CUSTERS FOLDY MOBILE SCAFFOLDING

Similar documents
Custers. Camino CHIMNEY SCAFFOLDING ASSEMBLY AND USER S INSTRUCTIONS. Nov. 2003

This User Guide provides you with step by step instructions to ensure your system is erected easily and safely.

MiniMax USER GUIDE. Mobile Aluminium Trade Quality Access Tower System. 3T - Through The Trapdoor Method

TOWER EXTENSION PACK 3 Model No. SSCL3. TOWER EXTENSION PACK 4 Model No. SSCL4 INSTRUCTIONS FOR: PLATFORM SCAFFOLD STAND. Model No. SSCL1.

Safety First Mobile Towers - 3T Method

ASSEMBLY INSTRUCTION ROLLING TOWER RT 1400 & RT 1400XR ROLLING TOWER RT 750 & RT 750XR STAIR TOWER ST 1400 FOLDABLE TOWER FT 750 & FT 750XR

Assembly Instructions

Mobile Tower 3T Method (Through The Trapdoor) Please read this guide carefully. Please note that diagrams are for illustrative purposes only.

Safety First Mobile Towers - 3T Method

Inspect components prior to erection. Inspect tower prior to use. Castors locked and legs correctly adjusted. Stabilisers fitted as specified

Span 300 Manual. DESIGNATION EN1004 CEN 1298 IM - en. CEN designation of this instruction manual EN 1298 IM en

Span 300 Instruction Manual

LADDERSPAN AGR. BoSS Camlock Advance Guardrail Mobile Aluminium Tower 1450/850 Frames USER GUIDE

Mobile Towers - 3T Method

Span 400 Instruction Manual

Safety First Mobile Towers - 3T Method INTRODUCTION

LADDERSPAN 3T USER GUIDE. Mobile Aluminium Tower 1450/850 Ladderspan. 3T - Through the Trapdoor Method

SOLO 700. One Man Aluminium Tower 3T - Through the Trapdoor Method USER GUIDE

INSTRUCTION MANUAL MOBILE ACCESS TOWER

Span 500. Elite Instruction Manual. DESIGNATION SPAN 500 Double Width EN /12 XXXD SPAN 500 Single Width EN /8 XXXD

CLIMA 3T. Mobile Aluminium Tower with Climbing Frame 1450/850 3T - Through the Trapdoor Method USER GUIDE

BoSS Room-Mate. 3T - Through the Trap Method

Rolling Towers. Layher Rolling Towers Uni Wide. Safety Structure Instructions for Assembly and Use. Mobile working platforms to DIN EN 1004:

BoSS. Mobile Aluminium Tower 1450/850 Ladderspan. 3T - Through the Trapdoor Method

Span 400 Series Instruction Manual

Safety First Mobile Towers - 3T Method INTRODUCTION

PROFESSIONAL ROLLING TOWER SYSTEMS

BoSS Clima USER GUIDE. Mobile Aluminium Tower with Climbing Frame 1450/850. 3T - Through the Trapdoor Method

ROOM-MATE. 3T - Through the Trapdoor USER GUIDE

CLIMA 3T. Mobile Aluminium Tower with Climbing Frame 1450/850 3T - Through the Trapdoor Method USER GUIDE

Single Width Tower Assembly Guide

BoSS SOLO 700. One Man Aluminium Tower EN /4 EN1298-IM-EN 3T - Through the Trap Door USER GUIDE

AGR TOWER. Standard Features include. Tower Assembly Training Available

Instruction Manual. DESIGNATION SPAN 500 Double Width EN /12 XXXD SPAN 500 Single Width EN /8 XXXD

CLIMA AGR. Mobile Aluminium Tower with Climbing Frames 1450/850 Camlock Advanced Guardrail USER GUIDE

Safety First Mobile Towers - 3T Method INTRODUCTION. Please read this guide carefully. Please note that diagrams are for illustrative purposes only.

LEWIS Miniscaff Folding Tower Assembly Guide

Rolling Towers. Layher Uni Light Tower Instructions for Assembly and Use. Mobile working platforms according to DIN EN 1004:

GENERAL SAFETY RULES DOUBLE WIDTH 232 (NARROW RUNG) 3T INSTRUCTION MANUAL DISMANTLING NOTES: The 232 Tower Approved to the requirements of BS EN 1004

8 Rung Industrial Tower

BoSS Climalite Camera and lighting tower

Snappy Ladder 300 Instruction Manual

EASY-SET SCAFFOLD TOWER OPERATIONAL SAFETY AND ASSEMBLY INSTRUCTIONS MODEL: AL-Q0107. Customer Service

EASY-SET SCAFFOLD TOWER OPERATIONAL SAFETY AND ASSEMBLY INSTRUCTIONS MODEL: AL-Q0106. Customer Service

Assembly Instructions

Assembly and Usage Instructions Z 600 S-PLUS mobile scaffold tower with stabilisers Z 600 S-PLUS folding scaffold unit COMPACT

GENERAL SAFETY RULES. INSTRUCTION MANUAL (Platform Heights 1.1m, 2.1m, 3.1m & 4.1m)

Rolling scaffold single/double width Safe-Quick Guardrail RS TOWER 51/52/54

1 Man Mobile Aluminium Tower System

Layher. Aluminium Rolling Towers. Layher SuperKlaxTower. Instructions for Assembly and Use

STAIRMAX 700. Camlock Guardrail Aluminium Tower 3T - Through the Trapdoor USER GUIDE

3T - Through The Trapdoor Method

1450/850. Instruction Manual. Mobile Access Tower

3T - Through The Trapdoor Method

COLD DEFORMATION: A STRONGER ALTERNATIVE

MOBILE ACCESS TOWER INSTRUCTION MANUAL SHALLOW BRACE. Incorporating the 3T method of assembly

EASY-SET SCAFFOLD TOWER OPERATIONAL SAFETY AND ASSEMBLY INSTRUCTIONS MODEL: AL-Q0108. Customer Service

Mobile Safety. EN Assembly and Use manual Rolling tower 4100 and 4200 Folding tower 4400-K C-0711.

INSTRUCTIONmanual. BoSS COMPACT SIDE CANTILEVER TOWER SCAFFOLD 3T Method - Through the Trap Door

User Manual. JUMBO FOLDING SCAFFOLD w/stairs & railing

A-0312 ASSEMBLY GUIDE

Assembly and usage instructions REACHMASTER

Assembly and usage instructions. Z600 brace-free mobile scaffold

SIDE CANTILEVER TOWER SCAFFOLD. 3T - Through the Trapdoor Method USER GUIDE

A SAFER WAY TO REACH NEW HEIGHTS. Instruction Manual. Mobile Access Tower. 3T - Through the trap method

STAIRMAX 700 MK2 USER GUIDE. Aluminium Tower 700 Climbing Rung. 3T - Through The Trapdoor Method


Instruction Manual Span Scaffolds

ONE MAN TOWER. Instruction/safety manual

Tower ASSEMBLY GUIDE

AR SCAFFOLDING AR ALUMINUM MOBILE AR STEEL MOBILE

SAFE ERECTION AND USE OF ALUMINIUM TOWERS/SCAFFOLDS

Industrial Aluminium Towers

Industrial Aluminium Towers

COMPONENT SCHEDULE SINGLE WIDTH SPAN TOWERS WITH LADDER FRAMES TO BSEN RUNG STARTER FRAMES

ASSEMBLY GUIDE FOR USE WITH EURO TOWERS LADDER FRAME 3T TOWER SYSTEMS ONLY

Industrial Aluminium Towers

Industrial Aluminium Towers

Niklas portable freestand

Low Level Access Platform

PERI PD 8 The cost-effective shoring for slab tables and high loads

ALUMINUM SCAFFOLDING

PROPERTY OF JUMBO STILLADS A/S

Thanks for viewing this information PDF. There's more products, details, speci cation etc. on our website - CLICK THE LINKS ABOVE

OPERATING INSTRUCTIONS

WORKING AT HEIGHT. The company will comply with the Work at Height Regulations 2005, its schedules and Codes of Practice.

SafeDeck Supported Scaffold System

USER S MANUAL HAKI CONTINENTAL

END LINKED TOWER SCAFFOLD. 3T Method - Through The Trapdoor USER GUIDE

1. Introduction Norms and certifications General information ID Data Load moved from the post to the anchorage point 4

SAFE WORK PROCEDURE LOCATION OF WORK: WRITTEN BY: APPROVED BY: DATE: LAST REVISION: Leon Prevost Brent Vandenbosch

USER S MANUAL HAKI PUBLIC ACCESS STAIR

USER S MANUAL HAKI PUBLIC ACCESS STAIR

Mini-Max Access Tower System Data-Sheets

Free-standing rail systems, adjustable. Item no:

Assembly and Use manual Rolling tower 5100 and 5200 Stair tower 5300 Folding tower 5400 and 5500 EN C

USER S MANUAL HAKI COMPACT STAIR TOWER


Edge Support Trench Lining System

Transcription:

INSTRUCTION MANUAL CUSTERS FOLDY MOBILE SCAFFOLDING Maximum payload: 150 kg/m 2 (2 persons plus equipment) 9505.770.001EN sept 2016 CUSTERS HYDRAULICA B.V. Smakterweg 33 5804 AE VENRAY NL Tel. : +31 (0) 478 55 30 00 P. O. Box 22 5800 AA VENRAY NL Fax : +31 (0) 478 55 30 10 e-mail: custers @ custers.nl Website : www.custers.nl

CONTENTS 1 INTRODUCTION... 2 2 WARRANTY AND LIABILITY... 3 3 INSPECTION OF THE DELIVERY... 3 4 SAFETY INSTRUCTIONS... 3 4.1 Inspection before assembly... 3 4.2 Assembly... 4 4.3 Lifting of parts... 4 4.4 Outriggers... 4 5 ASSEMBLING THE SCAFFOLD... 5 5.1 Platformheight 1m.... 5 5.2 Platformheight 1,8m.... 6 5.3 Platformheight 3,5m.... 8 5.4 Platformheight 5,2m.... 10 6 USING THE SCAFFOLD... 13 7 MOVING THE SCAFFOLD... 14 8 ANCHORING... 14 9 DISASSEMBLING THE SCAFFOLD... 14 10 MAINTENANCE... 14 11 PARTSLIST... 15 11.1 Platformheight 1m.... 15 11.2 Platformheight 1,8m.... 16 11.3 Platformheight 3,5m.... 17 11.4 Platformheight 5,2m.... 18 Custers Hydraulica B.V., Venray - the Netherlands. No part of this publication may be reproduced / copied or published by photography / printing / microfilm / video / CD-ROM / Internet or any other form, without prior permission in writing by Custers Hydraulica B.V. 1

1 INTRODUCTION The CUSTERS Foldy scaffold is part of a wide range of aluminium scaffold-products. The CUSTERS Foldy scaffold meets the EN1004 requirements, provided that it is assembled as mentioned in the manual. The CUSTERS scaffold is available in the versions: - platformheight : 1-1,8-3,5 5,2 m This manual instructs you step by step how to assemble your scaffold in an easy and safe way. If the scaffold is not assembled correctly, it could jeopardize the user; therefore: read the instruction carefully. Assembly and disassembly should be done by skilled and experienced persons. The user is responsible for having this manual at the working site. The user is also responsible for having the manual in the site-supervisor s possession. If you have any questions regarding this manual, please do not hesitate to contact your supplier and/or the manufacturer. Manufacturer: Custers Hydraulica B.V. Smakterweg 33, 5804 AE Venray, the Netherlands Tel. +31 (0)478 553 000 Fax +31 (0)478 553 010 E-mail custers@custers.nl Website www.custers.nl Supplier: 2

2 WARRANTY AND LIABILITY Custers warrants that the products will be free from defects in material and workmanship for a period of 12 month from the date of delivery. For all defects reported to us within the warranty period our liability is limited to repairing or replacing any defective products at our opinion and no charge to the customer. If for discharge of our liability under the warranty we replace (parts of) products supplied by us, the products (or parts) replaced will become our property. All costs and expenses exceeding the liability specified above, inducting but not limited to transport charges, travel expenses and the cost of disassembly and reassembly, will be for the account of the customer. If for the discharge of our liability under this warranty we carry out repairs to products supplied by us, the products concerned shall remain entirely at the risk of the customer. Our liability is not valid: a. if any defect is the result of abuse, misuse or inexpert use, or the result of other causes than unfitness of material or workmanship; b. if the cause of any defect cannot be conclusively proved; c. if our instruction for the use of the products and other specifically applicable warranty instructions have not been accurately and fully observed. Our warranty will cease if during the warranty period the customer (or any person acting on the customer s instruction) has subjected the products supplied by us to unauthorised modifications and/or repairs. 3 INSPECTION OF THE DELIVERY The customer has to inspect the mobile scaffold upon delivery. Contact your supplier immediately if parts are damaged and/or the scaffold is incomplete. 4 SAFETY INSTRUCTIONS 4.1 Inspection before assembly Check whether the mechanics are sufficiently skilled and if the site where the scaffold will be positioned, is safe and of proper surface. Make sure that: the surface is flat and hard enough; the area is free from obstacles, both on the ground and above; the wind-conditions allow working with the scaffold; all parts are present at the site; damaged, wrong or non-original parts are never used. 3

4.2 Assembly The scaffold assembly as described in the assembly instructions, must be done by at least two persons (platformheight 3,5/5,2m). Always use (temporarily mounted) guardrails during the assembly. The scaffold must be assembled on a flat surface. The wheels must always be blocked, except during the moving. The platforms must be secured by sliding the wind-securing pin under the frame rung. The mutual frames must be secured with frame securing clips. The horizontals and backside frames must be mounted on the frames with the open side of the claw pointing to the scaffold outside. The working level (platformheight 1,8/3,5/5,2m) must always be equipped with a trapdoor platform; the working level (platformheight 3,5/5,2m) has to be equipped with principal guardrails, intermediate guardrails and toeboards around. The rest level (platformheight 5,2m) should also always be equipped with a trapdoor platform. The rest level should be equipped with principal guardrails and intermediate guardrails around. The rest level will be changed into a working level by mounting toeboards around. 4.3 Lifting of parts Lifting or pulling up parts should be done by handing the parts from one platform to the other. It is not allowed attaching lifting equipment onto a mobile scaffold. 4.4 Outriggers The outriggers (if necessary) must always be mounted as soon as the lower part of the scaffold has been build. The instructions in the pictures below (outriggers 45 degrees rotated) are to be strictly followed! Disregarding these instructions imply that you should use additional ballast weight (contact your producer / supplier on this). 4

5 ASSEMBLING THE SCAFFOLD 5.1 Platformheight 1m. 1: if necessary: mount 4 x wheel (insert eccentric of wheel in tube, firmly turn on bolt) 1 2: place trapdoor platform (or: platform without trapdoor); slide both windsecuring pins under the rung. 2 5

5.2 Platformheight 1,8m. 1: if necessary: mount 4 x wheel (insert eccentric of wheel in tube, firmly turn on bolt) 1 2 2: place the end guardrails; secure the guardrail with 2 securing clips 6

4 3: place trapdoor platform; slide both windsecuring pins under the rung 4: place the 4 horizontals (open side of claws pointed to the outside). 3 7

5.3 Platformheight 3,5m. 3 1: if necessary: mount 4 x wheel (insert eccentric of wheel in tube, firmly turn on bolt) 2: place the horizontal (open side of claws pointed to the outside) 4 1 2 3: place the diagonal 4:assemble both outriggers: -place the upper coupling on the stand below the rung -put base on the ground -loosely attach the bottom coupling to the stand and push the coupling up over the stand until the outrigger is a little bit under pressure -firmly tighten both couplings 5 6 nb. when using the scaffold freestanding use 2 additional outriggers 5: place the mounting frames; secure the frame with 2 securing clips 6: place the backside frame between the mounting frames (open side of claws pointed to the outside) 8

8 7 7: place trapdoor platform; slide both windsecuring pins under the rung 8: place the end guardrails; secure the guardrail with 2 securing clips 9 12 10 11 9: place the 4 horizontals (open side of claws pointed to the outside) 10: place the 4 toeboardholders 11: place both toeboards (on the short side) 12: place both toeboards (on the long side). 9

5.4 Platformheight 5,2m. 3 4 1: if necessary: mount 4 x wheel (insert eccentric of wheel in tube, firmly turn on bolt) 2: place the horizontal (open side of claws pointed to the outside) 1 2 3: place the diagonal 4:assemble both outriggers: -place the upper coupling on the stand below the rung -put base on the ground -loosely attach the bottom coupling to the stand and push the coupling up over the stand until the outrigger is a little bit under pressure -firmly tighten both couplings 5 8 7 nb. when using the scaffold freestanding use 2 additional outriggers 6 5: place the mounting frames; secure the frame with 2 securing clips 6: place trapdoor platform; slide both windsecuring pins under the rung 7: place the backside frame between the mounting frames (open side of claws pointed to the outside) 8: place the 2 horizontals (open side of claws pointed to the outside) 10

9 10 9: place the mounting frames; secure the frame with 2 securing clips 10: place the backside frame between the mounting frames (open side of claws pointed to the outside) 12 11 11: place trapdoor platform; slide both windsecuring pins under the rung 12: place the end guardrails; secure the guardrail with 2 securing clips 11

13 14 16 15 13: place the 4 horizontals (open side of claws pointed to the outside) 14: place the 4 toeboardholders 15: place both toeboards (on the short side) 16: place both toeboards (on the long side). 12

6 USING THE SCAFFOLD Prior to every use you must check whether: the base (among others outriggers) of the scaffold is correct; the total composition / construction is correct and complete; there is no change in conditions, which affect the safe use of the scaffold. The scaffold is built to provide a safe working place on a height. It is not allowed using the scaffold as a stairway-tower for other constructions. It is also prohibited using it as hanging scaffold or using it for stepping over to other constructions. It is forbidden using bridges between mutual scaffolds or between a scaffold and a building. The maximum workload is 150 kg/m 2 (scaffold class 2); each scaffold may have maximum load on only one level. It is not allowed to jump on the platforms; the trapdoor must always be closed, except when you are climbing up or down. The maximum platformheight is dependent of the version- : 1m., 1,8m., 3,5m. en 5,2m. The FOLDY scaffolding with platformheight 1m. and 1,8m. may only be used inside. The FOLDY scaffolding with platformheight 3,5m. en 5,2m. may be used both inside and outside. You may only climb from the inner side of the scaffold (onto frames) Do not put boxes, stairways or other equipment on the platform in order to gain height. It is forbidden to work on the scaffold if the wind force is stronger than 6 Beaufort (big leaves move, umbrellas bend, wind speed is 11-14 m/s = ± 45 km/h). If a wind force higher than 6 Beaufort is predicted, the scaffold must be disassembled, anchored or transported to a wind free area. This should also be done if the scaffold is not in use. Please be careful with openings between buildings, edges and spots of buildings, extra wind forces could be possible. The maximum allowed horizontal force is 30 kg, so be aware of this when you exercise horizontal forces (e.g. drilling), which could endanger the stability of the scaffold. It is not allowed to step onto horizontals, diagonals and guardrails. It is not allowed to attach wind-catching materials such as advertising boards or canvasses onto free-standing scaffolds. Do not expose the scaffold to aggressive liquids or gasses. It is not allowed attaching lifting equipment onto a mobile scaffold.

7 MOVING THE SCAFFOLD The scaffold may only be moved lengthways by hand from the ground. During this move you may not exceed the normal walking speed and no persons or materials are allowed on the scaffold during this move. Be aware of any obstacles that could be on/above the ground when you move the scaffold. If the wind is stronger than 4 Beaufort it is forbidden to move the scaffold (dust, sand and paper blow up, little leaves are torn off, wind speed is 4-6 m/s = ± 18 km/h). You should be very careful when the scaffold is moved over bad surfaces (inclined planes, insufficient load-carrying capacity, holes, etc.); the wheels should be free or braked, depending on the situation. If you move the scaffold, the supporting points of the outriggers should only be a few centimetres above the ground. After moving, put the supporting points on the ground again. 8 ANCHORING The anchors must be used when the scaffold gets too instable, e.g. by strong wind. The anchors must be solid and must be attached to both frame-stands by couplings. Anchor only on durable spots onto a construction or building. At about 3 meter height 2 anchors must be used (so: one per frame). 9 DISASSEMBLING THE SCAFFOLD Disassembly is done in reversed order. Lowering parts should be done by handing the parts from one platform to the other. Disassemble the scaffold from the top to the base. Never throw with parts. 10 MAINTENANCE All parts, particularly the pivoting parts and the welds, must be inspected regularly, but at least once per year, on wear and damages. Lost or damaged parts must be replaced. Aluminium scaffolding parts are not allowed to be used in the following cases: when round tubes have one or more dull dents with a depth of more than 3,0 mm; when round tubes have one or more dents directly next to a welding junction, in spite of the depth or shape of the dent; when square of rectangular tubes have one or more dull dents with a depth of more than 2,0 mm; when round or square tubes have one or more sharp dents or cracks, regardless length, depth or location of these dent(s)/crack. Pivoting parts, among others wheels, must be clean and run smoothly. Repair of scaffold-material may only be done in consultation with the producer. 14

11 PARTSLIST 11.1 Platformheight 1m. In the following table you will see which parts are needed assembling a scaffold with a 1m. height. Make sure that all necessary parts are present. nr. amount part order dimension (m) weight (kg) 1 1 folding scaffold (see remark 1) 770.010 1,86x0,74x0,20 22,4 2 1 trapdoor platform 1785 (alternative: platform 1785) 316.015 (316.010) 1,85x0,61x0,08 12,5 Remark 1: use castor wheels with spindle (510.010 of 510.050) on a not leveled surface. Remark 2: forbidden to use outside 1 2 inside use only 15

11.2 Platformheight 1,8m. In the following table you will see which parts are needed assembling a scaffold with a 1,8m. height. Make sure that all necessary parts are present. nr. amount part order dimension (m) weight (kg) 1 1 folding scaffold (see remark 1) 770.010 1,86x0,74x0,20 22,4 2 1 trapdoor platform 1785 316.015 1,85x0,61x0,08 12,5 3 4 horizontal 1785 200.058CR 1,85x0,05x0,05 2 4 2 end guardrail 720.001 1,17x0,74x0,05 3,6 5 4 securing clip 410.163 round 10mm 0,06 Remark 1: use castor wheels with spindle (510.010 of 510.050) on a not leveled surface. Remark 2: forbidden to use outside Remark 3: as alternative for 2 x end guardrail (720.001) and 2 x horizontal (200.058CR) can be used 1 x folding guardrail 770.060. 4 3 2 5 folding guardrail 770.060 1 inside use only 16

11.3 Platformheight 3,5m. In the following table you will see which parts are needed assembling a scaffold with a 3,5m. height. Make sure that all necessary parts are present. nr. amount part order dimension (m) weight (kg) 1 1 backside frame 720.055 1,86x0,66x0,05 5,6 2 1 folding scaffold (see remark 1) 770.010 1,86x0,74x0,20 22,4 3 2 mounting frame 720.048 1,9x0,74x0,05 7,7 4 1 diagonal 200.057CR 2,24x0,05x0,05 2,5 5 1 trapdoor platform 1785 316.015 1,85x0,61x0,08 12,5 6 5 horizontal 1785 200.058CR 1,85x0,05x0,05 2 7 2 end guardrail 720.001 1,17x0,74x0,05 3,6 8 4 toeboardholder (with hole) 800.089 0,1x0,1x0,1 0,2 9 2 toeboard 200.086 1,73x0,16x0,03 2,5 10 2 toeboard 200.092 0,6x0,16x0,03 1,2 11 2 outrigger (see remark 2) 430.200 2,25x0,1x0,05 6,5 12 8 securing clip 410.163 round 10mm 0,06 Remark 1: use castor wheels with spindle (510.010 of 510.050) on a not leveled surface. Remark 2: when using the scaffold freestanding use 2 additional outriggers. Remark 3: as alternative for 2 x end guardrail (720.001) and 2 x horizontal (200.058CR) can be used 1 x folding guardrail 770.060. 6 7 9 8 1 10 12 5 11 3 4 2 17

11.4 Platformheight 5,2m. In the following table you will see which parts are needed assembling a scaffold with a 5,2m. height. Make sure that all necessary parts are present. nr. amount part order dimension (m) weight (kg) 1 2 backside frame 720.055 1,86x0,66x0,05 5,6 2 1 folding scaffold (see remark 1) 770.010 1,86x0,74x0,20 22,4 3 4 mounting frame 720.048 1,9x0,74x0,05 7,7 4 1 diagonal 200.057CR 2,24x0,05x0,05 2,5 5 2 trapdoor platform 1785 316.015 1,85x0,61x0,08 12,5 6 7 horizontal 1785 200.058CR 1,85x0,05x0,05 2 7 2 end guardrail 720.001 1,17x0,74x0,05 3,6 8 4 toeboardholder (with hole) 800.089 0,1x0,1x0,1 0,2 9 2 toeboard 200.086 1,73x0,16x0,03 2,5 10 2 toeboard 200.092 0,6x0,16x0,03 1,2 11 2 outrigger (see remark 2) 430.200 2,25x0,1x0,05 6,5 12 12 securing clip 410.163 round 10mm 0,06 Remark 1: use castor wheels with spindle (510.010 of 510.050) on a not leveled surface. Remark 2: when using the scaffold freestanding use 2 additional outriggers. Remark 3: as alternative for 2 x end guardrail (720.001) and 2 x horizontal (200.058CR) can be used 1 x folding guardrail 770.060. 7 5 1 6 8 10 9 3 11 12 4 2 18