Pre-owned 240 MW Combined Cycle Gas Turbine Power Plant

Similar documents
Carrington Power Station

High Bridge Combined Cycle Plant

Application of Advanced Process Control systems in Enel Thermal Generation (Eleonora Porro, Giorgio Mazzola, Giordano Proietti Marini)

Combined Cycle Power Plants. Combined Cycle Power Plant Overview (Single- and Multi-Shaft) Training Module. ALSTOM (Switzerland) Ltd )*+,

NOx CONTROL FOR IGCC FACILITIES STEAM vs. NITROGEN

Carbon Capture Options for LNG Liquefaction

GAS-FIRED COMBINED-CYCLE POWER PLANTS HOW DO THEY WORK? A company of

Combined Heat and Power

Hitachi H-25 & H-80 Gas Turbine. Bucharest, Apr.23, 2013

Steam Turbines. A Finmeccanica Company

2. TECHNICAL DESCRIPTION OF THE PROJECT

CO-GENERATION PLANT KUSHA INDUSTRY CO.

Kawasaki Gas Turbines-Americas Gas Turbines Power Generation Technology & Applications

GASIFICATION TECHNOLOGY CONFERENCE

Performance Evaluation of a Supercritical CO 2 Power Cycle Coal Gasification Plant

Power Engineering II. Technological circuits of thermal power plants

MEC-MOS-E-2004 Gas Turbine Maintenance Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

Matching of a Gas Turbine and an Upgraded Supercritical Steam Turbine in Off-Design Operation

Guidance Document for Cogeneration Emissions. (Cogeneration Guidelines)

Course 0101 Combined Cycle Power Plant Fundamentals

Equipment Design. Detailed Plant Conceptual Design. Version 9.0

Gas turbine power plant. Contacts: Mail: Web:

Equipment Design. Detailed Plant Conceptual Design. Version 7.0

A COMPLICATED PROJECT FOR POWER AND WATER CO- GENERATION: THE RAF SITE

Your partner for the right solution

UC Davis - Facilities O&M Cogeneration Plant Bid Package October, 2007

MEC-MOS-E-1999 Lead Field Commissioning Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

Combined Cycle Gas Turbine Problems And Solution

GE Energy H SYSTEM WORLD S MOST ADVANCED COMBINED CYCLE TECHNOLOGY

Design Optimisation of the Graz Cycle Prototype Plant

Insert flexibility into your hydrogen network Part 2

The 34 th Congress of Euroheat & Power

The H-25/H-15 Gas Turbine A Product of Hitachi Quality

District Heatingwithor. C For Additional And Cleaner POWER. ISCC and Solar Boost. Conference Paper CONFERENCE PAPER

PROMISING DIRECTION OF PERFECTION OF THE UTILIZATION COMBINE CYCLE GAS TURBINE UNITS

CO 2 Capture: Impacts on IGCC Plant Performance in a High Elevation Application using Western Sub-Bituminous Coal

OPTIMIZATION OF PARAMETERS FOR HEAT RECOVERY STEAM GENERATOR (HRSG) IN COMBINED CYCLE PLANTS

Available online at Energy Procedia 4 (2011) Energy Procedia 00 (2010) GHGT-10

EXERGY ANALYSIS OF GAS-TURBINE COMBINED CYCLE WITH CO 2 CAPTURE USING PRE-COMBUSTION DECARBONIZATION OF NATURAL GAS

Gas Turbine Inlet Air Cooling System

Overall nuclear power plant thermal efficiency will decrease if... A. the temperature of the steam at the turbine exhaust increases.

A comparison of advanced thermal cycles suitable for upgrading existing power plant

Alstom Cogeneration Plants Meeting the Requirements of the Asian Energy Markets

Energy Saving Efforts in Indian Ammonia Urea Plants

Applied Thermodynamics - II

FULL PAPER FP_A.5_CLP_CCGT Upgrade

Efficient and Flexible AHAT Gas Turbine System

Design of Chiller Type Inlet Air Cooling System to Enhance the Performance of Combined Cycle Power Plant

University of Illinois Utility Master Plan and Dispatch Model

THE ASSESSMENT OF A WATER-CYCLE FOR CAPTURE OF CO2

A TECHNOLOGY FOR TODAY. Atlanta 2010

Combined-Cycle Units and Block Design Data (Voluntary Reporting)

INTRODUCING THE SGCC6-5000F 2x1 REFERENCE POWER BLOCK FOR IGCC APPLICATIONS

SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN

PM0011 CCGT Capital Cost Benchmark Study Final Report

SOAPP-CT Version 8.0 Released

Examining Applications Of Offshore Technology To Onshore Gas Compressor Stations For The Profitable Generation Of CO2-Free Power

By Order of A W Graham Esq and R A Croxen Esq of KPMG LLP the Joint Administrators of Aylesford Newsprint Ltd

Modelling of Combined Cycle Powerplants with EBSILON Professional. Dr. Hans-Peter Wolf AGH Letniej Szkoły Energetyki 2018

EFFECT OF AMBIENT TEMPERATURE, GAS TURBINE INLET TEMPERATURE AND COMPRESSOR PRESSURE RATIO ON PERFORMANCE OF COMBINED CYCLE POWER PLANT

Operation and Maintenance Energy Technology

Improving Flexibility of the Combined Cycle Power Plant Hamm Uentrop to Cover the Operational Profiles of the Future

Benchmarking of power cycles with CO 2 capture The impact of the chosen framework

Available online at Energy Procedia 4 (2011) Energy Procedia 00 (2010)

Packaged AHR (Advanced Heat Recovery) Systems for Engines, Gas Turbines, & Industrial Waste Heat. Tom Pierson

The H-25/H-15 Gas Turbine A Product of Hitachi Quality

1300 MW Repowering Project: Claus C

360 vision page 13. Air-cooled evolution page 18. 3D testing page 22. Patriot gains page 26

Chapter 4.3: Cogeneration, Turbines (Gas, Steam)

MLNG DUA DEBOTTLENECKING PROJECT

Design Details of a 600 MW Graz Cycle Thermal Power Plant for CO 2

POST COMBUSTION CO 2 CAPTURE SCALE UP STUDY

OPERATIONAL EXPERIENCE AND CURRENT DEVELOPMENTS.

A Further Step Towards a Graz Cycle Power Plant for CO 2 Capture

NTPC O&M Conference Performance and Optimization of Water Utilisation Increase of Existing Power Plants. Speaker Name; Tufani Ram 13-14/02/2013

Thermodynamic Analysis on Gas Turbine Unit

Gasification to meet refinery hydrogen, electricity and steam demands: Availability vs Costs

Integration and Onsite System Aspects of Industrial Post-Combustion CCS

Chapter 8. Vapor Power Systems

Integrated production of liquid sulphur dioxide and sulphuric acid via a lowtemperature

Heat Recovery Steam Generators for Flexibility

Environmental Assessment Report

Low temperature cogeneration using waste heat from research reactor as a source for heat pump

2016 BioCleantech Forum TURBODEN ORC TECHNOLOGY: STATE-OF-THE-ART. Ilaria Peretti. Manager, Sales and Business Development North America

Borregaard Case Study. Sarpsborg I & II

CHAPTER 2 STUDY OF 210 MW BOILER SYSTEM 2.1 DESCRIPTION OF 210 MW BOILER

MEC-MOS-E-2004 Assistant Commissioning Manager / Assistant Operation Lead

PINCH ANALYSIS : For the Efficient Use of Energy, Water & Hydrogen. NITROGEN-BASED FERTILIZER INDUSTRY Energy Recovery at an Ammonia Plant

Consider a simple ideal Rankine cycle with fixed turbine inlet conditions. What is the effect of lowering the condenser pressure on

- The Osaki CoolGen Project -

NEW TECHNOLOGIES IN COAL-FIRED THERMAL POWER PLANTS FOR MORE EFFECTIVE WORK WITH LESS POLLUTION

Understand boiler performance characteristics. Use these suggestions when buying, designing or optimizing steam generators

Improving energy efficiency in an ammonia plant

A novel CO 2 -capturing natural gas combined cycle with LNG cold energy utilization

BCE Program March-2017 Electrical Power Systems Time: min Quiz 1 Model A رقم المجموعة:

COST EFFECTIVE SERVICING, REPAIR & REFURBISHMENT. JOHAN FREDRIK BOK

MARAMA Webinar August 7, Angelos Kokkinos Chief Technology Officer Babcock Power, Inc.

Post Combustion CO 2 Capture Scale Up Study

New equipment layouts of combined cycle power plants and their influence on the combined cycle units performance

Scott Hume. Electric Power Research Institute, 1300 West WT Harris Blvd, Charlotte NC 28262

Transcription:

P.O.Box 130571 20105 Hamburg/Germany For Sale: Ref.-No: Tel. +49 40 33441944 Fax +49 40 33441945 Pre-owned 240 MW www.lohrmann.com info@lohrmann.com Combined Cycle Gas Turbine Power Plant GT-CC-045 (short) Power Plant Description The GTCC plant entered in operations in March 2001. Originally the plant had a gross power output of 288 MW at ISO conditions, featured by a 189 MW GT13E2 Alstom gas turbine and a 99 MW AEN steam turbine in a multi- shaft arrangement. The plant was able to burn syngas and to generate power and steam both for site captive consumptions and for power export. The plant worked regularly with high availability rates (over 90%) under an O&M contract by ABB/Alstom. The maintenance, in compliance with the structure of the project finance operation through which the initiative was implemented, was continually carried out directly by ABB/Alstom based on the contractual scheme. Picture 1a and 1b CCGT power plant GT-CC-045 240MW Page 1 of 3

Modification and Details of GT Upgrade in 2013/2014 Starting from January 2013 the plant underwent activities aimed at modifying the CCPP section in order to feed the plant with natural gas. The following replacements were carried out: New gas turbine blades, with VIGV (Variable Inlet Guide Vane) inlet blading; New GT compressor, axial type with 21 compression stages (compression ratio approx. 15); New GT rotor; New combustion chamber, ring shaped; New NG burners, 48 Advanced Environmental Burners (AEB). The natural gas fed power plant is characterized at ISO conditions by gross power output of 240 MW 1, being 155 MW the gas turbine output and 85 MW the steam turbine output. Neither the ABB generators (222 MVA and 117 MVA) nor the step-up transformers (15,75 kv to 132 kv) nor the steam cycle (steam turbine, condenser and heat recovery steam generator (HRSG), that is equipped with 3 steam drums at different pressure levels and a DeNOx catalytic system) were modified, with the exception that the HRSG was equipped with a new CO catalyst aimed at lowering the emissions at minimum load. The plant is equipped with sea water cooling system. The converting interventions ended in 2014 and the plant, having successfully completed the commissioning activities on March 2015, has never entered in commercial operations. CCGT plant highlights The following strength points characterize CCGT plant, as modified by the activities carried out in order to feed the gas turbine with natural gas: the plant size, in terms of gross power output, represents a non-standard opportunity both for captive consumptions of mid/large size industrial sites and for business activities mainly oriented at power generation; the electrical efficiency is performing and the global efficiency can be increased if electrical power generation is integrated with thermal power generation in cogenerating configuration; the plant is characterized by limited environmental impacts, that have been further lowered through the recent adoption of a CO catalyst allowing the emissions reduction at minimum load (the daily emission limits are 65 mg/nm 3 for NOx and 50 mg/nm 3 for CO, for a load range from 100% GT relative load down to 50% GT relative load); the gas turbine is a new equipment, as well as the rotor and the combustion chamber, that after the conversion to natural gas has never been put in operations; the steam cycle equipment, as well the generators and the transformers, has about 10 years of operations, having been regularly and properly maintained. GT-CC-045 240MW Page 2 of 3

The power train is a multi-shaft arrangement consisting of: - one Gas Turbine type GT13E2 ( GT ) with combustion chamber and air compressor with variable inlet guide vanes, mounted on a single shaft (made by Alstom); - one steam turbine ( STG ) made by Ansaldo; - two generators made by ABB, one 221.9 MVA of the type WY21Z-092 LLT for the GT and one 117.3 MVA type WX18Z-090 LLT for the STG; - two step-up transformers 132/15,75 kv (215 MVA for the GT and 120 MVA for the STG); - one heat recovery steam generator ( HRSG ) with triple pressure natural circulation, producing superheated HP, MP and LP steam. A DeNOx system is installed in the boiler; - Auxiliary Systems: Water and steam cycle, feed water treatment, sea water intake and cooling system, instrument and air plant distribution, nitrogen distribution, electrical distribution, fire-fighting system. The plant gross power output at maximum load is 240 MW (155 MW GT + 85 MW STG) at ISO conditions. The plant gross efficiency at maximum load is equal to 52.5 %. Scope of Supply Complete CCGT plant consisting of the foll. main components: power generation section: gas turbine, steam turbine, generators and transformers; heat recovery steam generator and condenser; auxiliaries: 2 pumps for cooling water circulation (18.000 m 3 /hr and 1 MW each), 1 unit for demineralized water supply (130 tonnes/hr); optionally: 1 auxiliary 140 tonnes/hr high pressure steam generator (100 barg and 500 C). GT-CC-045 240MW Page 3 of 3

Heat Recovery Steam Generator (HRSG) Steam Turbine GT-CC-045 240MW Page 4 of 3

New Gas Turbine Rotor New GT Filtration system GT-CC-045 240MW Page 5 of 3

New Fuel Gas treatment station GT step-up transformer GT-CC-045 240MW Page 6 of 3