adjustable fusion shower pan surface mounted on subfloor installation guide

Similar documents
adjustable fusion shower pan on wood joists installation guide

fusion shower pan on wood joists installation guide

1 PVC or ABS drain with strainer

Ubau Flo Shower Element Installation Manual

1850 x 40/50mm Raised Shower Tray Kit

Assembly Instruction. wedi Fundo Primo Steam Shower System

BioPrism Solid Surface

Assembly Instruction. wedi Fundo Primo Shower System

Shower Drain Installation Guide

Multi-Piece Shower with Trench Drain

Multi-Piece Shower with Trench Drain

USG DUROCK BRAND INFINITY DRAIN SHOWER SYSTEM Shower Floor and Drain Installation Guide

Assembly Instruction wedi Fundo Floor element

30mm Height Linear Drain Shower Trays

Multi-Piece Shower with Trench Drain

Low-Profile Multi-Piece Shower with blue, high-density polyurethane bottom

STEP UP SHOWER BASE INSTALLATION GUIDE FOR TIMBER AND CONCRETE FLOORS

OPEN SET SYSTEM. Easy-to-install Waterproofi ng Shower System. Installation guide

FreeStyle Linear Drain with Full Mortar Bed Adapter Kit

When I started tiling, we didn t do our own shower pans that BATHS

With an ARC TrueDEK structural shower base, Installation Instructions. TrueDEK. Watch our Contractor videos: Linear

BioPrism Solid Surface

Watertight & maintenance-free. Schluter -Shower System FOR TILED SHOWERS

DeltaTrayTamar PCS. Installation Guide for Centre and Offset Drain. INSTALLING DELTATRAY tamar A PCS GUIDE TO CREATING THE PERFECT WETROOM

WARMUP TILED SHOWER SOLUTION

Typical Installation Details

WALK-IN SHOWER BASE INSTALLATION GUIDE FOR CONCRETE FLOORS

Shower Tray - Timber Floors

BRANZ Appraisal Certificate # 461 (2010) Internal wet areas.

Dural Durabase WP Installation Instructions For showers and general waterproofing (800)

6032 SH 3P Residential Shower Installation Instructions Gelcoat & Solid Surface Bathware

STANDARD INSTALLATION GUIDELINES

Infinity - Century Combination Installation Instructions Gelcoat & Solid Surface Bathware

Multi-Piece EasyStep Product Installation Instructions

INSTALLATION GUIDELINES

Multi-Piece EasyStep Product Installation Instructions

Se incluyen las instrucciones en español

Pittsburgh Corning ProVantage Glass Block Installation System Assembly Instructions

Easy Drain. INSTALLATION MANUAL Xs - Linear shower drain FOR WOODEN OR CONCRETE SUBFLOORS

Shower Installation Manual APF Barrier Free Shower Models

Pro Advanced Custom MUD Tiled Shower Kit

The Level Entry Shower System

Shower Pan Extension Installation Guide

Installation Guide. for Wood Construction. The Level Entry Shower System Create Spa-Like, Accessible, Curbless Showers

HELPFUL HINT. This way your customer won t be without a working bathroom if you have to wait for a replacement.

INSTALLATION INSTRUCTION Purusline Living Wetroom Solution 600 Stainless Steel Grate

Freedom Barrier Free Shower Pan Installation Instructions

Freedom Barrier Free Shower Pan Installation Instructions

Division 7-Moisture Protection Section 7-Under Tile Waterproofing Exceeds ANSI A Rev. 05/2012 Page 1

FLOORING INSTALLATION INSTRUCTIONS

SlimLine Neo-Angle Base & Q-Wall-2

Channel Drain Shower Base. Aqua Line pro. Installation Instructions

Cornerview Shower Enclosure & Base

Freedom One-Piece Barrier Free Showers Installation Instructions

IMPORTANT: Levelness of the walk-in floor is critical. If the floor is not level, vertical panels cannot be aligned properly.

ZS880 Linear Shower Drain Installation Instructions

The professionals choice. Installation instructions Torridon. shower tray

Please Note: PhoneStar was previously branded as Phonewell

Impression Graphic panels

Light-Metal Roof Edge, Raised

Prime Shower Enclosure & Base Kit

ThermaSteel Corporation ASSEMBLY MANUAL

2K UniSlope Kit. Wet Room Materials UK: 25 Town Street, Duffield, Belper, Derbyshire, DE56 4EH

PROTECTO DECK INSTALLATION INSTRUCTIONS

OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide. RobinsonBrick.com

Eco friendly manufacture which is kind to the environment. Kind to the Environment. High Compressive Strength. Lightweight & Easy to Handle

SlimLine Single Threshold Base & Q-Wall-5.1 BASE & BACKWALL INSTALLATION INSTRUCTIONS

2. Install the front plate insulation

Prime Shower Enclosure & Base

MARBLE / STONE PROJECT NAME: HARD ROCK HOTEL & CASINO TULSA DATE: MAY 20, 2011 JOB #: 91002

The Complete Waterproofing Solution over Shower Trays and Baths

Installation Manual. Foundations. Version 4.3ᵠ

ZA3 Shower drain Standard Installatibn. install location& Notes: Linear Shower Drain. by stainless steel. More 20 grate desige

GUIDE TO DUKKABOARD AQUA 77

Roth Compact system. German quality since Installation 1/6

FORMWORK 66 x 40 x 24 Lithic Freestanding or Alcove Box Bathtub Installation Guidelines. STYLE No. CAUTION: BATHTUB IS EXTREMELY HEAVY

TABLE OF CONTENTS. 1.0 INTRODUCTION 1.1 Greenstone Structural Engineered Panels 1.2 Drawing and Element Numbers

PanelGrip Dry Glaze Glass Railing System

Technical Data. wedi Prefabricated Elements

Easy Drain. Basic Drain ZERO. INSTALLATION MANUAL Basic Drain Zero - Linear shower drain

SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 )

Linear Drainage Z886. Perma-Trench. Installation Instructions. 100mm Clear Opening

INSTALLATION GUIDE 5 EASY STEPS TO PLACE & QUIET. Primary Acoustics ) ) ) ) ) \ \ \ \ \

how to easy! TILE A BATHROOM DIY made Scan here to watch the video HOW TO TILE A BATHROOM

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu

RADIANT PANEL SYSTEM PLANNING & INSTALLATION. Roth Radiant Heating Systems

Knauf Aquapanel Interior. Tile Backing. Cement board for wet areas. Will not deteriorate in water. Easy to score and snap

PlayTime Wet Room 600

aquapanel InstallatIon GuIde

Introduction. Before you begin. Structure installation

Installation Guidelines for all Quaker products with nail fins New construction nail fin installation with a drainable weather resistant barrier.

USG Tile & Flooring Solutions. Lightweight cement board. Easy to cut and fasten. Faster installation USG DUROCK BRAND CEMENT BOARD INSTALLATION GUIDE

Substation #9 Instructions for Assembly of the HO scale kit. v1.1

ACO DRAIN Site Installation Manual

SECTION SHEET MEMBRANE WATERPROOFING AND CRACK ISOLATION

INSTALLATION INSTRUCTIONS

C.R. LAURENCE CO., INC. Intelli-Track SPS. Phase One - Installation Instructions

INSTALLATION INFORMATION

Glasboard Liners. installation details. Installation Guide for Glasbord Fibreglass Reinforced Plastic (FRP) panels

AFM Anti-Fracture Membrane & AFM-WM Anti-Fracture Waterproofing Membrane Three-Part Specifications

Transcription:

a a) Wall b) Tile c) Adjustable Shower Pan d) Liquid Membrane e) Crack Isolation Tape f) Cement Board g) Subfloor h) Joists b d c f h g e adjustable fusion shower pan surface mounted on subfloor www.trendingaccessibility.com 815 Hylton Road - Suite # 4 Pennsauken, New Jersey 08110 Phone: 866-829-8335 - Fax: 866-422-1084 installation guide Trending Accessibility 2016/05/11

b) f) Installation Guide c) Required Components (included) a) Adjustable Fusion Shower Pan b) Tile Drain c) Liquid Waterproofing - 2 gallon bucket (covers approx. 100 sq ft with 2 coats) d) Roll of Rubberized Crack Isolation Tape (100 ft) e) 2 - Inside corners of Rubberized Crack Isolation Tape f) Gasket Membrane 24-2 ½ screws 12 - ¾ screws 2 e) d) Note: If you have a larger room and need more waterproofing supplies, please contact us before completing your order. a) Adjustment 360 Important: Do not install this kit without the appropriate waterproof membrane liners or coating. Required Tools (not included) Drill Jigsaw Level Square Caulk Gun Hammer Utility Knife or Scissors Tape Measure Paint Rollers Paint Brush Belt or Orbital Sander / Sandpaper Latex or Acrylic Caulk (DAP Dynaflex 230) Splash Goggles Chemically resistant or impermeable gloves

3 Stainless Steel Grate Stainless Steel Drain Frame Height Extension Ring (5/8-1 ) (Optional) - This must be fixed in place using solvent cement. Height Adjustment Ring (1/4-5/8 rotate counter-clockwise to increase height - This must be fixed in place using solvent cement. Gasket Clamp (use solvent cement on inner face to achieve seal) Gasket Membrane 3/4 Screws Drain Adapter Flange Adjustable Rotating Center Adjustable Fusion Pan Sealing Washers

4 Step 1 For optimal performance, it is imperative there is a level surface prior to installation of new Adjustable Pan. Check existing floor to make sure it is level. If it is not, please correct prior to installation. Place the Adjustable pan in desired location and check to make sure it is level. subfloor Step 2 Once the pan is in the desired location, holding the pan steady, trace the inner circle of the pan without the rotating plate inserted. You have now marked the location of the drain on your subfloor. If you need to cut the pan to fit into a custom location, please refer to the cutting and drilling guidline on page 12 for detailed directions Step 3 Using your mark as a guide, cut along line as accurately as possible. Make sure to adjust the depth of your saw to the thickness of the subfloor to avoid cutting through the joists. It is best to use a jigsaw to accurately cut your circle. Note: If possible, please check or mark location of existing plumbing and electrical to avoid damaging them. Step 4 Set the pan into place. We now want to make sure that the rotating plate lines up with the waste line. First, insert the rotating plate onto the Adjustable Shower pan.

5 Step 5 If the drain position lands over a joist, Simply rotate the plate until free of obstacles. Step 6 Once plate is set in the desired location, mark the orientation on the plate and the pan. This will ensure that you have the plate properly aligned when you go to reinstall it later. While in place, note the location of the drain and make your connections to the wasteline. Install drain in accordance with current plumbing and building codes. Mark the orientation of the rotating plate Step 7 For your dry run, position the Adjustable Fusion pan into place and check to make sure the pan is level. If you notice any rocking or flexing in the pan, you may need to shim or shave areas. Step 8 Important: You must sand the top of the pan lightly with a palm or belt sander to roughen up the surface for proper adhesion of waterproofing.

6 Step 9 To prep for permanent installation, remove the Adjustable Fusion pan from the surface. Apply a generous amount of construction adhesive to the subfloor. Step 10 Carefully set the Adjustable pan into place. Drill and countersink holes in the pan. Using the 2 ½ screws provided, attach the pan. Do not aggressively screw and over tighten, as you may force the pan out of level. Now attach the rotating plate using the same screws provided. Be sure to match up your tick marks done in step 6. Refer to the Cutting and Drilling guidline on page 11 Step 11 On top of existing subfloor and walls install cement backerboard in preparation for tiling. Make sure that the top of the backerboard is roughly 1/8 higher than the Fusion pan. Start with a bed of thinset using a 1/4 notched trowel. Next, attach the first layer of 1/2 backerboard with 1 1/4 cement board screws 8 on center. Then, making sure to stagger the joints, attach the second layer of 1/2 backerboard with 1 5/8 cement board screws 8 on center. Finally, finish the joints with alkali-resistant mesh tape. thinset 1/2 backerboard 1/2 backerboard subfloor Step 12 Gasket Clamp Adapter Drain Flange You now want to attach the Drain adapter flange to the Adjustable Pan. First apply a bead of caulk to the underside of the drain adapter flange. Lightly push the flange into place, and screw it down using the four ¾ screws provided. Remove any excess caulk that squeezes out. membrane clamp height adjustment ring Remove the tile height adjustment ring and membrane clamp and place to one side; these will be required later in the installation.

7 Step 13 Check that the Fusion Pan is level on all four sides. Fill in any gaps around the perimeter of the pan over 1/8 with latex or acrylic caulk. Do not use 100% silicone. Step 14 Make your final connections to the drain. First apply a bead of caulk to the underside of the strainer body. Pass the strainer through the drain adapter flange, and tighten. Make sure connection is snug but do not over tighten. Step 15 Materials needed for wet room waterproofing. You will now begin waterproofing the wet room. BEST PRACTICE: To achieve the best results, we recommend waterproofing the whole room. Minimum requirements, shown in these instructions, show you that you only have to waterproof the shower zone, which is 6 ½ feet high and about 2 feet outside of the showering area. Step 16 Begin taping the wetroom floor at the interior corners of the Adjustable Fusion Pan using the corner pieces of the crack isolation tape provided. Using a paint brush or trowel, slather liquid waterproofing into corner, press piece into place, then apply liquid waterproofing on top. Make sure to smooth out any creases. Repeat for additional corners.

8 Step 17 Using the 5 crack isolation tape provided, cut strips of tape to length, to cover all seams (Corner seams, wall/floor seams, pan/floor joint). Put pieces aside. If you are creating full wet room, you will need to tape any seams throughout the entire room. If you are only waterproofing the shower zone, you will only need to tape the seams up to 2 feet outside the shower area. Step 18 Just like you applied the corner pieces, use your cut strips of Crack Insulation Tape to cover all the seams. Again, trowel or paint liquid waterproofing onto seam, press tape into position and coat the top to seal. Make sure to fully cover both sides of the crack isolation tape with the liquid waterproofing product. To make this process more manageable, it is best to work in two foot sections. 2 feet Extend the tape 2 feet past the shower pan NOTE: Illustration just shows tape use. Please apply liquid waterproofing to the wall and tape before applying. Step 19 Using the 5 crack isolation tape. Overlap all seams of cement board used on either the floors or walls. Overlap the seam where the Adjustable Fusion pan and cement board meet. Make sure the tape overlaps the seams equally. Step 20 Gasket Clamp Using the provided precut piece of gasket membrane, slather area where gasket piece will adhered to the drain area. Place over drain adapter flange, making sure to cover all screw holes, and securely press down into flange. Coat top of gasket piece with liquid waterproofing. Important: Remember to remove the clamping ring prior to placing drain gasket. Drain Adapter Flange Gasket Membrane

9 Step 21 Now attach the clamping ring. Apply solvent cement to inside of clamping ring. Press firmly into position and allow the solvent to set. NOTE: Do not allow the solvent cement to come into contact with the membrane Gasket Clamp Drain Adapter Flange Gasket Membrane Step 22 Begin the application of the liquid waterproofing membrane. Paint a layer of liquid waterproofing over all taped joints. It is easiest to begin with the walls first and then proceed to the floor area. For consistant application, use a paint roller to apply waterproofing to all surfaces. Allow the waterproofing to dry for about 4 hours. After first coat is dry, re-coat in the opposite direction. If you rolled up and down for the first coat, roll left to right on the second coat. Step 23 Apply two coats of liquid waterproofing to achieve 2 mils. (roughly the thickness of a credit card) Make sure that the V section of the gasket clamp is filled with the liquid waterproofing. Best Practice To achieve the best results, we recommend waterproofing the whole room. The waterproofing must cure for at least 12 hours before flood testing. If flood testing, perform test before tiling. Use modified thinset when placing the tile.

10 Step 24 In order to set the correct height of the grate frame, you may need to use the height extension ring (see diagram to the right). If the height extension ring is required, it will need to be fixed to the height adjustment ring using solvent cement. The grate frame can now be attached to the height adjustment or extension ring, depending on tile thickness. This is done by using firm pressure to clip the components together; it is a tight fit. 1/4 to 5/8 Tile Height 5/8-1 Tile Height grate frame grate frame extention ring click adjusting ring adjusting ring Step 25 The height adjustment ring and floor drain bowl must now be fixed together using solvent cement. Because solvent cements sets very rapidly we strongly recommend the adjustment is done dry first. To set the permanent height of the grate frame, place a floor tile beside the frame. Rotate the frame until the height is about 1/16 higher (this accounts for adhesive thickness). Now mark the position of the adjustment ring. This mark shows the final height position. Remove ring, apply solvent cement, and re-align components to your marked position. It is best to hold securely until pieces are fully bonded. Step 26 You are now ready to tile. If you are using large format tiles, they must be cut diagonally and laid to follow the pitch in the Fusion Pan (From the corners of the grate frame to the corners of the Fusion Pan). Apply the tile adhesive, and lay the tiles in a regular pattern.

11 Step 27 Once your tiling is complete, grout the floors and walls. Finalize by adding the drain grate. Your Fusion Pan installation is now complete. Enjoy! Tiling Guide Standard drainage position Drainage position 90 to the right Drainage position 90 to the left Drainage position less than 90 to the right If you cannot rotate the drainage point a full 90, left or right, it is best to use smaller tiles (maximum size 2.75 square) or mosaic tiles.

Cutting and Drilling Guidlines Installation Guide Do not cut into central solid oval section Maximum cut Maximum cut 12 Fig.1 Cut using an old or disposable handsaw. Maximum cut Maximum cut Additional timber Additional timber Additional timber Fig.2 Cut to length. Fig.3 Cut to accommodate d ia go na l wa ll. Fig.4 Cut to acc ommo da te dra in p oint. Fig.5 En sure cut ed ge s a re fixed. Ensure all the cut edges are supported, then drill, countersink and screw the Pan to the joists below in around 7.87 intervals (avoiding pipes, electric wires, etc.). Important: Do not cut the edges that adjoin surrounding floor. Cutting the Pan may reduce flow rate pe rformance. Additional fixing points Additional drilled and countersunk screws required if Pan is not in contact with joists/ concrete floor. Fig.6 If Pan is not in contact with joist/concrete floor you must drill out and countersink the Pan to ensure it does. Failure to do this will allow unacceptable movement and may cause floor tiles to crack or become loose.