Deon Louw Deputy Director: Electro Technical Services Overstrand Municipality South Africa

Similar documents
Title of presentation

Electrical utility distribution network capital planning

CIPS Pan African Conference

HOW TO READ YOUR ELECTRICITY BILL

Alan Tait Managing Director Pragma Africa

ROLE OF THE NATIONAL ENERGY REGULATOR (SOUTH AFRICA) Lambert du Plessis: Senior Regulatory Specialist

Strategic Direction for Eskom s Retail Tariffs 2011 onwards

ELECTRICITY DISTRIBUTION INDUSTRY RESTRUCTURING

Distribution Code Definitions

Eskom s Single Buyer Office Perspective on renewable energy procurement. Clean Power Africa Conference. 5 September 2012.

A summary of the MYPD3 application and the proposed tariff restructuring plan

Residential Heat Pump Rebate Programme

An Effective Convergence of Analytics and Geography

Learning from telcos on how to meet the demand for real-time charging and billing in the utilities sector

Performance Reporting Criteria

ESKOM UNIVERSAL ACCESS TO ELECTRICITY BUSINESS PLAN

UNIÃO AFRICANA ELECTRICITY SMART GRID

Energy Storage Application definitions and how these relate to the South African EDI policy, legislation and regulation:

The Electricity System Operator Who we are and what we do September 2018 CONFICONFIDNEITA

EU DONOR FUNDED SMART GRID PROGRAMME

Ergon Energy Investment Plans and restructure

SUMMARY OF DISTRIBUTION BUSINESS

LOS ANGELES DEPARTMENT OF WATER AND POWER

DISCUSSION PAPER ON THE DECOMMODIFICATION OF ELECTRICITY

Quantifying the capital requirement: 19% RE by 2030

ELECTRICITY DISTRIBUTION INDUSTRY (EDI) RESTRUCTURING : 11August 2005

South African Distribution Code

Assessment of Wholesale Competition in the Nigerian Electricity Market

Impact of localised Energy Efficiency (EE) and Renewable Energy (RE) on Ekurhuleni s finances over the next 10 years Report.

Economic Regulation of the Regional Electricity Distributors: Critical Challenges

SUBMISSION BY THE SOUTHERN AFRICAN CLOTHING AND TEXTILE WORKERS UNION (SACTWU) TO NERSA ON ESKOM S PROPOSED ELECTRICITY TARIFF INCREASES

ELECTRICITY SUPPLY INDUSTRY OF SOUTH AFRICA

CONTENTS 1. INTRODUCTION POLICY CONTENT...

Impact of localised Energy Efficiency (EE) and Renewable Energy (RE) on City of Cape Town s finances over the next 10 years Report.

SOUTH AFRICA POWER MARKET OUTLOOK TO MARKET TRENDS, REGULATIONS AND COMPETITIVE LANDSCAPE

Pricing and the tariff

Impact of Energy Efficiency and Renewable Energy on Municipal Revenue

Dr Baholo Baholo Sector Leader Energy (Africa & Middle East) Aurecon

UK Power Networks. Technology Watch (Smart) Networks Context & Innovation. 28 th April, 2015 David Boyer, Smart Networks Policy Lead

Smart Metering AMI Program - AFRICA Advanced Revenue Program: Large Power Users

Energize your power business with ABB business management systems

Improving the way we price our network services. Consultation paper

The 30 Year Electricity Strategy Queensland State Government Directions Paper

Utility sector overview & their challenges. Dependency on Energy sector. What needs to addressed in 2018 & beyond

INAUGURAL RED ONE REGIONAL ENGAGEMENT FORUM CALVINIA

ASSET VALUATION A PRACTICAL APPROACH TO VALUING MUNICIPAL POWER SYSTEM ASSETS

Roadmap for moving to a competitive low carbon economy in Gijs Berends EU DELEGATION TO JAPAN ec.europa.eu/clima/policies/roadmap/index_en.

Grid Modernization Initiatives at ComEd

Revenue Enhancement Project Naledi Local Municipality. August 2016

EXHIBIT GG. DATE FILED: February 9, :29 PM FILING ID: 9B5E9BDEA737B CASE NUMBER: 2016CV144

Towards being a smart energy enabler - meeting customers expectations on the energy market. Annika Viklund, CEO Vattenfall Eldistribution, Sweden

Bryan Municipal Utilities. Strategic Plan

Transmission & Distribution Overhead Line Network Inspections and Maintenance Dr Willie de Beer Independent Consultant South Africa

IPAP 2012/15. Impact of rising input costs on manufacturing and beneficiation

STRATEGIC CONTEXT FOR ENERGY PLANNING CHAPTER 2

Source: regional government planning documents, official forecasts

Policy Brief, March 2018

MITIGATION OF OPERATIONAL RISKS FOR THE 2010 FIFA SOCCER WORLD CUP

IMPLEMENTATION OF FREE BASIC SERVICES BY MUNICIPALITIES PROVINCIAL & LOCAL GOVERNMENT PORTFOLIO COMMITTEE 21 JUNE Contents

NERSA Consultation Paper

AMT-SYBEX and National Grid. Case Study. Copyright AMT SYBEX 2011.

LOS ANGELES DEPARTMENT OF WATER AND POWER

CONSULTATION PAPER COST OF SUPPLY FRAMEWORK FOR LICENSED ELECTRICITY DISTRIBUTORSIN SOUTH AFRICA

Africa is lagging behind in terms of energy use, with limited access to electricity and biomass often remaining the main energy source

Intelligent energy and data solutions for tomorrow's world. Investor Presentation Q1 2018

Deloitte Public Sector Working together to make an impact for our country

COMPLIANCE MONITORING REPORT OF NKOMAZI LOCAL MUNICIPALITY

Opportunities to decarbonize the building sector through renewables

Smart Metering. Big Data and the Value of Analytics WHITE PAPER

Are Eskom s concerns relating to Renewable Energy Independent Power Purchase Agreements valid?

Counties Power Limited

Distributed Energy Management: The New Era of Demand Response RESEARCH BY:

CLOSING THE CARBON GAP WWF S RECOMMENDATIONS FOR THE UK S EMISSIONS REDUCTION PLAN

Planning for Infrastructure Service Delivery in Municipalities: The Role of Comprehensive Infrastructure Plans. DJW Wium

The true state of infrastructure challenges in the City of Johannesburg

DATA, BENCHMARKING AND RATIONALE BC Hydro Service Plan 2018/19 to 2020/21

Energy Policy 2013 Annual Update

African Utility Week Eskom s s Cogeneration Project. Thursday 31 st May, 2007

City Power Johannesburg (SOC) Ltd. Business Plan. Final Draft: Subject to NERSA Approval of the Tariffs

Presentation to NERSA Work performed relating to Deloitte s review of Eskom s RCA application

VIRGIN ACTIVE SOUTH AFRICA

Why Africa should get smart about its metering

SMART GRID PROTECTION Mahendra G.Mathukiya 1, Kalpesh R.Ranipa 2 1

Stakeholder Consultation on Draft IEP/IRP 2016

62 nd AMEU Convention 2010

Strategic Business Continuity Management

ENERGY SUMMIT DECLARATION

Why Increase Electricity Prices?

2 Final Business Plan PR09

Reliability Centered Asset Management (RCAM)

Water Pricing in South Africa incorporating social and environmental elements Sacramento Water Pricing Workshop, February 2016 Barbara Schreiner

PAGE 38 THOMAS KUSTERER THE GERMAN ENERGY TRANSITION

Sarah Ward Head: Energy & Climate Change City of Cape Town South Africa

TasNetworks Corporate Plan Current at 30 June 2014

How to stimulate the South African rooftop PV market without putting municipalities financial stability at risk A Net Feed-in Tariff proposal

South Africa s Sub-National Debt legal framework, implementation and reforms. Intergovernmental Relations October 2018

Proposed rationalising of Eskom tariffs to Municipalities

SECTOR ASSESSMENT (SUMMARY): ENERGY 1

ASEAN Smart Grid Congress 2

MUNICIPAL SERVICE DELIVERY: IMPROVING QUALITY AND QUANTITY: 6 December 2012 Infrastructure Dialogue: DBSA

Transcription:

Deon Louw Deputy Director: Electro Technical Services Overstrand Municipality South Africa

MAINTENANCE AS A UTILITY IMPERATIVE ELECTRICITY DISTRIBUTION INDUSTRY (EDI) SOUTH AFRICA

Presentation Content Overview Challenges Prognosis Options Conclusion

Abbreviations Used ADAM - Approach to Distribution Asset Management EDI - Electricity Distribution Industry ESI - Electricity Supply Industry NIRP - National Integrated Resource Plan Rbn - Billion Rand

Current ESI Structure Currently, South Africa operates in the traditional mode of vertical integration with financial and physical flows following the same path EDI Generation Distribution Industry Transmission ESKOM = Physical Energy Flow = Financial Flow Municipalities Metering & Billing Residential Business

Overview Based on EDI Holdings 2008 Report Values ( 1) The EDI is an asset intensive business Asset base replacement value ~ R260 billion Distribution overhead lines >400 000 km Distribution underground cables >210 000 km Average age of asset base ~45 yrs Customer centric business Serving ~9.2 million customers 1USD = R9 (approximately)

Overview Based on EDI Holdings 2008 Report Values ( 2) Large employer ~31 000 people employed in the EDI On average 26% of electricity staff are 50 and older, 62% are between 31 & 50 and 12% are under 30 Average age of electricity staff in critical technical positions >50 years 35% average vacancy rate Significant player in the economy of South Africa

Challenges ( 1) Despite pockets of good performance the EDI infrastructure shows that reliability and asset management needs urgent investment Current practices in the EDI are no guarantee for business sustainability and economic growth Evidence of significant under investment in people development, infrastructure and asset management

Challenges ( 2) Deterioration of electricity service delivery in many areas Supply interruptions cost the Economy ~ R2.9bn to R 8.6bn p.a (2006)* The EDI Holdings infrastructure assessment (2008) and the development of the Approach to Distribution Asset Management (ADAM), revealed that: The maintenance, refurbishment and strengthening backlog ~R27,4 billion (2008) The backlog is growing at a rate of ~R2.5bn per annum Note: *Cost to the economy of unplanned system outages, based on the NIRP 2006 guidelines (NERSA, NIRP report 17January 2006)

Maintenance, Refurbishment & Replacements ( 1) Average Electricity Distribution Network life span is 50 years With proper maintenance, refurbishment and replacement, the remaining life of the network should be kept at an average of 25 years. to minimise expenditure. This means that generally 2% of the network should be replaced yearly together with appropriate maintenance and refurbishment.

Maintenance, Refurbishment & Replacements ( 2) Current value of 2% replacement is approx R6.5bn. We estimate a annual shortfall of nearly R3.5bn in 2011 terms Under current circumstances the average remaining life of the network is therefore aging with another year after every two years of operation. It was estimated that the network average age was 45years in 2008. It would therefore be 47 Years currently

Rbn Asset Value vs Network Age 320 288 256 224 Network Asset Value 192 160 128 New 5 10 15 20 25 30 35 40 45 50 Age (Years) 96 64 32 Current Value 5 350 300 250 200 150 100 50 0

Cost Typical Asset Maintenance Cost Teething Problems Asset Life - Years

Problems Facing the Distribution Industry ( 1) Stop the ageing of the infrastructure Reduce maintenance cost by pulling out of the upward curve of the bathtub asset cycle Compounded operation cost due to: Huge tariff hike due to generation capacity increase Additional funds needed to drastically increase the replacement and refurbishment of assets Huge network expansion due to electrification at lower affordable tariffs but not balanced out with cross subsidisation of sufficient industry growth

Problems Facing the Distribution Industry ( 2) Training of sufficient electrical staff Financial, Maintenance and Network Support Technology vs Skills of Operational Staff

Prognosis ( 1) While there is a plan in place to address the generation related challenges, there is no integrated strategy/plan in place to address the distribution related challenges Currently the public perceives any electricity outages as Eskom Generation related, whereas many are related to Distribution Network related failures Current performance of the EDI-side will not be able to underpin the projected economic growth or create sustainable jobs

Prognosis ( 2) Performance of the EDI-side is deteriorating at a rapid rate and service delivery is going to become an even bigger challenge going forward If we are serious about a sustainable solution to the electricity challenges of South Africa; the EDI and the electricity supply industry (ESI) as a whole, requires an integrated and holistic approach, with support; from government, all industry players, business and citizens of this country

Options ( 1) To ensure, amongst others, the sustainability of the EDI, to support the required economic growth and create job opportunities in South Africa, it is essential that: Staff recruitment, training/development and retention be addressed Technology be leveraged to enhance service delivery and to improve amongst others customer service, revenue management & network performance

Options ( 2) Update the ADAM plan, adopt it and roll it out as an integrated multi year plan to address the current electricity distribution infrastructure related challenges Identify the entities and institutions with capacity to provide assistance/consolidation to bring about improvement in the areas where the biggest challenges are

Conclusion ( 1) Visible and committed strategic leadership/sponsorship and firm decisions are required to bring about the desired change in the EDI. First steps has appeared in the National Fiscus The support of every participant in the EDI will be required to bring about the desired change. From a technology deployment perspective it is essential to move away from the business as usual approach and pursue appropriate technology solutions and create a more intelligent grid which will improve service delivery.

Conclusion ( 2) For an EDI infrastructure turnaround strategy ito of governance and finance, It would be advisable to consider a similar approach as what is used in respect of the national electrification program. It is essential that the infrastructure funding allocation be defined and that the investment of the money earmarked for infrastructure is correctly applied. The infrastructure investment must be monitored to ensure that the refurbishment and replacement backlog shrinks.

THANK YOU