Behind the Meter Net Generation Initiative: Energy Supplier Participation Requirements

Similar documents
BTM:NG Initiative Energy Market Design Concepts

Concepts for Behind-the- Meter Net Generation

Resource Capability Testing

Expanding Capacity Eligibility

NYISO Pilot Program Update

CRIS for External-to-ROS Transmission Investment External-to-ROS Deliverability Rights (EDR)

Distributed Energy Resources Roadmap

Market Impact Assessment: Preliminary DAM Results Overview

Participation in the monthly auction and the capability period auction shall consist of:

Proposed ICAP Manual Revisions Regarding Deliverability Requirements for Capacity Imports from PJM

Applicable New York Wholesale Electricity Supplier Emissions

Market Design Concepts to Prepare for Significant Renewable Generation

Fixed / Price Sensitive Demand Bids, Load Response, Virtual Bidding & Pump Storage Optimizer in the Day Ahead Market

Compliance with FERC Order on Technical Conference re: Treatment of Zone K Export Constraints into the G-J Locality

Concepts for Aggregation Participation In Demand Side Ancillary Service Program (DSASP)

Deliverability Requirements for Capacity Imports

NYISO s Integrating Public Policy Project

DER: NYISO Operations Perspective

Growing Wind. Final Report of the NYISO 2010 Wind Generation Study. John Adams Principal Electric System Planner New York Independent System Operator

Scarcity Pricing. Market Issues Working Group (MIWG) October 25, 2012 Rensselaer, NY

NYISO Pilot Program Guide

the Real-Time Market will be based on the system marginal costs produced by the Real-Time

Demand Side Ancillary Services Program (DSASP)

Large Scale Solar Integration

the Real-Time Market will be based on the system marginal costs produced by the Real-Time

PJM Strawman Proposal

Benefits from Generation and Storage on the Distribution System

Energy Marketplace. Nicolé K. Grottoli. Market Overview Course. Senior Market Trainer, Market Training, NYISO. March 8, 2018 Rensselaer, NY 12144

Coordination with PJM

Locational Based Marginal Pricing

Distributed Energy Resources Market Design Concept Proposal

Wholesale Markets for the Grid of the Future Whitney Lesnicki Manager, Energy Market Design DRAFT FOR DISCUSSION PURPOSES ONLY

Limited Energy Storage Resource (LESR) Market Integration Update

Treatment of Zone K Export Constraints into the G-J Locality : Market Design Concept

Scarcity Pricing Informational FERC Filing

NEW YORK INDEPENDENT SYSTEM OPERATOR

RTO Overview and Day 2 Markets. EAI Technical Conference May 26, 2011

PJM Manual 14A: New Services Request Process Revision: 20 Effective Date: October 1, Prepared by Interconnection Planning Department

CAISO-IOU Technical Design Session

Carbon Pricing Import/Export Transaction Examples

New York Independent System Operator, Inc. NYISO Tariffs. OATT Schedules

Ramapo Phase Angle Regulator Cost Recovery Discussion

Niagara Generation Modeling. David Edelson Market Issues Working Group January 22 th, 2016

Demand Response Availability Data Systems Definitions

Installed Capacity Manual. August 2017

Ethan D. Avallone Senior Market Design Specialist, Energy Market Design ICAPWG/TPAS February 21, 2018 Rensselaer, NY

Capacity Performance FAQ Response

PJM Markets. Energy and Ancillary Services. PJM State & Member Training Dept. PJM /29/2014

Master Plan Wholesale Markets for the Grid of the Future. A Report by the New York Independent System Operator

Stakeholder Comments Template

Revised Draft Final Proposal for Participation of Non-Generator Resources in California ISO Ancillary Services Markets

Energy Markets - The Basics

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Carbon Pricing Carbon Residual Allocation

Policy Direction for Alberta s Capacity Market Framework

Carbon Pricing Straw Proposal Overview

Demand Response. Mathangi Srinivasan. New York Market Orientation Course (NYMOC) Senior Market Trainer, NYISO. March 20-23, 2018 Rensselaer, NY 12144

Comprehensive Shortage Pricing

Business Requirements Specification

Straw Proposal. Post-Release 1 MRTU Functionality for Demand Response

Energy Storage and Distributed Energy Resources Phase 3 ( ESDER 3 ) Issue Paper

SPP at a Glance. Located in Little Rock. Approximately 600 employees

Market Rule Amendment Proposal

Current Language Proposed Revisions Rationale

Broader Regional Markets Report

Two Settlement PJM /06/2016

Broader Regional Markets Report

20 Nov IEEE Chapters Seminar Grid Energy Storage: Policies. John Martin, AESO

Locational Export Capacity Proposal

RTC will make binding unit commitment and de-commitment decisions for the periods

Business Practice Manual for Distributed Generation Deliverability. Version

NYS Energy Storage Roadmap. March 16, 2018

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Regulation Energy Management Market Simulation. June 14, 2011

1st International Conference on Large-Scale Grid Integration of Renewable Energy in India Durgesh Manjure, MISO Energy September 6, 2017

Journey in supporting important energy and environmental policies while maintaining reliability through a resilient power grid system

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

DRAFT Version 1.2 of Installed Capacity Manual Attachment D For Discussion at Installed Capacity WG Meeting on January 27, 2005

Internal NYISO HVDC Controllable Line Scheduling. Concept of Operation. LECG Staff

CUSTOMER GUIDE TO PJM BILLING

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Renewables and Self Supply Compliance Filing

Virtual Workshop on PJM ARR and FTR Market 2017/2018

Flexible Ramping Products

Broader Regional Markets Report

Long Island Power Authority Seventh Revised Leaf No. 16

Financial Transmission Rights

Stakeholder Comments Template

Glossary of Terms Used in Reliability Standards. Preliminary Draft Version 0 Reliability Standards September 1, 2004

Network Load Reporting. March 28, 2018

CAISO Generator Deliverability Assessment Methodology. On-Peak Deliverability Assessment Methodology (for Resource Adequacy Purposes)

Journey in supporting important energy and environmental policies while maintaining reliability through a resilient power grid system

NYISO Carbon Charge Proposal for: Wholesale Suppliers Subject to the Carbon Charge and Applicable Carbon Emissions

Renewable Integration: Market & Product Review Phase 1

Operating Reserve / Revenue Sufficiency Guarantee Alignment Joint and Common Market Initiative. Joint Stakeholder Meeting October 5, 2007

Energy and Bilateral Transactions

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

RDRP Stakeholder Initiative

ENERGY STORAGE: FERC S TECHNICAL CONFERENCE AND NOPR

Transcription:

Behind the Meter Net Generation Initiative: Energy Supplier Participation Requirements Pradip Ganesan Market Product Specialist New York Independent System Operator MIWG July 8, 2015 Rensselaer, NY 2000-2015 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY

Background Currently, behind the meter resources can register as a wholesale generator by: Qualifying to and then selling the full capability into the wholesale markets ( coming out from behind the meter ). Moving the load they serve into the wholesale market via an LSE and, Setting up a wholesale market bilateral contract between the generator and LSE. The BTM:NG model is designed to allow the generator to participate in the NYISO wholesale markets without: Requiring the load to also become a wholesale customer; or Requiring the generator to avail itself entirely to the NYISO wholesale market. 2

Background There have been several requests from generators that serve load behind the meter to allow them to participate in the NYISO wholesale markets as a generator. A behind the meter (BTM) generator has excess or net generation (NG) capability after serving its retail load. The NYISO is proposing a set of market rule changes that would allow these generators to participate in the NYISO energy and capacity markets with this net generation. The NYISO BPWG process has identified a market design deliverable for 2015. 3

Benefits of BTM:NG Access to this additional supply may improve grid reliability and operational flexibility. Improve awareness of resources not currently participating in the NYISO wholesale markets. Provide more clarity and certainty for future resource investment within New York State. 4

Today s Discussion Review the scope of current market design proposal for BTM:NG participation. Define a BTM:NG resource. Review requirements for a BTM:NG resource to participate as an energy supplier. Review the different configurations that are allowed for a BTM:NG resource to participate in the wholesale markets. 5

Scope of BTM:NG Participation In order to meet stakeholder requests to expedite participation of BTM:NG resource in the NYISO markets, the initial phase of this design will not permit a generator: To register as a BTM:NG resource and as a Demand Response provider in a NYISO or Transmission Owner program or participate as a supplier in a Transmission Owner buy-back tariff program. To register as a BTM:NG if it is an Intermittent Power Resource (solar, wind, landfill gas) or if it is a Limited Control Run-of-River Hydro Resource. The design for participation in other demand response programs and as intermittent resources shall be considered after the initial phase is deployed. 6

BTM:NG Definition In response to questions raised during the May 28th ICAPWG meeting, the NYISO proposes the following definition of a BTM:NG resource: A facility within which a generator, or an interconnected group of generation units, regularly serves behind-the-meter load. The facility must: Have its load and generation interconnected within a defined electrical boundary behind a single ISO/TO approved net injection meter point; Be responsive to dispatch instructions as a single entity interfacing with the grid; Be configured to allow the NYISO to dispatch all or a subset of the generation units for the duration scheduled by the NYISO; Be operated to provide electricity to the behind-the-meter load, beyond station power, in the regular course of business, not only when more economic than grid provided energy. All generation inside the electrical boundary that will be serving load or providing the NYISO with excess energy must be permitted to operate other than as emergency generators. 7

Energy Market Participation Requirements A BTM:NG resource must be large enough to export (inject to the grid) at least 1 MW of energy after serving its behind-the-meter load. If selling capacity, a discount to its excess energy equal to the (1 + the IRM) * its connected Load (see 05/18/2015 ICAPWG presentation on BTM:NG for details) is also considered. The interconnection must also allow an export (injection to the grid) of at least 1 MW at the approved net injection meter point. The ISO shall review and approve each plant configuration on a case by case basis for a facility seeking to participate as a BTM:NG resource. Using the aggregation model discussed in this presentation, a BTM:NG resource may aggregate the generation source(s) at the facility in order to export at least 1 MW of energy. The generation and load at the facility must be electrically connected to each other in order to aggregate them. 8

BTM:NG Configurations Each BTM:NG in the configurations listed below shall require a net meter at each interconnection point from the BTM:NG to the distribution grid or the bulk transmission system. Participation at a facility will be either: As a single generator serving a load (Option 1); As an aggregated set of generators serving a load (Option 2); or As several BTM:NGs at a single facility each serving an identified, separately metered load (Option 3). 9

BTM:NG Configuration Option 1 Single generator serving a load 10

BTM:NG Configuration Option 1 Only one physical generation asset serving behind the meter load at the facility. In this configuration, the unit participating as a BTM:NG resource is eligible to provide spinning reserves and regulation because ramp rates can be adequately captured. The generator can offer to sell its excess energy up to its UOL in the DA and RT markets. If qualified and bidding flexibly, reserve offers will be required. If qualified and bidding flexibly, regulation service may be offered. 11

BTM:NG Configuration Option 2 Aggregated set of generators serving a load 12

BTM:NG Configuration Option 2 In the aggregated model, several generation assets are aggregated behind a single PTID with a single dispatch signal to the facility. A grouped (2x1) combine cycle plant with a single PTID is modeled and treated this way in the wholesale market. An aggregated BTM:NG resource: May offer Energy and Capacity. Is required to offer non-spinning reserve up to its scheduled UOL if qualified and bidding flexibly. An aggregated BTM:NG resource cannot offer spinning reserves or regulation: The NYISO has no view into the operating state of individual assets in the aggregation. Therefore, the NYISO assumes a BTM:NG resource with an Operating Reserve schedule may have to turn on another unit to convert the reserves to energy. Similar concerns exist if a Regulation Service schedule was awarded. 13

BTM:NG Configuration Option 2, cont d. An aggregated BTM:NG resource that has an offer with no load included and is not currently providing energy will be paid start-up and minimum generation costs if scheduled by the NYISO. Incremental starts will not be eligible for start-up costs. Start up and min gen costs associated with the need to start an additional unit to meet the NYISO s dispatch will not be paid. 14

BTM:NG Configuration Option - 2 Example Consider the following plant configuration: Generation = Three 20 MW units. Typical Load ~ 25 MW. Two units ON at any given time (40 MW capacity). The BTM:NG can produce an additional 15 MW after serving its 25 MW load without incurring start up or min gen costs. If the BTM:NG resource is an energy-only supplier and intends for the NYISO to dispatch it above 15 MW, if economic, the unit needs to bid a gross UOL of 60 MW, and the third unit needs to be turned ON. If the facility does not intend this result, the facility would bid a gross UOL of 40 MW. 15

BTM:NG Configuration Option 3 Several BTM:NG resources at the same facility 16

BTM:NG Configuration Option 3 A facility with several generation assets each serving separately metered load may choose to register each generating unit serving discrete behind the meter load as a BTM:NG resource, each with a single PTID. Load and generation must be paired for each BTM:NG resource PTID. In this configuration, each unit participating as a BTM:NG resource is eligible to provide spinning reserves and regulation because ramp rates can be adequately captured. Requires each registered generation resource and behind the meter load to have separate meters installed. In addition, each BTM:NG resource PTID must have a separate net injection meter. 17

Next Steps Review energy market and capacity market design concepts with stake holders at a joint MIWG/ICAPWG meeting specifically for the BTM:NG initiative in late July. Present the BTM:NG concepts for energy market and capacity market participation to stake holders for concept approval during the August 12th BIC session. 18

19