Delaware River Basin Commission

Similar documents
Revised PCB Water Quality Criterion for Zones 2-6 and Enhanced Implementation for the Stage 2 PCB TMDLs for the Delaware Estuary

Modeling Eutrophication Processes in the Delaware Estuary to Link Watershed Efforts to Control Nutrient Impacts

PCB Pollutant Minimization Plans: Background and Guidance

DRBC and Agency Expectations for Annual Reports

Evaluation of PCB TMDL Efforts in the Delaware Estuary

Photo Optional. Using a PMP Approach to Attain TMDLs (An update to the PMP Approach to PCB Loading Reduction at Two Amtrak Facilities) Presented by:

Implementing PCB TMDLs: Pollutant Minimization Plan (PMP) Status. Gregory J. Cavallo Modeling, Monitoring and Assessment Branch May 10, 2012

Pollutant Minimization Plan Regulations: Section of the DRBC Water Quality Regulations

IMPLEMENTATION POLICIES AND PROCEDURES: PHASE I TMDLs FOR TOXIC POLLUTANTS IN THE DELAWARE RIVER ESTUARY

Evaluation of PCBs and Dioxin/Furans (DxFs) Concentrations in Sediment from the Delaware Estuary

Delaware River Basin Commission

TOXICS ADVISORY COMMITTEE May 7, 2002

Water Quality Workshop Delaware Bay Region Pilot Study Summary. March 11, 2008

Delaware River Basin Commission

Pollutant Minimization Plan for Polychlorinated Biphenyls (PCBs) in the Delaware River Estuary

Water Quality Programs of the Delaware River Basin Commission

The Chesapeake Bay TMDL -

Final TMDL Implementation Plan. Prepared for Minnesota Pollution Control Agency

Detroit River E. coli TMDL Public Notice Draft

PA Municipal Separate Storm Sewer System (MS4) TMDL Plan

Delaware River Basin Commission

Joint STAC-MACC Meeting

Too Many Dadgum Letters TMDLs and NPDES

Camden County MUA s. PCB Pollution Minimization Plan

Delaware River Basin Compact

Pennsylvania s TMDL Program

Total Maximum Daily Load

MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore MD

The Total Maximum Daily Load (TMDL) Program in Illinois. Watershed Management Section Bureau of Water

Technical Analysis for the Proposed Inland Bays Drainage Basin Bacteria TMDLs

Stormwater Monitoring for PCBs in the Delaware Estuary

Critical Period for the Chesapeake Bay TMDL

WWOA Annual Conference October 6, John Kennedy. Green Bay Metropolitan Sewerage District Cleaning Water Today For Tomorrow s Generations

Chesapeake PCB Consortium Conceptual Framework and Proposed Exploration

Setting Wasteload Allocations in a TMDL

Total Polychlorinated Biphenyls (PCBs).

Final Total Maximum Daily Load Allegheny River, Allegheny County PCBs

Federal Storm Water Requirements

Philadelphia Water Department 9/24/13

Water Is Not a Pollutant

Septic Systems 4% Chemical Fertilizer: Agricultural Land 15%

Contaminants of Emerging Concern in the Delaware River Estuary

Approaches for Determining and Complying with Total Maximum Daily Load Requirements Related to Stormwater Runoff. Presented by Anna Lantin, P.E.

Lake Pepin Watershed TMDL: Looking Ahead. August 2008 Sector Meetings. Lake Pepin Photo by Guy Schmickle

Monitoring in Tributaries of the Delaware River for Ambient Toxicity 2016 Narrative Report

Final Total Maximum Daily Load for the Susquehanna River, PCBs

INFORMATION SHEET. Proposed Total Maximum Daily Load (TMDL) for Stump Creek, Jefferson and Clearfield Counties, Pennsylvania

The Role of Indicators. Delaware River Basin Commission Estuary Science Conference

Evolving NPDES Permits

Benefit-Cost Analysis of Improved Water Quality in the Delaware Basin. Delaware Estuary Summit Cape May, NJ Jan 30, 2013

TOTAL MAXIMUM DAILY LOAD (TMDL)

Turbidity TMDL Allocations

4 PROBLEM ANALYSIS AND GOAL SETTING

Presentation Overview. Background issues Study objectives Study design Schedule

Final Total Maximum Daily Load for the Monongahela River, Greene County PCBs and Chlordane

Camden County MUA s. PCB Pollution Minimization Plan

The Total Maximum Daily Load (TMDL) Program in Illinois. Trevor Sample Planning Unit Watershed Management Section Bureau of Water

(3) Location, type, significance and interaction of pollutant sources;

Chesapeake Bay Water Quality Restoration:

Total Maximum Daily Load (TMDL) & Pollutant Reduction Plan (PRP) For Skippack Creek Franconia Township Montgomery County, Pennsylvania

Data Review & Analysis

Marina del Rey Enhanced Watershed Management Program Plan

Action Plan for the James River (Tidal) Bacteria TMDL ( MS4 General Permit)

The City of Cocoa (City) is located in east

Federal Water Quality Update

Florida Department of Environmental Protection An Overview of Florida s Statewide TMDL for Mercury in Fresh & Marine Waters

Restoring the Long Island Sound While Saving Money

TMDL and Stormwater Regulations & Policy: Recent Developments and their Implications for MS4 Permit Holders

Innovative Storm Water Program Implementation

Greater Trinity River Bacteria TMDL Project

Delaware River Basin Commission

Tampa Bay Nit r ogen Management Consor t ium: RA and TMDL Updat e. ABM November 13, 2008 H. Gr eening, TBEP

Receiving Waters Monitoring Work Plan Guidance for the CSO Program. March, 2015

MINNESOTA POLLUTION CONTROL AGENCY Municipal Division Municipal Wastewater Section

Narrative Water Quality Objective

UPDATE OF BALTIMORE REGION TOXICS WORKSHOP (Aug 3) AND REGIONAL CASE STUDIES OF NOVEL PCB REMEDIATION

STUDY OF THE LOADINGS OF POLYCHLORINATED BIPHENYLS FROM TRIBUTARIES AND POINT SOURCES DISCHARGING TO THE TIDAL DELAWARE RIVER

Total Maximum Daily Load & Impaired Waters List

Susan Myerov, AICP Watersheds Program Director Pennsylvania Environmental Council Michael Helbing Staff Attorney Citizens for Pennsylvania s Future

Delaware River Basin Commission

Contaminants of Emerging Concern in the Tidal Delaware River a Pilot Monitoring Survey

APPENDIX C Technical Approach Used to Generate Maximum Daily Loads

CHESAPEAKE BAY TMDL PHASE III WIP NORTHERN VIRGINIA OPENING STAKEHOLDER MEETING AUGUST 17, 2018 NORMAND GOULET NVRC

Phase II WIP Background & Development Process. February 2011

The Clean Water Act and Sediment Remediation

Florida s Water Quality Trading. Carla Seiwert EPA R

U.S. Environmental Protection Agency s Interim Expectations for the Phase III Watershed Implementation Plans

2413 (6) Authorize random audits by the director of documentation developed or submitted by certified water quality professionals to ensure

APPENDIX A. Nutrient Trading Criteria Specific for the Chesapeake Bay Watershed

Minnesota River Integrated Watershed Management Interagency Study Team Meeting Of the Modeling Focus Group

City of Daphne, Alabama Water Quality Monitoring Plan For Phase II MS4

2009 Mercury Science and Policy Conference

Using the Intake Credit - Data Needs and Considerations

What is the purpose of the plan? Why did we choose Raccoon Creek? What pollutants does this TMDL address? Where do the pollutants come from?

What is a TMDL? MWEA NPDES Permit Compliance Seminar. December 2, 2009

Chesapeake Bay TMDL Report Outline Reevaluation Technical Workgroup Conference Call September 3, Attachment A

FINAL. Appendix D: Newport Bay

Feasibility Study Work Plan. for the. Passaic River Study Area

Chesapeake Bay Program in Pennsylvania. Karl G. Brown Executive Secretary PA State Conservation Commission

U.S. Environmental Protection Agency s Interim Expectations for the Phase III Watershed Implementation Plans

Transcription:

Delaware River Basin Commission Updating TMDLs for PCBs for the Delaware Estuary Thomas J. Fikslin, Ph.D. Namsoo S. Suk, Ph.D. Delaware Estuary Science & Environmental Summit January 24, 2017

Outline Background History of PCB TMDLs in the Delaware Estuary Need for Update of Stage 1 TMDLs Comparison of Loadings: Stage 1 vs Stage 2 Stage 2 Principles Proposed Schedule 2

The estuary consists of 5 water quality management units called Zones. EPA Regions II & III establish Stage 1 PCB TMDLs for Zones 2 5 in December 2003. Each Zone is assigned a TMDL. EPA Regions II & III establish Stage 1 PCB TMDL for Zone 6 (Delaware Bay) in December 2006. TMDL History

TMDL History (cont.) These TMDLs were complicated for several reasons: 1) Legal deadlines. 2) The current human health criteria of both the states and the DRBC at that time needed updating. 3) Point and non point sources were not well characterized. 4) A PCB water quality model was needed to develop the TMDLs. 5) An equitable wasteload allocation procedure was needed. 6) An implementation strategy was needed to address the concerns of stakeholders. 7) Consensus decision for a staged approach for TMDLs.

Stage 2 TMDLs Stage 2 TMDLs are needed to: Update the TMDLs to the revised WQ criterion, Refine loadings using consistent, high quality data, Utilize a new, more equitable wasteload allocation procedure agreed upon by stakeholders, Implement a new procedure for developing the TMDLs for each Zone, and Include a revised implementation strategy for point and non point sources as an Appendix to the Stage 2 TMDL report. Provide certainty to this long term process.

Stage 2 TMDLs The conceptual approach for developing the Stage 2 TMDLs involved: 1) The use of a uniform Total PCB criterion of 16 pg/l. 2) The use of a representative hydrological year (February 2002 January 31, 2003) for long term model simulations. 3) The use of an allocation procedure called Equal Effluent Concentration (EEC). 4) Use of an explicit Margin of Safety of 5% (same as in Stage 1 TMDLs). 5) Comparisons of Stage 1 PCB loadings from each source category to the current loadings from each category.

Stage 2 TMDLs By Zone Stage 2 TMDLs for each of the Zones 2 6 consist of wasteload allocations (WLAs) for point sources including CSOs and MS4s, and load allocations (LA) for non point sources including: Contaminated sites, Tributaries, Two upstream boundaries (Delaware River at Trenton and the Schuylkill River), and the remaining non point sources (direct runoffs and atmospheric deposition). Allocations were calculated by multiplying the daily average flows during the cycling year by a water quality target of 15.2 pg/l.

Point Sources 96 NPDES Permittees Penta PCB load (kg/year) 1.2 1.0 0.8 0.6 0.51 137 Outfalls 0.4 0.2 0.0 Comparison of Stage 1 and Stage 2 Annual Penta PCB loads Point Sources 0.17 1.00 0.20 0.83 0.34 0.53 0.09 0.001 0.008 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Stage 1 Load Stage 2 Load

Contaminated Sites Comparison of Stage 1 and Stage 2 Annual Penta PCB loads Contaminated Sites 4.5 4.25 97 Sites: NJ 8 PA 20 DE 69 Penta PCB load (kg/year) 4.0 3.5 3.0 2.5 2.0 1.5 1.0 0.5 0.0 0.001 0.002 0.859 1.37 0.316 0.50 0.121 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Stage 1 Load Stage 2 Load"

Tributaries 37 Tributaries NJ 13 PA 6 DE 18 0.7 0.6 0.5 Comparison of Stage 1 and Stage 2 Annual Penta PCB loads Tributaries 0.58 0.55 0.53 0.51 0.48 penta PCB load (kg/year) 0.4 0.3 0.2 0.29 0.36 0.31 0.28 0.1 0.0 0.00 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Stage 1 Load Stage 2 Load

Major Upstream Boundaries 4.0 3.5 Comparison of Stage 1 and Stage 2 Annual Penta PCB loads Delaware River at Trenton and Schbuylkill River 3.65 Penta PCB Load (kg/year) 3.0 2.5 2.0 1.5 1.0 2.13 2.63 2.57 0.5 0.0 Delaware River at Trenton Upstream Boundary Schuylkill River Stage 1 Loads Stage 2 Loads

Comparison of Annual Penta PCB Loads from each Source Category 7.9 Stage 1 Penta PCB Load Stage 2 Penta PCB Load Annual penta PCB Load (kg/year) 6.1 2.6 2.6 3.6 2.9 3.2 2.1 1.7 1.9 1.7 1.8 1.3 0.8 0.5 1.0 CONTAMINATED SITES SCHUYLKILL RIVER DELAWARE RIVER AT TRENTON OTHER TRIBUTARIES POINT SOURCES CSOS MS4S REMAINING NPS Source Category

Current Status Significant reductions (over 70%) in loading from point sources occurred following establishment of Stage 1 TMDLs through the implementation of Pollutant Minimization Plans through NPDES permits, and monitoring to track progress. The additional Stage 2 implementation requirement of Action Levels will serve to maintain loading reductions achieved. Focused effort is needed in Stage 2, however, to: 1. Further identify and reduce loadings from contaminated sites. 2. Develop and implement TMDLs in tributaries with a priority on those with the largest PCB loading. Are the loadings reductions reflected in the media???

PCBs in Fish Tissue Delaware River Estuary 2000 to 2015 2000 Nanograms per gram (ppb) - wet weight 1800 1600 1400 1200 1000 800 600 400 200 0 2000-01 2002 2003 2004 2005 2006 2007 2010 2012 2015 Years White Perch Channel Catfish

Historical Trend in PCBs in Fish Tissue Crosswicks Creek - Delaware Estuary 2,000 1,800 1,600 Nanograms per gram (ppb) wet weight 1,400 1,200 1,000 800 600 400 CC 123 ppb WP 79 ppb 200 0 2000-01 2002 2003 2004 2005 2006 2007 2010 2012 2015 Years Channel Catfish White Perch

Historical Trend in Total PCBs in Fish Tissue Tacony-Palmyra Bridge - Delaware Estuary 2,000 1,800 1,600 Nanograms per gram (ppb) - wet weight 1,400 1,200 1,000 800 600 400 200 0 2000-01 2002 2003 2004 2005 2006 2007 2010 2012 2015 Years Channel Catfish White Perch

Summary The adaptive management approach utilized for the PCB TMDLs for the Delaware River Estuary is working, but this approach requires periodic assessment of progress and adjustment. The Stage 2 TMDLs reflect this approach through the measurement of progress, the updating of the TMDLs, and the implementation strategy that will continue progress to achieving the TMDLs. While some progress is evident, the focus of load reductions in Stage 2 needs to shift to contaminated sites and tributaries while load reductions at point sources continue under the PMPs.

Acknowledgements The authors wish to acknowledge the following members of the Science & Water Quality Management Branch who contributed to the development of the Stage 2 PCB TMDLs: John Yagecic, P.E. Gregory Cavallo, P.G. Elaine Panuccio