AR SCAFFOLDING AR ALUMINUM MOBILE AR STEEL MOBILE

Similar documents
Multi-Purpose Scaffolding Instruction Manual

GSSIM. Mini Scaffold (Interior or Exterior) Assembly & Operating Instructions

GSSIM. Mini Scaffold (Interior or Exterior) Assembly & Operating Instructions

WARNING SAFETY RULES AND INSTRUCTIONS FOR BIL-JAX UTILITY SCAFFOLD

Sectional Scaffold Product Selection Guide

SCAFFOLD COUNT AND MESSAGE SHEET

Assembly Instructions

Sectional Scaffold. Scaffold Access Unit Installation Instructions

SafeDeck Supported Scaffold System

STANDARD PRACTICE INSTRUCTION

Systems Scaffold Tubular Scaffold Access Unit Installation Instructions

Scaffolding. Safety Guide. STOP! Before you climb

OSHA Rules for Scaffolding

Safety Documents > Safety Manual > Scaffolds

OSHA Rules for Scaffolding

AGR TOWER. Standard Features include. Tower Assembly Training Available

Scaffolds. OSHA Office of Training & Education 1

OPERATING INSTRUCTIONS


Scaffolds. OSHA Office of Training & Education 1

Instruction Manual Span Scaffolds

SCAFFOLDING PROCEDURE

GENERAL SAFETY RULES DOUBLE WIDTH 232 (NARROW RUNG) 3T INSTRUCTION MANUAL DISMANTLING NOTES: The 232 Tower Approved to the requirements of BS EN 1004

Aluminum Scaffold Safety Rules

Sample Written Program. For. Scaffolds

Scaffold Safety

Construction Safety Education Forum. 6 March Scaffolding. Dimitri Barlas, State Coordinator Construction Work Health and Safety Division DRAFT

Universal Panels & Accessories

Span 300 Manual. DESIGNATION EN1004 CEN 1298 IM - en. CEN designation of this instruction manual EN 1298 IM en

DUQUESNE UNIVERSITY SAFETY PROGRAM FOR WORKING AT ELEVATED HEIGHTS

Elevated Work Safety Meeting

CAL SCAFFOLD USER GUIDELINES COURSE SUMMARY

TOWER EXTENSION PACK 3 Model No. SSCL3. TOWER EXTENSION PACK 4 Model No. SSCL4 INSTRUCTIONS FOR: PLATFORM SCAFFOLD STAND. Model No. SSCL1.

ANID GROUP SARL. For. Scaffolds

Reliant Holdings Ltd Safety Management System

BoSS SOLO 700. One Man Aluminium Tower EN /4 EN1298-IM-EN 3T - Through the Trap Door USER GUIDE

SOLO 700. One Man Aluminium Tower 3T - Through the Trapdoor Method USER GUIDE

Scaffold Users Safety Quiz

OPERATING INSTRUCTIONS

PORTABLE LADDER SAFETY

Issue Date: 3.2. Bearer: A horizontal member of a scaffold upon which the platform rests and which may be supported by ledgers.

Introduction. Estimated length: 30 minutes Audience: construction workers

Span 300 Instruction Manual

ONE MAN TOWER. Instruction/safety manual

New Hire s Training. Print Name

WARNING. *All Tele-Tower manuals are available free from Telpro Inc. Call Customer Service at or if you need a copy.

3T - Through The Trapdoor Method

Big Ox Energy Siouxland, LLC. Safety Management System. Authority: President

SCAFFOLDING. Scaffolding Systems. Aerial Work Platforms. Access ways

Mobile Towers - 3T Method

Safety First Mobile Towers - 3T Method INTRODUCTION

8 Rung Industrial Tower

WORKING AT HEIGHT. The company will comply with the Work at Height Regulations 2005, its schedules and Codes of Practice.

MOBILE ACCESS TOWER INSTRUCTION MANUAL SHALLOW BRACE. Incorporating the 3T method of assembly

This User Guide provides you with step by step instructions to ensure your system is erected easily and safely.

SAFE ERECTION AND USE OF ALUMINIUM TOWERS/SCAFFOLDS

EASY-SET SCAFFOLD TOWER OPERATIONAL SAFETY AND ASSEMBLY INSTRUCTIONS MODEL: AL-Q0107. Customer Service

EASY-SET SCAFFOLD TOWER OPERATIONAL SAFETY AND ASSEMBLY INSTRUCTIONS MODEL: AL-Q0106. Customer Service

Scaffolding Procedures

MiniMax USER GUIDE. Mobile Aluminium Trade Quality Access Tower System. 3T - Through The Trapdoor Method

SCAFFOLDS Revision No: 3

Metal Scaffolds. (1) Metal scaffolds shall be designed to support all dead, live, and wind loads to which they will be subjected.

CLIMA 3T. Mobile Aluminium Tower with Climbing Frame 1450/850 3T - Through the Trapdoor Method USER GUIDE

GENERAL SAFETY RULES. INSTRUCTION MANUAL (Platform Heights 1.1m, 2.1m, 3.1m & 4.1m)

ROOM-MATE. 3T - Through the Trapdoor USER GUIDE

Date Issued: June 2010 Revision Date: February 2013 Review Date: February 2016 Revision #

OSH5063EP(PRS3607) Workplace and Work Equipment Hazard. Session 9. Working at Height

LADDERSPAN 3T USER GUIDE. Mobile Aluminium Tower 1450/850 Ladderspan. 3T - Through the Trapdoor Method

Span 400 Series Instruction Manual

1450/850. Instruction Manual. Mobile Access Tower

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 7

Document Number: HSE Created: February 21, 2013 SCAFFOLDING. Author: A Holland

Span 400 Instruction Manual

Safety First Mobile Towers - 3T Method

Illinois State University. Scaffolding Procedure

BoSS Room-Mate. 3T - Through the Trap Method

Scaffolding Safety Procedures

COMPONENT SCHEDULE SINGLE WIDTH SPAN TOWERS WITH LADDER FRAMES TO BSEN RUNG STARTER FRAMES

Scaffolding Safety Awareness Program

Table of Contents Big expertise. Real convenience. Concrete commitment.

Introduction to Basic Scaffold Safety

Span 500. Elite Instruction Manual. DESIGNATION SPAN 500 Double Width EN /12 XXXD SPAN 500 Single Width EN /8 XXXD

3T - Through The Trapdoor Method

EASY-SET SCAFFOLD TOWER OPERATIONAL SAFETY AND ASSEMBLY INSTRUCTIONS MODEL: AL-Q0108. Customer Service

Industrial Aluminium Towers

A SAFER WAY TO REACH NEW HEIGHTS. Instruction Manual. Mobile Access Tower. 3T - Through the trap method

1 Man Mobile Aluminium Tower System

Safety First Mobile Towers - 3T Method

Industrial Aluminium Towers

Safety on Heights: Our Policy

LADDERSPAN AGR. BoSS Camlock Advance Guardrail Mobile Aluminium Tower 1450/850 Frames USER GUIDE

The original WACO RED premium frame scaffolding and shoring systems.

Scaffolding Safety. Scaffolding

References. EM , Sections 22 OSHA 29CFR (Subpart L ) UFGS [Latest] ANSI A

Scaffolding. This Section shall also apply to all GWC Sub-Contractors Introduction:

Supported Scaffold Inspections

Scaffold Inspection Procedures for the Competent Person. Merle Errthum

CLIMA 3T. Mobile Aluminium Tower with Climbing Frame 1450/850 3T - Through the Trapdoor Method USER GUIDE

ASSEMBLY.

Single Width Tower Assembly Guide

Transcription:

SAFETY RULES and INSTRUCTIONS FOR AR SCAFFOLDING AR ALUMINUM MOBILE AR STEEL MOBILE INTERIOR or EXTERIOR USE

! WARNING! Improper assembly, dismantling or use of Multi-Use Scaffold may result in serious injury or death. Assemblers, dismantlers, and users of AR Multi-Use Scaffold must read and fully understand these Safety Rules & Instructions as well as the OH&S, state and local regulations pertaining to this equipment prior to use. LOAD CAPACITIES 1.9 metres Length Unit Light duty rates - 225kg SWL Maximum Load 450kg (WORKERS & MATERIALS) WARNING! DO NOT OVERLOAD SCAFFOLD, MAY RESULT IN SERIOUS INJURY! ITEM SPECIFICATIONS Product Length Width Height Folded Length Highest Standing Level Weight AR Aluminum 1900mm 750mm 4.8m 1900mm 3.6m 90kg Net AR Steel 2 1900mm 750mm 4.6m 1900mm 3.6m 181kg Net AR Steel 3 1900mm 750mm 6.5m 1900mm 5.3m 250kg Net Thickness 3.0mm 3.0mm 3.0mm ASSEMBLY INSTRUCTIONS For proper assembly, your AR Multi-Use Scaffold must comprise of 13 individual parts. (as per drawing) 2

Parts List per Box No. Part Name QTY A Frame 2 B Side Brace 2 C Platform 1 D Castor 4 E Lock Pin 4 Step 1 - Attach side brace B to two frames A Pull L-shape lock pin at each end of side brace to the disengaged position. (see exhibit A) While holding L-shape pin in disengaged position, place U-channel on each end of side brace B around leg of frame A at desired platform height. Release lock pin and be sure that pin fully engages into hole in frame A leg. Step 2 - Attach second brace B to two frames A Repeat instructions in Step 1.! WARNING! Both side braces must be positioned at the same height on the frames so that the platform will be level. Be sure all 4 L-shape lock pins are fully engaged in holes of frames. Be sure all 4 L-shape lock pins are in the locked position. 3

Step 3 - Install platform C on side braces B so that the platform is fully seated within inner channel on top of side braces. Step 4 - Rotate the platform clips into the engaged position. Step 5 - Install 4 castors D into legs of frame A and pin with lock pins E. Step 6 Install 4 outriggers into legs of bottom frame. Step 7 While standing on first platform, insert third frame A into top of first mobile scaffold frame. Then insert fourth frame A into top of first mobile scaffold frame. Step 8 Attach second side brace B to two frames A ensuring the L-shape lock pin at each end of side brace is engaged. And repeat other side. Step 9 Install platform as per Step 3 and 4 Step 10 Install guardrail! WARNING! Recheck all side brace lock pins for full engagement before accessing platform. Recheck platform to be sure it is properly seated within side brace channel and the platform clips are fully engaged before accessing. When accessing platform, climb over top of frame ladder DO NOT SWING AROUND SIDE OF FRAME. SOME TYPICAL APPLICATIONS INCLUDE: Painting Acoustical / Ceilings Drywall Installation & Taping Window Cleaning & Treatment Installation HVAC Installation And much more Sign Installation & Maintenance Overhead Door Installation Lighting & Wire Maintenance & Electrical General Building Maintenance Functions as shelving 4

DISMANTLING NOTES The work of dismantling scaffolding should be under the supervision of an individual with proper experience and competence. The following should be observed while dismantling: 1. It shall be the responsibility of the individual to read and comply with the following common sense guidelines which are designed to promote safety in the dismantling of the scaffolding. 2. Check to ensure if scaffold has been structurally altered in any way which would make it unsafe; and it so, reconstruct where necessary before commencing with the dismantling procedures. 3. Dismantle scaffold from the top down. Begin removing all accessories from that section being dismantled. 4. On stacked scaffolds do not remove ties and braces until dismantling has reached the second to which they are attached. 5. Always work within the inside of the scaffold. 6. When moving up or down the scaffold DO NOT climb on ties, braces, or non-braced components. Climb over the top of the frame. DO NOT swing around outside of the frame. 7. Be sure that the area below is clear of personnel not involved in the dismantling and the ground is secured against unauthorised access. 8. Lower the scaffold components in a safe controlled manner. Avoid dropping or throwing the components as this could result in injury to personnel below, or damage to the equipment. 9. Use energy absorbing lanyards and full body harness when required by law. 5

SCAFFOLD SAFETY RULES SERIOUS INJURY OR DEATH MAY RESULT FROM IMPROPER ASSEMBLY OR USE of scaffold equipment. Assemblers and users must be familiar with and follow safe practice and the Safety Rules written below. These Safety Rules cover generalised situations only and should not be used to replace any other additional safety and precautionary measures that may be necessary to cover the many usual or unusual conditions encountered during installation or dismantling. The rules are not intended to conflict with, or supersede the requirements of the OH&S Laws or any other government regulations, codes and rules; the user must refer to and comply with all such specific provisions of law. A. FOLLOW SAFE PRACTICE OF THE SAFETY RULES AND COMPLY WITH OH&S laws and other federal, state and local rules, codes and regulations pertaining to scaffolding during any use of the equipment. B. THE POTENTIALLY HAZARDOUS NATURE OF SCAFFOLDING ASSEMBLY makes it important that all personnel assigned to this work be instructed in these safety rules, safe practices and procedures and be under the supervision of an experienced person. Ensure that these Safety Rules are posted and that all assemblers and users of the scaffold are aware of and follow them. C. REPORT ANY UNSAFE CONDITIONS TO SUPERVISORS. Do not work or allow persons to work on scaffolds when sick or suffering from dizziness, unsteadiness or any other physical symptom which could affect their ability to work safe. D. INSPECT ALL EQUIPMENT BEFORE USE. Never use any equipment which is damaged, defective, or deteriorated in any way. E. INSPECT ASSEMBLED SCAFFOLD FREQUENTLY and be sure that it is maintained in a safe condition, ensure that the scaffold connections have not become loosened and that components have not been improperly released or removed. F. MAINTAIN ALL EQUIPMENT IN GOOD REPAIR. Never use corroded or excessively rusted equipment; the strength of such equipment is not known. G. CONSULT YOUR SCAFFOLDING SUPPLIER WHEN IN DOUBT. Never take chances. H. ALWAYS READ THESE SAFETY RULES in conjunction with all safety regulations. I. ALWAYS PLACE SCAFFOLDS ON A SOUND, STABLE SURFACE and assure that it is adequate to support the intended scaffold loads. Never place scaffolds on unstable where loose objects could tip, break or become dislodged. J. LIFT AND LOWER COMPONENTS CAREFULLY AND SAFELY; use tag lines where appropriate to the handling method. Never allow excessive quantities of components to be stockpiled on partially complete scaffolds. Stock only sufficient components consistent with the progress of the work. Lower dismantled components as soon 6

as possible. Never drop components deliberately. K. THE TIEING OF THE SCAFFOLD TO THE STRUCTURE IS OF GREAT IMPORTANCE TO the stability and safety of the scaffold. Assure that the structure to which the scaffold is tied or anchored is capable of safely supporting all loads imposed by the scaffold. L. FREE STANDING SCAFFOLDS other than wall scaffolds must be restrained from tipping by guying or other means or otherwise stabilised as appropriate, recognizing that stability is essential to the safety of the scaffold. M. INSTALL GUARDRAILS, MIDRAILS, AND TOEBOARDS at all openings, open sides, and ends of every work platform. N. NEVER USE LADDERS OR MAKESHIFT DEVICES on tops of scaffold to increase the height. Never place plank on or stand on guardrails and mid-rails. O. POWER LINES NEAR SCAFFOLDS ARE DANGEROUS. Use extreme caution and consult the electrical company to have the lines de-energised, insulated, or otherwise rendered safe. Never allow any installation or use of scaffolds until this is completed. a. Never ride mobile scaffolds. b. Remove all materials and equipment from the scaffold before moving. c. Lock castor and outrigger brakes when scaffold is not being moved. d. Do not attempt to move mobile scaffold without sufficient help and roll on even surfaces only. Watch out for holes or surface obstructions and for overhead obstructions, including power lines and other hazards. e. The maximum platform height of a mobile scaffold must not be exceeded. All OH &S laws must comply when using mobile scaffold. f. Move the scaffold using the bottom frame. Never attempt to move the scaffold when on top. g. If mobile scaffolds are used outdoors, care must be taken to assure that they cannot become unstable due to wind or other conditions. R. DO NOT OVERLOAD SCAFFOLDS. Refer to and do not exceed the scaffold load capacities. P. WHEN ANY CANTILEVERS ARE USED, such as brackets, etc; proper care and precautions must be taken to prevent tipping of the scaffold. Q. FOR MOBILE SCAFFOLDS FOLLOWING THESE ADDITIONAL SAFETY RULES: 7