HOME SYSTEMS CONSTRUCTION PROCEDURE

Similar documents
MODULAR ACOUSTIC FENCING INSTALLATION GUIDE

INSTALLATION MANUAL KOCH

Panel Clip with (2) ¼ 14 x 2 Fasteners at Each Panel Joint. Base Angle. Fasteners to Concrete 24 O/C Base Z Flashing

DETAIL INSTRUCTION No. 1

KS SERIES - VERTICAL INSTALLATION

OmniFlex 300 Plus Installation Instructions

NU-WALL EXTRUDED ALUMINIUM CLADDING. Installation Specifications Vertical orientation (over cavity)

IMPORTANT: Levelness of the walk-in floor is critical. If the floor is not level, vertical panels cannot be aligned properly.

ThermaSteel Corporation ASSEMBLY MANUAL

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

6x5. Assembly Manual CAUTION. Sharp Edges PATENTS ARE PENDING. Building Dimensions. Approximate Size. Storage Area. Interior Dimensions

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

DRAWING INDEX Description

Nortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1

TABLE OF CONTENTS. 1.0 INTRODUCTION 1.1 Greenstone Structural Engineered Panels 1.2 Drawing and Element Numbers

Chapter 7. Roof Framing

SECTION NON-STRUCTURAL METAL FRAMING

Carpentry/Carpenter CIP Task Grid

bull-nosed verandah Construction guide using custom blue orb

Instruction Manual for Installing OutBack Steel-Framed Buildings. Gambrel Buildings

Union County Vocational - Technical Schools Scotch Plains, New Jersey

rockspan installation guide horizontally laid panel

europanel installation guide horizontally laid panel

ECONO 200 INPLANT OFFICE

Planning and installation instructions

Revision Date: April 01, Premier Vinyl Enclosure

TYPICAL ROOF CONDITION LAYOUT

1.52mm 1.52mm. Exterior Siding Sheet: Fabricated from Z275 steel material conforming to ASTM A653M grade 230 steel

BENCHMARK Evolution Axis

Absco Premier Garden Shed Assembly Instructions Model: 30232G

NATIONAL GYPSUM COMPANY 3-Hour Area Separation Wall System

PLATON FOUNDATION WRAP

130mm CROATIA BOARD 180mm V-GROOVE

FOCAL POINT RENDAPANEL TM CLADDING SYSTEM

Standard Sizes: 2.125m underside of gutters m total height m roof m roof m roof.

NEW ILLUMINATED LED SIGNAGE PAINTED STOREFRONT W/ VINYL GRAPHIC AND NEW LED SIGNAGE PAINT FINISHES (PROVIDE (2) COATS FOR ALL PAINTING) PT-1

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

In addition to performing as an interior vapor retarder, MemBrain the Smart Vapor Retarder may be installed as a continuous, interior

Chapter 32 - Garage. June 2015 Garages 32-1

Installation Instructions DEKO PV 1090

The better way to build TM. Installation Manual NAILBASE PANELS

Absco Premier Garden Shed Assembly Instructions Model: 30302G

SOUNDGUARD INSTALLATION MANUAL

SQUARE SUN TUNNEL INSTALLATION INSTRUCTION

Pre-Installation See detail page for general notes concerning trim accessories, holes, fasteners, gaskets, caulking and support columns.

HouseWrap Applications System R-Value: R-4.17 Horizontal Heat Flow Only

A. Flat corner wall-to-wall See page 8. C. Outside corner wall-to-wall See page 8. B. Inside corner kit wall-to-wall See page 7

NATIONAL GYPSUM COMPANY 2-Hour Area Separation Wall System

200 / 300 SERIES PANELS COLD STORAGE

maintenance-free free from painting easy to install Fixing Guide Cedral Click

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK

SECTION NON--STRUCTURAL METAL FRAMING

$50,800 COUNTRY HOME 252. owner builder. ease of construction. in mind. Designed for. 252m 2. x4 x2 x2. with the STEEL KIT HOME INCLUSIONS

Flashings Materials Longitudinal flashings. 10 Ends of sheets

Fundamentals of Insulated Panel Installation. MBCEA 2016 Clearwater, FL

Regarding the refusal to issue a code compliance certificate for a house constructed with structural insulated panels at 420 Blackrock Road, Masterton

Manufacturer of Coolers, Freezers, Step-Ins, Refrigeration Trailers and Sliding Doors COOLER AND FREEZER INSTALLATION MANUAL

1. Non-load-bearing steel framing systems for interior gypsum board assemblies. 2. Suspension systems for interior gypsum ceilings and soffits.

STEEL DECK INSTITUTE Industry Standard Terms & Definitions

Build Options The Allrounder can be built DIY or let us do it for you. We offer 2 main build options and can customise our service to meet your needs.

Industry Standard Terms & Definitions Of The Steel Deck Institute

ELEVATION FOR DETAIL REFERENCE ONLY

GypLyner (walls) Metal framed wall lining system. GypLyner.

Flushglaze For Steel Tube Applications and Horizontal Panels. Façades Installation Guide

Absco Premier Garden Shed Assembly Instructions Model: 30232G

N Scale Double Track Lift Bridge v1.2

Specifications subject to change without further notice. Intellectual property is protected by copyright patents and registered designs

Modular Buildings. Installation Manual

NatureScape. 3 Thermally Broken 2 Non-thermal

SKATEWHEEL FLOW RACK

Appendix 4. Bills of Quantities

DIVISION 5 METALS SECTION COLD-FORMED METAL FRAMING

H-Body Sealants Guide

Perkins Statewide Articulation Agreement. Documentation item: Secondary Competency Task List Coversheet

SUPERIOR ROOF SYSTEMS

Project No: Pakenham Branch Library, Pakenham, Ontario Section DECEMBER, 2016 Page 1 of 6

Brownbuilt BROWNBUILT PROFILED SHEETING AND ACCESSORIES SHEETING FINISH FOR BROWNBUILT ROOF SHEETING FIXING BROWNBUILT BROWNBUILT FLASHINGS SAFETY

PROLOK EAVE PROLOK ROOFING PANEL ROOFING NAIL

YCW 250 I-Beam Curtain Wall System Installation Manual

$18,500. WEEKENDER 60 60m x2 x1 x1 STEEL KIT HOME INCLUSIONS

C&O Standard Brick Cabin Instruction Manual

Container Installation Guide

150MM FREE STANDING WOOD FIRE FLUE KIT MKIII INSTALLATION INSTRUCTIONS

150MM FREE STANDING WOOD FIRE FLUE KIT MKIII INSTALLATION INSTRUCTIONS

rondo accessories CONTENTS:

SUPRAFRAME BOX STUD SITE REFERENCE. Construction of a SUPRAFRAME Boxed Stud Wall Framing System. 600 mm stud spacing. Tile Roof.

FACADES - ACM BASE AT OVERHANG (WITH BASE FLASHING) INDEX SHEET

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

Installation Guide. This installation guide is furnished as a supplement to the project specific panel installation drawings.

Euro Corner Entry Shower Screen Installation Instructions

Container Installation Guide

SECTION COLD-FORMED METAL FRAMING

COMMERCIAL & INDUSTRIAL CI-CFR-INDEX SHEET INDEX CI-CFR-INDEX SHEET INDEX CI-CFR-INFO C & I DISCLAIMER

DOOR AND WINDOW OPENINGS PREPARE IN ADVANCE VBUCK CONSTRUCTION

SECTION NON-STRUCTURAL METAL FRAMING

SPECIFICATION SHEETS. SLIDING Gate systems

rainspan installation guide horizontally laid panel

TECHNICAL INFORMATION SHEET NUMBER 1a

Chapter 53: Endwall Overhang(s) Only - Enclosed

Installation Guide. PAROC panel solutions

Transcription:

HOME SYSTEMS WWW.QUICKBUILTHOMES.COM.AU CONSTRUCTION PROCEDURE

INDEX - PARTS LIST PARTS LIST QBRC75(C) QBRM75C) QBSIPS75 QBRFSZ75C QBRFBC75C QBRF3030G QBRGSQC QBRFRC75C QBRFZEC QBRF4040C QBSACC75 QBFR7330WC QBRGECC QBRGBC QBSID820/720 QBSSTS121445 QBSSCF1830 QBRFZPJS75LM QBSSD85 QBSPHDJ90 QBSS40W QBSSTS121420B/N QBSSW1016C QBSS135/150 QBSSTA25

STANDARD FIXING DETAILS PREPERATION PREPERATION // Recommended equipment Safety attire Power Tools Hand Tools STANDARD FIXING DETAILS EXTERNAL CORNER JOIN #12 TEKS 40 x 40 x 1.6mm GAL EXTERNAL STEEL CORNER 30 x 30 x 0.7mm GAL INTERNAL STEEL CORNER Scaffold Props // Check the sub floor is correct in size by measuring the length and width of the floor. // Check the floor is square by measuring the diagonals of the floor, ie corner to opposite corner, or by using the 3 4 5 method. Measure from a corner of the floor along one edge of the floor 3.0m and measuring from the same corner along the other edge of the floor 4.0m. Then measure from the 3.0m mark on the floor edge across to the other 4.0m mark on the other floor edge, the floor is perfectly square if this measures 5.0m. // Check the floor is level with a spirit level or a dumpy laser level. // Check materials supplied against Bill of Materials referring to images of products supplied 6mm DURALINER EPS - FR CORE (75mm) 9mm DURAGROOVE EXTERNAL WALL JOIN 6mm DURALINER INTERNAL & EXTERNAL 70 x 0.7mm SILICONE BEAD GAL JOINING STRIP 9mm DURAGROOVE FLOOR TO WALL 6mm DURALINER 75 x 0.7mm STEEL FRAMING CHANNEL CONCRETE SLAB (OR RAISED FLOOR) #12 TEK SCREWS 9mm DURAGROOVE INTERNAL WALL JOIN 6mm DURALINER 70 x 0.7mm GAL JOINING STRIP FIBRETEK SCREWS 25mm Ø ELECTRICAL SERVICES PENETRATION INTERNAL WALL JOIN DETAIL INTERNAL WALL 75 X 0.7 STEEL FRAMING CHANNEL INTERNAL WALL 6MM DURALINER FIBERTEK SCREWS INSULSPAN PANEL ROOF OPTION OFF WHITE METAL INTERNAL LINING #12 TEK SCREWS EXTERNAL CORRUGATED IRON ROOFING SHEET

1 STEP 1 BASE FRAMING SECTION INSTALLATION // Trim and fix the 75mm base Steel Framing Section (QBSACC75) to the external edge of the floor. Note that there should be no framing section at the door openings. // No need to mitre the Steel Farming Section at the corners, simply cut square the channel ends so the internal legs of the channel neatly touch. NOTE - ELECTRICAL LAYOUT: Mark visibly and very clearly on the floor the proposed electrical layout. This is necessary when fitting the Top Caps as you stand wall panels. // Fix the channel down to the steel flooring system with 45mm Metal Teks or to concrete slab with Dynablolts. ( Engineer specification ) // Fix 75mm Base Steel framing section (QBSACC75) to the floor for internal wall installation as marked on the plans supplied STEP 2 EXTERNAL WALL INSTALLATION // Start at Corner Panel E3-1 and corresponding corner panel on Elevation 2 as marked on plans supplied. // Prepare the appropriate temporary bracing for propping the external walls. (Suggested bracing long lengths of timber decking) // Place Corner panel E3-1 in position, plumb, brace and fix to the inside of the 75mm Steel Framing base channel. // Place Corner panel on Elevation 2 in position, plumb, brace and fix to the inside of the 75mm Steel Framing base channel. // Fit the 30 x 30 internal steel corner angle (QBRF3030G) to join the corner. Fix to corner panels at 200mm centres as per engineering specifications // Continue to fit the panels along Elevation 3 by placing the correctly labeled panel in order onto the Steel Framing Section 2

STEP 2 EXTERNAL WALL INSTALLATION // Once the panel is positioned, install the 75mm internal Gal steel strips (QBRFZPJS75LM) internally and externally behind the Fibre Cement (FC) sheets in the foam routes provided // Temporary brace each wall section at each window opening. Install the bottom panel of the window opening. // Carefully measure the window opening and install the Top header panels above the Window and the Doors. These panels are clearly labelled per the drawing supplied. When fixing the top header panels above the Window and Door Openings, ensure that there are sufficient fixing screws into the side of each panel into the steel strips behind the joins. This will ensure that the top header panels stay into position prior to installing the windows and the doors

// Starting at Panel E4-1, proceed to Elevation 4 ( Side Wall ). // Place corner panel E4-1 in position, plumb, brace and rivet the inside leg of the base channel. // Fit the 30 x 30 internal steel corner angle (QBRF3030G) to join the corner. Fix to corner panels at 200mm centres as per engineering specifications // Erect Elevation 4, in the same manner or process as described for the erection of Elevation 3 wall. // Starting at Panel E1-1, on Elevation 1 // Place corner panel E1-1 in position, plumb, brace and rivet the inside leg of the base channel. // Fit the 30 x 30 internal steel corner angle to join the corner. Fix to corner panels at 200mm centres as per engineering specifications // Erect Elevation 1, in the same manner or process as described for the erection of Elevation 4 wall. // Temporary brace each wall section at each window opening. // Complete all window and door openings and framing as described above // Starting at Panel E2-1, on Elevation 2 // Place corner panel E2-1 in position, plumb, brace and rivet the inside leg of the base channel. // Fit the 30 x 30 internal steel corner angle to join the corner. Fix to corner panels at 200mm centres as per engineering specifications // Erect Elevation 2, in the same manner or process as described for the erection of Elevation 4 wall. // Temporary brace each wall section at each window opening. // Complete all window and door openings and framing as described above

3 STEP 3 INTERNAL WALL INSTALLATION // Mark the internal walls out with a chalk line, from the external walls. // Cut the 75mm Steel Framing base channel (QBSACC75) to suit the internal wall lengths and fix down through the steel floor frame or concrete slabs with 40mm Metal Teks or Dynabolts at 450mm centres. // Mark the internal skin of the external wall panels at position of the internal walls. Using a level and string line, position the 75mm Steel Framing Section vertically against the external wall panels and fix at 200mm centres. // Stand the internal wall panels in position onto the 75mm Steel Framing channel. // Once the panel is positioned, install the 75mm internal Gal steel strips (QBRFZPJS75LM) internally and externally behind the Fibre Cement (FC) sheets in the foam routes provided // Temporary brace each internal wall section

4 STEP 4 TOP PLATE AND ELECTRICAL CABLE INSTALLATION // Transfer the electrical layout marked on the floor to the ceiling and walls. Cut the appropriate power point, light switch and light holes in position // ELECTRICIAN to run cables around the top of the wall panels in the foam routes provided. Feed electrical cables into the wall panels per diagram and in the vertical foam routes provided. // Install the Top 75mm Steel Framing section onto the external and internal wall panels. Note that holes must be cut in the steel framing section where cables are required to enter roofing panels // Ensure that the Top 75mm Steel Framing section is fixed internally and externally to wall panels prior to the roof being installed // Allow enough cable for the roof lights (requirements) and pull through holes cut in the top 75mm steel framing section

5 STEP 5 INSULSPAN ROOF PANEL INSTALLATION Insulspan Roof panel Installation // Looking at the front of the Home, start on the left hand side of the Home, Elevation 4 // Cut the male side Corrugated roof sheet and under skin off the first Roof Panel (QBRC100(C)) flush with the styrene. Place the first Roof Panel in position over and flush (or eave as required) with the outside of the side wall, Elevation 4. // Using 150mm Metal Teks (QBSS135/150) at 150mm centres, fix the panel down. // Place the next panel alongside the first panel, lap the Corrugated roof sheet and lift the female side of the roof panel approximately 30 degrees and lower until the under skins engage. // Repeat this process until the roof is completed, fixing each panel down as you go using 150mm Metal Teks at 150mm centres. Electrical Cutouts - Between 150mm Centres // At points where electrical cable resides, cut hole in the bottom of the roof panel in line with the foam route provided // Pull the electrical cable through roof panel and cut hole where cable exit required. // Pull cable through hole in the ceiling panel // Where electrical cables go through steel channels or ceiling skin plastic grommets are recommended Stitch Roof Sheet Overlaps // At roof sheet laps stich with 20mm Tek Screws (QBSSTS121420B/N) with Rubber Gromets at 1000mm centres

6 STEP 6 ROOF AND WALL FLASHINGS TRIMS INSULSPAN ROOF // Start with the 2 External Wall Corner Caps - On elevation 1 and 3, Fit the External 40mm x 40mm Corner Angles (QBRF4040C) with #12 Tek Screws ( Fix at 200mm centres both sides ). The External Corner Cap starts at the top underneath the Roof panel and extends down the full length of the corner, finishing flush with the bottom edge of external wall panel. (fig. 6.6) // Roof Flashings - Z Flashing - On elevation 3, fix the Z flashing (QBRFZC75C) underneath the corrugated roof sheet using coloured M4 rivets at 300mm centres and coloured M4 rivets through the underside of the Roofing panels at.450mm centres. (fig.6.9) // Barge Capping - Barge capping s (QBRFBC75C) are supplied for elevations 1, 2 & 4. Place barge capping on the roof into position on elev. 2 or 4. Align barge capping with edge of roof panel on elevation 1 and at the other end, mark a line on the Barge capping flush with the face of the Z flashing (Fig. 6.8) and cut. Place the Barge into position on the roof and use 45mm metal tek screws (QBSSTS121445) to fix the top of barge into the insulated roof panel at.900mm centres and M4 colored rivets (QBSS40W) to fix the bottom of barge capping to the underside of the roof panel at.500mm centres. // Repeat this same process for the barge at the opposite side of the side building. // Front Barge - The front barge (QBRFBC75C) is supplied about.300mm longer than the roofing on elevation 1. This allows for.150mm fold over on each end once the barge is fitted. Measure and mark lines on barge capping.150mm on each end and cut on lines. (See fig. 6.11). Place barge into position on roof (elev. 1) and fold ends over sides (fig 6.10) then fix as per instructions above. Fig. 6.7

STEP 6 ROOF AND WALL FLASHINGS TRIMS INSULSPAN ROOF // Gutter Brackets - Fit the gutter brackets (QBRGBC) to the Z flashing using M4 Rivets at.900mm centres with minimal fall towards the down-pipe at the end of elevation 3. (fig. 6.9) // Fitting the Gutter - Fit gutter end caps (QBRGECC) to both ends of the gutter (QBRGSQC) and apply silicone internally, (allow to dry for 1-2 hours). Apply silicone to any gutter joins. Once silicone has dried, lift the front top lip of the gutter over the gutter brackets that are fixed to the Z Flashing on elevation 3, Then lower the gutter down into the brackets and bend the gutter brackets clip down securing the gutter into Place. // Horizontal Angle - 25mm x 25mm metal angles 6b (QBSSTA25) are supplied for elevations 1, 2 and 4. Starting on elevation 2 or 4, the 25 x 25 angle should be fixed from corner to corner of the elevation. Fasten angle to underside of roof panel (eave) using coloured M4 rivets at.450mm centres, and fasten to the external wall sheet using coloured Wafer Tek screws at.450mm centres. (See fig 6b) // Repeat the same process on all elevations. Fig. 6b

STEP 7 WINDOW AND GLASS SLIDING DOOR INSTALLATION // Carefully measure the window opening and install the Top header panels above the Window and the Doors. These panels are clearly labelled per the drawing supplied. When fixing the top header panels above the Window and Door Openings, ensure that there are sufficient fixing screws into the side of each panel into the steel strips behind the joins. This will ensure that the top header panels stay into position prior to installing the windows and the doors // Install the 75mm Gal Steel Capping Channels (QBFR7330WC) internally into the Window and Door Openings into the foam routes provided // Window and Door internal frames will have been installed in Step 2(a) above // Insert the face fix windows and doors into appropriate opening and externally fix to wall panels with 10mm Coloured Wafer Teks // Finish the internal side of the window or door with aluminium window architrave mitred in each corner. // Fix Internal architrave with 10mm Wafer Teks // Cover Internal and External Fixings with Plastic Cover trims provided 7

STEP 8 INTERNAL DOORS // Cut and assemble the pre hung timber door jambs (QBSPHDJ90) on the floor and fit the internal timber door to the door jamb. Position the door in the jamb with a standard 3mm gap between the door and jamb. Temporary brace the top corner of the jamb. One to brace the jamb square and position, 2. Prevent the door from swinging out while standing and positioning the door and jamb into position. // Lift the assembled door jamb into the opening // Complete the door with the handle. 8 STEP 9 PAINTING AND FINISHING // Refer Dulux or other manual for exterior and interior paint finishes and procedures 9

NOTES

NOTES

// QUICKBUILT SYSTEMS IS A PROUDLY AUSTRALIAN COMPANY SPECIALIZING IN MODULAR, PREFABRICATED PANEL SYSTEMS. // WE USE A LIGHTWEIGHT PREFABRICATED PANEL SYSTEM FOR WALLS, FENCES AND CEILINGS GIVING TOTAL FLEXIBILITY TO DIY AND TRADES PEOPLE ALIKE. INSULATED ROOFING PANELS WWW.QUICKBUILTSYSTEMS.COM.AU