Non-destructive Testing of Installed Soil Nails Using Sonic Echo Test Method

Similar documents
SPECIAL SPECIFICATION 4401 Prestressed Ground Anchors

SPECIAL SPECIFICATION 4492 Tie Back Anchors

STANDARD SPECIFICATION FOR MICROPILE CONSTRUCTION

Soil Improvement by Compaction Grouting

Best Management Standards / Specifications. For Concrete Slab Raising. Prepared in conjunction with the Concrete Repair Association

ITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items:

FIVE STAR PRODUCTS, INC. (800)

SECTION NONPRESTRESSED ROCK ANCHORS. 1. Placing drawings. 2. Bar details. 3. Manufacturer s data, and recommendations for grout.

SPECIAL SPECIFICATION 4703 Repair Of Impact Damaged Prestressed Concrete Bridge Beams

SPECIAL SPECIFICATION 4491 Type CAC Concrete

Multi-Institutional Academic Health Science & Research Center Evansville, IN

Typical Specifications of Compaction Grouting Scope

SPECIFICATION 1035 M

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS

CITY OF ODESSA SPECIAL SPECIFICATIONS ITEM 1000 GLASS-FIBER REINFORCED POLYESTER (FRP) REHAB/REPLACEMENT MANHOLE

San Antonio Water System Standard Specifications for Construction ITEM NO. 812 WATER MAIN INSTALLATION

Bi-Directional Static Load Testing of Drilled Shafts

Bi-Directional Static Load Testing of Drilled Shafts

WATER LINE IN TUNNELS

SECTION 552 HELICAL ANCHORS AND HELICAL PILES

SECTION BORING AND/OR JACKING PIPE

The work required for this project includes, but is not limited to, the following items, not listed in order of execution.

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS

DIVISION 300 TRENCHING SECTION 308 BORING AND JACKING 2.2 STEEL CASING PIPE

SPECIAL SPECIFICATION 5925 Polyvinyl Cloride (PVC) Sewer Pipe and Fittings

ITEM 432 TUNNEL CONSTRUCTION

STANDARD SPECIFICATION Section Auger-Grout Injected Piles Civil Engineering Group Revised: August, 2000

SECTION DUCTILE IRON PILES

CONSTRUCTION SPECIFICATIONS FOR ALABAMA STATE PORT AUTHORITY MCDUFFIE TERMINALS CONVEYOR 44 PILING INSTALLATION

STANDARD SPECIFICATIONS SECTION BORING AND JACKING. A. Section includes requirements for boring and jacking casing pipe.

SECTION CAST-IN-PLACE CONCRETE

SECTION 2831 ITEM F-162 CHAIN-LINK FENCES

FIVE STAR PRODUCTS, INC. (800)

SECTION 920 SANITARY AND STORM SEWER MANHOLES

APPENDIX I NASP TEST PROTOCOLS

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS

SECTION PORTLAND CEMENT CONCRETE PAVEMENT. All subsurface utilities must be inspected, tested, and accepted prior to any paving.

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS

Section WATER LINE IN TUNNELS

September 1, 2003 CONCRETE MANUAL SPECIAL TYPES OF CONCRETE

SAN ANTONIO WATER SYSTEM 2013 REHABILITATION WORK ORDER CONSTRUCTION CONTRACT 4 SAWS Job No SAWS Solicitation No.

ITEM 432 RIPRAP. Dry Riprap is defined as Stone Riprap of the required type with voids filled only with spalls or small stones.

HORIZONTAL BORING HORIZONTAL BORING. Underground Electric Distribution Standards I. GENERAL

1. Cast-in-place concrete is specified in Section

San Antonio Water System Specifications for Construction ITEM NO. 853 SANITARY SEWER GLASS-FIBER REINFORCED POLYESTER (FRP) MANHOLES

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

Rapid Axial Load Testing of Drilled Shafts

San Antonio Water System Standard Specifications for Construction ITEM NO. 848 SANITARY SEWERS

SECTION CHAIN LINK FENCES AND GATES (PARK)

III. TECHNICAL SPECIFICATIONS DIVISION 56 BORED PIPE

ITEM 555 CHAIN LINK FENCING

Texas Department of Transportation BOOK 2 TECHNICAL PROVISIONS. US 181 HARBOR BRIDGE PROJECT Design-Build Project ATTACHMENT 13-1 STRUCTURE PROVISIONS

SECTION TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following:

Specifications. Chapter 13. Specifications (800) CULVERT 96

SPECIAL PROVISION Concrete Pavement

MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications

San Antonio Water System Standard Specifications for Construction ITEM NO. 853 SANITARY SEWER GLASS-FIBER REINFORCED POLYESTER (FRP) MANHOLES

SPECIAL SPECIFICATION 5989 Settlement Gauge

TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following:

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER. OPR:CT 1 of 5 APPR:JAR:DBP: FHWA:APPR:

SECTION GROUT. A. American Society for Testing and Materials (ASTM):

SPECIAL SPECIFICATION 5787 Manhole Rehabilitation

SPECIFICATION : BORING AND JACKING

Section CONCRETE SIDEWALKS. 1. Payment for concrete sidewalks is on square foot basis.

CONTINUOUS FLIGHT AUGER (CFA) PILES QC/QA PROCEDURES. Preferred QC/QA Procedures

715 - PRESTRESSED CONCRETE MEMBERS SECTION 715 PRESTRESSED CONCRETE MEMBERS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04

SECTION 39 - MANHOLES TABLE OF CONTENTS

GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410

ITEM 416 DRILLED SHAFT FOUNDATIONS Materials. All materials shall conform to the requirements of the pertinent items as follows:

SPECIAL SPECIFICATION 4429 Multiple-Layer Polymer Concrete Overlay

ITEM 442 METALS FOR STRUCTURES

1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK

DIVISION II TECHNICAL SPECIFICATIONS SECTION S-003 SANITARY SEWER FORCE MAIN SYSTEM

FIVE STAR PRODUCTS, INC. (800)

ITEM 522 PORTLAND CEMENT CONCRETE PLANTS

Section TUNNEL GROUT. A. Mix design requirements, testing, furnishing, and production of grout for:

SECTION TILT-UP PRECAST CONCRETE. A. Work includes, but is not limited to, the following:

SECTION GRAVITY WASTEWATER LINES

DMS REINFORCED CONCRETE PIPE FABRICATION AND PLANT QUALIFICATION

SPECIAL SPECIFICATION 6666 Charter Communications System

NTPEP Evaluation of Spray Applied Non-Structural and Structural Pipe Liners for Storm Water Conveyance

DIVISION 33 - UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES SECTION UTILITY PIPE BORING AND JACKING

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

STANDARD SPECIFICATIONS FOR CONSTRUCTING SANITARY SEWER FACILITIES DIVISION III - CONSTRUCTION SPECIFICATIONS SECTION 4

Micropile Lateral Load Testing in the Charleston, SC Area

ITEM 460 REINFORCED CONCRETE PIPE Description. This Item shall govern for the furnishing of reinforced concrete pipe.

Section REINFORCING STEEL

STANDARD SPECIFICATIONS SECTION TUNNELING. A. Section includes requirements for constructing tunnels 48-inch and larger diameter.

ITEM 404 DRIVING STEEL PILING

Low 28 Day Compression Strength NOW WHAT?

ITEM 426 PRESTRESSING Definitions. For this Item, the following definitions shall apply:

SPECIAL SPECIFICATION 3402 Reflective Crack Relief Interlayer (RCRI)

SPECIAL SPECIFICATION 8625 All-Weather Traffic Markings

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL

SPECIAL SPECIFICATION 4190 Multiple-Layer Polymer Concrete Overlay

2004 Specifications CSJ SPECIAL SPECIFICATION DIRECT FIXATION TRACK CONSTRUCTION

Bear Exhibit Fence Upgrades. The following modifications are hereby made part of the contract documents:

Transcription:

Non-destructive Testing of Installed Soil Nails Using Sonic Echo Test Method Specifications for Grouting Mixtures and Procedures for Soil Nail Installations Research Project Number 0-4484 Research Product Number 0-4484-P3 Priyantha Jayawickrama and John Turner Performed in Cooperation with the Texas Department of Transportation and the Federal Highway Administration Center for Multidisciplinary Research in Transportation Texas Tech University

SPECIAL SPECIFICATION 4116 Soil Nail Anchors 1. Description. Construct reinforced soil nail anchors in place. 2. Materials. Provide materials conforming to the following requirements. (1) Hydraulic Cement Concrete. Use materials that meet the requirements of Item 421, Hydraulic Cement Concrete. Provide a neat cement or sand cement mixture for the grout for soil nail anchors with a 7-day compressive strength of 3,000 psi. Determine grout strength by testing the grout used for the test soil nail anchors in cubes in accordance with Test Method Tex-307-D or cylinders in accordance with Test Method Tex-418-A. Test further as directed or if the grout mixture is modified. If allowed, use test results from previous projects using an identical grout mix. When a sand cement mixture is used for grouting soil nail anchors, the grout mixture shall have a minimum slump flow of 20-inches. The slump flow of the grout shall be tested in accordance with ASTM C 1611-Test Method for Slump Flow of Self-Consolidating Concrete. Do not use mobile continuous volumetric mixed grout. (2) Reinforcing Steel. Use materials that meet the requirements of Item 440, Reinforcing Steel. Provide epoxy-coated reinforcing steel bar of the size and grade shown on the plans. (3) Nail Centralizers. Provide expanded slit PVC centralizers with a minimum diameter of 1 in. less than the nail-hole. Wheel type centralizers will not be allowed. 3. Equipment. Furnish suitable equipment to drill the holes to the specified diameter, depth, and line. Provide a continuous flight auger. On walls where open-hole grouting cannot be accomplished, use hollow stem auger equipment. If an auger becomes worn to the degree that the drilled hole is less than the required diameter, remove the auger from service. Do not return the auger to service until it is repaired and can provide a hole of at least the required diameter. Furnish a hydraulic jack and reaction frame for stressing test soil nail anchors. Furnish a grout mixer and pump of sufficient capacity to place grout properly in the required quantities. The grout pump volumetric flow rate should be compatible with the flowability characteristics of the grout mixture used. Project 0-4484-P3 i

4. Construction. (1) Drilling. Drill the hole so that its diameter is not smaller than the diameter shown on the plans or established by test soil nail anchors. Control hole alignment so that it varies no more than 5 degrees from the line specified on the plans. (2) Grouting. Place the soil nail anchor with centralizers that are spaced no more than 8 ft. apart in the hole. Set the centralizers to position the soil nail reinforcing bar within 1 in. of the center of the hole. Grout each nail within 8 hr. of the completion of drilling. Whenever conditions permit, grout the hole before nail insertion. However, if the grout mixture is too stiff, it will be necessary to insert the tendon fitted with the centralizers into the hole first and then grout the surrounding annular space. To grout, advance the grouting pipe to the bottom of the hole, and leave it there until the hole is filled with grout and a return is evident at the top of the hole. Withdraw the pipe slowly while grouting continues, filling the void left by the grout pipe. If unstable hole conditions develop and prevent open hole grouting, furnish hollow stem auger equipment, and place the nail reinforcing bar and grout through the auger. Use grouting methods that result in complete filling of the hole at the ground surface. Methods may include placement of grout in multiple stages, use of a packer or soil to dam the hole to retain grout, or other approved methods. Completely remove any soil or device used to dam the front of the hole immediately after the grout takes an initial set. Record the following information concerning the grouting: (a) Type of mixer (b) Water-cement ratio (c) Types of additives (d) Type of cement (e) Volume of grout (3) Soil Nail Anchor Test. Construct and test the soil nail anchors as indicated on the plans. Test the soil nail anchors before installing any production soil nail anchors. Within 6 months before stressing the test soil nail anchors, calibrate the jack and gauge used together as a system, and furnish certified copies of load calibration curves for all jacks and gauge systems to be used in the work. Recalibrate stressing systems when required. Provide an adequate reaction pad large enough to resist the required load without sinking into the soil or shifting laterally during the test. Do not use a Project 0-4484-P3 ii

reaction pad that sinks into the soil more than 2 in. or that allows the free end of the soil nail reinforcing bar to move laterally more than 2 in. Failure to provide an adequate reaction pad will void the soil nail anchor test. Provide additional test soil nail anchors until an adequate reaction system is achieved. Furnish additional test soil nail anchors, required due to inadequate reaction pads, at no expense to the Department. Provide a reaction pad with a center opening larger than the hole diameter to ensure that no bridging or interaction occurs between the grout column and the reaction pad. Similarly, remove all pneumatically placed concrete, excess grout, or other foreign material to expose the full face of the grout column. Ensure the reaction system does not contact or interfere with the soil nail anchor reinforcing bar during the test. Conduct the following testing method: (a) Apply test loads to soil nail anchors in increments of approximately 10% of the required test load. Hold each load increment long enough to obtain the gauge readings. Hold the final maximum test load for 10 min. -3 4116 09-05 (b) Perform initial tensioning to take the slack out of the testing apparatus at 5% of the required test load unless otherwise directed. (c) Provide suitable means for measuring the movement of the soil nail anchor to the nearest 0.001 in. Provide gauges that extend and retract freely and move smoothly throughout their range. Provide a rigid and secure system to support the gauge independently of the jack or reaction system. In the event that the test soil nail anchors fail to provide the minimum pullout capacity specified on the plans, modify construction methods or procedures. Then install and test additional test soil nail anchors until adequate pullout capacity is achieved. Test soil nail anchors, in addition to the number specified on the plans, are subsidiary to the Item, Soil Nail Anchors. If the Contractor chooses to modify construction procedures after test soil nail anchors are completed and approved, the Engineer may require additional testing. This additional testing is subsidiary to the Item, Soil Nail Anchors. 5. Measurement. Soil nail anchors will be measured by the foot of acceptable soil nail anchor in place. The soil nail anchor length measured is the length of the drilled and grouted hole as specified in the plans or modified by the Engineer. Soil nail anchor tests are subsidiary to this Item. 6. Payment. The work performed and materials furnished in accordance with this Item and measured as provided under Measurement will be paid for at the unit price bid for Soil Nail Anchors. This price is full compensation for materials, equipment, labor, tools and incidentals. Project 0-4484-P3 iii