HIGHVELD STEEL PROSPECTUS: IRON PLANT 1 APRIL 2016

Similar documents
HIGHVELD STEEL PROSPECTUS IRON MAKING PLANT 1

DC arc furnaces The story of a successful South African technology. Rodney Jones

PRODUCER SERVICE PROVIDER INDUSTRY SUPPLIER PROJECT INCUBATOR REDUCTANT SPECIALIST COMMODITY SUPPLY SPECIALIST SOUTHERN AFRICAN AGRI VALUE CHAIN

Technology Innovations in the Smelting of Chromite Ore

The History of DC Arc Furnace Process Development

SUPPORTING YOUR. A global leader in mineral and metallurgical innovation

Investing in African Mining Indaba Cape Town

THE PERFORMANCE OF A RESISTANCE-BASED FURNACE CONTROL SYSTEM ON A SUBl\fERGED-ARC FURNACE

FREE ZONE SOHAR SULTANATE OF OMAN

GRANULATION OF FERROALLOYS RESULTS FROM INDUSTRIAL OPERATIONS AND COMPARATIVE STUDY ON FINES GENERATION

Chrome Ores on Ferrochrome Smelting

New technologies for PGM smelting: An overview of the ConRoast process. Rodney Jones

Realizing a state of the art All Indian Pellet plant by MECON. MECON LIMITED A House of Engineering Excellence

Mintek, Randburg, Johannesburg, South Africa. Water Atomization of Iron-Nickel Alloys. Recovery of oxide nickel. Mintek (Established 1934)

Basic Metals and Mining SBU

AN IMPROVED DC-ARC PROCESS FOR CHROMITE SMELTING

DECEMBER 2013 QUARTERLY REPORT TO SHAREHOLDERS

Dr Danko Konchar, CEO Afarak Group WHAT LIES AHEAD FOR SOUTH AFRICA S CHROME INDUSTRY?

PYROMETALLURGICAL RECOVERY OF CHROMIUM FROM SLAGS

Eurasian Natural Resources Corporation PLC

Qinghai Provincial People s Government Notice on Issuing Opinions for the Implementation of the Iron and Steel Industry Adjustment and Revitalization

CHROMIUM ALLOYS PRODUCTION AND OPERATION GRANULATION OF FERROALLOYS - RESULTS FROM INDUSTRIAL OPERATIONS AND COMPARATIVE STUDY ON FINES GENERATION

For personal use only

Technology Improving Your Meltshop Performance

Energy consumption, waste heat utilisation and pollution control in ferro alloy industry

Metallurgical Gas Cleaning System Design for Emissions Control and Energy Efficiency

Effect of South African Reductants on Ferrochrome Production

Optimization of Process Parameter for Smelting and Reduction of Ferrochrome

Windimurra Vanadium Plant Project Update. Investor Presentation August 2011

FERRO ALLOY DESIGN, FERRO ALLOY SELECTION AND UTILISATION OPTIMIZATION WITH PARTICULAR FOCUS ON STAINLESS STEEL MATERIALS

SERENJE PROJECT PROCESSING OPTIONS ANALYSIS

EVRAZ Q4 and FY 2016 PRODUCTION REPORT

EFFECT OF CHROME ORE QUALITY ON FERROCHROME PRODUCTION EFFICIENCY

ESS Smelting Technology Enabling FeNi Smelting from Limonite

Bushveld Vametco on an expansion path

B. GENERAL CONDITIONS

INVESTOR SITE VISIT WONDERKOP SMELTER

OUTOTEC ROASTING SOLUTIONS

The history and development of the pyrometallurgical processes at Evraz Highveld Steel & Vanadium

COMPETITION TRIBUNAL OF SOUTH AFRICA. Panel : U Bhoola (Presiding Member), Y Carrim (Tribunal Member), and M Holden (Tribunal Member)

Water-cooled tap-hole blocks

Chrome ore and ferrochrome global outlook Loïc Racon

Concast Steel & Power Limited. Opportunity overview

Overview of the global chrome market Philippe Richard

IRON-NICKEL SCOPING STUDY COMMENCES ON KALGOORLIE NICKEL PROJECT

ARM COPPER. Thando Mkatshana Chief Executive: ARM Copper and ARM Coal. Vale/ARM joint venture 50% 50% Refining. Flash/ Isa smelt smelting

CHAPTER 7 COMMISSIONING OF 65 MT ENERGY OPTIMIZING FURNACE AT SISCOL

Robert Davis Hickman, Williams & Company. Steel Founders Society of America March 23, 2011

OUTOTEC FLASH SMELTING TECHNOLOGY

ENGINEERING SERVICES

COLUMBUS: SOUTH AFRICAN STAINLESS ALL OVER THE WORLD

PILOT PLANT CAMPAIGN CONFIRMS PRODUCTION OF COMMERCIAL GRADE FERRONICKEL AT ARAGUAIA PROJECT, BRAZIL

AIR QUALITY MANAGEMENT IN THE NORTH WEST PROVINCE OF SOUTH AFRICA A SUCCESSFUL PARTNERSHIP WITH INDUSTRY

COPPER SMELTER PROJECTS & SERVICES

Pelletizing technologies for iron ore

Tilting Rotary Furnace World Class Melting Technology

MICROSILICA - Finding new ways of using the well-known product

OM HOLDINGS LIMITED (ARBN )

Reductive Smelting for the Recovery of Nickel in a DC Arc Furnace

PILOT PLANT PRODUCTION OF FERRONICKEL FROM NICKEL OXIDE ORES AND DUSTS IN A DC ARC FURNACE. Abstract

For personal use only

This procedure applies to the operations of two 5000 lb. capacity furnaces with one 1250 kw variable frequency power unit to melt steel.

MARKETS. TNC Kazchrome JSC, Aktobe, Republic of Kazakhstan

HIGH CARBON FERROCHROMIUM OPERATIONAL MANAGEABILITY WHILE DIVERSIFYING PRODUCTS

OM HOLDINGS LIMITED (ARBN )

McFaulds Lake ( Ring of Fire ) Mineral Exploration and Development Overview. (MNDMF) May 11, 2010

REDUCTION OF CHROMITE FINES IN SOLID STATE USING A MIXTURE OF GASES CONTAINING NATURAL GAS, HYDROGEN AND NITROGEN

MELTING CASTING KNOW-HOW. World class melting technology. meltingsolutions.co.uk

ZincOx Resources plc. Corporate Overview

Proposals for new NFM BAT conclusions for Ferro-Alloys production

COMPLETE SOLUTIONS FOR THE FERRO ALLOY INDUSTRY

Central Eyre Iron Project Environmental Impact Statement CHAPTER 2: PROJECT JUSTIFICATION

CARLOW COUNTY COUNCIL GUIDANCE NOTE FOR APPLICANT AIR LICENCE

Laboratory Investigations of the Electrical Resistivity of Cokes and Smelting Charge for Optimizing Operation in Large Ferrochrome Furnaces

Working towards an increase in manganese ferroalloy production in South Africa - a research agenda

Magnetite potential of the Upper Zone of the Bushveld Complex in the Northern Limb. Limpopo Minerals Conference 12 November 2015.

Developments in production costs and competitiveness in ferrochrome

For personal use only

Investor Presentation Jogjakarta Iron Sands Project

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD

Company Overview. August 2011

Low-cement chrome-oxide-free castable for use in ironmaking rotary kilns

--> Buy True-PDF --> Auto-delivered in 0~10 minutes. GB Translated English of Chinese Standard: GB

FURNACES. A furnace is a device used for heating. The name derives from Latin Fornax; oven.

PRECAST BIG BLOCK SOLUTIONS FOR COKE OVENS

Gulf Minerals Smelter Conference

Technology of Ferro Alloys Making in India - A status and Recent Developments

Sustainably produced hot-rolled sections in sustainable buildings

For personal use only. Company Overview. 30 May 2011

N McEwan, Verref. Chromite A critical raw material for the Refractory Manufacturer

by WS Steinberg Supervisor: PC Pistorius

A New Approach to EAF Melted Steels

Granular material for use in the construction industry. Aggregates can be natural, industrially manufactured

AVOID. IPO Report MISHRA DHATU NIGAM LTD. Valuation. IPO Details. Research Analyst : Astha Jain

How raw material procurement can pave the way out of the crisis

OM HOLDINGS LIMITED (ARBN )

Building a new supplier of raw materials for the steel industry

Challenges and limiting factors for the Recycling of steel scrap in Europe

Exploring possibility of exploiting old known processes to create a new process J.M. Sathaye.

Circular Pelletizing Technology

Transcription:

HIGHVELD STEEL PROSPECTUS: IRON PLANT 1 APRIL 2016

IRON PLANT 1 EXECUTIVE SUMMARY Highveld Steel and Vanadium was founded in 1960 with the objective of building a unique plant with the ability of beneficiating vanadium bearing Titaniferrous ore from the Bushveld Igneous mineral complex. Highveld remains the only company in South Africa with the processing facility to beneficiate this ore reserve for the production of steel as well as vanadium slag. Recent developments have resulted in the directors voluntarily filling for business rescue which amongst others opens the opportunity for the sale of assets as individual operating units. The sale of Iron making Plant 1 offers investors a unique opportunity to acquire a versatile, state-of-theart smelter plant capable of profitably producing a range of products including Pig Iron, Ferro Alloys and valuable slag by-products from fines. The smelter plant, boasts three modern Open Slag Bath furnaces as well as two older submerged arc furnaces and 10 pre-reduction or preheating kilns. There is significant flexibility in operation and it is possible to spilt the plant into different product streams. With an estimated ramp-up to full production in approximately 12 weeks, the lead time to market is significantly reduced when compared to the construction of a similar sized smelter plant. Kilns View Structural Steel Sections 2

Introduction Process overview Investment case Investment case: Pig Iron Investment case: Ferro Chrome Manning requirements Maintenance requirements Environmental considerations Conclusion and way forward 3

INTRODUCTION EVRAZ Highveld Steel and Vanadium ( Highveld Steel ) was, prior to its business rescue proceedings, South Africa s second largest steel maker and the primary producer of medium and heavy structural sections. Highveld Steel has contributed significantly to the South African economy, supporting South Africa s industrial and economic development. De-commissioned operations During April 2015, Highveld Steel filed for voluntary business rescue as a result of lack of funding in challenging market conditions and ceased operations during July 2015. Under the direction of the of the business rescue practitioners and management, Highveld Steel: Preserved assets in care and maintenance mode Identified strategic assets for future sale o Agreed with creditors to enable suppliers to continue business with Highveld when operations restarts. o Performed various trials on the Open Slag Bath furnaces to verify the flexibility of units and suitability for ferroalloy production. o Successfully decommissioned the operations under a controlled environment and preserved assets for future startup. o Commenced with care and maintenance on strategic assets. o Identified various assets as future strategic assets which can be sold as loose standing operational units. o Ring-fenced the Iron making Plant 2 facility for sale and future start-up. Highveld Steel has identified Iron plant 2 as an strategic asset capable of profitably producing a range of products including Pig Iron or Ferroalloys. The location and layout of the asset allows for a stand-alone operation. 4

Introduction Process overview Investment case Investment case: Pig Iron Investment case: Ferro Chrome Manning requirements Maintenance requirements Environmental considerations Conclusion and way forward 5

IRON PLANT 1: PROCESS OVERVIEW Dedicated raw material receipt & storage area 10x 60m rotary prereduction kilns Iron making Plant 1 comprises amongst others of: Dedicated raw material handling equipment with both rail and road receipt infrastructure. Ten 60m co-current rotary kilns ideal for pre-reduction or pre-heating of ores. Hot charge transfer system to transfer hot material discharged from kilns in to smelting furnace with minimal heat losses. Three state-of-the-art 38MW Open Slag Bath Furnace, capable of processing a variety of ores with sizes ranging from fines to lumpy material. Support services including electricity, compressed air, oxygen, etc. to operate at a capacity of up to 700t of liquid pig iron per day. Plant can be purchased as a single plant or be subdivided into smaller units dedicated to different products as shown in the layout slide. Furnace feeding scheme from kilns is significantly more flexible as to what is shown in the layout and further details will be provided to interested parties. Three 38 MW recently upgraded Open Slag Bath Furnaces 6

IRON PLANT 1: HIGH LEVEL LAYOUT SHOWING POSSIBLE KILN AND FURNACE CONFIGURATION FOR MULTIPLE PRODUCT STREAMS Plant can be purchased as a single operating unit Plant can be divided into smaller components / lesser kiln configuration Kiln feeding arrangements are more flexible than what is shown 7

Introduction Process overview Investment case Investment case: Pig Iron Investment case: Ferro Chrome Manning requirements Maintenance requirements Environmental considerations Conclusion and way forward 8

IRON PLANT 1: INVESTMENT CASE The purchase of Iron making Plant 1 has the following distinct advantages: The Flexibility of equipment: The newly upgraded Open Slag Bath has a proven track record of producing a range of products including ferroalloys. Production of range of products utilising lumpy or fines Open Slag Bath and pre-heating technology: Inherent to the design of the plant is the ability to process large amount of fine material which are problematic in conventional Submerged Arc Furnaces. The plant furthermore boasts the ability to pre-heat feed material resulting in significant reduction in energy required. Strategic location: The Iron making Plant 1 is strategically situated close to major routes which allows easy access to various customers & distribution channels as well as key suppliers such as raw material suppliers, etc. Strategically located to supply market & access to key suppliers Immediate access to market: A project to erect a green fields plant similar to Iron making Plant 1 can take up to 4 years to complete. The purchase of the existing plant allows the investor immediate access to the market at a significantly discounted rate when compared to a green fields project of similar size. Low Manning requirements: The plant is substantially automated and skills required to re-start and operate Iron Plant 1 is readily available in the Witbank area. Access to existing infrastructure 9

IRON PLANT 1: INVESTMENT CASE (CONT.) Production of range of products utilising lumpy or fines Strategically located to supply market & access to key suppliers Established Infrastructure: Although the sale transaction will ultimately revolve around the purchase of the smelter plant as an entire asset, the purchaser will have the option to access the following services: On site laboratory services. Fire and rescue teams including medical station. Training facility adequate to perform both engineering and production related training. Mechanical and electrical workshops to perform selected maintenance tasks. Information technology systems such as communication networks, weigh bridges, etc. Roaming security including access control to site. Environmental monitoring services specifically related to water and waste streams. Slag handling facilities. Canteen and change-house facilities. Access to existing infrastructure 10

Introduction Process overview Investment case Investment case: Pig Iron Investment case: Ferro Chrome Manning requirements Maintenance requirements Environmental considerations Conclusion and way forward 11

IRON PLANT 1: INVESTMENT CASE PIG IRON Pig iron is a raw material in the production of steel products. Highveld boasts a 17MT de-vanadised ore resource which can be blended to be used as iron ore input into the process at a significantly discounted rate. De-vanadised ore used as iron ore input at low cost Installed capacity of up to 700tpd of foundry grade pig iron Low capital working capital investment required to ramp-up plant which will predominantly be allocated towards raw material stocks. Conservative estimates indicate that production of pig iron can yield positive returns at current pig iron pricing. Model at a glance: Product quality: Foundry grade Pig Iron Raw Material source: 75% de-vanadised ore, 25% Magnetite Production rates: 450tpd Sales price: 190 USD/t ex-works Low working capital required to enter market 12

Introduction Process overview Investment case Investment case: Pig Iron Investment case: Ferro Chrome Manning requirements Maintenance requirements Environmental considerations Conclusion and way forward 13

IRON PLANT 1: INVESTMENT CASE FERRO CHROME Ferro chrome is an alloy utilised in the production of stainless steel. The open slag bath boasts the ability to process chromite fines generated from the mining operations which are available at discounted rates. Furthermore are the rotary kilns ideally positioned to perform preheating of ore which reduces the electricity requirement at the smelting phase. Environmental regulations requires licensing of ferrochrome production in line with listed activity legislation. Chromite fines charged as input into process Kilns ideally positioned to perform pre-heating of ore Conservative estimates indicate that production of ferrochrome can yield positive returns at current market. The are furthermore positive indications that the chrome price has bottomed and positive movements in the Ferrochrome price is expected. Model at a glance: Product quality: High Carbon Ferro Chrome Raw Material source: 46% Cr Fines Production rates: 175tpd Sales price: 0.65 $/lb ex-works Produce up to 180t on current installed equipment 14

Introduction Process overview Investment case Investment case: Pig Iron Investment case: Ferro Chrome Manning requirements Maintenance requirements Environmental considerations Conclusion and way forward 15

IRON PLANT 1: MANNING REQUIREMENTS The total compliment will be dependant on the product and plant configuration. A proposed plant organagram is available based on a 3 kiln and one furnace structure. The majority of the plant s former employees are located in Witbank. Plant layout lends itself to a flexible manning structure Following the large scale retrenchment of workers in the broader smelter industry particularly in Witbank and Middelburg it is expected that the majority of ex-highveld employees will still be available for re-employment. Majority of work force based in Witbank 16

Introduction Process overview Investment case Investment case: Pig Iron Investment case: Ferro Chrome Manning requirements Maintenance requirements Environmental considerations Conclusion and way forward 17

IRON PLANT 1: MAINTENANCE REQUIREMENTS Whilst planning the shut down of the operation, careful consideration was given to the restart of the operations. This included the following important aspects: Melting down and draining of the Open Slag Bath furnace to reduce impact on refractory lining. Emptying out of the kilns prior to switch out to avoid uneven cooling & distortion of kilns. Switch out of plant carefully planned & coordinated Kilns & Furnace back on line in approximately 12 weeks Following the switch out of the plant, routine maintenance is being performed to ensure that equipment is ready for startup. It is anticipated that the furnace & associated kilns can be brought back to full capacity within a period of 12 weeks. Start-up maintenance costs may include: Maintenance to critical raw material conveyors. Various routine maintenance tasks on kilns. Load testing and other statutory testing of lifting equipment such as cranes, etc. Replacement of Kiln ESP (3 off) to ensure environmental compliance. Upgrade of furnace roof refractory anchoring system (3 of). 18

Introduction Process overview Investment case Investment case: Pig Iron Investment case: Ferro Chrome Manning requirements Maintenance requirements Environmental considerations Conclusion and way forward 19

IRON PLANT 1: ENVIRONMENTAL CONSIDERATIONS Iron Plant 1 operates under the Atmospheric Emissions License. The current licenses are applicable to the production of steel and vanadium. In the event of alternative products being produced or changes made to the raw material feed, new licences will have to be obtained from the relevant licensing authority. Detailed environmental information will be made available subject to signing of a non disclosure agreement. Highveld Steel in possession of AEL Most of the waste management activities are existing lawful activities New AEL required for different products 20

CONCLUSION AND WAY FORWARD As illustrated in this presentation, Iron Plant 1 is well positioned to offer an investor the opportunity to produce of a wide range range of products. This plant offers amongst others the following opportunities to a potential investor: Versatile equipment supported by a newly upgraded Open Slag Bath furnaces which allows the processing of fines and pre-heating of feed material. Strategically located facility situated close to major routes. Access to established infrastructure including electricity supply, oxygen supply, rail links, etc. Immediate access to market compared to a similar sized green fields project which could take up to 4 years to complete. Direct access to required skills to re-start and operate the facility. Indicative financial estimates indicate that the plant is capable of producing Pig Iron as well as Ferrochrome profitably even at current depressed market prices. In order to preserve it, the asset was placed under care and maintenance. 21

ENVIRONMENTAL COMPLIANCE The prospective bidder must determine all environmental legal responsibilities, in line with the prevailing legislation as may be amended from time to time, relating to the processes and activities to be undertaken by the prospective bidder and, if successful, to ensure full environmental compliance with such identified responsibilities. All planned processes and activities including any identified environmental responsibilities in relation thereto, will be made clear to Highveld in writing, as part of the bid process, to ensure a transparent relationship and agreement on the environmental compliance requirements. The prospective bidder must lead any discussions with the relevant environmental authorities and obtain the required environmental authorisations relating to the various environmental compliance requirements. The prospective bidder will carry all costs associated with such authorisations and discussions. Any supporting information required from Highveld relating to environmental concerns and compliance requirements must be identified by the prospective bidder and, if available, will henceforth be supplied by Highveld and not be unreasonably withheld, to support the drive of the prospective bidder towards environmental compliance. 22

CONFIDENTIALITY AND DISCLAIMER This document is strictly confidential and is not for publication or circulation. All information and ideas are strictly confidential and proprietary and may not be communicated, transmitted or distributed to any party in any form or for any purpose without the express prior written consent. By accepting this document, the recipient both understands and accepts this confidentiality clause. 23