ELECTRODE LENGTH MEASUREMENTS WITH ELMO

Similar documents
MEASUREMENTS OF BLOWS IN FESI FURNACES ABSTRACT

ELECTRODE MANAGEMENT INVESTIGATION INTO SOFT BREAKS AT 48MVA FeCr CLOSED FURNACE

THE PERFORMANCE OF A RESISTANCE-BASED FURNACE CONTROL SYSTEM ON A SUBl\fERGED-ARC FURNACE

COMPLETE SOLUTIONS FOR THE FERRO ALLOY INDUSTRY

INTELLIGENT CONTROL OF SUBMERGED-ARC FURNACES

The Si process DRAWINGS. Thorsteinn Hannesson

WASTE HEAT UTILIZATION FROM A SUBMERGED ARC FURNACE PRODUCING FERROSILICON

UNIT - II TIME SERIES

Lecture 26 Degassing Practice

Vocabulary. Heat production and transfer

Dr LJ Erasmus June 2013

STUDIES ON INFLUENCE OF LIQUID LEVEL ON BLAST FURNACE PERFORMANCE AND MONITORING OF HEARTH DRAINAGE

The Knowledge Bank at The Ohio State University. Ohio State Engineer

Liquid Metal Cleanliness Analyzer for Continuous Monitoring

Manganese Furnace Dust: Drying and Reduction of Zinc Oxide by Tar

PROTECTIVE COATING FOR GRAPHITE ELECTRODES

Lecture 19: Emerging Steelmaking Technologies

DIGITAL VERSION. Microsoft EXCEL Level 2 TRAINER APPROVED

Office Building. Analysis #2: Utilizing a Matrix Schedule

9. Welding Defects 109

Lab 3: Conservation Equations and the Hydraulic Jump

SMARTT An innovative process control for rotary degassing of aluminum alloys

Glass-Technology International 2/2000

COMPARISON OF WELDING/BONDING METHODS

CHM-202 General Chemistry and Laboratory II Laboratory 2 Molar Mass by Freezing Point Depression

Statistical Techniques Useful for the Foundry Industry

ALKALI AGGREGATE REACTIVE MORTAR CYLINDERS PARTLY RESTRAINED BY EXTERNAL CFRP FABRIC EXPANSION AND CONFINEMENT

Fast and reliable temperature measurement at end of melting cycle in EAF

Carbon Materials for Silicomanganese reduction

Furnace Monitoring and Billet Cutting System

The Safe Use of High Power in a DC Arc Furnace

EXPERIMENTS WITH THE THERMODYNAMIC METHOD

HIGHVELD STEEL PROSPECTUS IRON MAKING PLANT 1

TRADE OF VEHICLE BODY REPAIR

Simultaneous Oxygen, Nitrogen and Hydrogen Determination of Metals. Dennis Lawrenz, John Hawkins

SMARTT - An innovative process control for rotary degassing of aluminium alloys

Spot Welding Instrumental technique. Soumabha Bag CY08D

NAME 345 Welding Technology Lecture 09 SAW, ESW & Resistance Welding

Engineering Materials

Coimisiún na Scrúduithe Stáit State Examinations Commission

New technologies for PGM smelting: An overview of the ConRoast process. Rodney Jones

LiMCA III Liquid Metal Cleanliness Analyzer

Fundamental Course in Mechanical Processing of Materials. Exercises

(12) United States Patent

Application of the Optical Floating Zone Apparatus for Researching Material Sciences. Part-1

United States Patent (19) Udo

Total Dissolved Solids

REACTION RATE OF REDUCTION MATERIALS FOR THE (FERRO)SILICON PROCESS

Casting. Forming. Sheet metal processing. Powder- and Ceramics Processing. Plastics processing. Cutting. Joining.

Copyright 1999 Society of Manufacturing Engineers. FUNDAMENTAL MANUFACTURING PROCESSES Heat Treating NARRATION (VO): HEATING..., AND COOLING CYCLES.

SHARC - Shaft arc furnace with efficient scrap preheating concept provides low conversion costs

IJSRD - International Journal for Scientific Research & Development Vol. 4, Issue 06, 2016 ISSN (online):

3 TIG welding. 3.1 A description of the method. 3.2 Equipment

THE GANTT CHART WHAT IS USED FOR HOW TO MAKE IT WITH EXCEL

Continuous Casting. B.G. Thomas Mechanical & Industrial Engineering University of Illinois at Urbana-Champaign

Properties of Carbon Steel Shot

AMETAL AMETAL AMETAL APPLICATIONS GENERAL

MANUAL METAL ARC (MMA) STICK WELDING

TI-B 102 (15) Test Method Strains from Creep and Early-Age shrinkage

Chapter 3 Assembly Systems. Screen Titles

7. Design for Castability

Impact of Electrode Paste on Soderberg Electrode Performance

SpeedPulse a productivity and efficiency increasing further development of MSG- Pulse welding

SF70-1EH SF45 TRACKERS FEINA

FINITE ELEMENT MODELLING OF ELECTRIC CURRENTS IN AC SUBMERGED ARC FURNACES

PART II: Metal Casting Processes and Equipment

RAINBOW GELS: AN INTRODUCTION TO ELECTROPHORESIS. STANDARDS 3.1.7, , Westminster College 3.3.7, , 3.3.

Forensics with TI-Nspire Technology

Engineering Materials

A METALCUTTING TECHNICAL ARTICLE BETTER TOGETHER: Non Defective Bonding of Resistance Spot Welding Electrodes

4 Image Analysis of plastic deformation in the fracture of paper

Test and Analysis of Metallurgical Converter Equipment

TAM Plus is the new range of hot rolled mechanical tubes, designed by Tenaris to better meet the needs of industrial sector.

London Examinations IGCSE

Chapter 4.1. Estimating Manure Inventory. learning objectives

Lab #3 Conservation Equations and the Hydraulic Jump CEE 331 Fall 2004

PRESENTING AND APPLYING INDUSTRIAL END-USE METERED DATA. Leslie A. Carlson, RLW Analytics, Inc. Wilbur Johnson, Alabama Power Company

Manufacture of Iron & Steel. Prepared By: John Cawley

Rockets Describe space explorations and the understandings gained from them including: Technologies used to explore space.

WELDING Topic and Contents Hours Marks

Thermoelectric Detection of Spherical Tin Inclusions in Copper by Magnetic Sensing

4/19/2018. The heat generated for welding comes from an arc

Manufacturing Process-I Prof. Dr. D.K. Dwivedi Department of Mechanical and Industrial Engineering Indian Institute of Technology, Roorkee

Steel is the most important material for the

Investigation of shape recovery stress for ferrous shape memory alloy

In-Process Monitoring and Adaptive Control during Pulsed YAG Laser Spot Welding of Aluminum Alloy Thin Sheets

COMPUTATIONAL STUDY OF A TRAILBLAZER MULTI REACTOR TUNDISH (MRT) FOR IMPROVING YIELD AND QUALITY OF STEEL DURING CONTINUOUS CASTING

Rubbish chute CONSTRUCTION SECTOR SOLUTIONS. INNOVATIVE SYSTEMS Tekcnoplast &

Steelmaking using Induction Furnace

THE NEW COPPER CASTING-MACHINE: EXPERIENCES AT FERROATLANTICA

Q11. Helium condenses into the liquid phase at approximately 4 K. What temperature in degrees Fahrenheit, does this correspond to?

PHYSICAL SCIENCE 0652/06

4 Shielded Metal Arc Welding*

Adaptive Control and Repair for Lap Welds of Aluminum Alloy Sheets Based upon In-Process Monitoring.

Battery Maintenance - + Section 6-2 HOW IT WORKS

Solid-State Welding Processes. Solid State Bonding 12/2/2009. Cold Welding

DEPARTMENT OF QUANTITATIVE METHODS & INFORMATION SYSTEMS

Lab Exercise #2: Tension Testing (Uniaxial Stress)

International Journal of Scientific & Engineering Research, Volume 5, Issue 7, July ISSN

Seismic Behaviour Of A Soft Storey Building With & Without Viscous Dampers

Transcription:

INFACON 7, Trondheim, Norway, June 1995 Eds.: Tuset, Tveit and Page Publishers: FFF, Trondheim, Norway 423 ELECTRODE LENGTH MEASUREMENTS WITH ELMO E. B. Gudmundsson and J. Hilfdanarson Bresi Equipment Engineering! Icelandic Alloys Ltd. Grundartangi 301 Akranes Iceland Abstract The paper describes a method developed at Icelandic Alloys Ltd. for determining the length of the electrodes in a submerged electric arc furnace. The system is in use on two 36 MW furnaces that produce 75% FeSi. Weighing cells are installed under the hydraulic cylinders suspending the electrode. The signals from the cells are treated in a computer program to reduce their noise level and the electrode lengths are calculated from the weight. All results are presented in clear graphics on the computer screen. Introduction Furnace operators dwell every day on the questions: How long is the electrode? How deep is the tip position? These are actually two aspects of the same statement as the tip position is a direct function ofthe electrode length and the holder position. The first question concerns the electrode itself and the accurate answer allows an optimal operation of the Sbderberg electrode with the correct slipping rate adjusted in accordance with the measured consumption. The second question is related to the electrical and metallurgical conditions in the furnace. The knowledge of the current tip position gives the operator a better tool to optimise the carbon balance ofthe furnace and the electrical set point. The traditional method for sounding the electrode has been to melt down the charge, shut down the current, raise the electrode and locate the tip by pressing iron bars below it. This reduces the operating time and interferes with normal furnace operation. Therefore frequent use is not advisable.

424 The weighing ofthe electrode is a straightforward way to determine the length. With Soderberg electrodes accurate accounts must be kept ofnew casings added and the amount ofpaste charged. The furnace charge causes however buoyancy and friction effects which can easily introduce errors in the weight determination. With modem computer technology these obstacles can be overcome as will be described in the next chapter. ELMO The Electrode Length Monitor (ELMO) is a electrode weighing system that has been developed at Icelandic Alloys for measuring the length of the electrodes. Figure 1 shows a schematic drawing ofthe system. ELECTROOE 1 --- a ---.---.-------.-.---------.~~~E ~~_U.R.E_~~~Ty -- \\\~} ------.-----.DJ.- (WEiGHT ABOvE CONTACT CLAMPS) WEIGHING CELLS (WEIGHT) MANUAL INPUT (HOLDER POSITION) (FURNACE LOAD) (SUPPING) ElECTROOE LENGTH FURNACE COMPUTER FlG. 1. ELMO, schematic drawing of the system ~ ICELA:\DIC ALLOYS LTD --"" The two furnaces are run on 36 MW each and have Soderberg electrodes with a diameter of 155 cm. For the weighing, load cells are placed under the two hydraulic cylinders that suspend the electrode and move it up and down. The weighing cells are specially constructed to fit under the cylinders, around the piston rods. The signals from the weighing cells are amplified in an amplifier and forwarded to an analog/digital converter that is connected to an industrial computer. The computer is also connected to the furnace control computer and gets from there continuos registration of the holder position ofthe electrodes, the slipping and the furnace load.

425 The weight values are filtered and evaluated in a specially developed computer program. From the total weight of the electrode the variable weight of the electrode above the contact clamp has to be subtracted. For this purpose the time of paste addition, amount of paste and time of addition of new casing has to be entered into the computer. From the inputs the computer calculates the electrode length and displays it among with other relevant information. The program runs under Microsoft Windows and is illustrative and user fiiendly. Figure 2 shows a picture ofthe electrodes as they.are displayed on the computer screen. The picture is updated every minute. To the right in the picture the furnace load is shown as a column, the man with the butterfly starts to smile when the load passes 35.0 MW. The electrodes are shown as cylindrical with a flat end. The method determines the average length ofthe electrodes and cannot detect how far they are "pencilled" or in other way deviating from an ideal cylindrical shape. - ELMO -S.kri ~ahald Innslittur Unum Tliflur Lengdargildi!::!jilp Ofn 2 09.03.9418:43 50 40 30 20 10 o 37.4 MW FIG. 2. ELMO, computer display ofthe electrodes Figure 3 shows another display ofthe computer. The picture is here in black and white but in colour on the screen. The weight of the electrode (presented in the unit cm of electrode length) is shown as a function of time (over 26 hours). Furthermore the holder position of that electrode and the furnace load is drawn. The scattered points show the minute by minute values ofthe electrode weight. Clearly these give little information without statistical evaluation. Three curves are drawn through the

426 points, two show the weight values filtered with different time constants and the third is the best line between time ofaddition ofpaste, calculated by linear regression. 400 (erne I cm) 350 V>J '~11 FiJrnllce Loilld :M'lV/lp) SKAUT 11 OFNI 1 EyOsla (gaer) =59 StOId< =108 EyOsla =78 Fylgni =0.81 300 150. :.~:~ 0~ ~I\ (r,,]v~h~nv~.mr :: ~:~\:~ 100 ~,~~VN\J \..\~ ''''~\VI'''''>J '"' f oldjerj OS~OIV r" -V ~ 50 4 5 6 7 8 9 10111213141516171819202122230 1 2 3 4 5 6 7 ~~) V1GT (BG) 114 sia20 (G) 155 SIA83 (B) 166 HST (R) 105 AFL (R) 37.3 25.02.94 07:20 - q.. FIG 3. ELMO, display of the weight of the electrode The figure shows how the weight decreases as the electrode is consumed during the day. At the beginning ofthe day shift (8:00 hour) new paste is added to the electrode casing causing a step increase in the weight. Then the curves fall slowly according to the consumption until new paste is added the next day. The filtered weight values are corrected for the movement of the electrodes as a downward movement makes the electrode slightly lighter and an upward movement heavier. Therefore a small correction factor is added if the electrode is on the way down and subtracted if the electrode moves up. The computer registers the weight at intervals of 10 seconds. It excludes values out oflimit and takes the average over one minute of the remaining values. The screen pictures are updated with that frequency. Figure 4 shows the current electrode length of the three electrodes as evaluated by the computer. In the lower part ofthe picture the cumulative slipping lengths of the electrodes are shown. The values are put to zero at seven o'clock each morning. ' To calculate the current electrode length the computer uses the filtered weight values. To the filtered value the slipping length is continuously added. Furthermore the effect ofthe paste

427 and casing addition is taken into account. That infonnation is put in manually but if no new data is entered the computer uses the values it calculates from the steps it detects in the weight curves when new paste is added. The picture of the current electrode length is important for the furnace operators and very illustrating. One look at the picture tells if the electrodes are becoming shorter or longer during the day. The electrode consumption is a reflection ofthe carbon balance ofthe furnace as is the tip position. Furthennore an irregularity such as breakage is detected. ~...... SKAlfTALENGD..~ ~ 400 (eme I em) SKAUTALENGD OG SIG IOFNI 2 350 300 250 200 150 100 50 1516171819202122230123456789101112131415161718 (klst) SKAUT 1 (R) 284 SKAUT 2 (G) 320 SKAUT 3 (8) 295 09.03.94 18:45 FIG. 4. ELMO, cwtent length ofthe electrodes Figure 5 shows a breakage ofelectrode 1, 120 cm falls offthe electrode. Figure 6 shows the weight values for that occurrence. The breakage was not clearly seen in the behaviour of the furnace or any other parameters measured. But action as increasing the slipping rate could be taken immediately to prevent further consequences. Soft electrode breakage In the period when the electrode weight system was developed a soft breakage occurred on one ofthe electrode ofthe furnace. Molten electrode paste poured into the furnace. Simultaneously a huge explosion shook the furnace building, ripping offa part ofthe roof together with some of the wall panels. It was quite clear that the explosion occurred inside the electrode column. People were however uncertain as to the correct sequence of events or cause and effect, that is which came first, the breakage or the explosion.

428 ~;'1'. '... SKAU1ALENGU..~., 400 (cme I cm) SKAUTALENGD OG SIG IOFNI 1 350 300 250 200 150 100 50 15 1617 18192021 22230 1 2 3 4 5 6 7 8 9 1011 121314 15 1617 18 (~st) SKAUT 1 (R) 236 SKAUT 2 (G) 310 SKAUT 3 (8) 261 23.10.94 19:15 FIG. 5. Electrode breakage, length ofthe three electrodes d%"jf6luij (eme I cm) SKAVT 1 'OFNll EyOsla (ga) =253 StOId< =106 EyOsla =62 Fylgni =0.35 300 ' '&.':.&' I I <~'.:"~,. ~?I. I! ';, ~\'h.. 1516171819202122230 1 2 3 4 5 6 7 8 9 101112131415161718 ~~) VIGT (BG) 156 sla20 (G) 161 SlAe3 (B) 168 HST (R) 11 AFL(R) 36.2 23.10.B4 18: 18 FIG. 6. Electrode breakage, weight of the broken electrode 111 =

429 The data from the electrode length measurements revealed the course of events. The electrode length computer recorded the minute values for the furnace load, the holder position and the weight of the electrode. Therefore it was possible to go back and print out the sequence as shown in the attached Figure 7. As can be seen from the figure, most of the molten paste poured into the furnace in less than one minute. Then the flow slowed down during the following six minutes. At that time a hole must have opened up through the remaining paste, allowing gases (volatile matter from the paste) to rise up into the electrode column that acted like a chimney. There the gases exploded with a devastating effect and the explosion pressed out some ofthe remaining molten paste. Two minutes after the explosion the furnace was switched off Soft Electrode Breakage Furnace 2 Electrode 2 500 ~--------------------------------, 400...--""------ p--o-~i Soft breakagei i ~ 300.., j E 200 ~ c :~Cl ':.., '" loo t-+--+---+--+--+---+---+,--+~,--t--_+--+--..-~ Q == O-t--+--+---+--+--+-+-+--+-----i-l-+--+--+--+--+--+--+-+-t+---+--i-t--+---,--+--+--+-----4 18:35 18:40 18:45 18:50 18:55 E 1830 ~.c.~ -100 ~ -200-300..L- --' FIG. 7. Soft electrode breakage Thursday, March 22, 1990 1-0- Weight 2 --+- Holder Position 2 ---Load I As described seven minutes passed from the breakage until the explosion. This is a fairly long time. The operator was operating the stoking car and stoking the furnace at the furnace door opposite the electrode that broke. The break was not detected until the explosion. ELMO now gives a warning signal when it detects a sudden weight change of the electrode. This reduces the risk ofan explosion following a soft electrode breakage as the furnace operator will have time to shut down the furnace and press down the electrode. In the event described this would have prevented the main damage.. As to the electrode breakage that occurred during a fully normal furnace operation, no explanation was found to its cause.

430 Summary ELMO, an electrode weighing system for monitoring the electrode length has been in use for several years at Icelandic Alloys. It has been constantly improved. The current version ofthe program runs under Microsoft Windows. It is user friendly and displays the infonnation in different graphics and trend curves. It gives inputs for controlling the carbon balance and the electrode operation. It reduces the risk of explosion in a connection with a soft electrode breakage.