Survey of Major Shippers

Similar documents
MULTIMODAL FREIGHT STUDY

REPORT. Freight Physical Infrastructure Profile May 11, Submitted to: Rappahannock-Rapidan Regional Commission (RRRC)

VTrans2040 Multimodal Transportation Plan Corridors of Statewide Significance Needs Assessment North-South Corridor

U.S. 220 Multimodal Corridor

VTrans2040 Multimodal Transportation Plan Corridors of Statewide Significance Needs Assessment North-South Corridor (G)

U.S. 29 Multimodal Corridor

Regional Performance Measures Annual Progress Report TPO Board - 2/4/2016 Presentation by: Chris Wichman, Senior Planner

Corridors of Statewide Significance: Introduction

I-95 / I-395 Integrated Corridor Management. Hari Sripathi, P.E. Regional Operations Director

VTrans2040 Multimodal Transportation Plan Corridors of Statewide Significance Needs Assessment North Carolina to West Virginia Corridor

Statewide Multimodal Networks

Ohio 21 st Century Transportation System It s Ours to Create!

VTrans2040 Multimodal Transportation Plan Corridors of Statewide Significance Needs Assessment Western Mountain Corridor (L)

Grottoes. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Summary. Freight transportation in New England

Factors Affecting Transportation Decisions. Transportation in a Supply Chain. Transportation Modes. Road freight transport Europe

2009 Ohio Conference on Freight

Leveraging Intermodal Transportation. Georgia Environmental Conference August 21, 2014

Chapter 1 Introduction

WELCOME. Schedule. Contact Information. Please Provide Written Comments

Intermodalism -- Metropolitan Chicago's Built-In Economic Advantage

Modeling Applications for Freight Tennessee DOT Freight Planning

Kansas Freight Advisory Committee

Transportation Advisory Board May 21, 2014

Corridors of Statewide Significance

VTrans2040 Multimodal Transportation Plan Corridors of Statewide Significance Needs Assessment Coastal Corridor (A)

DRAFT NATIONAL CAPITAL REGION FREIGHT PLAN. July 2016

Wilmington-Harrisburg Freight Study. Presentation to the Delaware Valley Regional Planning Commission April 16, 2003

6.0 CONGESTION HOT SPOT PROBLEM AND IMPROVEMENT TRAVEL DEMAND MODEL ANALYSIS

Essex County Freight Profile

What is the Transportation Policy Plan (TPP)?

GREATER CHARLOTTE REGIONAL FREIGHT MOBILITY PLAN ADVISORY COMMITTEE MEETING

Report to Governor-elect Northam From Transition Policy Council on Transportation

NORTHERN VIRGINIA TRANSPORTATION PLAN

Statewide Multimodal. Statewide. Multimodal Freight. Freight Flows Study. Executive Summary. Preserving Minnesota s Economic Competitiveness

Freight Handler to the Nation. Freight Planning in the Chicago Metropolitan Area

Benefit Cost Analysis Narrative

Hawthorne, Mineral County Nevada And the Intermountain West Corridor I-11

Introduction... 1 Florida s Rail System... 1 Rail Freight... 3 Rail Passengers... 5 Conclusions... 9

GULF COAST RAIL DISTRICT VISION FOR REGIONAL RAIL

2030 Transportation Policy Plan SUMMARY PRESENTATION. Land Use Advisory Committee November 15, 2012

MARCH 14 TH 2017, 2:00 PM ET WITH

Public Open House and Stakeholder Meeting Summary

FAIRFAX COUNTY PARK-AND-RIDE DEMAND ESTIMATION STUDY

Infrastructure and Growth Leadership Advisory Group Ideas and Approaches Survey

Delaware State Rail Plan. October 12,2011 DVRPC Freight Committee

SUMMARY REPORT September 11, 2012 DRAFT

Ohio s World-Class Transportation, Distribution and Logistics Industry Learn how your business can benefit from Ohio s leadership in logistics.

Appendix B. Commodity Flow Profile

U.S. 17 Multimodal Corridor

OHIO STATEWIDE FREIGHT STUDY PROGRESS UPDATE. Ohio Conference on Freight: September 12, 2012

ATTACHMENT A. Detailed Study Scope. I-66 (Inside) Multi-modal Study Scope

MPO/RPO Briefings. MPO/RPO Briefing. Briefing Topics Plan framework o NCDOT Policy to Projects process o Relationship to local/regional plans

FEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION

PROJECTS. The KIPDA MPO s Central Location

D E C AT U R I N T E R M O D A L R A M P O P P O R T U N I T Y F I N A L R E P O R T A U G U S T 3 1,

Developing New Revenue Streams For Transit

Freight and Rail Stakeholder Webinar. January 7, 2014

Chapter 5 Freight Movement

INLAND DISTRIBUTION LOGISTICS PRESENTATION TO AMERICAN ASSOCIATION OF PORT AUTHORITIES

Virginia Statewide Multimodal Freight Study, Phase I

Appendix O Level of Service Standard and Measurements

Minnesota Statewide Freight System Plan Action Agenda Development Lead Agency (MnDOT or

Project Initiation Form

The Crescent Corridor Improving Lives and Livelihoods

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives.

14.0 TRANSPORTATION PLANNING RULE COMPLIANCE

2017 TIGER DISCRETIONARY GRANT APPLICATION

Massachusetts Rail Plan. September 16, 2010

NEW YORK TRANSPORTATION FACTS ECONOMIC IMPACTS

A Customer-First Commitment

VTrans2040 Multimodal Transportation Plan Corridors of Statewide Significance Needs Assessment Eastern Shore Corridor

Highway and Freight Current Investment Direction and Plan. TAB September 20, 2017

VMTP 2025 Needs Assessment

12 Evaluation of Alternatives

Niagara Region Transportation Master Plan Goods Movement Technical Paper

2017 TRANSPORTATION POLICY STATEMENT

NASHVILLE REGIONAL FREIGHT & GOODS MOVEMENT STUDY PHASE II TECHNICAL MEMO #3: EXISTING TRENDS AND CONDITIONS

Transform 66 Multimodal Project: Prioritization Process and Evaluation Criteria Approved March 3, 2016

MUTUAL COMMITMENT PROGRAM MASTER AGREEMENT Revised July 2015

Rail Freight Service Review. Submission of the New Brunswick Department of Transportation

Transit Service Guidelines

April 12, Dear Chairman Wojahn and Members of the Transportation Planning Board:

State of Ohio Rail Plan. MORPC Community Advisory Committee June 4, 2018 Meeting

A MICRO-APPROACH TO UNDERSTANDING URBAN COMMERCIAL VEHICLE MOVEMENTS: PRELIMINARY RESULTS FROM A WEB-BASED ESTABLISHMENT SURVEY

2. Goals and Objectives

Airports in the Region Case Study

MOBILITY 2045: A FOCUS ON TRANSPORTATION CHOICE:

Northeast Rail Operations Study (NEROps)

Transportation Concurrency

Transportation Concurrency

Integrating Freight into Transportation Planning. Keith Robbins District Freight Coordinator, FDOT District One

Chapter 6 Freight Plan

Transportation Facility Inventory

INDIANA S INTERMODAL MANAGEMENT SYSTEM Stephen C. Smith Planning Manager, Transportation Planning Division Indiana Department of Transportation

MEMORANDUM #4. DATE: November 4, Warrenton TSP Project Management Team. Ray Delahanty, AICP, DKS Associates Kate Petak, EIT, DKS Associates

FREIGHT AND INTERMODAL SYSTEMS

Corridor Planning Organizations and Ports I-95 Corridor: A Marine Highway Corridor

3.6 GROUND TRANSPORTATION

M E M O R A N D U M. To: Council Members AGENDA ITEM 7

Transcription:

RAPPAHANNOCK-RAPIDAN REGIONAL MULTIMODAL FREIGHT STUDY Survey of Major Shippers Rappahannock Rapidan Regional Commission 420 Southridge Pkwy. Suite 106 Culpeper, VA 22701 www.rrregion.org February 2010 1 P age

Study Overview As part of its ongoing development of a Regional Long-Range Transportation Plan, the Rappahannock- Rapidan Regional Commission (RRRC) was awarded funding for a regional, multimodal freight study to assess the impacts of freight in and through the Rappahannock-Rapidan Region. The study examines the movement of freight by truck, rail and air originating, destined to, or passing through the region in order to identify strategies on how the region can best position itself to accommodate future freight growth while minimizing adverse impacts on the region s transportation system and environment. It also provides recommendations for future infrastructure investments and policies that enable the region s transportation system to continue to operate at the highest levels of efficiency and safety in the years ahead. This study includes several key elements that will help regional decision makers understand how freight fits into the overall regional planning framework. Freight Movement Profile Survey of Major Shippers Freight Infrastructure Profile Project Analysis and Recommendations Final Report The Freight Movement Profile provides a baseline understanding of the current movement of freight to, from, and through the region. In many ways, this is the demand portion of the study where current patterns and future trends are analyzed and presented to help tell the story of regional goods movement. Topics covered include the variety of data sources for freight data, the types of freight moved and how that can be expected to change in coming years. The Survey of Major Shippers summarizes locally collected information from regionally significant shippers who produce or consume large quantities of commodities. One goal of this survey is to identify more specific information from these shippers regarding what they ship, how they ship it, how that will be changing and their perspectives regarding local freight issues and opportunities. It is expected that this survey will also open a long-term dialog with these shippers so that their insights can help inform transportation planning decisions in the years ahead. The Freight Infrastructure Profile captures the supply side of the study. It provides inventories and analyses of nationally and regionally significant freight infrastructure, how it is utilized or under-utilized, and helps set the stage for identifying critical gaps, deficiencies and opportunities. 2 P age

Project Analysis and Recommendations takes the findings from the first three tasks and explores options to solve current freight deficiencies, to plan for future issues and to lay out options that will shape future strategic investments. In this report, the relationships between land use, transportation and investments are explored and a case is presented for making strategic policies and investments that will improve the goods movement capabilities of local employers, the economic competitiveness of the region and the overall quality of life of its residents. Together these four elements comprise the Final Report, which is intended to help inform the development of the region s long-range transportation plan and ensure freight-related issues are addressed and weighted appropriately in the analysis of projects an important step in informing decision makers of the tradeoffs between various modes and investment strategies. Survey Methodology A list of the fifty largest employers in the Region was developed by starting with the largest employers for each of the five counties in the Region, as identified by the Virginia Employment Commission s Community profiles. This list was supplemented with businesses identified by local economic development offices, while certain businesses known to have minimal freight needs were removed from the list. A chief contact person was identified for each business, most often the local manager (for businesses headquartered outside the Region) or company president or CEO (for businesses with headquarters or single locations within the Region.) Each lead contact was sent a letter from the RRRC Executive Director, explaining the purpose of the Multimodal Freight Study and asking that he or she complete a brief online survey. A link to the survey was provided. A follow-up email was sent to businesses that did not respond or complete the survey within a predetermined time, and attempts were made to reach lead contacts by phone after three weeks, if they had not completed the survey. These attempts yielded nine completed surveys and contact with several businesses that expressed interest in the multimodal freight study. Follow up interviews were conducted with three of the businesses to produce the Region Case Studies presented here. Survey Content The survey was administered using the SurveyMonkey.com website. A link to the survey was posted on the RRRC website. The survey was intentionally brief to make it easy to complete, and questions were designed to ask for basic information and avoid questions that a business might consider too probing. 3 P age

Opportunity was provided for narrative comments on most subjects. The survey included the following questions: 1 What company do you represent? 2 What is the nature of your business and/or facility? 3 What are your primary products and customers? 4 How many people are employed at your facility? 5 What methods/modes do you employ for your facility s shipping and receiving of goods (Please check all that apply.) Air Medium Truck (Box Truck, Van, etc.) Heavy Truck 6 Can you provide estimates for the following? The number of truck moves into your facility per day and/or week The number of truck moves out of your facility per day and/or per week Major product origins into your facility 7 Does your business operate its own trucking fleet or utilize local/regional/long-haul shippers? If the latter, who are your main shipping providers 8 Is there room for expansion at your facility in terms of amount shipped and received? What factors might influence decisions about future expansion? 9 What are the main issues affecting your business s shipping and receiving capabilities? 10 Are transportation modes and networks with, and outside of, the region adequate for your business needs? Please explain. 11 What infrastructural additions, changes or improvements, if any, would you like to see made to the region s multimodal transportation network (vehicle, rail, air, pedestrian, transit, etc.) that would be most helpful to your company? 12 Please provide your contact information. 4 P age

Survey Results Respondents included a manufacturing plant, a distribution center, local business membership organizations, a large retailer, a highway construction company that also supplies construction aggregate, a milling plant, and a uniform and textile rental and laundry service. The number of persons employed ranged from 28 to over 300, with weekly truck moves ranging from 20 per week to 100 per day. Three respondents reported using rail, in addition to trucks, for freight movement. Six of the nine respondents said that the existing transportation infrastructure is adequate for their transportation needs and that future expansion of their business will depend on economic circumstances, not on freight transportation capacity. They reported no significant issues with their businesses shipping and receiving capabilities. However, three of the largest shippers who responded to the survey all from the southern part of the region expressed the need for better access to the interstate highways. Their suggestions included a bypass for Gordonsville, dedicated truck ramps onto I-81, and complete fourlaning of regional arterials, including VA 3, VA 20, US 522 from VA 3 to VA 20, and US 15 from Culpeper to Orange. One freight rail user expressed concern that emphasis on expanding commuter rail may interfere with the efficiency of freight rail on the Norfolk Southern line. Case Studies of Regional Shippers Response from the survey and other contact with freight-intensive businesses led to development of case studies of three employers, representing a sample of major shippers in the region. These case studies, presented on the following pages, profile a variety of employers who depend on an efficient transportation network for the success of their business operations. 5 P age

REGIONAL CASE STUDY: CEDAR MOUNTAIN STONE CORPORATION MITCHELLS, VA CEDAR MOUNTAIN STONE CORPORATION /CHEMUNG CONTRACTING CORPORATION LOCATION: MITCHELLS, VA (CULPEPER CO.) INDUSTRY: CONSTRUCTION AGGREGATE SUPPLY/HEAVY & HIGHWAY CONSTRUCTION PRODUCTS: CRUSHED STONE & ASPHALT EMPLOYEES: 40 CEDAR MOUNTAIN STONE CORPORATION/CHEMUNG CONTRACTING CORPORATION (CMS) SUPPLIES CRUSHED STONE AND CONSTRUCTION AGGREGATE MATERIALS TO CONSTRUCTION CONTRACTORS, LOCAL JURISDICTIONS AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION, AS WELL AS PRIVATE DEVELOPERS AND HOMEOWNERS. THE MITCHELLS, VA. LOCATION HOUSES A QUARRY, IN ADDITION TO ADMINISTRATIVE OFFICES. EXISTING TRANSPORTATION INFRASTRUCTURE : CMS MITCHELL LOCATION IS SERVED BY ROUTE 615, A TWO-LANE SECONDARY ROAD THAT PROVIDES ACCESS TO ROUTE 522 NEAR CULPEPER. A NORFOLK/SOUTHERN-OWNED RAILROAD LINE RUNS ADJACENT TO ROUTE 615 AND CEDAR MOUNTAIN STONE HAS WORKED WITH NORFOLK/SOUTHERN AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION ON AN INNOVATIVE, COST-SHARING PROJECT THAT HAS PROVIDED DOUBLE-SWITCH SIDING AT BOTH ITS MITCHELLS AND GAINESVILLE LOCATIONS. THESE INFRASTRUCTURE IMPROVEMENTS HAVE ALLOWED CEDAR MOUNTAIN STONE TO IMPROVE EFFICIENCY IN SHIPPING MATERIALS BETWEEN ITS TWO LOCATIONS BY USING ITS OWN RAIL CARS FOR 40 RAIL CAR LOADS PER WEEK BETWEEN THE TWO FACILITIES. CEDAR MOUNTAIN STONE ESTIMATES THAT RAIL HAS BEEN AT LEAST 50% MORE COST EFFICIENT VERSUS USING DUMP TRUCKS ALONE. CEDAR MOUNTAIN STONE CONTRACTS WITH LOCAL, INDEPENDENT HAULERS RATHER THAN OPERATING ITS OWN FLEET OF HEAVY TRUCKS FOR LOCAL DELIVERIES. POTENTIAL TRANSPORTATION INFRASTRUCTURE IMPROVEMENTS CMS INDICATED THAT THE TRANSPORTATION INFRASTRUCTURE ARE SUFFICIENT ON A LOCAL SCALE, BUT INSUFFICIENT ON A REGIONAL LEVEL. IMPROVEMENTS TO SOME OF THE REGION S PRIMARY ROUTES, INCLUDING ADDITIONAL LANES OR ALTERNATE PARALLEL ROADS FOR ROUTES 3, 15, 20 AND 522 WOULD GENERATE COST SAVINGS FOR CMS. ON THE RAIL NETWORK, CMS INDICATED THAT THERE WILL BE A NEED FOR ADDITIONAL TRACKING AS PASSENGER RAIL BECOMES A LARGER PRESENCE ON THE REGION S CORRIDORS, ESPECIALLY THE NORFOLK/SOUTHERN-OWNED MAINLINE THAT RUNS NORTH TO SOUTH THROUGH THE REGION. 6 P age

REGIONAL CASE STUDY: ROSS INDUSTRIES, INC. MIDLAND, VA ROSS INDUSTRIES, INC. LOCATION: MIDLAND, VA (FAUQUIER COUNTY) INDUSTRY: FOOD PROCESSING EQUIPMENT MANUFACTURING PRODUCTS: MEAT TENDERIZERS, FOOD PACKAGING EQUIPMENT, FOOD PROCESSING SYSTEMS EMPLOYEES: >100 ROSS INDUSTRIES HAS ACHIEVED AN INTERNATIONAL REPUTATION AS THE DESIGNER, BUILDER, AND MARKETER OF THE WORLD S FINEST FOOD PROCESSING SYSTEMS. ALL ROSS SYSTEMS ARE DESIGNED TO STREAMLINE THE PROCESSING AND PACKAGING FUNCTION IN ORDER TO IMPROVE QUALITY AND PRODUCTIVITY WHILE MINIMIZING WASTE. THE MIDLAND, VA. LOCATION WAS OPENED IN 1972 AND HOUSES AN EQUIPMENT MANUFACTURING PLANT, IN ADDITION TO CORPORATE ADMINISTRATIVE OFFICES. EXISTING TRANSPORTATION INFRASTRUCTURE : ROSS INDUSTRIES MIDLAND LOCATION IS SERVED BY ROUTE 610 (MIDLAND ROAD), A TWO-LANE SECONDARY ROAD THAT PROVIDES DIRECT ACCESS TO ROUTE 28, A TWO-LANE PRIMARY ROUTE RUNNING NE/SW IN SOUTHEASTERN FAUQUIER COUNTY. A NORFOLK/SOUTHERN-OWNED RAILROAD LINE RUNS ADJACENT TO ROUTE 610, NORTHWEST OF THE ROSS MANUFACTURING PLANT. THE WARRENTON-FAUQUIER AIRPORT IS LOCATED IMMEDIATELY SOUTH OF THE ROSS INDUSTRIES SITE, ALTHOUGH THE COMPANY DOES NOT UTILIZE THE AIRPORT FACILITY FOR ANY FREIGHT NEEDS AT PRESENT. PRODUCTS SHIPPED VIA AIR FOR ROSS INDUSTRIES TYPICALLY ARE HAULED FROM THEIR PLANT LOCATION TO DULLES AIRPORT IN LOUDOUN COUNTY. ROSS INDUSTRIES CONTRACTS WITH PRIVATE FREIGHT SHIPPERS, SUCH AS UPS AND FEDEX FOR SHIPPING NEEDS AND ALSO UTILIZES LARGE-SCALE FREIGHT HAULERS, SUCH AS YELLOW FREIGHT AND FEDEX FREIGHT FOR ITS PRESENT SHIPPING NEEDS. POTENTIAL TRANSPORTATION INFRASTRUCTURE IMPROVEMENTS ROSS INDUSTRIES INDICATED THAT THE EXISTING TRANSPORTATION INFRASTRUCTURE DO NOT PRESENT ANY MAJOR PROBLEMS OR HINDRANCES FOR THEIR BUSINESS. FUTURE MARKET DEMAND WOULD DRIVE EXPANSION AT THEIR MIDLAND FACILITY, BUT THEY ARE NOT CURRENTLY CONSTRAINED BY TRANSPORTATION INFRASTRUCTURE ISSUES. 7 P age

ROSS INDUSTRIES DOES NOT ENVISION RAIL BECOMING A MAJOR PART OF THEIR SHIPPING METHOD, BUT DID INDICATE THAT EXPANDED COMMUTER RAIL SERVICE ON THE NORFOLK/SOUTHERN-OWNED LINE ALONG THE ROUTE 28 CORRIDOR WOULD ALLOW FOR AN EXPANDED BASE FOR EMPLOYEES AND LESS CONGESTION ON ROUTE 28. REGIONAL CASE STUDY: MPS GORDONSVILLE, VA MPS LOCATION: GORDONSVILLE, VA (ORANGE CO.) INDUSTRY: BOOK DISTRIBUTION PRODUCTS: BOOKS EMPLOYEES: 320 FREIGHT MODES: MEDIUM & HEAVY TRUCK MPS (MACMILLAN) IS A GROUP OF US PUBLISHING COMPANIES HELD BY VERLAGSGRUPPE GEORG VON HOLTZBRINCK (VHB), WHICH IS BASED IN STUTTGART, GERMANY. MPS AMERICAN PUBLISHERS INCLUDE FARRAR STRAUS AND GIROUX, HENRY HOLT & COMPANY, W.H. FREEMAN AND WORTH PUBLISHERS, PALGRAVE MACMILLAN, BEDFORD/ST. MARTIN S, PICADOR, ROARING BROOK PRESS, ST. MARTIN S PRESS, TOR BOOKS, AND BEDFORD FREEMAN & WORTH PUBLISHING GROUP. THE GORDONSVILLE, VA. LOCATION FEATURES A DISTRIBUTION CENTER, CALL CENTER, COMPUTER CENTER AND COLLECTIONS, IN ADDITION TO ADMINISTRATIVE OFFICES. EXISTING TRANSPORTATION INFRASTRUCTURE : MPS GORDONSVILLE LOCATION IS SERVED BY U.S. ROUTE 15. THE SECTION OF ROUTE 15 BETWEEN GORDONSVILLE AND ORANGE THAT MPS IS LOCATED IS A FOUR-LANE, DIVIDED HIGHWAY. HOWEVER, SOUTH OF GORDONSVILLE AND NORTH OR THE TOWN OF ORANGE, ROUTE 15 IS A TWO-LANE ROAD. A CSX TRANSPORTATION- OWNED RAILROAD LINE RUNS ADJACENT TO THE MPS FACILITY, ALTHOUGH MPS DOES NOT CURRENTLY UTILIZE RAIL FOR ANY OF ITS FREIGHT SHIPPING NEEDS. MPS INBOUND AND OUTBOUND SHIPMENTS ARE OUTSOURCED TO PRIVATE, LONG HAUL CARRIERS, SUCH AS YELLOW FREIGHT, AVERETT, OLD DOMINION AND UPS FREIGHT AND PRIVATE SHIPPING FIRMS, SUCH AS UPS AND FEDEX. POTENTIAL TRANSPORTATION INFRASTRUCTURE IMPROVEMENTS MPS INDICATED THAT ACCESS TO THE TWO INTERSTATES CLOSEST TO THE RAPPAHANNOCK-RAPIDAN REGION INTERSTATE 64 TO THE SOUTH AND INTERSTATE 66 TO THE NORTH WOULD BE AN IMPROVEMENT THAT WOULD AID THE REGION S INDUSTRIES, GIVEN THE LACK OF FOUR-LANE, LIMITED ACCESS TRANSPORTATION OPTIONS TO BOTH OF THOSE INTERSTATES. 8 P age

MPS INDICATED THAT LOCAL TRAFFIC PATTERNS, SPECIFICALLY IN THE TOWNS OF ORANGE AND GORDONSVILLE AFFECT THEIR SHIPPING ABILITY, AS DOES THE DISTANCE FROM MAJOR SHIPPING HUBS THAT PREVENTS TIMELY PICKUPS AND SORTING MECHANISMS. 9 P age