESTMENT IN BRAZIL. April , Paris

First-half 2017 results

The present document was prepared by Séchilienne-Sidecfor the purposes of a presentation on 16 March 2010.

OUR NATURE IS FULL OF ENERGY

Tailoring Financing to Islands' Specificities. Olivier Grandvoinet SAIREC - October 5th, 2015

RenovAr PROJECT ON ARGENTINA Ministry of Energy and Mining Argentina Republic

Current Trends in Ethanol, Bioplastics, Cogeneration and Sustainability

FIRST HALF REPORT 2009

ANNUAL RESULTS 2013/14 (April 1st, 2013 / March 31st, 2014)

power ethanol Sugar Shree Renuka Sugars Ltd Audited Results for Quarter ended 30 th Jun 2014 Earnings Presentation

Enel Green Power. Clean Energy Summit. Gu Yoon Chung, Head of Business Development for Asia and Pacific area. Sydney, July 27 th 2016

General overview for investors in Hungary s energy market

Quarterly Financial Information at 31 March 2018 Sales up 3.0% targets confirmed Key figures. Highlights

LUIS HENRIQUE GUIMARÃES

Final Results Presentation Year ended 30 April 2011 July an Ebiquity company

INTERIM FINANCIAL REPORT

Grindrod Limited Additional information for analysts

Grifols closed 2009 with total revenues of MM euros, a 12.1% increase in comparison to 2008.

/ IBE-WATCH FACT SHEET Q1 2017

corporate presentation 4 April 2018

Lessons learnt from AFD bioelectricity portfolio Expert workshop on wood energy

Servelec FY 2015 results

RENEWABLE ENERGY AND ENERGY EFFICIENCY FINANCING AND POLICY NETWORK FORUM

2012 Annual Results Presentation. 2 April 2013

FORM 10-Q SECURITIES AND EXCHANGE COMMISSION Washington, D.C ERIE INDEMNITY COMPANY

India: Perspectives on the Draft National Wind-Solar Hybrid Policy

For Immediate Release February 14 th, 2015

ACCIONA Energy, a year affected by regulatory changes in Spain

Roadmap for Solar PV. Michael Waldron Renewable Energy Division International Energy Agency

Integration, disintegration,, consolidation? GDF SUEZ proposition. Gérard Lamarche. New York, October 22, 2007

Birth of a world leader

edp wind installed capacity in 2006 totaled 1,568 MW (of which 29 MW in France) or 8% above our target for 2006 (including AE acquisition)

The present document contains projections and descriptions of Séchilienne-Sidec s future strategy. objectives and prospects.

Macquarie s Eighth Alternative Energy Conference. London 22 September 2015

Khonburi Sugar Public Company Limited Opportunity Day Q2-2012

Excellent results in Energy

Enel Green Power and the Renewable Energies Scenario

Company Presentation 2Q and 1H 2013 Results 14 Aug Company Presentation 4Q and FY 2012 Results. 27 Feb 2013

DP World Limited and its subsidiaries

Vattenfall Q1 results 2011

Concession-type Infrastructures

Summary 2003 Summary 2003 ABENGOA 9 Annual Report 2003

microgen plc Audited Preliminary Results for the year ended 31 December 2015

Quarterly Financial Information at 30 September 2018 Sales up 5.3% targets confirmed. Key figures. Highlights and deployment of CAP 2030

Overview and Strategy Results for 2012

Q3 & 9M FY15 Results. Leading Diversified Renewable Energy Generation Company

9M 2018 Consolidated Results

Health Care Worldwide. Crédit Suisse Global Credit Products Conference October 1, Barcelona

Tres Valles Cogeneration Project. Frederik Staun, UNEP Risoe Centre, Carbon finance Belize City August, 2010

Renewable Energy: Wind Energy

Wind Energy. Evaluating the International Renewable Energy Market for the Creation of a Longstanding and Secure Energy Policy 12/29/10

YTL POWER INTERNATIONAL BERHAD (Company No H) (Incorporated in Malaysia)

Q4 PAT at Rs 377 crores, up 37% QoQ Annual revenue up 25% and PAT up 18%

PRO FORMA PRELIMINARY CONDENSED CONSOLIDATED FINANCIAL INFORMATION

Sale of Vattenfall Heat Poland s assets. revenue sources. Strategy Department

ECONOMIC TRENDS OF ITALIAN ELECTRICITY SECTOR SHORT TERMS STATISTICS

Third quarter and first nine months 2017 Results Release. October 19 th, 2017

Next Up forum. May 15, 2018

1Q18 Results Review. 1Q18 Results Review

Creating a Market for Ethanol - Challenges Faced in the Brazilian Experience

- A 300 million investment to acquire Befesa through a take-over bid.

1H18 results and strategic progress update

1H 2018 Consolidated Results

1. INTRODUCTION. Name of Feed-in Approval Holder (FiAH) : Future Atlas Sdn Bhd (FASB)

EBITDA & Net Surplus After Tax

Full-year 2012 results presentation

CLINICAL COMPUTING PLC HALF YEAR RESULTS FOR THE SIX MONTHS TO 30 JUNE 2010

PRO FORMA PRELIMINARY CONDENSED CONSOLIDATED FINANCIAL INFORMATION

YTL POWER INTERNATIONAL BERHAD (Company No H) (Incorporated in Malaysia)

MEDSERV PLC Interim Report CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS AND DIRECTORS REPORT

Global sugar demand will increase to 198 mn tones in 2021 and 257 mn tones by 2030 compared with 168 mn tones in 2014

Star St ar Conf Con er f ence, London

PRO FORMA FINANCIAL INFORMATION

Global Construction Conference. November, 2003

Current Status and Future Prospects of World s Renewable Energy Dr. Wolfgang Palz World Council Renewable Energy Former European Union Official

Company Presentation 1Q 2015 Results. 30 April 2015

SOLVAY GROUP Consistent implementation of our strategy for sustainable

INVESTOR PRESENTATION

Consolidated Financial Results for the Second Quarter of Fiscal Year Ending December 31, 2017 (Japan GAAP)

Renewable Energy Projects and potentials in Mauritius

UN Symposium on SDG7. Ensuring universal access to affordable, reliable and modern energy services. Raymond Carlsen, CEO. October 19 th.

FGB and NBAD have released pro forma financials preliminary condensed consolidated financial information

FY18 FY17 change (1.4) (240.2)

Solid activity levels Robust business development model

BUSINESS PROSPECT - BIOGAS PLANTS IN DENMARK

PagesJaunes Groupe: revenues up 5.7% on constant publication basis in first nine months of 2007

AMBITION TO LEAD THE ZERO CARBON TRANSITION

E1/83. ACS Servicios Comunicaciones y Energía S.L. Green Notes. Green Evaluation. Transaction Overview. Green Evaluation Overview.

Renewable & Alternative Energy Resources: What s the difference? 2

Dentsu Inc. H1 FY2018 Consolidated Financial Results

COMPANY ANNOUNCEMENT MEDSERV P.L.C. (THE COMPANY ) Half Yearly Report. Date of Announcement 27 August 2018 Reference 177/2018

YTL POWER INTERNATIONAL BERHAD (Company No H) (Incorporated in Malaysia)

Renewable electricity: Non-OECD Summary OECD Americas OECD Asia Oceania OECD Europe References...

For personal use only

Transcription:

26 July 2016 Paris

SOMMAIRE 1. 2. 3. 4. 5. 6. INTRODUCTION STRATEGIC POSITIONING - REMINDER OPERATIONAL PERFORMANCE: FIRST-HALF 2016 ASSESSMENT AND OUTLOOK 3.1 FRANCE 3.2 BRAZIL 3.3 MAURITIUS FIRST-HALF 2016 FINANCIAL RESULTS OUTLOOK APPENDICES 3 5 12 13 22 26 28 36 41 2

1. INTRODUCTION 3 3

ALBIOMA'S HIGHLIGHTS - FIRST-HALF 2016 Return to normal performance by French Thermal Biomass business New rider signed for Bois-Rouge plant contract Good half-year performance in Brazil Significant progress in the development of: France - Thermal Biomass Combustion turbine on Reunion Island: financing agreement signed (on 18 July 2016) and construction work begun Solar power Albioma awarded 5.9 MWp of projects for plants with integrated storage Brazil Third project signed on 20 May 2016: Vale do Paraná 1. INTRODUCTION 4

2. STRATEGIC POSITIONING - REMINDER 5 5

ALBIOMA - AN INDEPENDENT RENEWABLE ENERGY PRODUCER AND ENERGY EFFICIENCY PARTNER FOR THE SUGAR AND ETHANOL INDUSTRY In-depth knowledge of the sugar refinery process and related energy issues Highly-efficient energy recovery from sugar and ethanol by-products Over 24 years of experience in bagasse combustion Reliable production of steam and electricity to cover the sugar producer s energy needs (availability rate ~100%) Bagasse depot at Albioma Le Moule - Guadeloupe Surplus power exported to the electricity grid (120 kwh per tonne of sugar cane) 2. STRATEGIC POSITIONING - REMINDER 6

BAGASSE - ONE OF THE WORLD'S MAIN BIOMASS SOURCES 450 million tonnes of bagasse available Less than 10% is currently recovered, and only 3% in highly energy-efficient processes Renewable and storable fuel that can be used based on the needs of the electricity grid Sugarcane field in Rio Pardo Termoelétrica - Brazil 2. STRATEGIC POSITIONING - REMINDER 7

ALBIOMA - A PROVEN MODEL FOR ENERGY RECOVERY FROM BAGASSE SUGAR OR BIOETHANOL 115 kg Highly energy-efficient cogeneration operator supplying steam to the sugar refinery and electricity to the grid STEAM 450 kg ELECTRICITY 30 kwh ELECTRICITY 120 kwh SUGARCANE 1 tonne Additional fuel used outside of the sugar harvest: Historic alternative: coal Gradually being replaced SUGAR REFINERY Customer/partner COGENERATION PLANT ELECTRICITY NETWORK Customer by biomass BAGASSE 300 kg 2. STRATEGIC POSITIONING - REMINDER 8

2015 - A PIVOTAL YEAR FOR ALBIOMA: 50% RENEWABLE ENERGY 2023 TARGET 2015 20% 2013 80% 50% 36% 50% Renewable Renouvelable Fossile fuel 64% Renewable Renouvelable Fossilefuel Renouvelable Renewable Fossile fuel Rapid change in the energy mix thanks to: The conversion to biomass of the existing bagasse-coal power plants The construction of all-biomass plants (bagasse-biomass) in the French overseas territories Acquisition of all-bagasse plants in Brazil 2. STRATEGIC POSITIONING - REMINDER 9

ALBIOMA - A DIVERSIFIED GEOGRAPHIC FOOTPRINT 753 MW of installed capacity West Indies and French Guyana (174 MW) Guadeloupe, Martinique, French Guyana Metropolitan France & Rest of Europe (16 MW) Strong market share 51% of power generated on Reunion Island 42% of power generated in Mauritius 32% of power generated in Guadeloupe Brazil (108 MW) Indian Ocean (455 MW) Reunion Island, Mauritius, Mayotte Installed capacity by activity (MW) Thermal Biomass 3 675 Solar power Anaerobic digestion 2 1 3 75 2. STRATEGIC POSITIONING - REMINDER 10

ALBIOMA'S INTERNATIONALISATION CRITERIA GEOGRAPHIC BREAKDOWN OF GLOBAL SUGARCANE PRODUCTION OUR INTERNATIONALISATION CRITERIA Other 24% Brazil 40% Mexico 3% Pakistan 3% Thailand 5% China 7% India 18% Source 1. FAOSTAT, 2013 Brazil - Albioma's international priority Opportunistic development of solar power projects alongside thermal biomass projects 2. STRATEGIC POSITIONING - REMINDER 11

3. OPERATIONAL PERFORMANCE: FIRST-HALF 2016 ASSESSMENT AND OUTLOOK 12 12

3.1 France 13 13

THERMAL BIOMASS FRANCE: VERY GOOD AVAILABILITY IN THE FIRST HALF OF 2016 THERMAL PLANT AVAILABILITY POWER GENERATION 91,1% In GWh 82,9% 951 1 047 H1 2015 H1 2016 H1 2015 H1 2016 Availability up: All thermal power plants achieved a solid operational performance Few technical shutdowns at the plants other than scheduled shutdowns whereas the first half of 2015 was affected by a strike and two technical incidents Good call-out rate maintained in the first half of 2016 at the Galion peaking plant: 31.5% compared with 31.8% in the first half of 2015 3. OPERATIONAL PERFORMANCE: FIRST-HALF 2016 ASSESSMENT AND OUTLOOK 14

SIGNING OF RIDER TO ELECTRICITY PURCHASE CONTRACT BETWEEN EDF AND ALBIOMA BOIS-ROUGE POWER PLANT Compensation for the extra costs resulting from managing combustion by-products and processing liquid and gaseous waste Processing combustion by-products and reducing liquid waste Compensation for the extra costs resulting from managing the combustion by-products of the three tranches of the Bois-Rouge power plant, borne by it since 2013 following the change in the regulations (ministerial order of 28 May 2013) Adjustment of the remuneration to take into account all of the costs associated with bringing into compliance with the regulations the systems for processing liquid waste for tranches 1 and 2 of the Bois-Rouge power plant Treating atmospheric emissions EU Industrial Emissions Directive (IED) to come into force by 1 January 2020 at the latest Total investment of 200 million over five years for nine production units After the agreement obtained for the Albioma Le Gol power plant's three units, a rider was signed for tranche 3 of the Bois-Rouge power plant Total investment of 34 million Pre-tax ROCE of 11% THERMAL 3. OPERATIONAL PERFORMANCE: FIRST-HALF 2016 ASSESSMENT AND OUTLOOK 15

SOLAR BUSINESS ACHIEVES STABLE PERFORMANCE SOLAR POWER NUMBER OF EQUIVALENT FULL POWER HOURS POWER GENERATION 652 628 46 47 In GWh H1 2015 H1 2016 H1 2015 H1 2016 Plants achieved good performance despite less favourable sunshine conditions in the West Indies, French Guyana and Europe Production slightly higher than in 2015 due to the power plants acquired (3 MWp) on Reunion Island in April 2015 3. OPERATIONAL PERFORMANCE: FIRST-HALF 2016 ASSESSMENT AND OUTLOOK 16

ANAEROBIC DIGESTION (3MW) ANAEROBIC DIGESTION AVAILABILITY POWER GENERATION In GWh 71,7% 72,2% 10 10 H1 2015 H1 2016 H1 2015 H1 2016 Stable performance from the three power plants in operation The business is not profitable. It is currently the subject of a strategic review with a decision expected in the second half of 2016 3. OPERATIONAL PERFORMANCE: FIRST-HALF 2016 ASSESSMENT AND OUTLOOK 17

Good growth prospects in the French overseas territories 3. OPERATIONAL PERFORMANCE: FIRST-HALF 2016 ASSESSMENT AND OUTLOOK 18

GALION 2 PROJECT: FIRST ALL-BIOMASS PLANT IN THE FRENCH OVERSEAS DEPARTMENTS Construction started in 2015 assembly of combustion facilities in progress 40 MW installed Technology: Ansaldo combustion equipment, Doosan-Skoda turbine, Jeumont generator; baseload operation Fuel: bagasse, local and imported biomass (pellets) 30-year contract Total investment of 185 million Bank financing of 120 million over 20 years signed in April 2015 80% of capital held by Albioma Scheduled commissioning date: summer 2017 3. OPERATIONAL PERFORMANCE: FIRST-HALF 2016 ASSESSMENT AND OUTLOOK 19

COMBUSTION TURBINE IN SAINT PIERRE ON REUNION ISLAND Financing agreement signed on 18 July 2016 and construction work begun 41 MW installed Technology: General Electric LM 6000 Sprint gas turbine; peaking operation Fuel: bioethanol (1/3 produced locally) and light fuel oil 25-year contract Total investment of 60 million, including 45 million financed by project debt 22-year term Albioma Saint-Pierre and the surrounding area Banks: CEPAC, AFD and Natixis 51% of capital held by Albioma Scheduled commissioning date: end 2017 3. OPERATIONAL PERFORMANCE: FIRST-HALF 2016 ASSESSMENT AND OUTLOOK 20

NEW SOLAR POWER PLANTS WITH INTEGRATED STORAGE Albioma was a winner in the call for tenders launched by the French Energy Regulatory Commission on 18 May 2015 for three photovoltaic plants with integrated storage Le Port Reunion Island Three projects representing installed capacity of 5.9 MWp Technology: Two rooftop plants on Reunion Island (2.6 MWp) and one ground-based plant in Guadeloupe (3.3 MWp) Stade de l est Saint-Denis de La Réunion Total investment of around 13 million Scheduled commissioning date: 2018/2019 Sainte-Rose Guadeloupe 3. OPERATIONAL PERFORMANCE: FIRST-HALF 2016 ASSESSMENT AND OUTLOOK 21

3.2 Brazil 22 22

RIO PARDO AND ALBIOMA CODORA PLANTS ACHIEVE GOOD PERFORMANCE RIO PARDO - EXPORTED POWER CODORA - EXPORTED POWER 105 114 In GWh 127 In GWh 80 36 56 37 52 2013 2014 2015 S1 2015 S1 2016 2015 H1 2015 H1 2016 Rio Pardo Acquisition finalised on 1 April 2014 Excellent technical performances in the first half of 2016 Shutdown between harvests reduced to 40 days - a level never before achieved in Brazil Good availability of cogeneration for the sugar refinery (96.4%) Codora Energia Acquisition finalised on 4 August 2015 First period between harvests (maintenance) under Albioma's management Improved operating conditions resulting in increased productivity Sales hit by fall in spot price 3. OPERATIONAL PERFORMANCE: FIRST-HALF 2016 ASSESSMENT AND OUTLOOK 23

STRATEGY TO SECURE SALES CONTINUED Reminder: 2 electricity sales methods in Brazil Regulated market: long-term contracts awarded following tender process set out by the regulator Open market: short-term contracts with industrial customers or sale at the spot price Fall of the spot price between 2015 and 2016, from BRL 370/MWh in June 2015 to BRL 30/MWh in February 2016 (the period's low point). It was BRL 61/MWh in June 2016 RIO PARDO 2015: average price of BRL 354/MWh 2016: return to 'normal' after two exceptional years: average price expected at ~ BRL 210/MWh for the year (all power sold under contract), i.e.-40% vs 2015 2017-2019: ~ 60% of energy sold under contract at BRL 213/MWh (baseline 2016) CODORA 2015 (Jan. Dec.): average price BRL 221/MWh 2016: ~ 80% of energy sold under contract; average price of contracts: ~ BRL 203/MWh 2017-2019: ~ 65% of energy sold under contract at BRL 214/MWh (baseline 2016) Objective: 70%-80% of sales under contract (regulated and open market) 3. OPERATIONAL PERFORMANCE: FIRST-HALF 2016 ASSESSMENT AND OUTLOOK 24

SIGNING OF A THIRD PROJECT ON 20 MAY 2016: VALE DO PARANÁ A new investment fulfilling all our selection criteria: Vale do Paraná: Mill with annual sugarcane crushing capacity of 2 million tonnes Location: Suzanápolis, State of São Paulo (around 600 km to the north west of São Paulo) Shareholder structure: VDP is a subsidiary of the Pantaleon Group, Central America's leading producer (13 million tonnes) based in Guatemala and Manuelita, an agro-industrial producer based in Colombia (6 million tonnes) Creation of a company jointly owned by Vale do Paraná (60%) and Albioma (40%): Extension of the existing plant with the installation of a new turbine and connection to the grid Albioma is the technical partner during construction and operation: development of a "model" project 80% of electricity sales secured over 25 years as from 1 January 2021 at the price of BRL 243/MWh (2016 basis) Investment of around BRL 100 million (2016 basis) mostly financed by a BNDES loan Scheduled commissioning date: 2021 3. OPERATIONAL PERFORMANCE: FIRST-HALF 2016 ASSESSMENT AND OUTLOOK 25

3.3 Mauritius 26 26

EXCELLENT PERFORMANCE OF PLANTS IN MAURITIUS PLANT AVAILABILITY POWER GENERATION In GWh 89,6% 91,4% 552 590 H1 2015 H1 2016 H1 2015 H1 2016 The plants operated by Albioma performed well with a particularly high call-out rate at the Terragen plant since the beginning of the year 3. OPERATIONAL PERFORMANCE: FIRST-HALF 2016 ASSESSMENT AND OUTLOOK 27

4. FIRST-HALF 2016 FINANCIAL RESULTS 28 28

INCOME STATEMENT BY REGION/BUSINESS ( millions) H1 2016 H1 2015 Change 16/15 France Thermal Biomass 146.6 136.8 +7% France Solar Power (2) 20.6 20.5 +0% Brazil 7.0 4.1 +72% Holding & Other 2.9 2.5 +15% Revenues 177.1 164.0 +8% France Thermal Biomass (1) 49.8 35.5 +40% France Solar Power (2) 15.6 16.0-2% Maurice (equity accounted) 1.3 1.2 +9% Brazil 1.4 (0.2) n.a. Of which operating 2.7 1.9 +43% Of which holding and development (1.3) (2.1) +40% Holding & Other (2.7) (2.2) n.a. EBITDA 65.4 50.2 +30% Consolidated net income 15.7 10.8 +45% Consolidated net income (Group Share) 14.5 9.5 +53% Performances of the French thermal power plants returned to normal and new riders to the Bois Rouge contract were signed Poor sunshine conditions in mainland France, the West Indies and French Guyana The Mauritian entities achieved good performances The sugar harvest in Brazil began extremely well (1) Including non-recurring income related to the retroactive effect of price adjustments in H1 2016 totalling 4.4 million. (2) Including Spain and Italy 4. FIRST-HALF 2016 FINANCIAL RESULTS 29

INCREASED REVENUES Revenues increased by 8% despite a negative raw material price effect due to (i) the good operating performance achieved by the French Thermal Biomass plants, (ii) adjustments to pricing and (iii) the acquisition of Codora in Brazil in August 2015 millions 164.0 Impact of raw material prices (8.5) 155.4 Impact of Thermal France volume Bonuses/Penalties 4.9 Increase in fixed premiums 2.5 Pricing adjustments and indexation 9.4 Availability 91.1% vs. 82.9% Other Thermal France 1.5 (1.2) 3.7 (3.1) 3.5 0.4 Pricing adjustments Variable price Impact of BRL/EUR exchange rate Impact of Brazil volume (Rio Pardo) Impact of Brazil price (Rio Pardo) Brasil other Of which, change in consolidation scope: Codora 2.3 million Other 177.1 164.0 Thermal France: + 18.3 million excluding impact of raw material prices Brazil: + 2.9 million Other: + 0.4 million 177.1 155.4 H1 2015 H1 2015 H1 2016 Excluding impact of raw material prices 4. FIRST-HALF 2016 FINANCIAL RESULTS 30

EBITDA, AT 65.4 MILLION, SIGNIFICANTLY HIGHER THAN IN 2015 EBITDA increased significantly as compared with the same period last year, due mainly to (i) the good operating performance achieved by the French Thermal Biomass plants, (ii) the retroactive compensation granted by EDF following the signing of the new rider to the Bois-Rouge contract and (iii) the effect of the change in consolidation scope in Brazil millions 50.2 Retroactive effect 4.4 Increase in fixed premiums 2.5 Impact of Impact of Other Brazil volume Impact of Impact of Brazil price Thermal (Rio Pardo) Brazil change in BRL/EUR (Rio Pardo) consolidation scope Bonuses/Penalties France other Other 65.4 exchange rate 9.4 (2.0) (0.2) 3.7 (3.1) 0.2 1.1 (0.8) Acquisition of Codora In August 2015 50.2 Thermal France: + 14.3 million Brazil: + 1.7 million Other: 65.4-0.8 million H1 2015 H1 2016 4. FIRST-HALF 2016 FINANCIAL RESULTS 31

NET INCOME (GROUP SHARE) UP BY MORE THAN 50% Compared to the first-half of 2015, net income (Group share) included amortisation/depreciation and financial expenses related to Codora for the full half year millions Increase in fixed premiums Bonuses/Penalties 5.4 Other Thermal France (1.6) Impact of BRL/EUR exchange rate 0.3 Impact of Brazil volume (Rio Pardo) Impact of Brazil price (Rio Pardo) 3.6 (3.0) Brazil other (0.3) Impact of change in consolidation scope (1.0) Acquisition of Codora In August 2015 Holding company financial expense (0.2) Other (2.4) 14.5 Retroactive effect 1.3 9.5 2.9 Thermal France: + 8.0 million Brazil: - 0.4 million Other: - 2.6 million 14.5 9.5 H1 2015 H1 2016 4. FIRST-HALF 2016 FINANCIAL RESULTS 32

CASH UP SIGNIFICANTLY AT 97 MILLION Cash - flow H1 2016 Group cash Cash flow from operations 58 Debt service 32 Loan repayments 19 Interest costs 14 Investments 44 Operations 6 Development 38 97 New borrowings 68 Cash increase 49 48 Inflow Outflow 31 01-janv.-15 Dec. 2015 30 01-janv.-16 June 2016 4. FIRST-HALF 2016 FINANCIAL RESULTS 33

A STRONG BALANCE SHEET TO FINANCE GROWTH Gross debt increased mainly due to the debt raised to finance the projects currently under construction (Galion 2 and Albioma Le Gol IED compliance) Group average interest rate of 4.7% (of which France 4.2% and Brazil 14.8%) 83% of debt hedged or at fixed rates Non-recourse project debt except Brazil debt (around 35 million) and projects under construction 45 million of financing not yet drawn down (In million) 30-Jun-16 31-Dec-15 Change Project debt 526 476 11% Corporate debt 85 80 6% Total gross debt 611 556 10% Cash and cash equivalents (97) (48) 101% Guarantee deposits and equivalents (6) (6) 11% Total net debt 508 502 1% Net debt/ebitda 3.8x 4.2x Net debt/ebitda embedded 3.4x 4.0x Gearing* 126% 123% * Net debt/equity 4. FIRST-HALF 2016 FINANCIAL RESULTS 34

2016 OBJECTIVES 2015 2016 EBITDA ( millions) 120 122-130 Net income (Group share) 30 25-30 ( millions) Confirmation of 2016 guidance 4. FIRST-HALF 2016 FINANCIAL RESULTS 35

5. OUTLOOK 36 36

GRADUAL REORGANISATION OF THE SHAREHOLDER STRUCTURE Gradual reorganisation of the shareholder structure: SHAREHOLDER STRUCTURE AT 19 JULY 2016 2 crossings of the 5% ownership threshold in the first half-year (COFEPP and CDC) Strengthening of employee share ownership: approval of a new bonus performance share plan at the General Meeting of 24 May 2016 (through repurchase of the Company's shares on the market) Free float 65.7% Others 3.0% Directors (excluding Altamir) 0.3% Employees 1.5% Treasury shares 1.2% Altamir and affiliates (concert) 14.3% Financière de l'echiquier 5.1% COFEPP 5.9% Caisse des Dépôts et Consignations 6.1% 5. OUTLOOK 37

2013-2023 INVESTMENT PLAN FOR GROWTH Galion 2 Commissioning: 2017 Combustion turbine Reunion Island Commissioning: end 2017 185 60 200 CAPEX for modernisation programme Commissioning: 2016-2019 Solar power 2015 acquisition and projects to be commissioned in 2018/2019 Anaerobic digestion Commissioning: 2014 and 2015 Rio Pardo, Codora and Vale do Paraná Acquisitions: 2014 and 2015 and commissioning: 2021 30 35 105 295 90 Other projects in France to be developed Other projects in Brazil to be developed 1 project every 12 to 18 months Target 2013 to 2023: 1 billion confirmed Pre-tax ROCE target per project: 11% + country-risk premium 5. OUTLOOK 38

ALBIOMA - A HYBRID GROWTH AND INCOME STOCK Sustain and double the industrial asset base between 2013 and 2023 Objective to double net income (Group share) in 10 years (baseline 2013) Confirmation of the dividend distribution policy: 50% of net income (Group share), excluding nonrecurring items 2015 dividend paid in 2016: shareholders opting for payment of 50% of their dividend in new shares represented nearly 65% of the share capital 5. OUTLOOK 39

ALBIOMA = THERMAL BIOMASS + SOLAR POWER QUALITY ASSETS GENERATING HIGH RECURRING CASH FLOWS = STRENGTH CREATING VALUE FROM BIOMASS, A RESOURCE OF THE FUTURE = GROWTH A ROBUST INDUSTRIAL AND FINANCIAL MODEL = PROFITABILITY

6. APPENDICES 41 41

INCOME STATEMENT FOR THE HALF YEAR ENDED 30 JUNE 2016 ( millions) H1 2016 H1 2015 Change 16/15 Revenue 177.1 164.0 +8% EBITDA 65.4 50.2 +30% Depreciation/amortisation & provision (24.8) (19.6) -27% Operating income 40.5 30.6 +33% Net financial charges (13.6) (12.5) -9% Tax (11.3) (7.3) -55% Effective tax rate 44.1% 43.2% Consolidated net income 15.7 10.8 +45% Consolidated net income (Group share) 14.5 9.5 +53% Weighted average number of shares 29,468,800 29,607,618 Consolidated net earnings per share 0.49 0.32 6. APPENDICES 42

CASH FLOW STATEMENT FOR THE HALF YEAR ENDED 30 JUNE 2016 ( millions) H1 2016 H1 2015 Cash flow from operations 67.4 52.4 Change in working capital requirements 7.5 (0.7) Tax paid (16.9) (6.8) Net cash flow from operating activities 58.0 44.9 Operating capex (5.6) (10.2) Free cash flow from operations 52.4 34.7 Development capex (38.2) (19.8) Other/Acquisitions/Disposals (0.2) (10.4) Cash flow from investing activities (38.4) (30.2) Dividends paid to Albioma SA shareholders - - Borrowings (drawn down) 67.5 5.4 Borrowings (repaid) (18.5) (17.8) Cost of debt (13.8) (13.0) Other (1.3) 0.0 Cash flow (net) from financing activities 33.9 (25.5) Currency effect on cash 0.8 (0.7) Net change in cash and cash equivalents 48.8 (21.6) Opening cash and cash equivalents 48.2 103.1 Closing cash and cash equivalents 97.0 81.5 6. APPENDICES 43

BALANCE SHEET AT 30 JUNE 2016 ASSETS ( millions) 30-Jun-16 31 Dec-15 Goodwill 13 13 Intangible assets & Property, plant and equipment 995 958 Other non-current assets 42 42 Total non-current assets 1,051 1,013 Current assets 116 136 Cash and cash equivalents 98 48 Total ASSETS 1,265 1,198 EQUITY & LIABILITIES ( millions) 30-Jun-16 31 Dec-15 Equity (Group share) 337 348 Non-controlling interests 65 61 Total equity 402 409 Current and non-current financial liabilities 611 556 Other non-current liabilities 136 123 Current liabilities 116 110 Total EQUITY & LIABILITIES 1,265 1,198 6. APPENDICES 44