Approved non-notified resource consents approved between 6 November February 2005

Similar documents
Non-notified resource consents approved between 1 July and 18 September 2009

Non-notified resource consents approved between 10 July and 20 August 2010

Non-notified resource consents approved between 19 May and 9 July 2010

Non-notified resource consents approved between 19 February and 18 May 2010

Form 1: Application for resource consent

G: DESIGNATIONS PART G DESIGNATIONS KAPITI COAST DISTRICT COUNCIL G - 1 DISTRICT PLAN

Summary of Relief Sought by Transpower New Zealand Limited

E4. Other discharges of contaminants

Activities in the CMA section 32AA assessment

15. Network utilities

Proposed Kapiti Coast District Plan

3. Resource management issues, objectives and summary of policies and methods to achieve the objectives in the Regional Policy Statement

Good Practice Guide. Technical Guidance: Flood risk activity exemptions Date Published: April GPG 221 Document Owner: Flood Risk Strategy

Non-notified authorisations issued by the Taranaki Regional Council between 20 Jan 2017 and 02 Mar 2017

2 EARTHWORKS AND GEOTECHNICAL REQUIREMENTS

This chapter describes the potential hydrological effects of the Project in terms of:

Environment People Economy Mobility Living

Farmers rough guide to Environment Southland s rules

6.5 The Present Situation Water Quality Stormwater quality is currently being improved by:

FORM B: DAMMING AND DIVERSION OF WATER

Non-notified authorisations issued by the Taranaki Regional Council between 14 Jul 2017 and 17 Aug 2017

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E

Post-earthquake response plans for State Highways in the Wellington Region

Transmission Gully Project

Ecologically Beneficial Native Afforestation Site Prioritisation. for carbon sinks and other purposes. Kāpiti Coast District

No. 6 December, Wisconsin s Forestry Best Management Practices for Water Quality Forest Roads

Suggested Stormwater Management Practices For Individual House Lots

Town of Aurora Stream Management Master Plan PUBLIC INFORMATION CENTRE May 1 st, 2018

Temporary Watercourse Crossing: Culverts

Application for resource consent Form B Damming and diversion of water

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Appendix 11. Erosion and Sediment Control Management Plan. Appendix 11

Created by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq

Natural Flood Management. Measures & Multiple Benefits. Steve Rose (JBA)

E7. Taking, using, damming and diversion of water and drilling

Impacts of Harvesting and Road Construction to Malakwa Creek

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

Peka Peka to North Ōtaki Expressway Proposal

Appendix 16 - Erosion and sediment control guidelines for earthworks

FRST 557 Lecture 7b Cross Drainage Structures: Culverts and Bridges

Temporary Watercourse Crossing: Fords

City of Glendale Stormwater Management Plan Checklist

IDEM Wetlands and Streams Regulatory Overview. An overview of IDEM permitting for work in Waters of the State

Settlement Effects Management Plan (SEMP)

14 NATURAL HAZARDS Background Resource Management Issues

PART C APPLICATION OF EROSION AND SEDIMENT CONTROL PRACTICES

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5B

Regional Plan: Water for Otago

8. STRATEGIC ROAD NETWORK

17 Activities in the Coastal Marine Area (CMA)

Appendix 16 Erosion and sediment control guidelines for earthworks

Construction Environmental Management Plan (CEMP)

Restoration Work, General (Coastal Route)

Tools and methods to manage groundwater and settlement effects from the construction of an expressway on peat deposits

27 Land and groundwater contamination

Draft long term plan Consultation - supporting information. Draft activity chapters

GRADING, EROSION AND SEDIMENTATION CONTROL

Stage One North Detail Refer to Geoscience Drawings

AM-PR-003 Construction Environmental Management Plan (C-EMP)

Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

This designation is subject to conditions. A copy of the conditions is available at the Paraparaumu Council Office.

Information for File # RMM

Erosion & Sedimentation Control Policy

STATEMENT OF EVIDENCE OF BRYDON NICHOLAS HUGHES ON BEHALF OF THE KAPITI COAST DISTRICT COUNCIL. Groundwater. DATE: 5 October 2012

Flood Hazard Assessment Report Falls Gulch, Larimer County, Colorado January 16, 2013

Kapiti residents: consultation on options for a four-lane expressway

Storm Water Pollution Prevention Plan (SWP3) Checklist

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /

Annex F Scoping Checklist

TARANAKI REGIONAL COUNCIL REQUIREMENTS for good farm management in Taranaki

CONSTRUCTION PLAN CHECKLIST

Restoration Work: General works, design refinements and safety and resilience works (Coastal Route)

Appendix 14-I Description of Stream Crossing for Electrical Interconnect

PRM 220kV Connection Project. Draft Erosion and Sediment Control Plan

Inflow pipe. Drain. Drain

SCOTTISH ENVIRONMENT PROTECTION AGENCY PREVENTION OF POLLUTION FROM CIVIL ENGINEERING CONTRACTS: GUIDELINES FOR THE SPECIAL REQUIREMENTS

Section 208. SOIL EROSION AND SEDIMENTATION CONTROL

Maitland Valley WATERSHED

APPENDIX D: COST ESTIMATES FOR STUDY REACHES

Conditions of Section 401 Certification for Nationwide Permits and General Conditions. General Condition 12 (Soil Erosion and Sediment Controls)

Table D1: WC-R1 to WC-R3 (Wilket Creek Park)

City of Daphne Standard Operating Guidance (SOGs) For Storm Drain System Management

Fabric Drop Inlet Protection

30 November New Zealand Transport Agency, Christchurch Attn To: Richard Shaw PO Box 1479 Christchurch Dear Richard

14 NATURAL HAZARDS Background Resource Management Issues

BMP No. 1 Access Roads, Skid Trails, and Landings

Proposed Natural Resources Plan for the Wellington Region. Section 42A Hearing Report For Hearing Commencing 10 July Report Dated: 12 June 2017


SNOW REMOVAL & DISPOSAL POLICY

E2. Water quantity, allocation and use

D EROSION AND SEDIMENT CONTROL. Table of Contents

REPORT Greater Wellington Regional Council

Order of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below.

PUBLIC NOTICE Application for Permit

Auckland Unitary Plan Operative in part 1

STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents. SWMP Page # or Reference Location Yes/No

SECTION THREE: How water gets to our taps This section explores how water is delivered from water collection areas to our taps.

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Operative Ashburton District Plan

Block & Aggregate Drop Inlet Protection

Transcription:

Approved non-notified resource consents approved between 6 November 2004 1 February 2005 File WGN030141 New Zealand Forestry Group Kinnoull Station, 563 South To construct and maintain a 3.6km section of a Earthwork Makara Road, Makara logging access road. WGN040015 Hutt City Council Old Wainuiomata Landfills, To discharge stormwater and stormwater Landfill Discharge Wainuiomata contaminated with leachate from the old Wainuiomata Landfills to land. WGN040079 Pritchard Group Limited Taylor's Road extension, Otaki To take and use groundwater from an existing Take WGN050002 WRC Internal Unnamed tributary of Blackies Stream, Tunnel Gully, Upper Hutt bore for irrigation purposes. To construct, use and maintain a pipe culvert in an unnamed tributary of Blackies Stream, and to undertake associated disturbance of the bed of the stream. WGN050060 Upper Hutt City Council Mangaroa River, Upper Hutt To place, use and maintain a small section of walkway in the bed of the Mangaroa River, and undertake associated disturbance of the river bed. WGN050069 Kapiti Coast District Council Ngarara Stream, & Waimeha Stream, Waikanae WGN050071 Sparrow Construction Limited 4 Ladybell Grove, Lowry Bay, Eastbourne WGN050076 New Zealand Defence Force Shelly Bay Defence Facility, Shelly Bay Land use consent to place, use and maintain a pipeline over the bed of the Ngarara Stream. To construct and maintain an erosion protection wall and associated diversion in an unnamed stream. To obtain a coastal permit for the use and occupation of the CMA by existing structures located at the Shelly Bay Defence facility. WGN050082 Capital Projects Limited 19 Moana Grove, Waiwhetu To construct 3 bores for geotechnical monitoring purposes at 19 Moana Grove, Waiwhetu, Lower Hutt. WGN050083 Terry & Sandy White 11 Ashleigh Way, Waikanae WGN050088 Shell Oil New Zealand Limited Cnr Seaview and Barnes Street, Seaview, Wellington To construct a bore, at 11 Ashleigh Way, Waikanae, for domestic supply. To construct up to nine bores for groundwater quality and soil monitoring purposes. Structure: General Bridge. Pipeline/Cable Occupation PAGE 1 OF 7

WGN050089 Wellington City Council Porirua Stream, behind Oxford To place and maintain rock rip-rap and St, Tawa concrete blocks in the Porirua Stream for erosion protection purposes, including any associated disturbance and temporary diversion of the stream. WGN050091 Transpower New Zealand Ltd Oteranga Bay, Wellington To occupy and use the coastal marine area by Occupation placing four concrete blocks on the seabed at Oteranga Bay to repair a High Voltage Direct Current link cable. WGN050092 Department of Corrections Rimutaka Prison, Upper Hutt To temporarily divert the flow of an unnamed tributary of the Hutt River, to temporarily dam and install a culvert in the unnamed tributary, and to permanently divert the flow of the unnamed tributary through a pipe. WGN050095 L J McRoberts Laurie McRoberts, 636 Coast Road To discharge cleanfill material to land in circumstances where it may enter water, to form a stop bank 'bund' within the floodplain of the Wainuiomata River. WGN050096 B P Dillon 59 Kamahi St, Stokes Valley To place, use and maintain rock rip-rap in the bed of a tributary to the Stokes Valley Stream, including any associated disturbance of the bed. WGN050097 Caltex New Zealand Limited 189 Main Rd, Tawa To construct four bores for groundwater monitoring purposes. WGN050098 Zane Siegel 5 Queens Road, Waikanae To construct a bore. WGN050099 Kooroora Holdings Limited Unnamed tributary of the To extract sand from the bed of an unnamed Waikanae River tributary of the Waikanae River. WGN050100 Whitireia Community Coastal Marine Area To construct and maintain a stormwater outfall Polytechnic structure and undertake the associated disturbance of the coastal marine area. WGN050101 Steve Minogue 11 Consort Close, Paraparaumu To construct a bore. River/Stream Diversion, Reclamation & Structure: General Landfill Discharge Outfall/Intake Structure PAGE 2 OF 7

WGN050102 Upper Hutt City Council Mangaroa River, Upper Hutt Land use consent to place and maintain a driven rail iron retaining wall and associated structures in the bed of Mangaroa River, and to undertake associated disturbance of the bed of that river. WGN050104 N J Morgan 428 Te Moana Road, Waikanae To construct a bore. WGN050105 Paul Ridley-Smith 267 Peka Peka Rd, Waikanae To construct a bore for irrigation. WGN050107 Hutt City Council Korau Grove, Stokes Valley To replace an existing culvert in an unnamed Bridge tributary of the Stokes Valley Stream, including any associated temporary diversion and disturbance of the stream. WGN050107 Hutt City Council Stokes Valley Stream To construct a timber retaining wall, widen the stream channel and place gabion baskets, a debris trap and a concrete apron in an unnamed tributary of the Stokes Valley Stream, including any associated temporary diversion and disturbance of the stream. WGN050108 WRC Internal Martins Block, Tunnel Gully, To construct a culvert in order to harvest UHCC windthrown logs. WGN050110 Hutt City Council 15 Barnes Street, Lower Hutt To construct nine bore for geotechnical monitoring purposes. WGN050111 Karl Moen 26 Monarch Place, To construct a bore. Paraparaumu WGN050112 Mobil Oil New Zealand Ltd 5-13 Ludlum Crescent, Lower To construct a bore for the purpose of (Auck) Hutt monitoring groundwater quality. WGN050115 WRC Internal Wainuiomata River Water Collection Area To temporarily divert river flow to construct and maintain approximately 40 metres of riverbank edge protection works in the bed of the Wainuiomata River, to provide security for the intake to the Wainuiomata Water Treatment Plant water supply pipeline for flood protection purposes. /Diversion PAGE 3 OF 7

WGN050116 Aqua Installations & Maint. Ltd Takapu Stream, Grenada North To discharge contaminants to air, land and water associated with wet and dry abrasive blasting for pipeline maintenance; and to disturb the bed of the Takapu Stream in order to dig a trench under a pipeline to gain access for blasting. WGN050117 Steven and Kathleen Ransley 358 Ngarara Road Waikanae To construct a bore. WGN050121 Luke Lee & Jacqui 107-119 Flightys Road, Fairbrother Pauatahanui WGN050122 Hutt City Council 120-122 Kamahi Street, Stokes Valley To construct a permanent dam in the bed of an intermittently flowing tributary of the Pauatahanui Stream; to discharge water containing silt runoff from earthworks to the tributary; and to place, use and maintain a 525mm pipe and dam in the bed of the tributary. Land use consent to construct and maintain one railway iron retaining wall and two gabion basket retaining walls in the bed and banks of an unnamed stream, and to undertake any associated disturbance of the bed of that stream. WGN050123 Porirua City Council Kenepuru Stream, Porirua To lay a water pipe under the bed of the Kenepuru Stream. WGN050124 Mobil Oil NZ Limited Mobil Tank Farm, Miramar To construct up to nine bores for environmental monitoring purposes. WGN050125 Hutt City Council Rona Street Stream, Rona Bay To construct and maintain two gabion basket structures to form gravel traps and to install a debris trap in the bed of the Rona Street Stream, and to undertake temporary diversion and disturbance of the bed of the stream. WGN050126 Hutt City Council Waiwhetu Stream adjacent to Summit Road Lower Hutt Land use consent to maintain works in the bed and banks of the Waiwhetu Stream for flood and erosion control purposes. Discharge To Air, Stream Work & Industrial Waste Discharge Dam, Stormwater Discharge, and Stream Work PAGE 4 OF 7

WGN050127 Kapiti Coast District Council Muaupoko Stream, Waikanae To realign four sections of the Muaupoko Stream by excavating a new channel, back /Diversion, Reclamation filling the existing channel and protecting new banks with planting and rock material. To permanently divert the flow and reclaim the bed of the Maupoko Stream for works purposes. WGN050128 Neil & Jane Ashton 14 Field Way, Waikanae To construct a bore. WGN050129 Hutt City Council Black Stream To construct a new headwall and stormwater outfall in Black Stream. WGN050130 Horokiwi Quarries Limited Horokiwi Quarry, Horokiwi To discharge earth and rock cleanfill 'overburden material' to land with the potential to enter the Horokiwi Stream and to enable earthworks to be carried out involving the disturbance of more than 1,000 cubic metres of soil on erosion-prone land. Industrial Waste Discharge, Earthwork WGN050131 Wellington City Council Unnamed tributary of Porirua Stream, Court Road, Tawa To construct and maintain a concrete cleaning apron beneath the existing debris arrestor in the bed of an unnamed stream, to construct and maintain an access ramp near the existing debris arrestor to provide access for maintenance, and to undertake associated disturbance of the stream bed. Structure: General WGN050133 Mark & Rosemary Pettit 149 Renown Road Raumati To construct a bore. WGN050134 Werner Naef 155 Field Way, Waikanae To construct a bore for irrigation purposes. WGN050135 Hutt City Council Speedy's Stream, Major Drive, Kelson To place, use and maintain a driven rail iron retaining wall and concrete block structure in the true left bank of Speedy's Stream, and to undertake associated disturbance of the bed of that stream. WGN050139 R Colman & N E Wiberg 19 Consort Close, Paraparaumu To construct a bore. PAGE 5 OF 7

WGN050143 Wellesley College Wellesley College, Eastbourne Land use consent to install gabion basket weirs in the bed of an unnamed stream to build the stream bed up to its original level, to construct and maintain timber crib walls, to place rock rip-rap for fish passage, and to undertake associated disturbance. WGN050144 WRC Internal Taupo Swamp weir, Taupo To construct and maintain a fish pass and two Stream, Plimmerton grade control structures on the bed of Taupo Stream, including any associated temporary diversion of water. WGN050145 Helen Coleman 17 Dell Road, Raumati South To construct a bore. WGN050147 Keith & Lois Wiffen 2A Cedar Drive, Paraparaumu To construct a bore. WGN050148 David Walshaw 22 Lethbridge Road, Te Horo, Otaki WGN050151 WRC Internal Swampy Gully, Battle Hill Forest Park To take and use groundwater from an existing bore for the irrigation of an olive grove and market garden. To construct a deck in and over the bed of a pond which is located within a tributary of the Horokiwi Stream, Battle Hill Forest Park. To construct a culvert to provide access for WGN050152 WRC Internal Martins Block, Tunnel Gully, Upper Hutt logging trucks. WGN050153 Department of Corrections Rimutaka Prison, Upper Hutt To divert the flow and reclaim the bed of two unnamed tributaries of the Hutt River. To install a new concrete headwall and inlet structure in an unnamed tributary of the Hutt River. WGN050154 Kapiti Coast District Council Wharemauku Stream, Paraparaumu WGN050156 Rhys Morris Tributary of the Waiwhetu Stream, Lower Hutt Extract gravel from Wharemauku Stream to return the stream bed to 1994 levels, between SH1 to stream mouth; and to carry out routine maintenance works in the Wharemauku Stream between SH1 and the stream mouth. To place, use and maintain gabion baskets and reconstruct a deck in the true right bank of an unnamed tributary of the Waiwhetu Stream, and carry out the associated disturbance of the stream bed. Take Structure: General Reclamation. Stream work/diversion PAGE 6 OF 7

WGN050161 KRL Developments 182 Te Hapua Road, Te Horo, To take and use water from an existing bore Take Otaki for irrigation and domestic use purposes. WGN050166 Brett Abbott 32 Avian Crescent, Upper Hutt To discharge domestic sewage from a septic Sewage Discharge tank to land via underground disposal fields, within 20 metres of an unnamed tributary to the Mangaroa River. WGN050167 DS & AL Barton D S and A L Barton To construct a bore. WGN050171 Mangaroa Metal Company Paper road off Mangaroa Valley To re-lay and extend an existing culvert and Bridge Rd reclaim a section of a pond in an unnamed tributary of Cooleys Stream, and to undertake associated disturbance of the bed of that stream. WGN050172 Franz Burghuber 5 Flaxmere Street, Waikanae To construct a bore for domestic irrigation. WGN050173 Kapiti Coast District Council Te Puka Stream, Paekakariki To extract gravel from the Te Puka Stream and undertake associated disturbance of the stream bed in order to: - construct and maintain a sediment retention pool, maintain design stream bed levels, and remove gravel stockpiled in the floodplain in an ephemeral tributary of the Waikakariki Stream. WGN050184 Mr & Mrs Bob Tait 32 Hona Street, Waikanae To construct a bore for irrigation. WGN950266 Winstone Aggregates Winstone Aggregates Limited, Take SH1, Otaki Change condition 6 of existing consent to take water from a bore for the purpose of shingle washing.. Structure:Hazard Mitigation PAGE 7 OF 7