How Munilla Construction Management Paves With Accuracy And Efficiency

Similar documents
Stringless Concrete Slip Form Paving Using GPS Controlled Spreaders

Best Practices. Dennis Clausen Director of Training GOMACO Corporation

PRODUCTION STUDY. Rogier Tonies

Phone

Field Evaluation of Stringless Portland Cement Concrete Paving

Displayed with permission The American Surveyor March 2014 Copyright 2014 Cheves Media

At Work 24/7 on the Channel

Sustainable Airport Pavement Construction

PCCP Pavement Structures, 3D Modeling and Machine Control

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted June 21, 2018

Whitetopping: The Overlay Choice

**************************************************************************

**************************************************************************

American Society of Military Engineers

Executive Summary Arizona s Use of Asphalt-Rubber

Intelligent compaction is a concept gaining increasing attention from

Draft Special Provision for. Asphalt Treated Permeable Base

Oakland International Airport-Materials Management Program (MMP) Updated November 2007

4-07 Asphalt Treated Permeable Base (ATPB)

Concrete Remove & Replace Estimate Checklist By Consumer Advocate Patrick Mattingley

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2015

INVITATION TO BID ON TOWN PAVING PROJECTS

Airports Going Green Sustainability & Recycling. Los Angeles World Airports. Intissar Durham Chief Airports Engineer August 6,

McCarthy Improvement & C.W. Matthews Contracting Co., Inc. a Joint Venture. FC-6610 Runway 8L/26R Pavement Replacement Project

Wisconsin DOT: Adopting a Model-Based Approach to Roadway Design and Construction

Automated Machine Guidance

Stanford University Facilities Design Guidelines SECTION ASPHALT UNIT PAVING. A. ASTM C-33 Standard Specification for Concrete Aggregates.

Value Engineering of Construction Quantities: The Golden Report

Steps Every Contractor Needs to Take for Growth

MSCAA /04 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION MATERIALS

AC 15/ H UPDATE

mbl recycling Ahead of the curve

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

COMPARISON REPORT CATERPILLAR JOBSITE INFORMATION STUDY. Study Prepared: June 2016

CITY OF FARGO SPECIFICATIONS AGGREGATE BASES

SAN ANTONIO S PREMIER CIVIL CONTRACTOR

Pavement Design and Construction of Taxilane S to Accommodate New Large Aircraft at LAX

ASSOCIATED ENGINEERING CONSULTANTS, INC. Corporate Philosophy

Building an Enterprise GIS for SFO Then and Now

Innovative Sustainable Pavement Solutions

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

GET MORE MILEAGE FROM YOUR TELEMATICS DATA

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

FEBRUARY 2015 MONITORING

Pavement Design. TTP Orientation Seminar 2011

DIGITAL SOURCING IN THE NEW RETAIL ECONOMY

TRIMBLE EARTHWORKS SOLUTIONS

Structural Monitoring

Displayed with permission The American Surveyor October Copyright 2008 Cheves Media

CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. ACTION REQUESTED: Motion to Approve Amendment No. 1 to the Professional

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

CONSTRUCTION STAKING GUIDELINES

Cold In-place Recycling (CIR) It s Easy to be Green

Recycle Asphalt Materials

NCAT PAVEMENT TEST TRACK

FUTURE OF FIGHTING TERMITES

IGGA Guide Specification: Conventional Diamond Grinding for Pavement Preservation Introduction

Design Criteria and Testing for Cold In-Place Recycling. Todd Thomas Technical Services Engineer Colas Solutions, Inc.

The Hershey Company. w w w. f k i l o g i s t e x. c o m

CASE STUDY. Satterfield & Pontikes COMMERCIAL FOR THE DELTA TERMINAL AT JFK AIRPORT CLIENT: SATTERFIELD & PONTIKES

Section 25 Aggregate Subbase

C o m m e r c i a l S o l u t i o n

Mapping for manure management Written by Diane Mettler

2003 SPECIFICATIONS SECTION 301 DIVISION 300 BASES AND GRANULAR SURFACES

BNSF North SIG Intermodal Improvement Project. Seattle, Washington

MAPR: THE CONVERGED DATA PLATFORM FOR MANUFACTURING

Over the Alps with NAVITRONIC Basic and Swiss Precision

MAY 2015 ROAD RIDERS. Contractors and GPS. CST Training. GPS High Pointing A team effort. Mountain climbing. Staking and as-builting

Suggested Guidelines for Hot Mix Asphalt (HMA) Underlayment in Track by AREMA Committee l-sub Committee No. 2 - Ballast.

P r o f i l e A L Y A M A M A E N G I N E E R I N G C O M P A N Y ISO 9001

Special Provision Item P-152 Excavation and Embankment

Construction Scheduling and Estimating

Pay Schedule for Ride Quality

Solutions - for Non-Users Site. Tams Mullins Spectra Measuring Systems 6/10/09

CITY OF SAN ANGELO ITEM 360 CONCRETE PAVEMENT

Americans with Disabilities Act (ADA) Surveys

President. Myron Hillock. Sales Director

Concrete Overlays. ACPA Pennsylvania Chapter. ACPA Pennsylvania Chapter. Versatile & Sustainable Solutions. Reasons to Consider a Concrete Overlay

REQUEST FOR QUOTES: # LE

AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor April 9, :30 a.m.

SECTION BITUMINOUS CONCRETE PAVING

2. Determine Random Numbers: Determine random numbers for testing locations using the Probing, Coring, Texture and MIT-SCAN T2 Report.

Each year, TxDOT uses:

A Guide for Local Governments: EAM and GIS for Complete Asset Management

Pavement Design. TTP Orientation Seminar 2013

GUIDELINE FOR PLANTED INFILL INSTALLATIONS. Please read prior to installation, and have proper equipment and safety precautions in place.

Why is Laser Controlled Asphalt Paving Essential for Sports Surfaces?

GOODHUE COUNTY DEPARTMENT OF PUBLIC WORKS

Aviation Capital Construction Program Update

Destination. D/FW and the world. PRECON is the choice for waterproofing on Dallas/Fort Worth International Airport rail station project

SECTION ASPHALT PAVING

Site Investigation. Economic Haul. Machine Selection. Machine Selection. Machine Selection. Case Scenario. C Existing I-70

DENVER INTERNATIONAL AIRPORT GATE APRON REHABILITATION AND DRAINAGE IMPROVEMENT PROGRAM DESIGN AND CA SERVICES RFP/RFQ

APPENDIX B RUNWAY PAVEMENT STRENGTHENING STUDY

ADDENDUM #1. The following sheets have been revised and are being reissued as part of this addendum:

Mission Support Overhauls U.S. Air Force B-52s using Verisurf Reverse Engineering Software

Bryan Adair Concrete Construction Sets World Record for Continuous Concrete Pour

RECONSTRUCTION OF DISTRESSED PAVEMENTS Full-Depth Rehabilitation (FDR) (Portland cement)

Percent Passing by Weight. 105% Payment #200

Transcription:

How Munilla Construction Management Paves With Accuracy And Efficiency Munilla Construction Management proves the value of machine controlled paving in the Love Field Modernization Program. Love Field is a city-owned public airport that lies six miles northwest of Dallas, Texas. It was Dallas s only major airport until 1974, when its status was somewhat eclipsed by the opening of the larger Dallas/Fort Worth International Airport. But Love Field is still a major domestic hub for Southwest Airlines, Delta, and United. And it s the site of one of the nation s large ongoing construction projects, the more than $500 million Love Field Modernization Program, which will tear down all three original concourses, replacing them with a more efficient, centrally located, concourse. The LFMP will also add an expanded baggage claim area, a new ticketing wing, new lobby space, and will substantially expand airport concessions. 1

To serve the new concourse, several runways, taxiways and safety areas are being demolished and rebuilt. All of this work is being done while regular airport operations continue, and it s all being done, of course, to meet the FAA s extraordinarily tight tolerances for airport paving. Florida-based Munilla Construction Management (MCM) has won several demolition and paving bids at Love Field, including a full pavement demolition and rebuild for airway apron improvements, four full taxiway removals, and additional runway and taxiway reconstructions. Total project fees are at $78 million, and MCM expects to win more bids. Nearly 400,000 square yards of concrete and asphalt are being removed and replaced. Ordinarily, a project like this would require a virtual football team of land surveyors and string line crews, working full time to meet the very exacting standards required for airport paving. But MCM chose Love Field as their first machine controlled paving project, and made a major investment in Leica Geosystems technology that has eliminated string lining from their paving workflow. It hasn t been easy, but the decision has paid off; work is going well at Love Field, and MCM is ahead of schedule, with far fewer surveyor hours and no quality issues. In fact, the work at Love Field has become a proving ground for the use of this technology in tight tolerance projects. The use of Leica Geosystems machine control technology has eliminated string lining from MCM s paving workflow. 2

Not Graded on a Curve From a surveying point of view, the FAA requires the tightest tolerances we ve worked with, explains Munilla Texas Operations Manager Luis Munilla, P.E. Every layer of a paved surface, even the subgrade, has to pass a 16-foot straightedge test, with only three hundredths (.03 feet) of deviation allowed. Horizontal alignments are also tight. For example expansion seams, to avoid cracking, have to stay within one tenth (.1 feet) over 1,000 feet. So it s still surveyor-intensive work, even though we ve eliminated a lot of the staking and layout chores. In fact, reducing timelines with machine control was actually a secondary concern for MCM. Munilla says, We really felt we needed this for the precision, especially since we had to achieve such high accuracies on each layer. Bottom line is, accuracy takes time. MCM has a licensed surveyor on staff, plus another surveyor and a party chief on site at all times. Their work began with eight control points handed off by airport management. MCM used Leica Geosystems total stations a TS-15, and eight 1201s to establish a control net of 30 points that governs all work. The points are used to set up prisms and backsights for pavers, trimmers, and graders, and also for control when doing quality assurance topographic surveys of paving layers. They stay pretty busy, says Munilla. But we re still saving an immense amount of time compared to conventional paving and string lining; our crews aren t doing any staking or blue topping, and that eliminates a lot of hours. The accuracy of Leica Geosystems machine control solutions has enabled MCM to eliminate the straightedge testing of the subgrade, which has provided a substantial time savings. 3 3

All that timesaving is accomplished by a lot of machine controlled work; Love Field is practically a showroom floor of heavy equipment that includes multiple machine controlled paving and grading systems. rade NG a ico 3D Leic Leica PaveSmart 3D USED WITH Guntert & Zimmerman paver (robotic total station) Caterpillar Aspphalt Paver (robotic total station) Gomaco Trimmer (robotic total station) 4 Caterpillar D6M Dozer (GPS) Caterpillar 140H Grader (GPS & robotic total station) Caterpillar 140M Grader (GPS & robotic total station)

And all this equipment is working in the midst of busy airport operations. Munilla says that highlights one of the major advantages of machine controlled paving. It allows much more freedom when working. No string lines means greatly improved access; trucks can drive right in front of pavers, for example. That s especially important given the workflow of this project. MCM is demolishing and excavating existing runways and taxiways (typically 38 inches down to original subgrade), crushing and recycling concrete on site, and reusing the materials. All this hauling is made much easier, logistically, by avoiding long, truck blocking, string lines. Machine control has also made one aspect of quality control go faster. Normally, airport officials require a dense topographic survey of each paving layer, and straightedge testing multiply that by nearly 400,000 square yards, and the survey time really adds up. But one of those straightedge tests has been eliminated; When we were able to demonstrate the accuracy of machine control, we were able to eliminate the straightedge testing of the subgrade, Munilla explains. That has really helped a lot. Efficiency is secondary to accuracy on this project, but Leica Geosystems machine control enables MCM to achieve both goals. Worth the Investment We bid this, originally, as a conventional paving project, with no machine control, Munilla says. But then we decided it would be a great project for machine control, so we invested a lot. And even though it s working very well for us here, we don t expect it to pay off on just this project. It will be more like two or three projects. But it s the wave of the future, and we re very excited about taking on highway paving projects with this equipment. In addition to the substantial upfront investment, Munilla says there have been other challenges. Our initial days were difficult; this requires more knowledge and training, more skilled people generally, and some of our staff weren t especially computer literate when we got started. To get up to speed, MCM worked directly with Leica Geosystems and with Texas-based supplier Geomatic Resources. They also contracted with a third party trainer, and attended paving school in 2014. It s all been good training, and we re working very efficiently now, Munilla says. 5

On the office side, MCM is using Leica Geo Office and Carlson Survey software to work with outsourced models suitable for machine control. But, we recently invested in Carlson Civil Suite 2014 and AutoCAD 2014, Munilla explains. Going forward, we ll be building our own grading and paving models, and capturing even more efficiencies in house. In the future, even big paving projects will likely seem relatively straightforward to Munilla Construction Management, compared to the high pressure, tight tolerance project they chose for a pilot. By committing to the wave of the future in a big way, the global firm has proven that machine control paving on huge, demanding projects is a promising path forward. Learn more about machine control solutions or schedule a free consultation to discuss your needs CONTACT US 6