FACADE IMPROVEMENT PROGRAM Program Guidelines & Application

UPTOWN PLAIN CITY ORGANIZATION (UPCO) 2018 FAÇADE IMPROVEMENT GRANT PROGRAM

PROPOSED CITY OF WACO TAX INCREMENT FINANCE DISTRICT NUMBER ONE FAÇADE IMPROVEMENT PROGRAM

Downtown TIF Grant Application. Application Check List

Downtown TIF Grant Application. Application Check List

VIRGINIA TIF PROGRAM. 2. Property assembly costs, including acquisition, demolition, site preparation and improvement, etc;

Downtown Tax Increment Financing District Grant Application Guidelines

HARB Certificate of Appropriateness Information. Appropriateness (COA) as well as all necessary permits prior to proceeding with any work.

Facade Grant Program

APPLICATION FOR A HERITAGE PERMIT

SUGGESTED GUIDELINES Design Review Board

SUGGESTED GUIDELINES Design Review Board

Historic Downtown District Design Guidelines for Commercial Properties

TAX INCREMENT FINANCING Riverfront Improvement Fund Program Overview and Application Form

HISTORIC DISTRICT BOARD OF REVIEW SAVANNAH HISTORIC DISTRICT Instructions for Certificate of Appropriateness Application

Section 1 City of Pekin, Illinois. City of Pekin Downtown Revitalization Programs 01

Introduction. Purpose. Program Goals. Grant Allocation

MID-CITY HISTORIC DISTRICT Instructions for Certificate of Appropriateness Application

proposed changes must be in keeping with the architectural style of the building and use traditional detailing and materials.

A DESIGN MANUAL FOR FAÇADE IMPROVEMENTS AND NEW CONSTRUCTION HISTORIC DOWNTOWN LADYSMITH, WISCONSIN

City of Port Huron Michigan. Historic District Guidelines and Application

City of Rock Falls Facade Improvement Grant Application Packet

ARTICLE 3 OVERLAY ZONES. Table of Contents

Guidelines and Standards

Design Guidelines. for the. Downers Grove. Downtown Business District

2012 International Building Code 2011 National Electrical Code Local amendments to the codes are in Chapter 6 of the Code of City Ordinances

BYLAW 373. Municipal Heritage Designation Bylaw Banff Power Substation

City of Sebastopol Design Review Board Staff Report

CUYLER-BROWNVILLE HISTORIC DISTRICT Instructions for Certificate of Appropriateness Application

Special Land Use Permit Application Planning Division

Phone Fax Phone Fax. Owner/Agent Signature (Agents must provide written proof of authorization) OFFICE USE ONLY

a. Type of Signs Freestanding signs shall be limited to ground signs or post & arm signs. [Amended Ordinance #06-14]

BUILDING PERMIT CHECKLIST FOR THE TOWN OF GRAND LAKE

Commercial Tax Abatement

Downtown Life-Safety Compliance Grant Program

Application for Focus on Energy s Biogas Feasibility Study Grants for Anaerobic Pretreatment and Anaerobic Digester Facilities

Northfield Township Sanitary Sewer System 2550 Waukegan Road, Suite 100 Glenview, IL

Community Redevelopment Agency Commercial Façade Improvement Program Project Assistance Process

Overview of TIF Programs

BUILDING DESIGN STANDARDS

Lealman Community Redevelopment Area Non-Residential Improvement & Demolition Grant Program Application Package

SECTION 6.3 DOWNTOWN HISTORIC DISTRICT (DTH)

COMMUNITY ACTION CHIP LEAD PROGRAM Bids due to Community Action ATTN: BERNADETTE JOHNSON 175 Main St. Battle Creek, MI 49014

11.0 Commercial Infill

City of Kingston Engineering Department. Application for New Outdoor Patio. Note: Agreement:

BOROUGH OF WEST CHESTER

JANES AVENUE TIF DISTRICT Residential Improvement Grant

Minimum Standards for Construction of Aircraft Hangars MINIMUM STANDARDS FOR CONSTRUCTION OF AIRCRAFT HANGARS

in Vermilion s Downtown Historic District

HERITAGE PERMIT APPLICATION SUBMISSION GUIDELINES

City Wide Façade Grant Program

(d) Metal buildings used for industrial uses are not exempt from additional landscape standards as required in Section (e).

Design Guidelines - Commercial Buildings

Architectural Review Board Report

Certificate of Appropriateness Case Report

Evaluation Checklist

APPLICATION FOR WINDOW/DOOR REPLACEMENT

APPLICATION. Callaway CRA Commercial Façade Improvement Program Tyndall Parkway / Highway 20

Federal Tax Credits for Rehabilitating Historic Buildings Main Street Commercial Buildings

AGENDA HISTORIC PRESERVATION COMMISSION

5.0 SIGNS 5.1 SIGN DEFINITIONS

NEW CONSTRUCTION APPLICATION

Request for Proposal for Construction Management Services

2018 Vendor Application

Sec Development Standards in P-N-T Districts.

STATE UNIVERSITY CONSTRUCTION FUND

4.SIGNAGE INTRO TO CHAPTER 4. Sign Definitions 58

FACADE GRANT PROGRAM Make improvements to your building exterior with a grant from Main Street!

Special Land Use Permit Application Planning Division Form will not be processed until it is completely filled out.

BWA ENVIRONMENTAL CONTROL BOARD (ECB) APPLICATION

Design Guidelines To Enhance the Downtown Historical District. Developed by the Van Wert Community Main Street Design Committee June 26, 2007

THE RESERVE at Pueblo West

TOWN OF DENTON SIGN DESIGN GUIDELINES

Historic District Commission March 14, 2019 City of Hagerstown, Maryland

Architectural Services

University of Texas. Austin, TX. TAS Variance Application Guidelines For Qualifying Historic Structures

914. "I-1", LIGHT INDUSTRIAL DISTRICT

Model Development Block

REQUEST FOR PROPOSAL (RFP)

OVERHEAD SEWER PROGRAM

Maintenance, Repair, and Operations JOC Program

Town of Shelburne, Vermont CHARTERED 1763

109 S. MARKET CURTIS ARCHITECTURE & DESIGN PC SITE MAP EXISTING PHOTOGRAPH PROPOSED RENDERING

# 8 ) UN MME DISPENSARY AT 2113 N. LV BLVD SPECIAL USE PERMIT EXTENSION OF TIME PUBLIC HEARING

STATE PREFERENTIAL PROPERTY TAX ASSESSMENT PROGRAM

NEIGHBORHOOD EMPOWERMENT ZONE (NEZ) IMPACT FEE WAIVER CHECKLIST

Guidelines & Application

4.SIGNAGE INTRO TO CHAPTER 4 CHAPTER CONTENTS. Sign Definitions 58

What is a Heritage Permit Application?

CITY OF TYLER HISTORICAL PRESERVATION BOARD CERTIFICATE OF APPROPRIATENESS APPLICATION (Unified Development Code Article XI, Division B)

SECTION BID PROPOSAL FORM. Telephone NO: ( ) Facsimile NO: ( ) Oklahoma License NO:

DESIGN REVIEW COMMITTEE AGENDA ITEM

Request for Proposal for Annual Financial Audit Services

Rancho Serrano Homeowners Association. Architectural Submission Procedure and Requirements

Albany Park & Irving Park Special Service Area #60 North River Commission Façade Improvement Program

Custom Incentive Application for Business Customers

OVERHEAD SEWER PROGRAM

MEMORANDUM ARCHITECTURAL REVIEW COMMITTEE MATTHEW DOWNING, ASSISTANT PLANNER

DESIGN REVIEW COMMITTEE AGENDA ITEM

Transcription:

Mission Statement: (RDP) is a group of community members and business leaders dedicated to building a vibrant downtown by supporting local businesses and encouraging revitalization and historic preservation while creating a strong quality of life for all who live, work and visit. s Goals 1. Preserve and retain the historic integrity of the downtown 2. Improve the aesthetics of the downtown by building a cohesive and accessible downtown core 3. Promote the downtown as a destination for arts, culture and entertainment Facade Improvement Program Overview The program is designed to initiate aesthetic improvements and historical preservation of downtown Peru. RDP s design committee is the administrative group for the program and will work directly with applicants to achieve successful revitalization projects in a timely manner, providing financial support upon completion of projects. Business Eligibility Requirements 1. Business must be for commercial use and located within the designated facade improvement program district. 2. Commercial operators/tenants are eligible to apply with written approval of the property owner. 4. Maximum Funding: To maximize participation, prior facade program recipients, who have received the maximum funds, may submit only one application every 12 months. 5. Partial Funding: Applicants receiving partial funding are eligible to submit for the difference between the received funds and the maximum funding (within the 12 month period). After receiving the cumulative maximum funding, recipients are only eligible to submit a facade program application one calendar year after the last date funds were received. 6. Applicants and buildings with existing code violations must include their remedy as part of the proposal. 7. Applicants must get proper permits and go through the proper boards before beginning their projects to get approval. Eligible Activities Items included, but are not limited to, the following: 1

1. Exterior Painting : Paint improvement to building exterior facades, which are compatible to the architectural period of the building (rear and side facades and historic and/or artistic murals may be considered). All color schemes shall accent the building as well as harmonize with adjacent buildings. Colors must be approved by RDP. 2. Awnings: Canvas with or without signage (City of Peru has awning program already available. Awnings only applicable if City of Peru funding is no longer available). 3. Exterior Lighting: Install, replace or repair exterior lighting to enhance storefront facade and any landscaping elements directly in line of sight from roadway to facade. Lighting may illuminate the storefront and sidewalk, but not the awning alone. 4. Front Facade Windows and Upstairs Windows : Install, replace or repair door/window frames, sills, glazing or glass. Restoration of the original window size is encouraged (avoid filling in existing windows). 5. Brick Facade: Install a new brick facade to an already existing structure. 6. Facade Maintenance/Restoration: Maintenance and/or structural repairs to the facade system, masonry repairs, cleaning or re siding of buildings, restoration/repair/replacement due to deterioration of historic design detail. Restoration of the original building facade elements is encouraged. Funding Painting, Awning, Facade Maintenance, Exterior Lighting, Brick Facade and Windows Reimbursement: Applicants are eligible for a 50% reimbursement (up to $5000) of actual costs associated with these projects provided they receive RDP s Design Committee approval. The Committee will generally select the lowest responsible and qualified bid. It is recommended that applicants use a comparison specification sheet to ensure bids are comparable. Application Process Submit a Commercial Facade Improvement Program application to and include the following: 1. Current photograph of property to be improved 2. Project plans and specifications including a written description of improvements, including materials and colors 3. Application Checklist 4. Two preliminary estimates of costs by licensed contractors. Any work done by property owner or tenants requires an estimate from an outside source to verify that costs are within reasonable parameters. The submitted estimates shall be for the applicable facade improvements only. If applicant cannot secure two estimates, submit one estimate with explanation. RDP reserves the right to request an additional quote or reject the application. 2

3

Timeline 1. receives application. 2. Preliminary Approval: There will be an on site inspection of the property by the RDP Design Committee. After this inspection, the committee will make a preliminary decision on the status of the application. 3. Applicant submits the proposal to the building commissioner s office for approval and permitting. 4. Completed architectural drawings and plans of the building, which illustrate all proposed work, including any structural work or repair, drawings, cost estimates, construction schedules and paint colors submitted to RDP s Design Committee by the 15th of each month for consideration at RDP s next meeting. 5. The RDP Design Committee s approval to fund facade applications is based upon the availability of funds, the applicant s readiness to take action, project impact, building inspection and zoning approval and historic significance. If not approved, the RDP Design Committee will explain, in writing, to the applicant the reasons for rejection and what, if any, steps can be taken to receive approval. 6. Facade Application signed; total reimbursement determined. No funds will be issued without proof of payment. 7. Applicant is responsible for obtaining any permits required for the project. 8. Project proceeds. The RDP Design Committee must approve any changes in approved work specifications. Deviations from an approved plan may disqualify the applicant from this reimbursement. 9. All facade improvement projects, once approved and the application signed, are intended to be completed within one calendar year. No reimbursements will be made beyond this time without prior approval from the RDP Design Committee. 10. Project Completed. Project inspected and signed off by the RDP Design Committee. Proof of payment submitted and full reimbursement allocated. An after picture will be required for documenting purposes and may be used for RDP advertising/promotions in the future. This picture shall be submitted along with the proof of payment (paid receipts) in order for RDP to process the release of facade funds. 4

Application Program checklist and guidelines must be submitted as a supplement to this application I AM SEEKING FUNDING FOR THE FOLLOWING: (check all that apply) Paint New Brick Facade Windows Exterior Lighting Facade Maintenance Awning 1. Address of property to be improved: 2. Age of property (approx.): 3. Applicant name: 4. Applicant address: 5. Applicant e mail: 6. Applicant phone: 7. Owner name (if different from applicant): 8. Owner address: 9. Owner e mail address: 10. Owner phone: 11. Do you own or lease the property? Own Lease (Term) 12. Is the first floor of the building to be improved currently occupied? Yes No If yes Name of business: Type of business: Number of employees: Business phone: Is the 2nd floor of the building to be improved currently occupied? Yes No If Yes, please describe: 1. I understand that I am responsible for the maintenance of the design improvements described here for a period of five (5) years from the date of the project completion or until such time as the building is sold. I understand that all facade funds are repayable to the organization if ownership of the building has been transferred within one year from the award date. Monies repaid shall be returned to the Commercial Facade Improvement program. 2. I understand the facade funds must be used for the project described in this application and that Rediscover Downtown Peru Design Committee must review the application and approve it prior to beginning construction. I understand that failure to comply with the approved application may result in losing my eligibility to receive funds. 3. I understand that i must check with the appropriate zoning and planning administrators to make sure I have all of the needed permits and approval for work being done to the property/building. 5

4. I acknowledge that is obligated only to administer the facade program procedures and is not liable to the applicant, owner, or third parties for any obligations or claims of any nature growing out of, arising out of or otherwise related to the project of application undertaken by the applicant and/or owner. 5. I, the undersigned, acknowledge that I have not, nor have any other member, representative, or agent of the firm, company corporation or partnership entered into any combination, collusion or agreement with any person relative to the price to be bid. I further state that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such bid. Applicant s Signature Date Property Owner s Signature Date For Use Only Design Committee Project Inspected for Completion Date Project Approved for Payment Date (Date payment approved by a motion of the committee) Design Committee Chair Signature Date Executive Committee Program Checklist Completed Date Funds Issued Date Board President Signature Date 6

Commercial Facade Improvement Program Checklist ***This checklist must be submitted as part of your application*** Address of Property General Application to be due the 15th of the month Photograph of existing condition of property Project plans and specifications of proposed improvements, including all materials and colors. Written permission from property owner (if applicable) Painting Provide paint samples and note where each color will be used Note which color will be body color and which will be accent colors Submit two written estimates Windows, Awnings, Exterior Lighting Provide a color sample of design Include specifications as to size (height, width and depth) of the window, awning or lighting Note how and where the awning will be located on the building and how and where lighting is proposed. Note improvements to windows and where they are located on the building. 7

When installing an awning or lighting, provide information about the color, style and position Submit two written estimates (or explanation why second estimate is not included) Brick Facade Provide color sample of design and type of brick Include specifications as to the size (height, width and depth) of brick Note where brick will be placed and what it will cover When installing the new brick over the old exterior, provide information about the color, style and method of installing the bricks Submit two written estimates (or explanation why second estimate is not included) Facade Maintenance/Restoration Provide color samples and a complete description of the work to be completed Include specifications as to the size (height, width and depth) of facade elements to be replaced and/or restored Identify the existing building facade elements Identify the type of work anticipated Maintenance/structural repairs to the facade system Masonry repairs Cleaning or re siding of buildings Restoration, repair or replacement due to deterioration of historic design detail Submit two written estimates (or explanation why second estimate is not included) MAIL COMPLETED APPLICATION TO: Commercial Facade Improvement Program P.O. Box 536 Peru, IN 46970 8

9