How will the new changes affect Solid Waste Companies? By 1

Similar documents
Solving Your Stormwater Compliance Challenges

The California Industrial Permit and the Solid Waste Industry Laura Carpenter and Sean Porter Brown and Caldwell San Diego, CA

LEVEL 1 STATUS 9/27/2016 OVERVIEW

Recycling And The New Virginia Stormwater Management Program Regulations VIRGINIA RECYCLING ASSOCIATION 2014 ANNUAL CONFERENCE

Storm Water Permitting

Stormwater Management at Municipal Solid Waste Landfills

Landfills And The New Virginia Stormwater Management Program Regulations

Wastewater Pretreatment Plant Special Waste Generator Application

ATTACHMENT C RISK LEVEL 1 REQUIREMENTS

RECOMMENDED SCOPE OF ACCREDITATION (For Testing Laboratories) * Test Method / Standard against which tests are performed

Appendix B Stormwater Pollution Prevention Plan Outline

c. Sites subject to regulation under Subtitle D of RCRA. The following discharges are not authorized by this permit:

SECTION WATER POLLUTION CONTROL

LOS ANGELES UNIFIED SCHOOL DISTRICT REFERENCE GUIDE

Construction Permit Timeline

Storm Water Pollution Prevention Plan

SIGNIFICANT USER WASTEWATER DISCHARGE PERMIT. City of Las Cruces, at. Utilities Department Regulatory Environmental Services Section

ANNUAL INDUSTRIAL STORMWATER

Annex 7.1 National Ambient Air Quality Standards for Nepal, 2003

September A Monthly Newsletter on the California Industrial General Permit By WGR Southwest, Inc.

NC Division of Energy, Mineral, and Land Resources FACT SHEET FOR NPDES STORMWATER PERMIT DEVELOPMENT NPDES Stormwater Permit NCS000572

TPDES INDUSTRIAL STORMWATER MULTI-SECTOR GENERAL PERMIT (TXR050000) Lindsay Garza. Stormwater and Pretreatment Team Water Quality Division

Maryland Department of the Environment. 12-SW Permit Update for Stormwater Discharges Associated With Industrial Activity

Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR Storm Water Pollution Prevention Plan Worksheet Instructions

Annual Stormwater Pollution Prevention Training

Proposed Addition to ATTACHMENT E, LIST OF TOTAL MAXIMUM DAILY LOADS (TMDLs) APPLICABLE TO INDUSTRIAL STORM WATER DISCHARGERS

4.0 SAN GABRIEL RIVER WATERSHED MANAGEMENT AREA

DRAFT OHIO EPA INDUSTRIAL STORMWATER GENERAL PERMIT. I. Comparison with Existing General Permit (OHR000004)

2018 Schedule of Rates Fees and Charges City of Glens Falls, NY Water & Sewer Department Water Rates: $37.28 per Non-meter rate

Clean Water Act Industrial Stormwater Applicability Flowchart. July 2009

Risk Level 1 Annual Report Questions GENERAL INFO

DENR/DEMLR FACT SHEET FOR NPDES STORMWATER PERMIT DEVELOPMENT. NPDES Stormwater Permit NCS000548

American Public Works Association May 3, 2010 Southern California Chapter

DOE/PPPO/ &D1 FBP-ER-PRO-WD-RPT-0001 Revision 3 April ENVIRONMENTAL NON-RADIOLOGICAL PROGRAM INFORMATION

The Solution to Pollution is Dilution

Industrial/Commercial Inspection Workshop June 2016 Kristin Kerr, P.E. EOA, Inc.

Georgia Power Plant Bowen NPDES Permit No. GA Ash Pond Dewatering Plan. Revised December 2017

Frequently Asked Questions for Permitting

Clyde Mine Discharge/Tenmile Creek Water Quality Final Report

WASTEWATER DISCHARGE PERMIT APPLICATION SHORT FORM

Globeville Landing Outfall Surface Water. December 12, 2017 Andrew Ross, Jon Novick Denver Department of Public Health & Environment

Arizona Department of Environmental Quality Industrial Stormwater Program (Multi-Sector General Permit) Spencer J. York, Project Manager

Georgia Power Plant McManus NPDES Permit No. GA Ash Pond Dewatering Plan. Revised April 2018

Concentration of Metals (Cd, Hg, Ag; mean +SD) in sediment samples collected from Pit Specific Sediment Chemistry Monitoring for CMP 1 in May 2014.

General Permit No.: OHR Page 53 of 146

Key Requirements of the Construction General Permit Scott Taylor, P.E. Tanya Bilezikjian, P.E.

Storm Water Pollution Prevention Plan for CES Gravel #3800

B. CASQA Construction Handbook / Website Portal Available as a subscription service at:

Preliminary Outline of IGP QISP TOR Training (training to be provided by IGPTT)

Mount Polley Mining Corporation an Imperial Metals company Box 12 Likely, BC V0L 1N0 T F

Part 2.0 Non-Numeric Effluent Limitations

State of Georgia Department of Natural Resources Environmental Protection Division NOTICE OF INTENT. NOI - Version 2012

MECON LIMITED RANCHI , INDIA

Building & Grounds Maintenance

Newmont Mining Corporation Water Management Standard

Overview of the New Construction General Permit. Compliance Specialist

Hamlet of Aklavik. Water Licence Number: N3L Municipal Water Licence. Annual Report for the Year Date Prepared: March 9, 2017.

State of Nevada Department of Conservation and Natural Resources Division of Environmental Protection Laboratory Scope of Accreditation

STORMWATER POLLUTANT ASSESSMENT AT THE CITY OF KISSIMMEE

Cranston Sewer Use Ordinance

Best Management Practices (BMPs): Regulations and Case Studies

QSD/QSP Training Module 9 SWPPP Preparation

Pebble Project Surface Water Quality Program Streams, Seeps, and Ponds

Industrial Stormwater

UNDERSTANDING YOUR FACILITY S STORMWATER POLLUTION PREVENTION PLAN

SPECIFICATION NO.1197S Addendum No.4 Attachment D. Appendix L- Ground Water Quality Data and Revised Construction Groundwater Discharge Plan

Industrial Storm Water Permitting in Ohio. The New Multi-sector General Permit (MSGP) September 2011

As a reminder, continued participation in the Ecology Lab Accreditation Program requires the lab to:

Home Remodeling Projects

As a reminder, continued participation in the Ecology Lab Accreditation Program requires the lab to:

Water Quality Permitting Program Monitoring Matrix 1,2,3

b. Equipment cleaning and maintenance (including vehicle and equipment rehabilitation, mechanical repairs, painting, fueling, and lubrication).

Industrial Storm Water Permits. Summit County Safety Council Meeting Nov 15, 2018

Appendix O Example Industrial SWPPP Template

LAKE FORK OF THE GUNNISON RIVER WATERSHED: WATER QUALITY DATA ANALYSIS AND SUMMARY

MECON LIMITED RANCHI , INDIA

5.0 LOS ANGELES RIVER WATERSHED MANAGEMENT AREA

REQUEST FOR QUALIFICATIONS (RFQ) IGP QISP TRAINERS

Appendix M Framework Stormwater Pollution Prevention Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702

Industrial Storm Water

CONSTRUCTION AND DEMOLITION DEBRIS DISPOSAL SITE GUIDELINES

Mark Kelly, PE Industrial Waste Engineer July 25, 2013

Date Application Signed: Principal Executive Officer / Owner Signature FOR OFFICIAL USE ONLY

W12A Landfill Groundwater, Leachate, Water Well, Landfill Gas and Surface Water Quality Monitoring Program

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES

Public Notice. Issuance of Industrial Waste Discharge Permit

No violations were noted at the time of the inspection. Please refer to the attached inspection report for any comments.

Butte Highlands Joint Venture Mine Design, Operations, and Closure Conference Mine Water Treatment Short Course

Annex 2: National Environmental Quality Standards (Extract from the Gazette of Pakistan applicable to STZ CETP)

COMPLYING WITH YOUR INDUSTRIAL PRE-TREATMENT PERMIT INDIANA CHAMBER OF COMMERCE CONFERENCE OCTOBER 24, 2017 PERMIT AGENDA

APPENDIX I. LAMPIRAN I - RKL DAN RPL KEGIATAN TERPADU PROYEK PENGEMBANGAN TANGGUH LNG i

JEFFERSON RIVER METALS TMDL PROJECT. Public Meeting October 14, 2014 Whitehall, MT

II. JURISDICTION AND VENUE

BMPs: Best Management Practices are water pollution control practices.

Industrial Pretreatment Program Industrial User Guide

Environmental Management System

Treatability of Organic and Radioactive Emerging Contaminants in Stormwater Runoff

Evaluation of Pollutants in Wastewater Produced from Air Conditioning Cleaning Operations

ENVIRONMENTAL GUIDANCE NOTES: ENVIRONMENTAL STANDARDS AND LIMITS

Transcription:

California State Water Resources Control Board New General Permit For Storm Water Discharges Associated with Industrial Activities Order NPDES No. CAS000001 Effective July 1, 2015 How will the new changes affect Solid Waste Companies? By 1

Current Storm Water Requirements for Industrial Sites (Under Water Quality Order No. 97-03-DWQ effective since 1997) 1. Submit NOI & site map and receive a WDID (waste discharge identification) number 2. Storm Water Pollution Prevention Plan (SWPPP) & Monitoring Plan kept at site 3. Collect 2 storm water samples per year (if qualified storm event) 4. Conduct 8 monthly & 4 quarterly visual observations 5. Submit an Annual Report and conduct annual site inspection 6. Conduct Annual Training The NEW General Permit For Storm Water Discharges Associated with Industrial Activities (IGP) Order NPDES No. CAS000001 includes significant changes... 2

NEW Requirements /Changes Effective July 1, 2015 HOWEVER preparation ahead of time is required! 3

Online Submittal Requirements All Permit Registration Documents (PRDs) & submittals are required electronically via SMARTS https://smarts.waterboards.ca.gov/ by a Legally Responsible Person (LRP) or their Duly Authorized Representative 4

Online Submittal Requirements This includes: Notice of Intent (NOI) All applicable sites must submit either an NOI by July 1, 2015 or a No Exposure Certification (NEC) by October 1, 2015. SWPPP & map - Applicable sites must submit online by July 1, 2015. Upload future revisions to the SWPPP within 30 days. SWPPPs must be revised if Discharger s status changes due to annual Numeric Action Level (NAL) exceedance. Monitoring Results submit analytical data within 30 days of receipt Exceedance Response Action (ERA) Reports For annual NAL exceedances. Annual Reports 5

Qualified Industrial Storm Water Practitioner (QISP) New Dischargers that discharge to a water body with a 303(d) listed impairment must submit data and/or information, prepared by a QISP, when applying for IGP coverage QISP Description of Requirements: A QISP must complete a SWRCB approved training course or be a CA licensed PE, PG, or CEG. A competency exam may be required for certification as a QISP (similar to Construction QSP/QSD). Only QISPs can prepare the following documents: The SWPPPs for Level 1 & Level 2 dischargers. Level 1 status Exceedance Response Action Evaluation and Reports Level 2 status Exceedance Response Action Technical Reports / Plans and Level 2 status Exceedance Response Action Extension. 6

Minimum Best Management Practices (BMPs) Sites must implement the following BMPs or document why they are inapplicable, infeasible, inappropriate, etc.: Observe outdoor industrial activity areas and clean up debris, waste, spills, tracked, or leaking materials. Implement BMPs to minimize or prevent tracking. Cover all stored industrial materials that can be readily mobilized by contact with storm water. 7

Minimum Best Management Practices (BMPs) Continued: Contain all stored non-solid industrial materials (e.g., liquid, powder, etc.) that can be dispersed via wind or contact with storm water. Implement BMPs to ensure that facility areas impacted by rinse/wash waters are cleaned as soon as possible. Minimize authorized (NSWDs) Non-Storm Water Discharges (e.g., potable water, fire Hydrant testing, etc.) and prevent from contacting Industrial areas of the facility. Minimize storm water discharges from non-industrial areas (e.g., employee parking areas) from contact with industrial areas of the facility. 8

Minimum Best Management Practices (BMPs) Continued: Prevent or minimize handling of industrial materials or wastes that can be mobilized by contact with storm water during a storm event. Cover waste disposal containers & material storage containers when not in use. <<These may need covers unless they can be stored inside Direct run-on away from stock piled materials. 9

Minimum Best Management Practices (BMPs) Continued: Observe and clean outdoor material/waste handling equipment or containers that can be contaminated by contact with industrial materials or wastes. Establish a maintenance schedule for outdoor equipment that may spill or leak. Establish procedures for prompt maintenance and repair of equipment when conditions exist that may result in spills or leaks. 10

EROSION CONTROL BMPs Provide stabilization for inactive areas, slopes, and erodible areas prior to a forecasted storm event. Implement wind erosion controls. Direct run-on away from erodible materials. Maintain effective perimeter controls to control discharges of erodible materials offsite. Design sediment basins to ensure compliance with design storm standards. Maintain sediment and erosion control BMPs to comply with the General Permit during all times. 11

More Detailed BMP Information Required in SWPPP The SWPPP must include a narrative describing each BMP including: The pollutant the BMP is designed to reduce/prevent in storm water discharges. The frequency, time of day, or conditions when the BMP is implemented. The BMP implementation location within each area of industrial activity or pollutant source. The individual and/or position responsible for implementing the BMP. Procedures (including maintenance) to implement the BMP effectively. Equipment and tools required to implement the BMP effectively. 12

Increased Monitoring Requirements Monthly Daylight Visual Observations on days without precipitation (previously was Quarterly) Each month, the Discharger shall observe each drainage area for the following: i. Prior, current, or potential unauthorized NSWDs (Non-Storm Water Discharges) and their sources; ii. Authorized NSWDs, the sources, and associated BMPs; and, iii. Outdoor industrial equipment and storage areas, outdoor industrial activities areas, BMPs, and all other potential source of industrial pollutants. The Discharger shall provide an explanation in the Annual Report for uncompleted monthly visual observations. 13

Qualifying Storm Event (QSE) New Definition for a Qualifying Storm Event A Qualifying Storm Event (QSE) is a precipitation event that: a. Produces a discharge for at least one drainage area; and, b. Is preceded by 48 hours with no discharge from any drainage area. 14

Sample Frequency Requirements Increased Sample Frequency Requirements: Dischargers shall collect storm water samples from all locations that discharge storm water associated with industrial activity for 2 QSEs within the first half of each reporting year (July 1 to December 31) and 2 QSEs within the second half of each reporting year (January 1 to June 30). No More Excuses for Not Collecting Samples: Samples from each discharge location shall be collected within 4 hours of: a. The start of the discharge; or b. The start of facility operations, if the QSE occurs within the previous 12-hour period (e.g., for storms with discharges that begin during the night for facilities with day-time operating hours). 15

Sampling Parameter Selection Total Suspended Solids (TSS), ph, and Oil & Grease (O&G) required for all plus... Additional Standard Industrial Classification (SIC) Code Required Parameters Additional Parameters identified in a required site-specific pollutant source assessment Additional Parameters related to nearby 303(d) listed impaired water bodies Additional Parameters required by the Regional Water Board. Additional Parameters required by Subchapter N (Dischargers subject to Effluent Limitations Guidelines (ELG)) 16

SIC Additional Parameters Standard Industrial Classification (SIC) Code Required Parameters for Waste Handlers: 4953 Landfills & Land Application Facilities = Iron (Fe) 4953 Hazardous Waste Facilities = Ammonia (NH3), Chemical Oxygen Demand (COD), Cyanide (Cn), Arsenic (As), Lead (Pb), Magnesium (Mg), Mercury (Hg), Selenium (Se), & Silver (Ag). 5093 Scrap & Waste Materials = COD, Aluminum (Al), Iron (Fe), Lead (Pb), and Zinc (Zn). 5015 Dismantling or Wrecking Yards = Aluminum (Al), Iron (Fe), & Lead (Pb). NOTE: Copper (Cu) is no longer required for 5093. 17

Additional Parameters for 303(d) Impaired water bodies with Total Maximum Daily Loads (TMDL) Regional Water Board adopted and/or U.S. EPA established/approved TMDLs, as of the adoption date of this General Permit, that are applicable to industrial storm water Dischargers. Subject to change in future as more are added. Example.. San Diego Regional Water Quality Control Board Water Body Pollutant Chollas Creek Diazinon, Copper, Lead, and Zinc Los Peñasquitos Lagoon Sediment Rainbow Creek Total Nitrogen and Total Phosphorus Shelter Island Yacht Basin Dissolved Copper Baby Beach in Dana Point Harbor Indicator Bacteria Shelter Island Shoreline Park in SD Bay Indicator Bacteria Twenty Beaches and Creeks Indicator Bacteria 18

Field Measurements Field Measurements: Specific Conductance (SC) is no longer required Due to the 15 minute holding time, measurements for ph usually are made in the field. This can be done using a wide range ph litmus paper. However, if the discharger exceeds Numeric Action Levels (NALs), then the permit requires the use of a calibrated ph meter. This device must meet minimum standards for this type of field sampling and must be calibrated in accordance with the manufacturers specifications. 19

Numeric Action Limits TABLE 5: Parameter NAL Values, Test Methods, Detection Limits, and Reporting Units ph* PARAMETER TEST METHOD MDL*** field test with calibrated portable instrument, or lab sample per 40CFR 136. REPORTING UNITS ph units ANNUAL NAL INSTANTANEOUS MAXIMUM NAL 6.0-9.0 6.0-9.0 Total Suspended Solids (TSS)* SM 2540-D 1.0 mg/l 100 400 Oil & Grease (O&G)* EPA 1664A 1.0 mg/l 15 25 Zinc, Total (H) EPA 200.8 0.0005 mg/l 0.26** Copper, Total (H) EPA 200.8 0.0005 mg/l 0.0332** Cyanide, Total EPA 3135.2I 0.003 mg/l 0.022 Lead, Total (H) EPA 200.8 0.0005 mg/l 0.262** Chemical Oxygen Demand (COD) SM 5220C 1.0 mg/l 120 Aluminum, Total EPA 200.8 0.0005 mg/l 0.75 Iron, Total EPA 200.7 0.005 mg/l 1.0 Nitrate + Nitrite Nitrogen SM 4500-NO3- E 0.01 mg/l as N 0.68 Total Phosphorus SM 4500-P B+E 0.05 mg/l as P 2.0 Ammonia SM 4500-NH3 B+C or E 0.1 mg/l 2.14 Magnesium, total EPA 200.7 0.0005 mg/l 0.064 Arsenic, Total (c) EPA 200.8 0.0005 mg/l 0.15 Cadmium, Total (H) EPA 200.8 0.0002 mg/l 0.0053** Nickel, Total (H) EPA 200.8 0.0005 mg/l 1.02** Mercury, Total EPA 245.1 0.0001 mg/l 0.0014 Selenium, Total EPA 200.8 0.0005 mg/l 0.005 Silver, Total (H) EPA 200.8 0.0002 mg/l 0.0183** Biochemical Oxygen Demand (BOD) SM 5210B 3.0 mg/l 30 SM Standard Methods for the Examination of Water and Wastewater, 18 th edition EPA EPA test methods *Minimum parameters required by this General Permit **The NAL is the highest value used by EPA based on their hardness table in the 2008 MSGP. ***More stringent test methods with lower detection limits may be used. 20

Numeric Action Limits Exceedances Two Types of Numeric Action Limits (NAL) Exceedances: 1) Annual NAL Exceedance When the average of the annual sample results for a parameter are exceeded (refer to Annual NAL on Table 5). Note: Sites can take additional samples (>4 per year) if they want to try and lower the annual average for a parameter. 2) Instantaneous Maximum NAL Exceedance - when two or more results in a reporting year exceed (for TSS or O&G) or are outside the ph range per Table 5. 21

Exceedance Response Actions (ERAs) Baseline Status No Exceedance All Dischargers start NOI Coverage at Baseline Status. Level 1 Status - NAL Exceedance immediately triggers Level 1 status for parameters exceeded. Within 60 days discharger shall evaluate the SWPPP and pollutant sources. ASAP, or by October 1 following the reporting year, dischargers shall implement additional operational and/or source control BMPs, revise the SWPPP, and submit via SMARTS a QISP prepared Level 1 ERA evaluation. 22

Exceedance Response Actions (ERAs) Level 2 Status Structural/Treatment Control A Level 1 status immediately changes to Level 2 for parameters that have an NAL exceedance in any subsequent reporting year. Within 120 days discharger shall: a. Evaluate the SWPPP and pollutant sources and identify whether additional structural and/or treatment control BMPs are necessary. b. Submit via SMARTS a QISP prepared Level 2 ERA Technical Report including implementation schedule for design & construction of treatment and/or structural source control BMPs or a schedule to submit a Demonstration Technical Report. ASAP, or within one year discharger shall: implement structural and/or treatment control BMPs, revise the SWPPP, and (if applicable) submit Demonstration Technical Report. 23

Demonstration Technical Reports BAT/BCT Compliance Demonstration Technical Report: Evaluate cost of technology in relation to effluent reduction benefits, age of equipment & facilities involved, process employed, engineering aspects of the various types of control techniques, process changes, and non-water quality environmental impact (i.e. energy requirements) Non-Industrial Source Pollutant Demonstration Technical Report: Discharger must demonstrate that the pollutants causing the exceedances are solely attributable to storm water run-on from adjacent properties or from non-industrial portions of the Discharger s property, or from aerial deposition. Requires a quantification of the relative contributions of the pollutant from run-on, non-industrial sources, or aerial deposition. 24

Demonstration Technical Reports Natural Background Demonstration Technical Report includes: A summary of all data previously collected by the Discharger or others that describe the levels of natural background pollutants in the storm water discharge A summary of any research and published literature that relates the pollutants evaluated at the facility; A map showing the reference site location in relation to facility along with available land cover information; Reference site and test site elevation; Available geology and soil information for reference and test sites; Photographs showing site vegetation; Site reconnaissance survey data regarding presence of roads, outfalls, or other human-made structures; and Records from relevant state or federal agencies indicating no known mining, forestry, or other human activities upstream of the proposed reference site. 25

COMPLIANCE GROUPS & LEADERS Baseline/Level 1 Compliance Group (CG1) and Baseline/Level 1 Compliance Group Leader (CGL1) Requirements A group of Dischargers of the same industry type (facilities with similar types of industrial activities, pollutant sources, and pollutant characteristics) may form a CG1. The CG1 shall select a CGL1 to assist with all compliance activities in this General Permit other than Level 2 ERA compliance activities. For example SWPPP development, monitoring, visual observations and inspections. The number of samples required per year is reduced from four to two. 26

COMPLIANCE GROUPS & LEADERS A CGL1 must prepare a Consolidated Level 1 ERA Report, which provide a description of the common industrial pollutant sources, BMPs & ERAs, and also the industrial pollutant sources, BMPs & ERAs that are not common between the CG1 Participants. The CGL1 shall revise the Consolidated Level 1 ERA Report in accordance with any comments received from the Water Boards The CGL1 shall inspect all the facilities of the CG1 Participants at a minimum of once per reporting year (July 1 to June 30). The CGL1 shall update the Consolidated Level 1 ERA Report as needed to address additional CG1 Participants that trigger the ERA Level 1 reporting requirements 27

Quality Assurance & Record Keeping Records must be kept for a minimum of 5 years including: Records of BMP implementation (dates of implementation/maintenance) Training Records Spill & Clean-up related response activity records Sampling Data Inspection/Observation Records Annual Reports (due July 15 th ) ERA Demonstrations Demonstration Technical Reports 28

Conclusions Major changes from the current program Requires a Qualified professional to do the work More Chemical testing and Analysis of Data More Sampling & Monitoring Events are Required Field ph Measurements are required More Reporting and Electronic Submittals required Must meet Discharge Limits More Stringent Corrective Action Requirements 29