S 0632 S T A T E O F R H O D E I S L A N D

Similar documents
S 2185 S T A T E O F R H O D E I S L A N D

H 7413 S T A T E O F R H O D E I S L A N D

H 7413 SUBSTITUTE A ======== LC004207/SUB A ======== S T A T E O F R H O D E I S L A N D

Senate Bill No. 145 Senator Spearman

Ì739598nÎ LEGISLATIVE ACTION... The Committee on Communications, Energy, and Public Utilities (Fasano) recommended the following:

H 5369 S T A T E O F R H O D E I S L A N D

Energy and Climate Report

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2015

H 5802 SUBSTITUTE A AS AMENDED ======= LC01390/SUB A ======= S T A T E O F R H O D E I S L A N D

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION LEAST COST PROCUREMENT STANDARDS JULY 28, 2017

H 7514 S T A T E O F R H O D E I S L A N D

Draft Renewable Portfolio Standard Rule

DRAFT 8/11/08. I. Renewable Portfolio Standard. (a) The Commission shall establish minimum numerical portfolio standards for each investorowned

SENATE, No STATE OF NEW JERSEY

SMALL SCALE RENEWABLE ENERGY PROJECT STANDARD

HOUSE AMENDMENT Bill No. CS/HB 7229 (2010) Amendment No. CHAMBER ACTION

CHAPTER 112. C.26:2C-37 Short title. 1. This act shall be known and may be cited as the Global Warming Response Act.

The Vermont Statutes Online

APPROVED REGULATION OF THE PUBLIC UTILITIES COMMISSION OF NEVADA. LCB File No. R Effective December 19, 2018

H 5390 S T A T E O F R H O D E I S L A N D

'^E y^s THROUGH: Jason Eisdorferand JP Batmale

H 5426 S T A T E O F R H O D E I S L A N D

Designing Successful Energy Savings Targets

S 2355 S T A T E O F R H O D E I S L A N D

Report to the Environmental Review Commission and Joint Legislative Utility Review Committee January 2009

The Rhode Island Energy Efficiency and Resource Management Council

New England State and Federal Laws and Regulations and the Electric Power Sector

S 2188 S T A T E O F R H O D E I S L A N D

79th OREGON LEGISLATIVE ASSEMBLY Regular Session. House Bill 2468

S 0952 S T A T E O F R H O D E I S L A N D

A BILL IN THE COUNCIL OF THE DISTRICT OF COLUMBIA

Commonwealth of Massachusetts Executive Office of Energy and Environmental Affairs and Department of Environmental Protection

HOUSE BILL 332: Energy Policy Amendments

150,000. Article 1 Sec Senator... moves to amend S.F. No as follows: 1.2 Delete everything after the enacting clause and insert:

Utilities Kingston Report to Council Report Number

Ì926992QÎ LEGISLATIVE ACTION Senate...

State Energy Efficiency Resource Standard (EERS) Activity

SB 838: Oregon Renewable Energy Act Establishing an Oregon Renewable Energy Standard

H 8312 S T A T E O F R H O D E I S L A N D

ADOPTED REGULATION OF THE STATE ENVIRONMENTAL COMMISSION. LCB File No. R Effective January 28, 2010

PacifiCorp Renewable Portfolio Standard Oregon Implementation Plan 2011 through 2015

Community-Based Renewable Energy

H 7884 STATE OF RHODE ISLAND

August 31, 2015 PROCUREMENT OF RESOURCES PURSUANT TO PUBLIC ACT NOTICE OF PROCEEDINGS AND OPPORTUNITY FOR PUBLIC COMMENT

[First Reprint] ASSEMBLY, No STATE OF NEW JERSEY. 218th LEGISLATURE PRE-FILED FOR INTRODUCTION IN THE 2018 SESSION

State of Minnesota HOUSE OF REPRESENTATIVES

HOUSE OF REPRESENTATIVES

Florida Public Service Commission Staff Rule Development Workshop on Renewable Portfolio Standard Docket No EI

March 6, As of December 20, 2016, National Grid was projecting year-end results for the 2016 EE Program to exceed planned targets as well.

Subject: Conservation; water resources; Lake Champlain; total maximum 5. Statement of purpose: This bill proposes to amend requirements for 7

Referred to Committee on Natural Resources, Agriculture, and Mining. SUMMARY Revises provisions governing the management of water.

Energy Efficiency Law

H 7896 S T A T E O F R H O D E I S L A N D

S 2095 AS AMENDED S T A T E O F R H O D E I S L A N D

No. 58. An act relating to establishing a program for the collection and recycling of paint. (H.262)

Alternative Energy Portfolio Standards

Policy in Action: How Rhode Island Drives Large Investments in Energy Efficiency

EMERGENCY MEASURES ACT

I. Renewable Portfolio Standard

AN ACT IN THE COUNCIL OF THE DISTRICT OF COLUMBIA

H 7427 SUBSTITUTE A ======== LC004265/SUB A ======== S T A T E O F R H O D E I S L A N D

Information Technology

MICHIGAN RENEWABLE ENERGY STANDARD SUMMARY

Ordinance establishing a Community Choice Aggregation Program in accordance with

Minnesota s Utility Conservation Programs: Past, Present, Future. Joe Plummer

PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

PERSONNEL PROCEDURES: VACANCIES/HIRING/TRANSFERS. 1.0 Purpose. 2.0 Definitions

ASSEMBLY, No STATE OF NEW JERSEY. 218th LEGISLATURE INTRODUCED MARCH 22, 2018

House Bill 4086 Ordered by the House February 21 Including House Amendments dated February 21

Second Regular Session Seventy-first General Assembly STATE OF COLORADO INTRODUCED HOUSE SPONSORSHIP

A Bill Regular Session, 2009 HOUSE BILL 1663

Overview of the Future Energy Jobs Act

Vermont Department of Public Service and Vermont Department of Taxes. January 15, Authorization

EMERGENCY MANAGEMENT ACT

H 5917 S T A T E O F R H O D E I S L A N D

TESTIMONY of the CONSUMER TECHNOLOGY ASSOCIATION. SB 800 Changes to the Covered Device Recycling Act

S. ll IN THE SENATE OF THE UNITED STATES

STATE OF NEW JERSEY Board of Public Utilities Two Gateway Center Newark, NJ

WASHINGTON ELECTRIC COOPERATIVE 2018 ANNUAL PLAN FOR TIER III COMPLIANCE

INTERGOVERNMENTAL AGREEMENT FOR PAYMENT OF CERTAIN IMPACT FEES AND COSTS BY AND BETWEEN THE CITY OF FARMER CITY, DEWITT COUNTY, ILLINOIS AND

RE: Comments of Center for Resource Solutions (CRS) on IEMAC Meeting Materials for Sept. 21, 2018 and Draft Subcommittee Reports

Minnesota Session Laws

PRIOR PRINTER'S NOS. 1419, 1912, 1945 PRINTER'S NO THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL

Implementation of the Renewable Energy and Energy Efficiency Portfolio Standard (REPS)

Proposed Substitute Bill No. 7155

( ) Page: 1/11 UNITED STATES CERTAIN MEASURES RELATING TO THE RENEWABLE ENERGY SECTOR REQUEST FOR THE ESTABLISHMENT OF A PANEL BY INDIA

GLOSSARY OF TERMS January 2017

THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL

THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL

REPORT TO THE MINNESOTA LEGISLATURE

Overview of Illinois Public Act

SUBSTITUTE FOR HOUSE BILL NO. 4297

NYISO Governance Summary of Sector Definitions and Related Terms

H 5849 S T A T E O F R H O D E I S L A N D

PROPOSED AMENDMENTS TO HOUSE BILL 4001 GREENHOUSE GAS DEFINED FOR PURPOSES OF AIR QUALITY LAWS

Waste Heat and Carbon Emissions Reduction

SUBSTITUTE FOR SENATE BILL NO. 438

H 5607 S T A T E O F R H O D E I S L A N D

Transcription:

LC00 01 -- S 0 S T A T E O F R H O D E I S L A N D IN GENERAL ASSEMBLY JANUARY SESSION, A.D. 01 A N A C T RELATING TO PUBLIC UTILITIES AND CARRIERS - PUBLIC UTILITIES COMMISSION Introduced By: Senator Marc A. Cote Date Introduced: March, 01 Referred To: Senate Commerce It is enacted by the General Assembly as follows: 1 1 1 1 1 1 1 1 SECTION 1. Section -1-. of the General Laws in Chapter -1 entitled "Public Utilities Commission" is hereby amended to read as follows: -1-.. System reliability and least-cost procurement. Least-cost procurement shall comprise system reliability and energy efficiency and conservation procurement as provided for in this section and supply procurement as provided for in -1-., as complementary but distinct activities that have as common purpose meeting electrical and natural gas energy needs in Rhode Island, in a manner that is optimally costeffective, reliable, prudent and environmentally responsible. (a) The commission shall establish not later than June 1, 00, standards for system reliability and energy efficiency and conservation procurement, which shall include standards and guidelines for: (1) System reliability procurement, including but not limited to: (i) Procurement of energy supply from diverse sources, including, but not limited to, renewable energy resources as defined in chapter of this title; (ii) Distributed generation, including, but not limited to, renewable energy resources and thermally leading combined heat and power systems, which is reliable and is cost-effective, with measurable, net system benefits; (iii) Demand response, including, but not limited to, distributed generation, back-up generation and on-demand usage reduction, which shall be designed to facilitate electric customer

1 1 1 1 1 1 1 0 1 0 1 participation in regional demand response programs, including those administered by the independent service operator of New England ("ISO-NE") and/or are designed to provide local system reliability benefits through load control or using on-site generating capability; (iv) To effectuate the purposes of this division, the commission may establish standards and/or rates: (A) For qualifying distributed generation, demand response, and renewable energy resources; (B) For net-metering; (C) For back-up power and/or standby rates that reasonably facilitate the development of distributed generation; and (D) For such other matters as the commission may find necessary or appropriate. () Least-cost procurement, which shall include procurement of energy efficiency and energy conservation measures that are prudent, and reliable, and verifiable, and when such measures are lower cost than acquisition of additional supply, including supply for periods of high demand, and which when calculating least cost procurement energy efficiency and energy conservation measures which shall factor in the results of the annual savings verification conducted by the commission. (b) The standards and guidelines provided for by subsection (a) shall be subject to periodic review and as appropriate amendment by the commission, which review will be conducted not less frequently than every three () years after the adoption of the standards and guidelines. (c) To implement the provisions of this section: (1) The commissioner of the office of energy resources and the energy efficiency and resources management council, either or jointly or separately, shall provide the commission findings and recommendations with regard to system reliability and energy efficiency and conservation procurement on or before March 1, 00, and triennially on or before March 1, thereafter through March 1, 0. The report shall be made public and be posted electronically on the website to the office of energy resources. () The commission shall issue standards not later than June 1, 00, with regard to plans for system reliability and energy efficiency and conservation procurement, which standards may be amended or revised by the commission as necessary and/or appropriate. () The energy efficiency and resources management council shall prepare by July 1, 00, a reliability and efficiency procurement opportunity report which shall identify opportunities to procure efficiency, distributed generation, demand response and renewables, LC00 - Page of

1 1 1 1 1 1 1 0 1 0 1 which report shall be submitted to the electrical distribution company, the commission, the office of energy resources and the joint committee on energy. () Each electrical and natural gas distribution company shall submit to the commission on or before September 1, 00, and triennially on or before September 1, thereafter through September 1, 0, a plan for system reliability and energy efficiency and conservation procurement. In developing the plan, the distribution company may seek the advice of the commissioner and the council. The plan shall include measurable goals verifiable by a third-party expert and target percentages for each energy resource, pursuant to standards established by the commission, including efficiency, distributed generation, demand response, combined heat and power, and renewables. The plan shall be made public and be posted electronically on the website to the office of energy resources, and shall also be submitted to the general assembly. The commission shall include standards for annual verification of energy efficiency through a representative sample of all the types of energy conservation measures for which energy savings are claimed prior to and after their implementation. The results of this annual verification shall be used to adjust goals and factored into the least cost procurement calculation. The annual verification shall be conducted by the commission independent of the EERMC and the utilities, and the cost of the independent verification shall be part of the system benefit charge. () The commission shall issue an order approving all energy efficiency measures that are cost effective and lower cost than acquisition of additional supply, with regard to the plan from the electrical and natural gas distribution company, and reviewed and approved by the energy efficiency and resources management council, and any related annual plans, and shall approve a fully reconciling funding mechanism to fund investments in all efficiency measures that are cost effective and lower cost than acquisition of additional supply, not greater than sixty (0) days after it is filed with the commission. Provided, however, any system benefit charge provided pursuant to title used to support programs under this subsection shall be capped at the year 01 charge level for a period of five () years. () (i) Each electrical and natural gas distribution company shall provide a status report, which shall be public, on the implementation of least cost procurement on or before December 1, 00, and on or before February 1, 00, to the commission, the division, the commissioner of the office of energy resources and the energy efficiency and resources management council which may provide the distribution company recommendations with regard to effective implementation of least cost procurement. The report shall include the targets for each energy resource included in the order approving the plan and the achieved percentage for energy resource, including the achieved percentages for efficiency, distributed generation, demand LC00 - Page of

1 1 1 1 1 1 1 0 1 0 1 response, combined heat and power, and renewables as well as the current funding allocations for each eligible energy resource and the businesses and vendors in Rhode Island participating in the programs. The report shall be posted electronically on the website of the office of energy resources. (ii) Beginning on November 1, 01 or before, each electric distribution company shall support the installation and investment in clean and efficient combined heat and power installations at commercial, institutional, municipal, and industrial facilities. This support shall be documented annually in the electric distribution company's energy efficiency program plans. In order to effectuate this provision, the energy efficiency and resource management council shall seek input from the public, the gas and electric distribution company, the economic development corporation, and commercial and industrial users, and make recommendations regarding services to support the development of combined heat and power installations in the electric distribution company's annual and triennial energy efficiency program plans. (iii) The energy efficiency annual plan shall include, but not be limited to, a plan for identifying and recruiting qualified combined heat and power projects, incentive levels, contract terms and guidelines, and achievable megawatt targets for investments in combined heat and power systems. In the development of the plan, the energy efficiency and resource management council and the electric distribution company shall factor into the combined heat and power plan and program, the following criteria: (A) Economic development benefits in Rhode Island, including direct and indirect job creation and retention from investments in combined heat and power systems; (B) Energy and cost savings for customers; (C) Energy supply costs; (D) Greenhouse gas emissions standards and air quality benefits; and (E) System reliability benefits. (iv) The energy efficiency and resource management council shall conduct at least one public review meeting annually, to discuss and review the combined heat and power program, with at least seven () business day's notice, prior to the electric and gas distribution utility submitting the plan to the commission. The commission shall evaluate the submitted combined heat and power program as part of the annual energy efficiency plan. The commission shall issue an order approving the energy efficiency plan and programs within sixty (0) days of the filing. (d) If the commission shall determine that the implementation of system reliability and energy efficiency and conservation procurement has caused or is likely to cause under or overrecovery of overhead and fixed costs of the company implementing said procurement, the LC00 - Page of

commission may establish a mandatory rate adjustment clause for the company so affected in order to provide for full recovery of reasonable and prudent overhead and fixed costs. (e) The commission shall conduct a contested case proceeding to establish a performance based incentive plan which allows for additional compensation for each electric distribution company and each company providing gas to end-users and/or retail customers based on the level of its success in mitigating the cost and variability of electric and gas services through procurement portfolios. SECTION. This act shall take effect upon passage. LC00 LC00 - Page of

EXPLANATION BY THE LEGISLATIVE COUNCIL OF A N A C T RELATING TO PUBLIC UTILITIES AND CARRIERS - PUBLIC UTILITIES COMMISSION *** 1 This act would require verifiable least cost energy procurements and standards for annual verification of energy efficiency. This act would take effect upon passage. LC00 LC00 - Page of