Public Notice. MVK Ms. Tarmiko Graham (601) July 25, 2018 August 23, 2018

Similar documents
Public Notice APPLICATION NO.: EVALUATOR: PHONE NO.: FAX NO.: DATE: EXPIRATION DATE:

APPLICATION NO.: EVALUATOR: PHONE NO.: FAX NO.: DATE: EXPIRATION DATE:

APPLICATION NO.: EVALUATOR: PHONE NO.: FAX NO.: DATE: EXPIRATION DATE:

APPLICATION NO.: EVALUATOR: PHONE NO.: DATE: EXPIRATION DATE:

W. E. ~tlands (2.1 acres) Regulatory Branch. Legend c::j Project boundary. 14 January 2015 MVK Enforcement Section.

The following descriptions of the proposed project and associated impacts are based upon information provided by the applicant.

APPLICATION NO.: MVK (601)

PROSPECTUS. Proposed Beech River Canal Wetland and Stream Mitigation Bank

APPLICATION NO.: EVALUATOR: PHONE NO.: DATE: EXPIRATION DATE:

APPLICATION NO.: EVALUATOR: PHONE NO.: DATE: EXPIRATION DATE:

APPLICATION NO.: EVALUATOR: PHONE NO.: DATE: EXPIRATION DATE:

MVK Ms. Kristi Hall (601) Kristina. August 11, 2017 EXPIRATION DATE: September 1, 2017

APPLICATION NO.: EVALUATOR: PHONE NO.: FAX NO.: DATE: EXPIRATION DATE:

Public Notice Corps of Engineers

Public Notice ISSUED: October 16, 2017 EXPIRES: November 15, 2017

The following descriptions of the proposed project and associated impacts are based upon information provided by the applicant.

Public Notice. MVK Ms. Charlene Mosley (601) December 6, 2016 December 27, 2016

DEPARTMENT OF THE ARMY U.S. ARMY ENGINEER DISTRICT, MOBILE DISTRICT P.O. BOX 2288 MOBILE, ALABAMA

CEMVR-OD-P WETLAND COMPENSATORY MITIGATION BANK PROPOSAL

Public Notice ISSUED: May 21, 2013 EXPIRES: June 20, 2013

US ARMY CORPS Reply To: Public Notice No. OF ENGINEERS U.S. Army Corps of Engineers P-3121

Public Notice ISSUED: March 17, 2016 EXPIRES: April 17, 2016

PROSPECTUS FOR THE BAYOU DE LOUTRE MITIGATION SITE UNION COUNTY, ARKANSAS ARKNASAS STATE HIGHWAY AND TRANSPORTAITON DEPARTMENT

Project Information. Pursuant to Section 404 of the Clean Water Act (33 U.S. Code 1344), notice is hereby given that

Public Notice. CPM-MVK Ms. Charlene Mosley (601) June 27, 2017 July 27, 2017

APPLICATION NO.: EVALUATOR: PHONE NO.: DATE: EXPIRATION DATE:

PUBLIC NOTICE. CHARLESTON DISTRICT, CORPS OF ENGINEERS 69A Hagood Avenue Charleston, South Carolina

Information for File # DAS

Public Notice ISSUED: 11 February 2019 EXPIRES: 13 March 2019

Snitz Creek Park Wetland Mitigation Bank Prospectus. Pennsylvania Department of Transportation Engineering District 8-0

Public Notice. Name of Applicant: Mr. Ken Primos Klaas Partners, LLC 212 Waterford Square Suite 300 Madison, Mississippi 39910

Public Notice ISSUED: March 18, 2016 EXPIRES: April 18, 2016

July 9, PUBLIC NOTICE Savannah District

Public Notice ISSUED: November 7, 2018 EXPIRES: December 7, 2018

Public Notice ISSUED: 5/6/2014 EXPIRES: 6/5/2014

Mitigation Banking Instrument Outline For Proposed Mitigation Banks Within the State of Missouri (January 2010)

Project Information. Pursuant to Section 404 of the Clean Water Act (33 U.S. Code 1344), notice is hereby given that

DEPARTMENT OF THE ARMY U.S. ARMY ENGINEER DISTRICT, MOBILE DISTRICT P.O. BOX 2288 MOBILE, ALABAMA

Notice No Closing Date: September 5, 2017

Joint Public Notice. Proposed Wetland Mitigation Bank. Linnton Mill Restoration Site Mitigation Bank, Multnomah County, Oregon

Public Notice ISSUED: September 17, 2018 EXPIRES: October 18, 2018

JOINT PUBLIC NOTICE August 4, 2014

U.S. Army Corps of Engineers (USACE) Galveston District

Public Notice ISSUED: May 20, 2016 EXPIRES: June 20, 2016

Prospectus for the Lower Saline River Mitigation Bank Cleveland County, Arkansas. Arkansas State Highway and Transportation Department

Public Notice. Latitude: W Longitude: N 7.5 Minute Quad: Landsaw

Information for File # MHK

Guidelines for Preparing a Compensatory Mitigation Plan

Compensatory Mitigation Plan Requirements For Permittee Responsible Mitigation Projects St. Louis District, Corps of Engineers May 2010

Public Notice ISSUED: EXPIRES:

Public Notice. US Army Corps of Engineers Memphis District. NOTICE DATE: September 25, EXPIRATION DATE: October 25, 2018

CESAM-RD-N January 21, 2016 PUBLIC NOTICE NO. SAM JSC

-1- CORPS OF ENGINEERS STATE OF ARKANSAS Application Number: MVK Date: June 18, 2013 Comments Due: July 18, 2013

Project Information. Pursuant to Section 404 of the Clean Water Act (33 U.S. Code 1344), notice is hereby given that

Compensatory Mitigation Regulation ( Mitigation( Rule )

Public Notice ISSUED: December 11, 2018 EXPIRES: January 10, 2019

Project Information. Pursuant to Section 404 of the Clean Water Act (33 U.S. Code 1344), notice is hereby given that

Public Notice ISSUED: April 5, 2019 EXPIRES: May 6, 2019

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, MOBILE DISTRICT 105 SOUTH TURNER BOULEVARD MONTGOMERY, ALABAMA 36114

THE NEW WETLAND RULES How do they affect you? City Engineers Conference January 27, 2010

Public Notice ISSUED: 17 April 2018 EXPIRES: 17 May 2018

11590 N. Meridian Street, Suite 530 Indianapolis, Indiana North Cumberland Road, Fishers, Hamilton County, Indiana.

Public Notice APPLICATION NO.: EVALUATOR: PHONE NO.: DATE: EXPIRATION DATE:

Public Notice. Latitude: W Longitude: N 7.5 Minute Quad: Mazie. Latitude: W Longitude: N 7.5 Minute Quad: Mazie

Public Notice. US Army Corps of Engineers Fort Worth District. Applicant: Mill Branch Stream Mitigation Bank. Permit Application No.

October 3, PUBLIC NOTICE Savannah District

Public Notice. This notice announces an application submitted for a Department of the Army (DA) Permit, subject to Section 404 of the Clean Water Act:

Public Notice ISSUED: April 12, 2019 EXPIRES: May 13, 2019

Public Notice ISSUED: 22 October 2018 EXPIRES: 21 November 2018

Public Notice ISSUED: June 29, 2017 EXPIRES: July 31, 2017

JOINT PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS

JOINT PUBLIC NOTICE May 30, 2016

Information for File # TAW

Background. Literature Review

1.1 INTRODUCTION 1.2 GOALS AND OBJECTIVES 1.3 SITE PROTECTION INSTRUMENT 1.4 BASELINE INFORMATION. SWG Mitigation Plan Sheet 1 of 9

PUBLIC NOTICE Application for Permit

JOINT PUBLIC NOTICE May 14, 2018

MINOR CONSTRUCTION ACTIVITIES AT THE JOHN C. STENNIS SPACE CENTER, HANCOCK COUNTY, MISSISSIPPI REGULATORY JURISDICTION OF THE VICKSBURG DISTRICT

Public Notice. Latitude: N Longitude: W 7.5 Minute Quad: Lebanon Junction

Public Input Meeting. Proposed Central New York Wetland Mitigation Bank. March 20, 2017

CESAM-RD-NB August 15, 2013 PUBLIC NOTICE NO. SAM JSC

CESAM-RD-N April 30, 2015 PUBLIC NOTICE NO. SAM JSC

CESAM-RD-N January 10, 2018 PUBLIC NOTICE NO. SAM CMS

JOINT PUBLIC NOTICE May 11, 2015

Public Notice. Public Notice No. Date: Closing Date: US Army Corps LRL mad 6 Apr May 2018 of Engineers Louisville District

Information for File #MVP MVM

SECONDARY WETLAND IMPACTS ANALYSIS

Public Notice ISSUED: 18 December 2015 EXPIRES: 04 January 2016

WETLANDS AND OPEN WATERS Compensatory Mitigation Definitions of Factors

Stream and Watershed Restoration Design and Quantitative Benefits. Kelly Gutshall, RLA and Mike LaSala

JOINT PUBLIC NOTICE September 4, 2018

Public Notice ISSUED: 20-JAN-2016 EXPIRES: 19-FEB-2016

JOINT PUBLIC NOTICE. 29 January Leake Avenue Post Office Box 4313 New Orleans, Louisiana Baton Rouge, Louisiana

Public Notice. Notice No Closing Date: March 8, 2019

Public Notice ISSUED: July 13, 2018 EXPIRES: August 13, 2018

Public Notice ISSUED: 16 February 2018 EXPIRES: 19 March 2018

NOTICE DATE: May 04, Joint Public Notice U.S. Army Corps of Engineers and State of Arkansas

APPLICANT: Pinnacle Land Development, L.L.C., Attn: Mr. Steve Gower, Lake Bluff Dr., St. Louis, Missouri

US ARMY CORPS Reply To: Public Notice No. OF ENGINEERS U.S. Army Corps of Engineers P-3119

Information for File # MVP SJW

Transcription:

US Army Corps of Engineers. Vicksburg District 4155 Clay Street Vicksburg, MS 39183-3435 www.mvk.usace.army.mil Public Notice APPLICATION NO.: EVALUATOR: PHONE NO.: E-MAIL: DATE: EXPIRATION DATE: MVK-2018-336 Ms. Tarmiko Graham (601) 631-5540 Tarmiko.V.Graham@usace.army.mil July 25, 2018 August 23, 2018 Interested parties are hereby notified that the U.S. Army Corps of Engineers, Vicksburg District, is considering a proposal to establish the Berg Big Black River Mitigation Bank. A prospectus has been received describing the proposed bank from Berg Mitigation Banks, LLC, the bank Sponsor. The proposed site is located in Sections 1, 6, 7, 11, & 12, Township 19 North, Range 11 East, Webster/Choctaw Counties, Mississippi (enclosure 1 ). Description: The Berg Big Black River Mitigation Bank is being proposed by the bank Sponsor as a means to meet the requirements for compensatory mitigation for future and as yet unknown wetland and stream losses, which may be permitted by the Corps under the authority of Section 404 of the Clean Water Act. The bank Sponsor proposes to develop a mitigation bank by enhancing wetlands and riparian buffers within the Big Black basin. The proposed work would increase the wetland/stream function, provide species diversity, and provide a wildlife corridor within the Upper Big Black and Lower Big Black Watershed (HUC: 08060201 and 08060202). Baseline Conditions I Current Land Use I Proposed Actions: The property is comprised of approximately 603 acres located south of State Highway 82 near the town of Eupora. The property is divided into two parcels by the transecting South Sapa Road, approximately 415 acres is located west of South Sapa Road and approximately 188 acres is located east of South Sapa Road. Much of the property within the upper Big Black watershed has been historically impacted by agriculture and conversion of bottomland hardwood wetland loblolly pine plantation.

The property is located within the 100-year floodplain of the Big Black River. One unnamed canal and the Spring Creek Canal transect the proposed site. These features were historically constructed for flood control. The Big Black River transects/borders the site for approximately 13,513 linear feet. The majority of the property (approximately 400 acres) is currently planted in loblolly pine. Historically, the entire site would have been comprised of bottomland hardwood species. Various oaks and soft mast would have dominated the majority of the property. The few mature oaks found with the property include Willow oak, Water oak and Swamp chestnut oak. Dominant soft mast species currently within the property include Red maple, Sweetgum, Sugar hackberry, American elm and American hornbeam. The wetlands within the site are a combination of precipitation driven flats, areas flooded during storm events, and pockets of prolonged inundation. The objective of the proposed mitigation action is the enhancement and preservation of approximately 603 acres adjacent to the Big Black River. Approximately 492 acres of this parcel is comprised of jurisdictional wetlands. Approximately 350 acres of wetlands would be enhanced by removal of pine plantation and reforestation with bottomland hardwood species. Approximately 75 acres of the 350 acres of wetlands would require leveling of beds to remove impediments to hydrology. Approximately 141.5 acres of wetlands would require minimum enhancement and/or preservation to control invasive species. Approximately 6,625 linear feet of the original Big Black River channel would be protected by enhancement of 150 feet buffers on each side (43.62 acres). Approximately 70 acres of upland within the site would be enhanced by reforestation and included within the protective instrument of the mitigation site (enclosure 2). The proposed mitigation actions include the conversion of siviculture to bottomland vegetative communities within the wetland areas and the riparian buffer of the original Big Black River channel. Specific mitigation actions would include the removal of planted pine, site preparation and invasive species control, removing impediments to hydrology (bedded areas), enhancing riparian buffers, and enhancing upland buffers. Native bottomland hardwood species would be planted to restore the historic vegetative community with the site. Hydric Soils found within the site include: Chenneby silt loam, Chenneby Arkabutla association, Guyton silt loam, Oaklimeter silt loam, Bonn silt loam, Bude silt loam and Verdun silt loam. Service Area: This Mitigation Bank would be established to provide mitigation to compensate for impacts to waters of the United States, including wetlands, within the Corps of Engineers Vicksburg District. These areas are demarcated by the United States Geologic Survey as hydrologic unit code 08060201 and 08060202 2

(primary service areas). Decisions authorizing the use of credits from the Mitigation Bank will be made by the appropriate authority on a case by case basis in accordance with all applicable requirements. Comments on this proposed mitigation bank may be provided to the Corps at the address below. Comments should be received no later than the expiration date of this public notice. The prospectus, which outlines the conceptual plan for the bank, is available at the following website: http://www.mvk.usace.army.mil/missions/regulatory/publicnotices.aspx The prospectus, which outlines the conceptual plan for the bank, is available for review at the Vicksburg District, Corps of Engineers at the address given below. Please provide comments to: U.S. Army Corps of Engineers Vicksburg District ATTN: CEMVK-OD-F 4155 Clay Street Vicksburg, Mississippi 39183-3485.}~ 4 _ yus~ Thomas A. McCabe Chief, Evaluation Section Regulatory Branch 3

. Project Boundary (603 Acres) 1-,..,,---,..,, Bottonland Hardwoods Wetlands (141.5 Acres) r= Stream/Creek Bedded Pine Wetlands (350.4 Acres) -Other Waters of The United States (26,209.26 ft) -.,... 0 \.., THERE ARE JURISDICTIONAL WATERS OF THE U.S. IDENTIFIED WITHIN THE PROPOSED PROJECT BOUNDARY, THUS A PERMIT MAYBE REQUIRED '., MVK-2018-336 Berg Big Black River Mitigation Bank Webster County, MS Preliminary Jurisdictional Determination Aerial Imagery: ESRI World Imagery us Army Corps of Engineers. N. W E s Regulatory Branch Enforcement Section 0 475 950 1,900 --c::::::::::i Feet Prepared By: Jay Keen Enclosure 1

PROPOSED MITIGATION ACTIONS B e rg B ig B lack Mitigation B ank Propo se d Mitigat ion A c tions Map A pril 8, 2 018 B erg Mitigat i on B a n ks L LC Enclosure 2