Slide Presentation. Exercise (if there s time) Field Demonstration. Various Pollutants of Concern: Why Use BMPs? 10/02/2013

Similar documents
Post Construction Erosion Controls

Construction Stormwater Best Management Practices

Outline of Presentation. Inspecting Construction Site BMPs. Inspector. Back to Basics. Erosion Control. Erosion Control

CITY OF CHICO. Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects. Project Address: Building Permit Number:

City of West Sacramento Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects

Single Family Residential Construction Erosion/Sediment Control Standards

Best Management Practice (BMP) Guidance Manual

Erosion Control State Standards Sampling of Material Innovations

Temporary Erosion and Sediment Control (TESC) Report and Stormwater Pollution Prevention Plan For Construction Activities

SECTION EROSION AND SEDIMENTATION CONTROLS

The Good, The Bad, and The Ugly

Inlet Protection. Fe= (Depends on soil type)

Straw Bale Barrier. - Along the face and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow

City of Glendale Stormwater Management Plan Checklist

Common Construction-Site BMPs Quick Reference Guide

2010 California Green Building Standards Code. Residential and Non-Residential Development

Stormwater Management Permit Application LESS Than One Acre. Public Works Department st Ave East Kalispell, Montana (406)

Straw Bale Barrier. Parallel to a roadway to keep sediment off paved areas

Performance Standards Compliance Checklist

APPROVED FOR ISSUANCE REFER TO ENCROACHMENT AND/OR CONSTRUCTION PERMIT AND PLAN COVER SHEET FOR SPECIAL CONDITIONS AND PERMIT NUMBERING

Building Better Storm Water Quality

LAND DISTURBANCE PERMIT

Shelbyville, KY Stormwater Best Management Practices

Construction Site Inspections

City of El Centro. Erosion and Sediment Control Plan Review Checklist. Reviewer: Review Date:

Diversion Dikes. Fe=0.95

October 2016 CDRPC Workshop

Blue Book Update Overview

Storm Water Pollution Prevention Plan (SWP3) Checklist

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Organic Filter Tubes. Fe= (Depends on soil type)

Contractors, Illicit Discharges, & Best Management Practices. Chris Allen Stormwater Inspector

Planning & Building Department. Requirements for Erosion and Sediment Control

SE-6 GRAVEL BAG BERM. Objectives. Potential Alternatives

Best Management Practices (BMPs) for Construction Sites & Home Remodeling Projects

ACTIVITY: Silt Fence ES 14

Kristin Kerr EOA, Inc. Construction Inspection Workshop February 1, 2017

Paving and Grinding Operations

Storm Water Quality Construction Site Compliance / Controls

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY

APPENDIX C DURING CONSTRUCTION BMP TABLES

Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Sediment Management Practices (SMPs) Activity: Temporary Inlet Protection (TIP)

City of Doral 8401 NW 53 rd Ter. Doral, FL 33166

Storm Drain Inlet Protection

Rock Sock (RS) Rock Sock height.

Storm Water Quality Construction Site Compliance & Controls

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

SECTION V CHAPTER 12 STORMWATER POLLUTION PREVENTION POLICY

CITY OF URBANA CLASS 2 EROSION CONTROL PERMIT STANDARD DETAILS

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1

STORM WATER POLLUTION PREVENTION PLAN TEMPLATE

Erosion Control Blankets

The Construction General Permit and Erosion Prevention and Sedimentation Control

EROSION CONTROL GENERAL NOTES EC JAN 2017 C.B.

SECTION B. Prevention of sedimentation of waterways, open drainage ways, and storm and sanitary sewers due to construction activities.

Appendix B Construction SWPPP Short Form

Concrete Waste Management

CITY OF CAMARILLO STORMWATER POLLUTION CONTROL PLAN Demolition or Stockpile Activity Under One Acre

EC-7 GEOTEXTILES AND MATS. Objectives. Potential Alternatives

PART 1 GENERAL REQUIREMENTS

HYDRAULIC EROSION CONTROL PRODUCTS

Temporary Erosion and Sediment Control (TESC) Report and Stormwater Pollution Prevention Plan For Construction Activities

Home Remodeling Projects

WATER POLLUTION AND EROSION CONTROL NOTES:

Non-Vegetative Stabilization

Typical Local Erosion Control Requirements (Storm Water Management Authority, Inc.)

EROSION CONTROL REQUIREMENTS

York County STORMWATER LUNCH & LEARN

Earth Dikes and Drainage Swales

Construction Site Runoff (CSR) Permit Application Permit Fee $150.00

Division of Water Quality (701)

Stormwater Pollution Prevention Plan (SWPPP) for Construction Activity for Small Construction Sites

Tips with Creation of your Erosion and Sediment Control Plan

CITY OF VIRGINIA BEACH STORMWATER POLLUTION PREVENTION PLAN (SWPPP) FOR SINGLE FAMILY RESIDENCES AND ACCESSORY STRUCTURES ONLY

Construction Site Runoff Inspections and Enforcement

A. Each Contractor shall comply with the requirements outlined in these documents.

Concrete Waste Management WM-8

SECTION 806 WATER COURSE AND SLOPE EROSION PROTECTION

DESIGN AND CONSTRUCTION STANDARDS. Section 3: Standards by CSI Divisions. Storm Water Permit and Monitoring

METROPOLITAN UTILITIES DISTRICT No Page: 1 of 10

Kristin Kerr and Peter Schultze-Allen EOA, Inc. March 20, 2018

Training for Construction Site Inspectors

Description. Installation and Implementation Requirements

FIBER REINFORCED MATRIX (FRM)

Suggested Best Management Practices (BMPs)

SECTION EROSION CONTROL MATTINGS AND COMPONENTS

Material Delivery and Storage

2.1 MINIMUM WATER QUALITY PROTECTION REQUIREMENTS FOR DEVELOPMENT CONSTRUCTION PROJECTS

SECTION EROSION AND SEDIMENTATION CONTROL

Chapter 2: Selecting Best Management Practices (BMPs)

SECTION 11 PART I STORMWATER QUALITY PROTECTION Definitions / Acronyms 11-3 PART 1 CONSTRUCTION PRACTICES

Town of Fortville Utility Street Standards

NDDOT Erosion & Sediment Control Construction Course

CHAPTER 9 EROSION AND SEDIMENT CONTROL DESIGN

Storm Water Permitting Requirements for Construction Activities. John Mathews Storm Water Program Manager Division of Surface Water

Plaza and Sidewalk Cleaning

Water Pollution Control for Work in Sensitive Areas

Transcription:

TEMPORARY BEST MANAGEMENT PRACTICES FOR CONSTRUCTION SITES David Franklin CPESC, CESSWI, Trainer of Record EnviroTech NPDES Services April, 2014 Slide Presentation www.stormwatermanagement.biz 2 Field Demonstration Exercise (if there s time) 3 4 Why Use BMPs? Various Pollutants of Concern: 5 6 1

Pollutants of Concern Pollutants of Concern Sediment 7 Toxic Chemicals 8 Pollutants of Concern Pollutants of Concern Litter Bacteria 9 10 Pollutants of Concern Pollutants of Concern Nutrients Oxygen Demand 11 12 2

Pollutants of Concern Pollutants of Concern Oil and Grease Metals 13 14 Pollutants of Concern The Result? Elevated Temperatures Photo by Craig Solin Impacts to Plants, Animals and People 15 16 So What s the Answer During Construction?? 17 Temporary BMPs For activities and materials 18 3

Activities Potentially Contributing Pollutants Clearing, grubbing and grading Landscape maintenance Equipment use Saw cutting Paving operations Pressure washing Dewatering operations Soil importing and stockpiling Maintenance of public facilities Waste management Material Sources That Can Contribute Pollutants Soil, Dirt, and Sediment Paints and Solvents Pesticides/Herbicides Fertilizers Detergents Plaster or related products Green waste Sanitary waste Concrete compounds Asphalt compounds Petroleum products fuel, oil, and grease Hazardous chemicals acids, lime, glues, adhesives, and curing compounds Let s take a look at the BMPs 19 20 Temporary BMPs Framework for Compliance Categories Sections Narrative vs. Drawings/Details BMP Examples Temporary BMPs Framework for Compliance Categories Sections Narrative vs. Drawings/Details BMP Examples 21 22 Framework for Compliance Performance based Increasingly there are minimum requirements Framework for Compliance Local Ordinance Construction General Permit Contract SWPPP or EC Plan Industry Guidance 23 24 4

Temporary BMPs Framework for Compliance Categories Sections Narrative vs. Drawings/Details BMP Examples Categories of BMPs Planning Surface stabilization Run on; run off Sediment control Housekeeping Non stormwater Hmmm 25 26 Temporary BMPs Framework for Compliance Categories Sections Narrative vs. Drawings/Details BMP Examples Sections Definition Applications Objectives Limitations Specifications Maintenance Inspection 27 28 Temporary BMPs Framework for Compliance Categories Sections Narrative vs. Drawings/Details BMP Examples Narrative vs. Drawings/Details Narrative in contract plans and specifications Narrative in BMP cut sheets Drawings on plans Drawings on cut sheets There can be conflicts 29 30 5

Narrative vs. Drawings/Details Ultimately, rely on Principles of function Evaluation of performance 0 Know what is significant and what is not Fiber roll location vs. notch on the stake. Anyone caught following the drawings will be removed on the grounds of being incompetent 31 32 Temporary BMPs Framework for Compliance Categories Sections Narrative vs. Drawings/Details BMP Examples BMPs Examples Silt fence Fiber roll Check dams Drain inlet protection Straw application RECP ECB Concrete washout Construction Exits.and more 33 34 BMP Selection and Evaluation BMP Examples in classroom BMP Factors Juggling 3 schedules Phase of construction Categories of BMPs Flow type/direction Hold or let go Profile and return Contributing area Flexibility and conformity Permeability and rate Longevity Temporary and permanent Contents Area Soil preparation Handout Sterility Redundancy Treatment or prevention Location Duration Access Time to effective Blocking flow Self-anchoring Reusability Maintenance Measurability Lead time Cost 35 Focusing on Principles of function Phase of construction Associated BMPs 36 6

Associated BMP The sign is an associated BMP to washouts It plays a critical role in success and stems from the Planning category BMP Examples in field demo Focusing on Proper installation Evaluation of performance Maintenance and repair concerns 37 38 Silt Fence Temporary BMPs 39 Functions for sheet flow when it is installed properly and used during grading until slope is stabilized 40 Silt Fence SC 1 Silt Fence Installation Detail 41 42 7

SC 1 SILT FENCE Permeable fabric designed to intercept and slow flow of sedimentladen sheet flow runoff Material Requirements Silt fence shall be woven polypropylene fabric Minimum width of 900 mm (36 inches) The fabric shall conform to the requirements in ASTM (American Society for Testing and Materials) designation D4632 and have an integral reinforcement layer The permittivity of the fabric shall be between 0.1 sec -1 and 0.15-1 in conformance with ASTM designation D4491 43 44 SC 1 SILT FENCE Silt fence looses it s permeability when it comes in contact with sediment-laden runoff Runoff is ponded Sediment Fence The geotextile is no longer passing 20 gal/min. The forces exerted are great - proper staking and keying-in of silt fence is critical 45 Very nicely installed in the wrong place! 46 Six Dead Snakes 47 8

Silt Fence Silt Fence Improperly installed silt fence 49 50 Silt fence should never be used across concentrated flow 51 52 Fiber Roll It s better to let the river flow and stabilize the incomplete swale by laying the silt fence down!! 53 54 9

Fiber Roll Fiber rolls, hinge points, construction notes 55 56 57 58 59 60 10

61 62 63 64 65 66 11

Fiber Rolls as Art Check Dam Top to toe relationship 67 68 Check Dam BMP or Obstruction?? Under, over, around or through? 69 Q=VA 70 Drain Inlet Protection x Drain Inlet Protection and Flood Prevention 71 x 72 12

73 74 75 76 Minimizing Sediment in Discharge Preven ng Discharge 77 Water needs to enter! This sediment control is interfering with an engineered storm water system. 78 13

Straw 79 80 Straw Accessibility of Equipment 81 82 Soil Preparation 83 84 14

85 86 RECPs 87 88 RECP ECB 89 90 15

91 92 RECP and Fiber Roll 93 94 Steep slopes should be protected as quickly as possible. 95 96 16

Jute s Strength and Weakness Conformable, but open when stretched 97 Ph t D idf kli 98 99 100 Bonded Fiber Matrix Bonded Fiber Matrix Hydraulically applied system composed of long strand mulch fibers joined together by highstrength adhesives. The combination of mulch and adhesive creates a continuous, three dimensional blanket. When dry, creates a high strength, porous and erosion resistant mat. Generally include: Elongated wood fibers Cross linking soil stabilizer Adhesive glue Tackifier May include: Crimped synthetic fibers Other proprietary ingredients 101 102 17

103 There is no soil preparation and slurry is mixed on the wet side and applied to the point of runoff 104 105 106 107 108 18

109 110 Concrete Washout 111 112 113 114 19

Concrete Washout 115 116 117 118 Ph D idf kli 119 120 20

121 122 123 124 Small Washout Pits Compact pit using filled bags and plastic sheeting Sand or Gravel? Sand or Gravel? 125 WM 8 Concrete Waste Management 126 21

Construction Exit 127 128 Construction Road 129 130 Tire Wash Good 131 Housekeeping in a Nutshell 132 22

Juggling, Phases and Cost of Removal Combination of Effective Measures How do we define removal of temporary BMPs? 133 134 135 136 137 138 23

Combination of Effective Measures BMP Examples in field demo Focusing on Proper installation Evaluation of performance Maintenance and repair concerns 139 140 Inspecting BMPs BMP Selection and Evaluation Implementation was it done well? Evaluation is it working? Maintenance means what? Repair or replace? Any associated BMPs or redundancy needed? 141 BMP Factors Juggling 3 schedules Phase of construction Categories of BMPs Flow type/direction Hold or let go Profile and return Contributing area Flexibility and conformity Permeability and rate Longevity Temporary and permanent Contents Area Soil preparation Sterility Redundancy Treatment or prevention Location Duration Access Time to effective Blocking flow Self-anchoring Reusability Maintenance Measurability Lead time Cost 142 IT S NOT ROCKET SCIENCE! IT S NOT BRAIN SURGERY! I VE BEEN DOING THIS STUFF FOR 30 YEARS 143 144 24

Water Quality Thank You! What does it require? 145 146 www.stormwatermanagement.biz Contact: David Franklin, CPESC, CESSWI, ToR (916) 849-2028 david@envirotechservices.biz 147 25