Business. Case. 27 th Summit Africa- France. Conception and construction of a high standing residential complex. Bamako - Mali January 2017

Similar documents
Technology is always changing, it is just a matter of applying science and sustainability into the architecture of everyday life.

Capability Statement

Quality specifications for my home

AKASH ENTERPRISE INTRODUCTION: COMPANY PROFILE: PRODUCT ACKNOWLEDGEMENT:

monocabin PRICE LIST

GREENHOUSE ENGINEERING PREFABRICATED HOUSES

What is NUFORM HOUSE KIT?

About TSSC. Flat Pack Containers. Prefabricated Buildings. Light Steel Buildings. Security Cabins

MODULAR HOUSES MAIN PRODUCT LINES. Traditional Prefabricated Houses

Innovative Steel Structures LLC.

Modcrete. Modcrete OVERVIEW COMPONENTS COMPONENTS

Trient represents many quality products from around the globe:

Your Expert in Modular Prefab House Building

EPS Cement Sandwich Panels (FPB)

EXTRA CO EXTRA CO. Prefab and Interiors. Fibre Glass & Prefab Houses L.L.C. Fibre Glass & Prefab Houses L.L.C.

Exhibition sectors at BAU

STERLING. Construction & Development Corporation MODULAR BUILD. Cost Competitive System

The 2018 Carbon Dynamic product catologue - a selection of our residential lodge designs which can be personalised extensively.

Carpentry, Timber and Metal Construction We Build to Suit Your Needs

INNOVATIVE OFF-SITE MANUFACTURING

Construction through innovative thinking & exacting standards

ibuild Modulars SMART2 LOW cost for owners HIGH utility for occupants

HIGH END ARCHITECTURE MADE SIMPLE MIMA HOUSING

EXPANDABLE DWELLING SYSTEM FOR CHEAP AND FAST ERECTION AND DISMANTLING

Sheltering your value. Pre-fabricated Building

AWARD CATEGORIES RESIDENTIAL

SW40 Series Data sheet

CLADDING SYSTEM CLADDING PANELS.

GOOD LIVING STARTS HERE

ibuild Modular Buildings Cyclone Rated Termite Resistant Superfast Assembly Worldwide Delivery

CLT solid wood panels*

Bayti Frequently Asked Questions

APPENDIX B RESIDENTIAL DEVELOPMENT DETAILS

BUILDING SPECIFICATIONS

REEF RESIDENCE ON PLOT NO. JVC13JHRA002, JUMEIRAH VILLAGE CIRCLE, DUBAI, UAE.

id Essential Tarkett Luxury Design Tiles open up a world of possibilities for your interior scheme.

GLASS ROOF FACADES AND ALUMINIUM INSTALLUX

M-Series Issue One Smart Modular Home

M-Series Issue One Smart Modular Home

THE MODULAR HOUSE - PLOT 15 - SCOTLAND S HOUSING EXPO

Date: 4/13/2018 Project Name: Presidential Residence Project Number: Prepared By: Libby Ramirez. Design Program and Specification Narrative

Unit 39 / Unit 40 Terry Dicken Industrial Estate Stokesley North Yorkshire TS9 7AE. Tel: +44 (0) Fax: +44 (0)

AtlasPantou (Properties) Ltd

Precision in ball bearing slides and special profiles

MODULAR CONSTRUCTION SYSTEM

SOUTH KOREA. Why South Korea IMPORTANCE OF FORESTRY AND TRADE DIVERSIFICATION MARKET DEVELOPMENT SUMMARY. Korea buys construction grade lumber

LINPO Series Luxury Vinyl Tile Floor (LVT) Stone Plastic Composite Floor (SPC)

AUGUST 2018 ZED Pods Ltd. All rights reserved. Housing for key workers & young professionals

INTELLIGENT OFFSITE GUIDE TO EVALUATING BATHROOM PODS

BACKYARD CABINS STUDIOS for Art /Painting Studio, Home Office, Teenage or Parents retreat, holiday property accommodation, She shed, Mans cave, you

Precision in ball bearing slides and special profiles

T F

ECOCASITA PLUS63. Drawings. Outside elevation example. Ground floor plan example. Page 1 of 27

1.1 THE ARCHITECT S SPECIFICATIONS AND DRAWINGS 1.2 THE BIDDING CONTRACTORS

DALAL FLAT PACK MODULAR UNITS

COPYRIGHTED MATERIAL. Contents. 1 Making Buildings 3. 3 Wood Foundations and. Preface to the Sixth Edition xi. Sitework 31

Construction applications

DRY CONSTRUCTION SYSTEMS

Next. Advanced technology that doesn t cost the Earth

HIG HADDA INTERNATIONAL GROUP BUILD A BETTER FUTURE

LAVENDER VILLAS PHASE 03

Prefabricated Timber Solutions as an efficient alternative for construction in humanitarian context

Transpack Cabins. Steel Containers

Setra in brief. Setra = Swedish Wood

THE TECHNOLOGY DETAILS. 3D Monolithic Precast

Charnwood. A guide to buying a residential home from Willerby. Your home, your choice, your life. Contact us to talk through your requirements.

MACHAVA INDUSTRIAL PROJECT

elfbuild Whatever the style or size, your timber frame home is tailor-made to suit your own individual needs and requirements.

Location. Therefore this exceptional modern building will ensure Capital Growth Potential.

MODULAR OFFSITE MANUFACTURE

About Us. Management Team

for automatic doors Range of LEAVES

The SIPs Process. 1 Why SIPS? What is the typical process for building a home using SIPS Industries? The Factory Process...

Every Ecozid house is a valuable contribution to the environment

Radiant Heating Showcase Commercial & Industrial Applications

P.O. Box: DUBAI, U.A.E. TEL: FAX: WEB:

Urban Oasis BEAUTIFUL EHO

CRG CONSERVE RESOURCES GROUP ECO ENVIRONMENTAL AGRICULTURE TECHNOLOGIES CRG TECHNOLOGY DIVISION. DIY Cost Effective HOME.

EKATERINI COURT I 48 Kyriacou Matsi Avenue 2409 Egomi, Nicosia,Cyprus. EKATERINI COURT IV, Kantaras Avenue, Strovolos, Nicosia

The Total Service. Scotts of Thrapston is one of the country s leading suppliers of specialist timber products for the construction industry.

REEF RESIDENCE ON PLOT NO. JVC13JHRA002, JUMEIRAH VILLAGE CIRCLE, DUBAI, UAE.

FIREMASTER 60 SERIES. Fire Resistant, Affordable, Innovative

Bahrain / JW Marriott Hotel

CEMENT PLANKS. beauty & durability

Timber Building in the City of Tomorrow

Now our house. saves soooo. much energy! T h e N e w G e n e r a t i o n Energy Saving. S y s t e m. The Quality Profile

Bathrooms. Custom cabinetry INCLUDED

MASSEY HOFFMAN ARCHITECTS

Save time and money. with DMS-Africa. solutions!

30 July - 2 August 2018 AMMAN - JORDAN

BUILDER : DSD HOMES PVT.LTD. SITE ADDRESS : PLOT NO. CP-GH-5B, TECH ZONE IV, GR.NOIDA (WEST) BED ROOMS : 2&3 BHK SIZE : 1050 SQ.FT SQ.FT.

LUXURY SHIPPING CONTAINER CONVERSIONS

Container City I & II Trinity Bouy Wharf London England

Modular Buildings. Ortech Industries Pty Ltd P: F: E:

PARAGON RESIDENTIAL DESIGN

High Cube 40ft. 2,896 m. 12,192 m. 2,438 m. External L W H 12,192 x 2,438 x 2,896 m Internal L W H 12,025 x 2,348 x 2,690 m

World s best-performing glass curtain wall

Eco-Zen Villas Located 400m from the beach and village, in a calm and secure residence

Insultec is a worldwide multi-local organization specializing in the design, supply and installation of insulation for major industrial projects.

Transcription:

Business Case Conception and construction of a high standing residential complex 27 th Summit Africa- France Bamako - Mali 13-14 January 2017 Conception - Construction - Innovation

PROJECT HISTORY For the 27th Africa-France Summit, held in Bamako, Mali, on 13 and 14 January 2017, l Agence de Cession Immobilière (ACI) had set itself the ambition to contribute to the success of this meeting through the realization of hotel infrastructures to welcome the heads of states of around thirty countries. During these two days, all eyes were focused on the new face of Bamako. Coping with many constraints, such as very short deadlines, a limited budget, a sophisticated and complex construction goal, ACI entrusted ECO SYSTEM with the architectural design and construction of this project composed of 14 luxurious villas delivered «turnkey» for the accommodation of heads of states and governments. These well-appointed residences will be used as high standing hotel houses. ECO SYSTEM EXPERTISE Recognized for its expertise in high-end modular prefabricated constructions, ECO SYSTEM has successfully developed its activity to offer the professionals of the luxury hotel industry, modern constructions combining comfort, design, security while meeting environmental, acoustic and thermal standards. These innovative solutions originating from modular building technical substantially reduces construction delays as well as the fabrication, assembling and maintenance costs while respecting the refinement and elegance required for the prestigious standards of the hotel rooms. From the outset of the project, ECO SYSTEM s multi-disciplinary team composed of architects and engineers defines and specifies the procedures necessary to deliver the project as contracted. ECO SYSTEM ensured a clientspecific customized management of the project in terms of remote support for local content management, supervision, implementation, supply, installation and maintenance.

AN INNOVATIVE PROJECT ECO SYSTEM worked on a «turnkey» solution to build a complex residential facilities of 13 000 m² 14 luxurious villas of 220 m² each with terraces, parking and private outdoor areas a main road illuminated with solar lights green spaces and landscaping layout a video surveillance system to ensure the security a waste water treatment plant A real Challenge Construction of 3080 m² of high-end living space Laying the first foundation stone on 15 August 2016 Delivered to the client on 10 th January 2017 Construction time 5 months 100 local and European suppliers 4000 boxes of furniture 54 sea containers/12 air freight A team of 160 people including 20 expatriates Transfer of skills enhanced by obtaining diplomas for local teams Faced with the urgency of the Malian and French authorities in organizing the 27th Africa-France Summit, ECO SYSTEM has committed itself to extremely short deadlines. The contract was signed between the two parties on 6 June 2016 to deliver the 14 presidential villas on 10 January 2017. ECO SYSTEM took up a real challenge in terms of logistics, purchasing, local labor coordination and delivered a 100% product in accordance with the specifications. Each villa includes: A spacious presidential bedroom with its private bathroom and living room; A 56 m² living and dining areas; A fully equipped modern kitchen; Two «guest» rooms of 10 m² and 16 m², with common sanitary facilities; A storehouse; Connection to the internet and WIFI. The interior architecture of each villa has been designed according to criteria such as: safety, conviviality, aesthetics, comfort and a subtle blend of contemporary furniture and local craftsmanship. ECO SYSTEM has realized timeless villas, both by their quality and robustness and by their interior design. All the villas are furnished with refined furniture that harmoniously combine Italian design and Malian style.

Interior of the villas Kitchen Presidential bedroom Dining room Living room Dining room Presidential bedroom Bathroom Bar Guest bedroom Living room

EMPLOYED TECHNOLOGY Given the project s specificities and the very short lead times, the X-LAM construction system was selected and ECO SYSTEM committed itself to putting in place a reliable technical solution based on industrialized products for the villas construction. In compliance with the ISO 14001 standard, all the equipment used by ECO SYSTEM comes from ecologically sustainable forests. The X-LAM panel is made of selfsupporting solid wood and is factory-built with laminated-crossed pine boards. The pine / fir planks are fixed together on each side to form homogeneous layers of desirable thickness and size; each layer is superimposed on another, orienting the wood fiber orthogonally; the fastening system between the layers can be made with specifically adapted nails and / or glue. When assembly is completed, machines cut the panels to the final size leaving the locations for the windows and doors. Panels receive factory anti-termite treatment. The panels thus prepared are sent on site and assembled, using a crane, within a minimum period of time. Advantages Rapid and simple installation Traditional finishing Robustness and stability Possibility to build multiple floors up to nine storey s Environmentally friendly in accordance with the principles of eco-sustainability Non-polluting, recyclable and renewable building materials High thermal insulation in cold or warm climates offering a comfortable environment

OPERATIONS From the Monaco headquarters, in conjunction with its architects, the ECO-SYSTEM Operations Department have elaborated the architectural project, the preliminary and executive plans, established a detailed calendar, supervised and followed all the civil works and Engineering throughout the whole construction period. It also managed all the Supply Chain activities related to this project. Suppliers were selected through an assessment process with critical consideration towards environmental and safety standards, capacity to cope with delays, while maintaining a high level of quality. A selection of about a hundred European suppliers and local subcontractors with specific disciplines enabled the ECO SYSTEM team to effectively coordinate, monitor and manage the work as well as the suppliers and to satisfy all the contractual requirements defined in the specifications. The ECO SYSTEM team has given priority to involve and collaborate on each of its projects with local labor, thus ensuring a transfer and sharing of skills to contribute to the development of the country. On this project, electricians trained by expatriates will receive a diploma from the Malian authorities. The Supply chain management also played a key role in the success of this project. A total of 54 containers have been shipped to Bamako from Europe, 12 shipments by air freight and a truck from Morocco. These included the prefabricated structures (X-LAM panels), wood roofs, sandwich panels (insulation), waste water treatment facilities, video surveillance systems, equipment and furniture. The site manager, accompanied by his deputy and his 160 employees, spread among expatriates and local staff, worked intensively to carry out this project on time while meeting the quality requirements.

Some of our suppliers YÉLEEN DESIGN combines tradition and innovation by offering artisanal collections of plaids and cushions made by traditional weavers in a resolutely refined and modern line of cotton. The workshop NIARELA 240, combines cultures and know-how and has entirely manufactured by hand the double curtains installed in the rooms. Maliba Pottery took charge of the pottery and Oumar Kamara paintings. DJITTE was in charge of interior finishing works (painting and tiles) EGENEB, a construction company, carried out the foundations and perimeter wall. MGC was in charge of the rental of the construction equipment and supporting the waste water treatment s installation.

9, avenue Albert II 98000 Monaco Tél. : +377 97 97 76 76 Fax : +377 97 97 76 95 info@ecosystem.mc www.ecosystem.mc