February 12, 2018 NYSE:HL. Exploration Update. To accompany 02/12/18 news release

Similar documents
May 8, 2018 NYSE:HL. Exploration Update. To accompany 05/08/18 news release

Filtered Tailings: A Silver Bullet?

Hecla Reports Record Reserves for Silver, Gold and Lead Company Release - 2/7/2018 3:00 AM ET

N E W S R E L E A S E

N E W S R E L E A S E

AVINO SILVER & GOLD MINES LTD.

AVINO ANNOUNCES FOURTH QUARTER AND FULL YEAR 2017 PRODUCTION RESULTS FROM ITS AVINO PROPERTY

Nevada Copper Hits with 19 Mineralized Holes: Enhances Potential of Open Pit Economics

Coeur Files Technical Report for Palmarejo Complex

Sierra Metals Exploration Update Call

Newmont Reports 2017 Reserves and Resources; Reserve additions replace depletion, Resources increase

News Release. Highlights of the Cobalt Resource:

Current Drilling program at the Cuye Zone reflects high grade Polymetallic and Copper mineralization which continues and remains open to depth

Mining and Metallurgical Society of America Denver

Copper Silver Gold. TSX-V, Nasdaq First North: FIL filo-mining.com. Corporate Presentation October, 2017

SIERRA METALS REPORTS A 53.5% INCREASE IN NI COMPLIANT MINERAL RESERVES AT ITS YAURICOCHA MINE, PERU

Pan American Silver Mineral Reserves Increase to 288 Million Ounces

VALUE THROUGH GOLD BRUCEJACK PROJECT PREMIER S NATURAL RESOURCE CONFERENCE

Copper Silver Gold. TSX-V, Nasdaq First North: FIL filo-mining.com. Corporate Presentation July, 2017

Fortuna provides update on the Lindero gold Project in Argentina

Forward Looking Statement

Duluth Metals Highlights Twin Metal s Nickel Position with 4.7 Billion Measured and Indicated Pounds and 4.2 Billion Inferred Pounds

(TSX: AUQ) (NYSE: AUQ)

N E W S R E L E A S E

AMERICAS SILVER CORPORATION PROVIDES THIRD QUARTER PRODUCTION UPDATE

Suite West Hastings Street Vancouver BC CANADA V6C 2W2 Tel: Fax: December 3, 2013 #

Pine Point MRE Overview TSXV: OM

CANADA S NEXT INTERMEDIATE GOLD PRODUCER. Nishnawbe Aski Development Fund Aboriginal Partnership Conference Timmins, Ontario May 30, 2013

T S X : R M X N Y S E. M K T : R B Y. Rubicon Begins Stockpiling Mill Feed for Projected Production Commencing Mid-2015

Richmont Mines Provides a Status Update on an Expansion Case Preliminary Economic Assessment for the Island Gold Mine

930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4. Tel: (604) Tel:

Champion Bear Announces Drilling Results from Plomp Farm West Gold project

NEWS RELEASE New York - AG Toronto FR August 11, 2015 Frankfurt FMV Mexico - AG

FILO MINING REPORTS 61% INCREASE IN RESOURCE TONNES AT FILO DEL SOL PROJECT

555 Burrard Street, Suite 1800, Vancouver, B.C. V7X 1M June 5, 2018 SBB NR SBB TSX

T S X : R M X N Y S E. M K T : R B Y

Non-IFRS performance measure. Refer to the Non-IFRS Performance Measures contained in the Q Management s Discussion and Analysis.

N E W S R E L E A S E

SILVERCORP REPORTS Q3 RESULTS: NET INCOME OF $12.7 MILLION, $0.08 PER SHARE AND PROVIDES FISCAL 2019 PRODUCTION AND CASH COSTS GUIDANCE

ASX:MEI COBALT COBALT COBALT!

SILVERCORP REPORTS Q2 RESULTS: NET INCOME OF $11.1 MILLION, $0.07 PER SHARE

Torex Site Visit Consistent and Low Cost Gold Delivery Faysal Rodriguez

NEWS RELEASE GREAT PANTHER SILVER ACHIEVES SEVERAL PRODUCTION RECORDS IN THIRD QUARTER 2013

Sabina Gold & Silver Provides Project Development Update on Back River Gold Project Significant de-risking activities completed in 2018

News Release. Trilogy Metals Initiates Work to Establish Cobalt Resource Estimate for the Bornite Project in Alaska, USA

Sierra Metals discovers a significant new high grade zone at its Yauricocha mine in Peru

Corvus Gold Receives Sulfide Gold Recovery of +90% Using AAO Process at the North Bullfrog Project, Nevada

ASCOT INCREASES TOTAL GOLD RESOURCES AT THE PREMIER-DILWORTH PROPERTIES IN BRITISH COLUMBIA

Zinc Business. September 19, 2017 Dale Andres, Senior Vice President, Base Metals

Cardero Provides Update on Metallurgical Coal Quality at the Carbon Creek Deposit, Northeast British Columbia

Hidden Valley PNG s Newest Mine Briefing for Analysts

NEWS RELEASE LUNDIN MINING ANNOUNCES 2015 PRODUCTION RESULTS AND PROVIDES OPERATING AND CAPITAL GUIDANCE

CORPORATE PRESENTATION JULY 2017

Independent tests produced a concentrate with an extremely high grade of 56% copper

Santacruz Silver Reports First Quarter 2017 Production and Financial Results

BUCHANS & MINCO ANNOUNCE THAT DRILLING HAS STARTED AT THE WOODSTOCK MANAGNESE PROJECT IN NEW BRUNSWICK, CANADA

AMERICAS SILVER CORPORATION PROVIDES THIRD QUARTER PRODUCTION RESULTS AND SAN RAFAEL PROJECT UPDATE

GOLD RESOURCE CORPORATION UPDATES PROVEN & PROBABLE RESERVES, BOOSTING GLOBAL TONNES BY 16%, GOLD OUNCES BY 18% AND SILVER OUNCES BY 14%

JULY 21, 2003 ESTIMATE OF TONNAGES AND GRADES OF FAR NORTH DEPOSIT INCREASED BY RE-CALCULATION OF INDEPENDENT RESOURCE ESTIMATE

Regulus Announces that Preliminary Metallurgical Results Indicate Good Gold Recovery is Achievable at the Rio Grande Cu-Au-Ag Project, Argentina

People Characteristics: A predictor of cyber security incidents?

OCEANIC IRON ORE CORP. Ste Burrard Street Vancouver, BC V7X 1L3 Tel: Fax:

Update of Amaruq Agnico Eagle s near-term future in Nunavut Nunavut Mining Symposium, Iqaluit, Nunavut

Black Butte Copper Project Mine Design Conference, Fairmont, April TSX.V:TAU OTCQX:TINTF

INTEGRA RESOURCES COMMENCES METALLURGICAL TESTWORK PROGRAM AT THE DELAMAR GOLD-SILVER PROJECT

IDM Mining Updates Pre-Development Engineering and Optimization at Red Mountain Gold Project

SUITE WEST HASTINGS STREET VANCOUVER, BC V6C 2W2 CANADA TEL: FAX:

Argonaut Gold Announces Q1 Production of 30,963 Gold Equivalent Ounces, an Increase of 4% Over Prior Year

DIVERSIFIED METAL EXPLORATION & DEVELOPMENT COMPANY

BUCHANS AND MINCO ANNOUNCE OPTION AGREEMENT ON WOODSTOCK MANGANESE PROPERTY

SILVERCORP REPORTS SILVER PRODUCTION OF 5.0 MILLION OUNCES, CASH FLOWS FROM OPERATIONS OF $31.9 MILLION, OR $0

Sierra Metals Reports Second Quarter 2018 Production Results Including Record Consolidated Quarterly Ore Throughput

Copper Mountain Announces Robust Preliminary Economic Assessment Results for New Ingerbelle

SILVERCORP NET INCOME $43.7 MILLION, $0.26 PER SHARE, FOR FISCAL 2017

FIRST MAJESTIC SILVER CORP.

Progress Update on the Lower Footwall Zone

SOCIOECONOMICS & WORKFORCE. Ch. 3 of the PRO

NEWS RELEASE. Foran Finds Elevated Precious Metal Values at Depth

Sierra Metals Updates Mineral Resource Estimate for Cusi Mine, Mexico

NEWS RELEASE Trading Symbol: TSX: SVM

SILVERCORP REPORTS Q3 FISCAL 2016 FINANCIAL AND OPERATING RESULTS AND FISCAL 2017 GUIDANCE ISSUED

LUNDIN MINING ANNOUNCES UPDATED MINERAL RESERVES AND RESOURCES

Q Preliminary Production Results, 2018 Production Guidance and Mineral Reserve and Resource Update

NEW MINERAL RESOURCE ESTIMATE ADDS 281 MILLION TONNES OF HIGH-GRADE INFERRED RESOURCES TO THE HUGO NORTH COPPER-GOLD DEPOSIT IN MONGOLIA

NEWS RELEASE New York AG February 25, 2019 Toronto FR Frankfurt FMV. First Majestic Announces Financial Results for Q4 and Year End 2018

Brett Fletcher Executive General Manager PNG & Indonesian Operations

ENERTOPIA CORPORATION

Orezone Announces Updated Feasibility Study to Incorporate a Phase II High-Grade Sulphide Expansion

PRESS RELEASE CANADIAN ZINC REPORTS ON ANNUAL GENERAL MEETING OF SHAREHOLDERS. Company Provides Corporate Update

Advanced Biofuels & Bioeconomy

Safety Leadership Workshop

Great Western Scoping Study Update & Onsite Gold Processing

The Canyon Mine. A Developed Uranium Mine in the US Ready to Produce

Corvus Gold Announces Expanded Mineral Resource for the North Bullfrog Project, Nevada

Positive Preliminary Economic Assessment for Murray Brook Zn Cu Pb Ag Deposit, Bathurst Mining Camp, New Brunswick

METATES UPDATED PEA INDICATES EXCELLENT PROJECT ECONOMICS 26,000 METRE DRILL PROGRAM UNDERWAY

Kirkland Lake Gold Produces 130,425 Ounces of Gold in Q Supported by Strong Grade Performance at Macassa and Fosterville Mines

SILVERCORP REPORTS Q2 FISCAL 2017 RESULTS: NET INCOME UP 454%, CASH FLOWS FROM OPERATIONS OF $27.0 MILLION ON RECORD SILVER PRODUCTION

Farellon. January 2018

Cash and cash equivalents of approximately $35 million as at December 31, 2014;

Transcription:

February 12, 2018 Exploration Update To accompany 02/12/18 news release

Cautionary Statements Cautionary Statement Regarding Forward Looking Statements, This presentation contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended, which are intended to be covered by the safe harbor created by such sections and other applicable laws, including Canadian Securities laws. Such forward-looking statements may include, without limitation: (i) expectations of adding reserves and resources; (vi) the possibility of increasing production due to accessing higher grade material and surface pits at Casa Berardi; (ii) possible strike extensions of veins at San Sebastian, potential for new discoveries, ability to ramp up underground mining during 2018, ability to expand the Hugh Zone and extend mine life further. Estimates or expectations of future events or results are based upon certain assumptions, which may prove to be incorrect. Such assumptions, include, but are not limited to: (i) there being no significant change to current geotechnical, metallurgical, hydrological and other physical conditions; (ii) permitting, development, operations and expansion of the Company s projects being consistent with current expectations and mine plans; (iii) political/regulatory developments in any jurisdiction in which the Company operates being consistent with its current expectations; (iv) the exchange rate for the Canadian dollar to the U.S. dollar, being approximately consistent with current levels; (v) certain price assumptions for gold, silver, lead and zinc; (vi) prices for key supplies being approximately consistent with current levels; (vii) the accuracy of our current mineral reserve and mineral resource estimates; and (viii) the Company s plans for development and production will proceed as expected and will not require revision as a result of risks or uncertainties, whether known, unknown or unanticipated. Where the Company expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed in good faith and believed to have a reasonable basis. However, such statements are subject to risks, uncertainties and other factors, which could cause actual results to differ materially from future results expressed, projected or implied by the forward-looking statements. Such risks include, but are not limited to gold, silver and other metals price volatility, operating risks, currency fluctuations, increased production costs and variances in ore grade or recovery rates from those assumed in mining plans, community relations, conflict resolution and outcome of projects or oppositions, litigation, political, regulatory, labor and environmental risks, and exploration risks and results, including that mineral resources are not mineral reserves, they do not have demonstrated economic viability and there is no certainty that they can be upgraded to mineral reserves through continued exploration. For a more detailed discussion of such risks and other factors, see the Company s 2016 Form 10- K, filed on February 23, 2017 with the Securities and Exchange Commission (SEC), as well as the Company s other SEC filings. The Company does not undertake any obligation to release publicly revisions to any forward-looking statement, including, without limitation, outlook, to reflect events or circumstances after the date of this presentation, or to reflect the occurrence of unanticipated events, except as may be required under applicable securities laws. Investors should not assume that any lack of update to a previously issued forward-looking statement constitutes a reaffirmation of that statement. Continued reliance on forward-loo king statements is at investors own risk. Cautionary Note Regarding Estimates of Measured, Indicated and Inferred Resources The United States Securities and Exchange Commission (SEC) permits mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. We use certain terms in this presentation, such as resource, measured resources, indicated resources, and inferred resources that are recognized by Canadian regulations, but that SEC guidelines generally prohibit U.S. registered companies from including in their filings with the SEC, except in certain circumstances. U.S. investors are urged to consider closely the disclosure in our most recent Form 10-K and Form 10-Q. You can review and obtain copies of these filings from the SEC s website at www.sec.gov. Qualified Person (QP) Pursuant to Canadian National Instrument 43-101 Dean McDonald, PhD. P.Geo., Senior Vice President - Exploration of Hecla Mining Company, who serves as a Qualified Person under National Instrument 43-101("NI 43-101"), supervised the preparation of the scientific and technical information concerning Hecla s mineral projects in this presentation. Information regarding data verification, surveys and investigations, quality assurance program and quality control measures and a summary of analytical or testing procedures for the Greens Creek Mine are contained in a technical report titled Technical Report for the Greens Creek Mine effective date March 28, 2013, and for the Lucky Friday Mine are contained in a technical report titled Technical Report for the Lucky Friday Mine Shoshone County, Idaho, USA effective date April 2, 2014, for Casa Berardi are contained in a technical report titled "Technical Report on the mineral resource and mineral reserve estimate for Casa Berardi Mine, Northwestern Quebec, Canada" effective date March 31, 2014 (the "Casa Berardi Technical Report"), and for the San Sebastian Mine, Mexico, are contained in a technical report prepared for Hecla titled Technical Report for the San Sebastian Ag-Au Property, Durango, Mexico effective date September 8k 2015. Also included in these four technical reports is a description of the key assumptions, parameters and methods used to estimate mineral reserves and resources and a general discussion of the extent to which the estimates may be affected by any known environmental, permitting, legal, title, taxation, socio-political, marketing or other relevant factors. Copies of these technical reports are available under Hecla's and Aurizon's profiles on SEDAR at www.sedar.com. The Casa Berardi Technical Report was reviewed by Dr. McDonald on behalf of Hecla. To the best of Hecla's knowledge, information and belief, there is no new material scientific or technical information that would make the disclosure of the mineral resources and mineral reserves for Casa Berardi in this document inaccurate or misleading. 2

San Sebastian: Strong Exploration Potential Continued discoveries near mine infrastructure 3

Francine Vein polymetallic potential Polymetallic mineralization traced for over 5,000 feet of strike length FRANCINE VEIN LONGITUDINAL SECTION (Looking NE) West Francie Vein Target Area PROSPECTIVE FOR POLYMETALLIC MINERALIZATION Limit of Current Hugh Zone Resource 9.1 oz/ton silver 3% Cu, 3% Pb, 4% Zn over 2.6 feet Polymetallic (Hugh Zone) 8.2 oz/ton silver 2% Cu, 3% Pb, 4% Zn over 6.2 feet PROGRAMMED DRILL HOLE DRILL HOLE ASSAYS PENDING DRILL HOLE INTERCEPT $140 NSR + CUTOFF FOR UG MINING FAULT 12.8 oz/ton silver 2% Cu, 4% Pb, 6% Zn over 3.6 feet 4.7 oz/ton silver 1% Cu, 2% Pb, 2% Zn over 11.8 feet 4.6 oz/ton silver 2% Cu, 2% Pb, 4% Zn over 9.6 feet 9.2 oz/ton silver 2% Cu, 5% Pb, 5% Zn over 6.3 feet $NSR VALUE PER TON (5.9 FT DILUTED) 4

Expanding Middle Vein Polymetallic Mineralization High-grade polymetallic intercepts near the Middle Vein ramp MIDDLE VEIN POLYMETALLIC ZONE LONGITUDINAL SECTION (Looking NE) $NSR VALUE PER TON (5.9 FT DILUTED) 97 ZONE POLYMETALLIC MINERALIZATION PROGRAMMED DRILL HOLE 12.0 oz/ton silver 4% Cu, 6% Pb, 9% Zn over 5.4 feet DRILL HOLE ASSAYS PENDING DRILL HOLE INTERCEPT $140 NSR + CUTOFF FOR UG MINING 10.2 oz/ton silver 3% Cu, 10% Pb, 18% Zn over 4.4 feet 5

Middle Vein polymetallic potential Predicting a horizonal polymetallic zone below the oxide reserve MIDDLE VEIN LONGITUDINAL SECTION (Looking NE) MIDDLE VEIN NORTH RAMP MIDDLE VEIN OPEN PIT SHELL $NSR VALUE PER TON (5.9 FT DILUTED) 97 ZONE POLYMETALLIC MINERALIZATION PROSPECTIVE FOR POLYMETALLIC MINERALIZATION 0.001 oz/ton gold and 10.2 oz/ton silver 3% Cu, 10% Pb, 18% Zn over 4.4 ft PROGRAMMED DRILL HOLE DRILL HOLE INTERCEPT $140 NSR + CUTOFF FOR UG MINING FAULT JANUARY 2018 6

Casa Berardi: Great Exploration Potential Resources and mineralized trends defined from surface and UG drilling -7-

Casa Berardi: Underground drilling Continued strong results in lower 118 and 123 zones; open at depth -8-

Casa Berardi: Open Pit Potential Surface view showing potential series of open pits Surface Drilling -9-

Casa Berardi: East Mine Open Pits Strong drill results could extend both EMCP pit and proposed 160 Zone pit -10-

Greens Creek: Adding to the known trends Drilling expected to continue to convert resources into reserves -11-

East Ore Zone Drilling Narrow but very high grade -12-