Portola Valley Green Building Ordinance Build It Green, GreenPoint Rating Point Requirements*

Similar documents
building evaluation and rating system was appropriate for new buildings and major

Commercial Remodel Permit

Development Services Department. Building Division Handout San Pablo, CA Ph: (510)

FOR ADDITIONS and REMODELS Before filling out this application, read Green Building & Green Points Guideline Booklet for more in-depth information.

CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP

GRAYWATER SYSTEMS FOR RESIDENTIAL BUILDINGS

1. Contents. Table of Contents

7/15/2015 Item #10A Page 1

GRAY WATER SYSTEMS FOR RESIDENTIAL BUILDINGS

GREEN BUILDING IMPLEMENTATION GUIDELINES

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012

BUILDING PERMIT SUBMISSION CHECKLIST NEW SINGLE-FAMILY RESIDENCE NEW TWO-FAMILY RESIDENCE NEW MULTIPLE SINGLE FAMILY (TOWNHOUSE)

Napa County Building Officials Coalition

Green Building Requirements Fact Sheet Standards for Compliance

CITY OF ORANGE BUILDING DIVISION 2016 Green Building Code Requirements For Residential Construction

Chapter 13C GREEN BUILDING REQUIREMENTS

2016 CALGREEN RESIDENTIAL CHECKLIST MANDATORY ITEMS City of San Carlos - Building Division 600 Elm Street, San Carlos, CA Phone:

INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS

Minimum Requirements for Residential Occupancy Codes and FAQs

PROPOSED SAN FRANCISCO GREEN BUILDING CODE AMENDMENTS 2016 Edition

CITY OF CALABASAS RESIDENTIAL PLAN REQUIREMENTS 1 OF 5 8/2017 PLAN INFORMATION

Solar Photovoltaic System Permit

BUILDING PERMIT SUBMISSION CHECKLIST NEW MULTIPLE-FAMILY RESIDENCE NEW COMMERCIAL BUILDING

ORDINANCE NUMBER DRAFT. An ordinance amending Title 21-Subdivisions and Title 22-Planning and Zoning of the

A PRACTICAL GUIDE TO SAN FRANCISCO'S GREEN BUILDING ORDINANCE

New Single Family/Duplex/Townhome Application

2010 California Green Building Standards Code: Nation s First Mandatory Statewide Standards Code to Green Construction and Fight Climate Change

CUSTOMER AGREEMENT (REQUIRED)

2013 CALGreen Checklist Residential New Construction

Effective Date: April 25, 2016 Revised: November 7, 2017

RENTAL INSPECTION CHECKLIST. Helpful Definitions: Egress: the free and unobstructed access to the exterior of a habitable space.

MINIMUM PLAN INFORMATION REQUIRED FOR A BUILDING PERMIT

Permit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE

BUILDING PERMIT APPLICATION

RESIDENTIAL REMODELING AND BASEMENT FINISH

Commercial Solar Photovoltaic System Permit

WARWICK TOWNSHIP Dept. of Planning & Zoning

Permit applications must be submitted in-person by the owner or their authorized agent. Subdivision Name: Phase: Lot: Block:

Permit Application Commercial / Industrial / Mutli-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE (Form #2)

Appendix B. Certification of Intent to Comply

BASEMENT FINISH CONSTRUCTION PLANS REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS

Town of Truckee 2016 California Green Building Code Requirements Residential Mandatory Measures Submittal Checklist

City of Rohnert Park When Permits are Required

Requirements for Municipal and Private Developments Document Last Updated in Database: April 27, 2016

The following is required for a complete permit submittal for each unit.

KITCHEN REMODELS CITY OF MISSION VIEJO BUILDING SERVICES DIVISON 200 CIVIC CENTER, MISSION VIEJO, CA (949)

Executive Summary. Updates to GreenPoint Rated Version 7.0 New Single Family and Multifamily Programs

GRAYWATER SYSTEMS FOR RESIDENTIAL BUILDINGS

SEWAGE SYSTEM PERMIT GUIDELINES

RESIDENTIAL BUILDING PERMIT CHECKLIST FOR THE CITY OF SANTA ROSA

Town of Falmouth FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage COSTS FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE:

THE CITY OF NORTH RIDGEVILLE 7307 AVON BELDEN ROAD, NORTH RIDGEVILLE, OHIO TELEPHONE: (440) FAX: (440) Building Department

Typical Finished Basement Details

Westtown Township Building Permit Application Instructions Notes:

PREFACE. The Erosion and Sediment Control Ordinance and its requirements can be found at:

Executive Summary. Proposed Updates to GreenPoint Rated Version 7.0 New Single Family and Multifamily Programs

RESIDENTIAL ADDITION OR ALTERATION PERMIT REQUIREMENTS

GRAY WATER SYSTEMS (Reference California Plumbing Code Chapter 16 and 16A) Revised: 6/11/14

READ ONLY. Adopting Agency BSC SFM. Adopt Entire Chapter Adopt Entire Chapter as amended (amended sections listed below)

City of Walnut Creek Development Review Services 1666 N. Main Street, Walnut Creek, CA (925) phone (925) fax

WATER & SEWER SERVICES

ORDINANCE NO THE CITY COUNCIL OF THE CITY OF MANTECA DOES ORDAIN AS FOLLOWS:

Application for Commercial Plan Review and Building Permit. Address:

COUNTY OF NEVADA BUILDING DEPARTMENT POLICIES

Culver City Building Safety Division Mandatory Green Building Program

Town of Grantham, NH Building Permit Application Procedures

9) Home Inspection: As defined in Section 1-10 of the Act.

TITLE 68: PROFESSIONS AND OCCUPATIONS CHAPTER VIII: DEPARTMENT OF FINANCIAL AND PROFESSIONAL REGULATION

BUILDING CONSTRUCTION

ENGINEERING & CONSTRUCTION MANAGEMENT RESIDENTIAL PERMIT APPLICATION CHECKLIST

Section Standards of Practice. a) The following are terms commonly used in the writing of home inspection reports.

IMPORTANT CODE UPDATE ENFORCEMENT DATE FOR NEW NATIONAL ELECTRIC CODE IS SET FOR MAY 1, 2013

GRAYWATER STANDARD PLAN For Simple Residential System

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

NONCONFORMING STRUCTURES

Residential Building Permit Application Note: Storm Water Permit may be required.

Residential Basement Finish Guide

Application For Graywater Irrigation System Permit

Address: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Person:

PLEASE FOLLOW INSTRUCTIONS ON PAGE FIVE

Building Permit Application

TOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ FAX

Permit Type General Building* - first $1,000 of job cost - each additional $1,000

CODE CORRELATION COMMITTEE March 2, Issued February 8 th, 2011 Updated February 18 th, 2011 (Item #8 Added)

Accessory Building/Detached Building Permit

2011 Enterprise Green Communities Criteria Checklist

Residential Codes FAQs: 2015 International Energy Conservation Code (IECC) with MA Amendments & MA Stretch Energy Code

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE Information and Required Forms for Structures in Flood Zones AE & VE

Santa Fe County Sustainable Land Development Code ORDINANCE NO , December 8, 2015

Pat Preece, Fire Chief Steve Solomon, Fire Chief

Permit Posting and Inspection Procedures

RESIDENTIAL CONSTRUCTION PERMIT FEES

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

Office Hours: 9 a.m. to 5 p.m. Kristal Bachman Community Development Administrator. Jaclynn Workman Inspections Coordinator

Permit Application. Building - Electrical - Mechanical - Plumbing - Sign. Project Address: Building and Safety Permit Service Center

City of San Pablo Community Development Department Building Inspection Division Plan Review & Permit Requirements

Permit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE

NEW RESIDENTIAL BUILDINGS MANDATORY MEASURES 2016 CALGREEN CODE Effective January 1, 2017

Code Change Alert: Permitting of Solar Photovoltaic Systems in Washington State

Transcription:

Portola Valley Green Building Ordinance Build It Green, GreenPoint Rating Point Requirements* Project Type Size Points Required New Construction > 3,000 sf 75 Additional Points 1 for every 50 sf GPR Certification Requirement GPR New Construction < 3,000 sf 75 NA GPR Whole House Project > 400 sf 50 NA GPR Detached Accessory Structure Small Additions or Remodels Small Additions or Remodels > 120 sf 25 NA Self > 400 sf 25 NA Self < 400 sf NA (checklist completion only) NA Self GPR Checklist Requirement New Home Single Family New Home Single Family (Whole House Label) (Elements Label) (Elements Label) Accessory Dwelling Units (ADUs) Accessory Dwelling Units (ADUs) Accessory Dwelling Units (ADUs) Detached** 75 NA Self Attached** 50 NA Self Interior Conversions** 25 NA Self New Home Single Family (Whole House Label) (Elements Label) * See Additional Requirements Below ** Square footage thresholds for Accessory Dwelling Units will be defined in the update to the Second Unit Ordinance. 1

Portola Valley Green Building Ordinance Additional Requirements by Structure Type For new, single-family residential projects: Solar Photovoltaic and Solar Thermal Ready Infrastructure. Section 110.10 Mandatory Requirements for Solar Ready Buildings of the California Energy Code is added as mandatory and amended to read: Solar zone. The solar zone shall be located on the roof or overhang of the building and have a total area of no less than 500 square feet. If the project applicant determines that the entire energy needs of the project can be met with a solar photovoltaic system that occupies less than 500 square feet, the project applicant can demonstrate this with the Title 24 Calculation and solar photovoltaic system plans. Interconnection pathways. provide a pathway for conduit and plumbing to support the installation of future solar photovoltaic and solar thermal infrastructure. The pathway for conduit and plumbing shall be routed from the attic space (or equivalent) to the point of interconnection with the electrical service panel and the water-heating system. Electric Vehicle Ready Infrastructure. Section 4.106.4 Electric vehicle (EV) charging for new construction of the California Green Building Standards Code is added as mandatory and amended with the additional requirements as outlined below. Service panel and/or subpanel shall provide, at minimum, capacity to install a 208/240v, 50 amperes grounded AC outlet and dedicated branch circuit. Raceway or wiring with capacity to accommodate a 100-ampere circuit; terminating in a listed cabinet box, enclosure, or NEMA receptacle. The raceway shall be installed so that minimal removal of materials is necessary to complete the final installation. Graywater Ready Infrastructure. Install graywater ready systems as outlined below. Additional plumbing piping is installed to permit the discharge from all clothes washers and all applicable fixtures from bathrooms located above grade to allow for future installation of a distributed irrigation system, either subsurface or treated. All graywater ready systems must be installed in compliance with Chapter 16 of the California Plumbing Code. Identify an appropriate location for possible future installation of a graywater treatment system, including storage tanks. Include either a separate multiple pipe outlet or a diverter valve and an outside 2

stub-out installation on clothes washing machine hook-ups, to allow separate discharge of graywater direct for irrigation. Include a building drain(s) for lavatories, showers, and bathtubs, segregated from drains for all other plumbing fixtures connected to the black water pipe a minimum of three (3) feet from the building foundation. Provide power supply for future graywater treatment system. The graywater system shall be comprised of purple piping. The diverter valve on the clothes washing machine system shall be labeled as LAUNDRY-TO- LANDSCAPE CAPABLE. Reduction of Potable Water Use on Turf. For all projects with landscapes that include the use of turf, install rainwater catchment system. Irrigation needs of turf should be calculated using the Applied Water for Turf Calculator. All rainwater catchment systems must be installed in compliance with Chapter 17 of the California Plumbing Code. Rainwater Catchment System Size. The rainwater catchment system size shall be determined by using the Applied Water for Turf Calculator. The rainwater catchment system will need to be sized in order to satisfy 50 percent of the estimated annual water demands for the first 500 square feet of turf installed on the project. The rainwater catchment system will need to be sized in order to satisfy 100 percent of the estimated annual water demands for installed turf that is greater than 500 square feet. Alternative. A fully installed graywater system connected to an irrigation system that can satisfy all of the annual water demands of turf as identified in the Applied Water for Turf Calculator can be used as an alternative to installing a rainwater catchment system. For Accessory Dwelling Units (ADU): The Town desires to encourage the production of accessory dwelling units and, therefore has identified a simplified process for green building requirements related to all accessory dwelling units. Specifically, although minimum points are required as set forth below, selfcertification is allowed. All ADUs Laundry facilities. If the structure includes laundry hook-ups, include a diverter valve and an outside stub-out installation on the clothes washing machine hook-up, to allow separate discharge of graywater direct for irrigation. The diverter valve on the clothes washing machine system shall be labeled as LAUNDRY-TO-LANDSCAPE CAPABLE. 3

Detached ADU Only Solar Photovoltaic Ready Infrastructure. Section 110.10 Mandatory Requirements for Solar Ready Buildings of the California Energy Code is added and amended as follows: detached accessory dwelling units shall provide a pathway for conduit to support the installation of future solar photovoltaic infrastructure. The pathway for conduit and shall be routed from the attic space (or equivalent) to the point of interconnection with the electrical service panel. For new, non-residential projects: New, non-residential projects shall comply with all mandatory CALGreen measures. The mandatory measures shall be verified by a third party approved by the Town for which the applicant will pay for the review. Electric Vehicle Ready Infrastructure. Section 5.106.5.3 Electric vehicle (EV) charging for new construction of the California Green Building Standards Code is added as mandatory and amended with the additional requirements as outlined below. Service panel and/or subpanel shall provide, at minimum, capacity to install a 208/240v, 50 amperes grounded AC outlet and dedicated branch circuit. Raceway or wiring with capacity to accommodate a 100-ampere circuit; terminating in a listed cabinet box, enclosure, or NEMA receptacle. The raceway shall be installed so that minimal removal of materials is necessary to complete the final installation. Portola Valley Green Building Ordinance FAQs for Residential Projects What is Build It Green (BIG) and the BIG GreenPoint Rated Checklist? Build It Green is a non-profit membership organization whose mission is to promote healthy, energy- and resource-efficient building practices in California. BIG created Green Building Guidelines that are a comprehensive resource of best practices for green building. The BIG GreenPoint Rated Checklists (there is one for new residences and one for addition/remodels to existing residences) are tools used to assess how environmentally friendly a proposed building project will be via the use of a point system. What is GreenPoint Rated Certification? Click here for a link to Build It Green s website that outlines the GreenPoint Rated Certification process as well as fees and expected timelines: https://www.builditgreen.org/greenpoint-rated/how-it-works/rating-process-and-fees 4

What projects are required to complete and submit a BIG Checklist? All projects applying for ASCC review (new residences and additions larger than 400 sf). All building permits for new residences, additions and/or remodels regardless of square footage. How many points does a project need to achieve? See chart above, called Build It Green, GreenPoint Rating Point Requirements. How do I calculate the square footage of the project? Do basements count in this calculation of floor area? Do garages count in calculation of floor area? For new construction: Total square footage of all structures being proposed (residence and accessory structures). Basements (seven feet or greater in height) do count in this floor area calculation. Garages do count as floor area except that unconditioned garage space shall only count as 50% of that square footage. For addition/remodels: Total square footage of all new floor area plus the square footage of remodeled and replaced areas of the structure. Areas demolished shall not be deducted from the total new square footage. Is my addition/remodel considered a Whole House project or an Elements project under BIG? The Elements label applies to homes in the following situation: A portion of the home is undergoing a remodel or addition (e.g., a master bedroom addition or a kitchen remodel). The entire home will not be evaluated for green building practices. The homeowner anticipates qualifying for GreenPoint Rated Whole House over time and wants to verify sections under current remodeling. The home is undergoing some energy upgrades that do not encompass the requirements to meet GreenPoint Rated Whole House. A structure <400 sf that is accessory to the main structure. The Whole House label should be used in the following situations: The homeowner is completing a gut remodel and replacing all of the systems 5

(i.e., stripping less than 90% of the walls to the studs, leaving the foundation framing and exterior finish). Note: if the home has removed significant framing and the exterior casing, it is considered new construction. What projects need to be certified by a Green Point Rater? All new construction projects and addition/remodel projects achieving Whole House status with BIG that are subject to ASCC review will be required to be certified by a certified GreenPoint Rater. (Projects subject to ASCC review that are achieving an Elements status may be self- certified). Prior to building permit issuance, documentation must be provided by a qualified rater indicating that the proposed plans adequately meet the green building ordinance requirements (note: please include GreenPoint Rater name and signature on the checklist submittal). Prior to final inspections and occupancy for the project, a qualified rater shall provide documentation verifying that the project has been constructed in accordance with the approved BIG Checklist, the project meets the minimum number of points required by the Town s Green Building Ordinance, and has been GreenPoint Certified with Build-It- Green. What projects must be GreenPoint Certified under Build-It-Green? All projects that must be certified by a GreenPoint Rater (i.e., new residences and Whole House projects) must also be GreenPoint Certified with Build-It-Green prior to final inspections. Who can certify a project? Projects requiring certification must be done so by a qualified green building professional, i.e., a person trained through Build It Green as a certified GreenPoint Rater. What is self-certification? For Elements projects subject to ASCC review and all other smaller residential addition/remodel projects not subject to ASCC review, but requiring a building permit, self- certification of the project is permitted. Self-certification means verification by the project architect, designer, or a qualified green building professional certifying that the project has met the standards and has attained the compliance threshold as indicated on the approved BIG Checklist. 6

There are some items on the checklist that say R for Required do I need to also fulfill these requirements on the checklist? Yes, any and all items notated on the checklists as R must be met as part of the project. Does my completed checklist need to be on my permit plan sheets? Yes, include the checklist in your plans. Additionally, if your project requires certified GreenPoint rating, also include a signature line for the GreenPoint Rater on the plan sheet where the spreadsheet is printed. What happens if I am unable to meet the required number of points at the end of my project? The Town s Planning Director will review the submitted documents and determine whether the applicant has achieved the required compliance threshold as set forth by the ordinance. The Planning Director will determine if the project 1) complies, 2) there has been a good faith effort to comply, or if 3) the project is non-compliant. Projects deemed non-compliant shall not receive a final inspection until the applicant has implemented equivalent alternative measures approved by the Planning Director or unless and exemption is granted for the project. Can I switch out one checklist item for another during construction provided that I will still be able to achieve the number of points required for my project? If so, what is the procedure? Item substitution is acceptable provided that the mandatory checklist items are still met and that the project will still meet Title 24 energy requirements. Prior to final inspections of the project, project certification documents will be submitted to the Town that address any item substitutions. What if the ASCC approved my project at a point level above the required minimum threshold and I find that I cannot meet that point level (but I do meet the minimum threshold)? Even if the ASCC approved the project with a checklist showing more than the minimum required points, only the minimum point threshold need be met. Any points beyond the minimum requirements are encouraged, but are at the discretion of the applicant. 7

What do I need to do in order to get a final inspection/occupancy on my project? For new residence and Whole House projects, prior to final inspections and occupancy for the project, a qualified rater shall provide documentation verifying that the project has been constructed in accordance with the approved BIG Checklist, the project meets the minimum number of points required by the Town s Green Building Ordinance, and has been GreenPoint Certified with Build-It-Green. For Elements projects, prior to final inspections, verification by the project architect, designer, or a certified green building professional certifying that the project has met the standards and has attained the compliance threshold as indicated on the approved BIG Checklist is required. Upon receipt of this documentation, the Compliance Official will review the documentation and determine whether the applicant has achieved the required compliance threshold. Once approved, the final inspection may be scheduled. Is there an exemption from complying with the Green Building Ordinance? If an applicant for a covered project believes that circumstances exist that make it a hardship or infeasible to meet the requirements of this chapter, the applicant may request an exemption as set forth in the Ordinance. In applying for an exemption, the burden is on the applicant to show hardship or infeasibility. 8