ISSUES & RISKS Potential timing and coordination with a future system planning process Coordination with jurisdictions and partner transit agencies

Future System Planning (ST4)

FINAL. Sound Transit Long-Range Plan Update Issue Paper S.6: Potential Tacoma Link Extension - East. Prepared for: Sound Transit

Sound Transit Long-Range Plan Update/SEIS Agency Scoping Meeting. November 8, 2013

2004 FEASIBILITY STUDY UPDATE

Tacoma Link Stakeholder Group

Sound Transit Transit-Oriented Development (TOD) Policy

Lynnwood Link Extension 2013 Draft EIS Comments and Responses. Page 945

Rail & Transit Alternatives Analysis. NH Capitol Corridor. Public Scoping Meeting. March 5, 2014

APPENDIX I: COSTING DETAIL APPENDIX I COSTING DETAIL

Vanasse Hangen Brustlin, Inc. DRAFT. Appendices. MIS Appendices

Environmental Scoping Information Report

12 Evaluation of Alternatives

Red Line/HealthLine Extension Major Transportation Improvement Analysis

VRE Gainesville-Haymarket Alternatives Analysis Report

West Seattle and Ballard Link Extensions. Stakeholder Advisory Group March 14, 2018

Lynnwood Link Extension 2013 Draft EIS Comments and Responses. Page 216

Assessment of Current Status, Plans, and Preliminary Alternatives for High Capacity Transportation in the I-5 Corridor

Transportation and Utilities

Table of Contents. Green Line Extension Project. Draft Environmental Impact Report/Environmental Assessment and Draft Section 4(f) Evaluation

SOUND TRANSIT RESOLUTION NO. R Adoption of 1999 Regional Express Bus Service Plan BACKGROUND AND COMMENTS

Metro Blue Line Improvements & Project Update

Updating Sound Transit s Long-Range Plan. ITE November 12, 2013

MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: PHONE: Recommend to Board. Final Action

SOUTHWEST LRT (METRO GREEN LINE EXTENSION)

Gainesville- Haymarket Extension (GHX) VRE Operations Board Work Session July 15, 2016

Welcome to the VRE Gainesville-Haymarket Extension (GHX) Study Community Meeting

Transit Oriented Development Study

Overview of Alternatives Analysis

Corridor Advisory Group and Task Force Meeting #2

Chicago Transit Authority Orange Line Alternatives Analysis Study

Cotton Belt Corridor. Area Focus Group (AFG) DFW Airport/Coppell/Cypress Water May 4, John Hoppie, Capital Planning

Central Puget Sound Regional Transit Authority

Rail Corridor Feasibility Study

Progress Report Sounder Program

3. STATION SPACING AND SITING GUIDELINES

Progress Report Sounder Program

Update on ST3 West Seattle and Ballard Link Extensions

Progress Report Sounder Program

Capital Cost Estimating Methodology Technical Memorandum

Appendix B. Technical Memoranda and Reports

DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR HOUSTON DALLAS HIGH SPEED RAIL (TEXAS CENTRAL)

KNOXVILLE REGIONAL TRANSIT CORRIDOR STUDY

Southern Maryland Transit Corridor Preservation Study Charles County Board of County Commissioners September 22, 2009

1.1 Purpose of the Project

May 24, 2007 Board Meeting. Making Connections Sound Transit 2 The Regional Transit System Plan For Central Puget Sound

REPORT TO THE CITY COUNCIL rd Avenue NE, Woodinville, WA

10. PROJECT DEVELOPMENT, LEADERSHIP, AND OVERSIGHT GUIDELINES

Ann Arbor Station Environmental Review. Public Information Meetings April 2, 2014

EVALUATION OF ALTERNATIVES CARRIED FORWARD

Transit users will be able to access North Metro from eight stations in the corridor.

Riverview Corridor Pre-Project Development Study

Green Line extension Project Fall 2009

EXECUTIVE SUMMARY ORGANIZATION OF REPORT

APPENDIX N East King County Subarea High Capacity Transit (HCT) Analysis: Approach to Assessing System-Level Alternatives

<33 February OMF South Alternatives Evaluation Technical Memorandum

Columbia Pike Transit Initiative

Midtown Corridor Alternatives Analysis. Technical Advisory Committee Meeting November 15, 2012

Final Environmental Impact Statement and Section 4(f) Evaluation

West Seattle and Ballard Link Extensions. Level 2 Evaluation Results September 2018

A Presentation to: Project Advisory Group Meeting #7

PSRC s 2018 Regional FTA Competition Project Evaluation Criteria

VRE Gainesville-Haymarket Extension (GHX) Study. December 16, 2016

CHAPTER 2: Goals, Objectives & Standards

PUBLIC HEARING April 24, 2017

3.0 REVIEW OF PREVIOUS STUDIES

APPENDIX TRAVEL DEMAND MODELING OVERVIEW MAJOR FEATURES OF THE MODEL

Overview of City of Dallas and DART Interlocal Agreements

RURAL CENTER COMMUNITY ROLE COUNCIL ROLE RURAL CENTER ALL COMMUNITIES

Identification and Evaluation of Alternatives Tier 1

CENTRAL PUGET SOUND REGIONAL TRANSIT AUTHORITY GREEN BONDS

MONITORING IMPLEMENTATION AND PERFORMANCE

Phoenixville Passenger Rail Demonstration Project

Travel Demand Forecasting User Guide

Priorities are for AG comment at today's meeting. Four time frames proposed for implementation

Southwest LRT Update Freight Rail Technical Issue #21 City of St. Louis Park Council Study Session

GULF COAST RAIL DISTRICT VISION FOR REGIONAL RAIL

EXECUTIVE SUMMARY. The cities of Bellevue, Kirkland, Issaquah, and Redmond, commenced a two-year cooperative study in fall 2001 to

Evaluation of Alternatives

U.S. Department of Transportation Federal Transit Administration and Metropolitan Atlanta Rapid Transit Authority

Sound Transit is updating its Regional Transit Long-Range Plan, which

Central Valley Rail Working Group 1. INTRODUCTIONS

I-26 Fixed Guideway Alternatives Analysis. Transit Talk: ULI Executive Round Table Discussion. Thursday, April 30, :30 AM 1:00 PM

Date: May 4, Clare M. Look-Jaeger, P.E. Kevin C. Jaeger Linscott, Law & Greenspan, Engineers Weingart Projects Construction Traffic Analysis

Alternatives Analysis Executive Summary

Alternatives Analysis, New Starts

Peninsula Corridor Electrification Project. Draft Environmental Impact Report

Summary of transportation-related goals and objectives from existing regional plans

Transit Service Guidelines

SUBURBAN EDGE COMMUNITY ROLE COUNCIL ROLE ALL COMMUNITIES SUBURBAN EDGE

Chapter 5 Transportation Draft

KRM COMMUTER RAIL RATES HIGH WITH PUBLIC INSIDE THE KENOSHA-RACINE-MILWAUKEE COMMUTER LINK

Transcription:

Project Number S-16 Subarea Pierce Primary Mode Commuter Rail Facility Type Corridor Length 5.7 miles Version ST Board Workshop Date Last Modified 11-25-2015 PROJECT AREA AND REPRESENTATIVE ALIGNMENT SHORT PROJECT DESCRIPTION This project would establish commuter rail service from McMillin (near Orting) to the Puyallup Sounder station. Note: The elements included in this representative project will be refined during future phases of project development and are subject to change. REGIONAL LIGHT RAIL SPINE Does this project help complete the light rail spine? CAPITAL COST RIDERSHIP 2040 daily boardings KEY ATTRIBUTES Page 1 of 5 No $207 $222 <1,000 PROJECT ELEMENTS One at-grade station located near Orting, in McMillin, sized to accommodate a diesel multiple unit (DMU) One at-grade side platform station located across N Meridian Avenue A third track will be added from the transfer station in Puyallup to the Meeker Railroad junction Replacement of existing tracks with new tracks to accommodate passenger rail service from Meeker Railroad Junction to 128 th Street E at the southern terminus 125-car surface parking at proposed station location in McMillin One train car layover and siding area, with an operator relief facility Operational leases with BNSF and Meeker Southern Railroad 2 new vehicles (DMUs) Peak headways: 30 minutes 1 percent for art per Sound Transit Policy Non-motorized access facilities (bicycle/pedestrian), transit-oriented development (TOD)/planning due diligence, bus/rail integration facilities, and sustainability measures (see separate document titled Common Project Elements ) NOT INCLUDED Additional maintenance facility capacity; Holgate Yard assumed for maintenance See separate document titled Common Project Elements ISSUES & RISKS Land use in the Orting to Puyallup corridor is characterized by low-density residential developments with most of the existing travel market located west of a potential rail station; future development to the east of McMillin and south of Bonney Lake could utilize this service; existing access to the station area is limited; the residents in this area also have access to the existing Puyallup and Sumner Sounder Stations

KEY ATTRIBUTES ISSUES & RISKS The Orting-Puyallup line is a single track; the line is currently classified as excepted; this rating allows the track to be excepted from regulations and safety rules of the Federal Railroad Administration; the excepted rating allows some use of the track but at low operating speeds; the classification is not generally sufficient to allow passenger rail service This project would require negotiations with the railroad owner and operator (Meeker Southern Railroad) This project may require a new agreement with BNSF Page 2 of 5

Sound Transit has developed a conceptual scope of work for this candidate project for the purpose of generating a representative range of costs, both capital and operating; and benefits, including ridership forecasts, TOD potential, multi-modal access and others. This information is being developed to assist the Sound Transit Board as it develops an ST3 system plan, including phasing of investments and financial plan, for voter consideration. Final decisions on project elements (e.g., alignment, profile, number of stations, station locations, and number of parking stalls) will be determined after completion of system planning, project level environmental review, and preliminary engineering during which additional opportunities for public participation will be provided. Therefore, this scope definition should not be construed as a commitment that all representative features will be included in the final developed project. Long Description: This project would provide a transit connection between the Puyallup Sounder Station and McMillin (near Orting) using existing track owned by Meeker Southern Railroad. Service would be provided via Diesel Mobile Units (DMUs). Assumptions: One or more DMUs would serve the Sounder station in Puyallup A siding will be provided for access to the McMillin Station A transfer station platform will be provided in Puyallup A train layover and operator relief facility would be constructed with this project Modifications to the existing single track to allow for passenger rail service Service would be provided in the am and pm peak periods to connect with Sounder service; it is uncertain that all connections to and from Orting could be timed to coincide with Sounder arrivals and departures For non-motorized station access allowances, both stations are characterized as Suburban stations For bus/rail integration, facilities have been assumed at the McMillin Station Environmental: Sound Transit will complete project-level state and federal environmental reviews as necessary; provide mitigation for significant impacts; obtain and meet the conditions of all required permits and approvals; and strive to exceed compliance and continually improve its environmental performance. Utilities: Utility relocation as needed to complete the project, including fiber optics, sewer, water, overhead electric/communications, etc. Right-of-Way and Property Acquisition: Right-of-way acquisition would be required for the station, and the layover facility Property acquisition for bus/rail integration facility Potential Permits/Approvals Needed: Building permits: Electrical, Mechanical, Plumbing Utility connection permits Construction-related permits (clearing and grading, stormwater management, street use, haul routes, use of city right-of-way) Master use Land use approvals (Conditional use, design review, site plans, Comprehensive Plan or development code consistency, Special Use Permits) FRA approval to allow for passenger rail service All required local, state, and federal environmental permits NEPA/SEPA and related regulations Project Dependencies: Agreement with Meeker Southern Railroad Agreement with BNSF Potential Project Partners: Cities of Puyallup, Orting Meeker Southern Railroad Transit partners serving project: Pierce Transit BNSF FTA FRA Page 3 of 5

Cost: Sound Transit has developed a conceptual scope of work for this candidate project for the purpose of generating a representative range of costs, both capital and operating; and benefits, including ridership forecasts, TOD potential, multi-modal access and others. This information is being developed to assist the Sound Transit Board as it develops an ST3 system plan, including phasing of investments and financial plan, for voter consideration. Final decisions on project elements (e.g., alignment, profile, number of stations, station locations, and number of parking stalls) will be determined after completion of system planning, project level environmental review, and preliminary engineering during which additional opportunities for public participation will be provided. Therefore, this scope definition should not be construed as a commitment that all representative features will be included in the final developed project. In Millions of 2014$ ITEM COST COST WITH RESERVE Agency Administration $10.98 $11.75 Preliminary Engineering & Environmental Review $6.81 $7.28 Final Design & Specifications $13.23 $14.15 Property Acquisition & Permits $3.85 $4.12 Construction $134.91 $144.36 Construction Management $11.90 $12.74 Third Parties $2.85 $3.04 Vehicles $9.43 $10.09 Contingency $13.23 $14.15 Total $207.18 $221.68 Design Basis: Conceptual The costs expressed above include allowances for TOD planning and due diligence, Sustainability, Bus/rail integration facilities, and Non-Motorized Access. These allowances, as well as the costs for Parking Access included above, are reflected in the following table. Property acquisition costs are not included in the table below, but are included within the total project cost above. ITEM COST COST WITH RESERVE TOD planning and due diligence $0.39 $0.42 Sustainability $5.28 $5.65 Parking access $1.29 $1.38 Non-motorized (bicycle/pedestrian) access $17.57 $18.81 Bus/rail integration facilities $2.75 $2.95 Page 4 of 5

Evaluation Measures: MEASURE MEASUREMENT/RATING NOTES Regional Light Rail Spine Does project help complete regional light rail spine? No Ridership 2040 daily station boardings Capital Cost Annual O&M Cost Travel Time In-vehicle travel time along the project (segment) Reliability Quantitative/qualitative assessment of alignment/route in exclusive right-of-way System Integration Qualitative assessment of issues and effects related to connections to existing local bus service and potential future integration opportunities Ease of Non-motorized Access Qualitative assessment of issues and effects related to non-motorized modes Percent of Non-motorized Mode of Access Percent of daily boardings <1,000 $207 $222 $4.44 11 min Medium-High Medium 25-35% Some at-grade crossings Integration opportunities in Puyallup; Limited opportunities from the Orting area; Peak-our service only to medium intersection density with some barriers to nonmotorized access (open space a barrier to McMillin station) Connections to PSRC-designated Regional Centers Number of PSRC-designated regional growth and manufacturing/industrial centers served 1 center Regional Growth Center: Puyallup Downtown Land Use and Development/TOD Potential Quantitative/qualitative assessment of adopted Plans & Policies and zoning compatible with transit-supportive development within 0.5 mile of potential stations Very limited support in local and regional plans; approx. 25% land is compatibly zoned Qualitative assessment of real estate market support for development within 1 mile of potential corridor Density of activity units (population and employment for 2014 and 2040) within 0.5 mile of potential station areas Socioeconomic Benefits Existing minority / low-income populations within 0.5 mile of potential station areas 2014 and 2040 population within 0.5 mile of potential station areas 2014 and 2040 employment within 0.5 mile of potential station areas Pop/acre = 2014: 2; 2040: 2 Emp/acre = 2014: 0; 2040: 0 Pop + Emp/acre = 2014: 3; 2040: 3 19% Minority; 3% -Income Pop: 2014: 1,100; 2040: 1,100 Emp: 2014: 200; 2040: 200 For additional information on evaluation measures, see http://soundtransit3.org/document-library Very limited market support Page 5 of 5