Conceptual Framework and Process for Strategic Planning

Similar documents
STRATEGIC PLANNING: IMPLEMENTATION ROADMAP

PROJECT MANAGEMENT METHODOLOGY

Anticipate. Plan. Act. Adapt. Surviving and Thriving through Strategic Planning

How it works: Questions from the OCAT 2.0

Federal Segment Architecture Methodology Overview

Collaboration Assessment Guide and Tool

One Year Strategic Plan

Self-Study Guide Administrative Program Review

Advancement Framework Planning

Competency Model. Level B. Level C Applies to: Manager Coordinator. Applies to: Assistant Vice President Assistant Dean Director

Five Guiding Principles of a Successful Center of Excellence

Building a Change Capable Organization: Breaking Ground (PART 2 OF 2) LAMARSH.COM

the council initiative on public engagement

Project Design and Performance Management Guide A Logic Modeling Approach [WORKING DRAFT]

Guide to Strategic Planning for Schools

A Freshwater Partners White Paper

Guide for Annual and Periodic Program Planning & Self-Study

IT MANAGER - BUSINESS & TECHNOLOGY APPLICATIONS (12235) ( )

THE CANADIAN ALLIANCE OF STUDENT ASSOCIATIONS STRATEGIC PLAN

Designing Infrastructure Management for the New Era of IT

IT MANAGER - BUSINESS & TECHNOLOGY APPLICATIONS (12235) ( )

Capturing synergies to deliver deal value

PMO In A Box. Prepared for UBS

Large Federal Agency Leverages IV&V to Achieve Quality Delivery for Critical Modernization Initiative

Center for Work Education and Employment CEO Position Guide

Who Should be on Your Project Team: The Importance of Project Roles and Responsibilities

ICANN Root Server System Advisory Committee (RSSAC) Review Work Party. RSSAC2 Review Feasibility Assessment & Initial Implementation Plan

Program Sustainability Workbook 2015

Software Project & Risk Management Courses Offered by The Westfall Team

Program Review Self-Study Guidance Administrative Units

From Dictionary.com. Risk: Exposure to the chance of injury or loss; a hazard or dangerous chance

Are Your Physicians Aligned?

2017 to 2020 Strategic Plan. Approved by the CAA Board of Directors: March 1, 2017

Strategic Framework. Adopted at the Ordinary Meeting of the General Assembly, 22 June 2016

Job Posting Director, Monitoring, Evaluation and Learning - HQ

IBG GSA Schedule. IBG's GSA Schedule 70 contract number is: GS-35F-0546W

FAST TRACK PLANNING. A how to guide for strategic and operational planning in higher education

CSR / Sustainability Governance and Management Assessment By Coro Strandberg President, Strandberg Consulting

BECOMING AN OUTCOME- ORIENTED HOMELESS SYSTEM

New Central Library Readiness Audit

Seven Key Success Factors for Identity Governance

Society of Animal Welfare Administrators (SAWA) STRATEGIC FRAMEWORK and STRATEGIC PLAN

ADMINISTRATIVE, EDUCATIONAL, AND STUDENT SUPPORT (AES) UNIT REVIEW GUIDE

DIVERSITY & INCLUSION STRATEGIC PLAN,

FAA PMIWDC LUNCHEON SERIES STRATEGIC PLANNING; WHAT, WHY, AND HOW

Selling a supplier diversity strategy across a large organization starts with commitment and vision at the top.

GOVERNANCE PRESENTATION TO THE ANNUAL GENERAL MEETING JUNE 8, 2013

A Model for CAS Self Assessment

Career opportunity: Executive Vice President and General Manager, Worldwide - Wolters Kluwer Finance, Risk and Regulatory Reporting (FRR) - London

GLOSSARY OF TERMS For Business Performance Management

CORROSION MANAGEMENT MATURITY MODEL

ISPI s Performance Technology Standards

Chapter 7: Quality Project Review

TOOL 8.1. HR Transformation Milestones Checklist. The RBL Group 3521 N. University Ave, Ste. 100 Provo, UT

Planning and Evaluation Office of the Senior Vice President for Development and Public Affairs

Head of Diversification and Growth

Organizational Capacity for Engagement Survey

Risk Management Strategy

Scrum Alliance Certified Team Coach SM (CTC) Application SAMPLE

BUSINESS PRACTICE REENGINEERING: WHAT CAN YOU DO TO IMPROVE OUTCOMES?

Enterprise Risk Management

Building the Elegant Credit Union

Enterprise Monitoring Management

PROCEDURE AND TOOLS FOR EVALUABILITY REVIEW OF ILO PROJECTS OVER US$5 MILLION

A&WMA Strategic Plan

Strategic Planning 101

The City of Oregon City Oregon City Tourism Strategic Plan - Scope of Work. May 30, 2017 Submitted by Coraggio Group coraggiogroup.

Guidebook: Maximizing Investments Toolkit

BOARD OF REGENTS BRIEFING PAPER. 1. Agenda Item Title: integrate 2 Meeting Date: March 6/7, 2014

Practice Guide. Developing the Internal Audit Strategic Plan

Tanzania Revenue Authority Business Planning and Transformation

Strategic Planning & New Activity Development

Portfolio Management Professional (PfMP)

Agenda. Enterprise Risk Management Defined. The Intersection of Enterprise-wide Risk Management (ERM) and Business Continuity Management (BCM)

Strategic Monitoring Tools and Techniques for Successful Strategic Plan Implementation

Internal audit strategic planning Making internal audit s vision a reality during a period of rapid transformation

Developing and Executing a Strategic Plan. Margaret Carroll SLIS 5302 Fall, 2007

Stakeholder Engagement Plan

ISACA. The recognized global leader in IT governance, control, security and assurance

CHAPTER 1 Introduction

Request for Proposals Atlantic Canada Oil and Gas International Business Development (IBD) Strategy

Audit and Advisory Services Integrity, Innovation and Quality

Submitted to:

Analytics: The Widening Divide

Advancing Organizational Project Management Maturity

WHO managerial reforms

REX ENERGY CORPORATION CORPORATE GOVERNANCE GUIDELINES

U.S. Faster Payments Council Draft Operating Vision

STRATEGIC PLAN

Performance-Based Planning & Programming: Self-Assessment

Making it Happen: How Project Managers Drive Strategic Alignment and Strategy Execution. Jacob Parrish, MPH, PMP Vice President, Systems & Procedures

Global Partnership for Zero Leprosy Charter

ADVISORY. LEADERSHIP TRANSITION ACTION PLAN by Christina Drouin. Sample Transition Action Item Checklist

Capacity Building Application HousingASAP

Ways to Evaluate and Address Your Outsourcing Risk

STRATEGIC ASSET MANAGEMENT POLICY

Business Plan

Corporate Governance Statement Australian Men s Shed Association

Aligning and Integrating ERM and Business Process. Federal ERM Summit September 9, :00-12:00

A Value Management Approach to Business Transformation

Transcription:

Conceptual Framework and Process for Strategic Planning Defining Essentials and Aspirations, Evaluating Resources and Tradeoffs, Decisioning, and Developing an Actionable Approach for Achievement Version 1.0 September 16, 2015 Disclaimer This paper is for informational purposes only. In releasing this document for public use, Snowflake LLC makes no representation that it is providing specific business advice to any organization or individual, nor should the contents of this document be interpreted in any way as containing professional recommendations associated with a particular course of action. Snowflake LLC may not be held liable for any negative outcomes resulting from application of the concepts presented in this paper, and users may not disparage Snowflake LLC, in public or in private, in any forum or format, with regard to the framework presented herein nor use independent of Snowflake LLC thereof. By downloading or otherwise accessing this paper or any portion thereof, the recipient agrees to the above terms. Questions and requests for clarification related to this disclaimer may be directed to info@snowflakellc.com. Introduction This paper presents a notional framework for strategic planning for enterprise mission cost-effectiveness (EMC), where organizations are able to meet their essential goals at an affordable, sustainable cost, and potentially deliver additional outcomes using available resources. Snowflake LLC developed this framework based on our philosophy that all organizations should strive to achieve a state of EMC as a core business requirement, and our experience with different approaches to strategic planning interpreted in this context. This is a working document that will be edited periodically. Version changes are noted at the conclusion of this paper. Reader comments are encouraged for consideration in incremental refinements of the notional framework. Send feedback to info@snowflakellc.com. Concepts in this document should be broadly applicable to the public, private, and non-profit sectors. They are intended for organizational executives, and may also be beneficial to senior managers guiding strategic planning for major units (e.g., Offices, Departments, Divisions). For the latter audience, care should be taken to ensure that, in particular, resource evaluations and strategies are considered in the broader context of the parent organization. 2015 Snowflake LLC. All rights reserved. Use of this paper is subject to the disclaimer on the first page of this document. 1

Framework Overview Figure 1. Notional Strategic Planning Framework This approach to strategic planning is designed to help organizational leaders to define and achieve essential outcomes, while thinking more broadly toward expanded impacts on their markets. While the inputs and discussion points will obviously vary, there is no evident reason that the overarching framework (Figure 1, below) cannot apply across different sectors, industries, and client conditions. The vision is that the information required to inform this Strategic Planning Framework would be prepared from primary and secondary research augmented by management analysis, and evaluation and decisioning would occur through facilitated leadership sessions. The following is a brief description of the key phases in an associated general Strategic Planning process, represented in Figure 2. Note that for multiple phases can be considered during one facilitated session, depending on the size of the participant group, complexity of the issues discussed, and length of the event. However, some elements of the process are better suited for completion outside of group visioning work. Figure 2. Basic, Multi-phase Process for Strategic Plan Development and Actualization 2015 Snowflake LLC. All rights reserved. Use of this paper is subject to the disclaimer on the first page of this document. 2

Phase One Demand Exploration Understand the conditions you need to address. This phase is an assessment of the vision and mission in the context of current and anticipate market demands. The market can be broadly considered as the organization s key stakeholders, which may include customers, shareholders, constituents, oversight authorities, members, donors, etc., as well as other elements that affect (e.g., economy) or are affected by (e.g., environment) products and services. Assessment of the market involves two key components: Stakeholder Analysis Typically accomplished by interviews, focus groups, surveys, etc. that allow the organization to take the pulse of stakeholders needs and concerns from their perspectives. Conditions Assessment May involve primary and secondary research and analysis on the health of and risks to the population served, as well as surrounding economic, political, social, and other considerations. The result of these evaluations can be as simple as a demand matrix reflecting overall, contextual market demand, or what the market is concerned with and what may affect it in the future. This is subsequently compared to the vision and mission to assure that identified needs and priorities are consistent with what the organization exists to accomplish, and what it wants to become. Because this output is the basis for planning, it is critical to be thorough and accurate. Phase Two Goals and Measures Define the outcomes that define the organization s success. The second phase, often the first discussion point of a facilitated leadership session, is an articulation of organizational goals and how they will be measured, and the associated targets that are the threshold for success. There are two key components of this discussion, both of which are informed by the outcomes of the earlier Demand Exploration phase. Leaders need to consider how to characterize their: Essential Goals and Metrics The goals the organization must achieve to be considered successful in fulfilling on its purpose, the indicators use to measure its effectiveness, and the minimum threshold for sufficient results. Aspirations Stretch targets for essential goals, as well as additional goals that are non-essential but, if achieved by meeting established indicator targets, would deliver further beneficial results in line with the mission. As shown in Figure 1, above, leaders will exit this discussion with a set of essential goals and associated minimum and stretch result targets, and a set of aspirational goals with corresponding delivery metrics. These should be reconciled against the Demand Exploration outputs to ensure that they are aligned with market wants and needs, such that key stakeholder and surrounding requirements are adequately met. Phase Three Outcome Strategies Identify the major steps needed to accomplish the goals. Following goal-setting, discussion turns to outcome strategies, or objectives, which essentially represent the first-level plan of attack for achieving the organization s strategic goals and targets. Objectives established during this discussion are the initial step to answering how will we get there, outlining the key programs, initiatives, etc. that, if executed successfully, will lead to accomplishment of their associated goals. 1 Objectives should still be viewed as strategic (vs. tactical), and should be: Feasible, with Realistic Expectations Executable in full, likely to deliver outcomes that the organization anticipates (e.g., a program will attract a certain number of participants who act in desired ways), acceptable risk. Tied to Contributions Clear articulation of the objective s contributions to achievement of the related goal, either directly or by enabling or supporting pursuit of another objective. Implications of failure should also be discussed. 1 Some objectives will contribute directly to attainment of the desired outcomes and fulfillment of the strategic goals. Others may impact the bottom line indirectly, affecting the ability of front-line programs, initiatives, etc. by enabling them to be more efficient and/or effective in achieving results. In some instances, certain objectives that comprise the strategy for achieving a goal may be considered essential, while others associated with the same goal will assist in meeting aspirational performance targets. 2015 Snowflake LLC. All rights reserved. Use of this paper is subject to the disclaimer on the first page of this document. 3

Once identified, a first pass analysis of objectives centers on include, consider, or delete options, determined by consensus or other previously established decision rules, Those included or deferred for later consideration are then sequenced to the extent possible, with rough estimates of duration. While this is primarily a brainstorming session, prework (e.g., developing a strawman for presumed or previously established goals) is helpful to spur discussion. Phase Four Resource Analysis Determine what resources are required, and identify gaps. All objectives will require resources (e.g., financial, people, capital assets) to execute properly. These requirements need to be estimated and compared against existing resources so that the organization can understand current capacity and gaps, determine how to address them, and prioritize based on the importance of the goals and objectives vs. the ability to deliver on them. This is critical to ensuring that, ultimately, the strategic plan is feasible for its intended outcomes. Requirements Enough detail to roughly indicate the resource types, sizes (e.g., number of staff, square footage of facilities), and specific key attributes (e.g., permanent vs. volunteer resources, major skills) for an objective. Gap Analysis Comparison against existing and high-confidence anticipated resources, on aggregate, to identify where the organization lacks capacity to deliver on its comprehensive objectives. Included in this discussion is an examination of how existing resources should be deployed, covering essential goals and objectives first, and noting (a) deficiencies inhibiting critical delivery, and (b) shortcomings in resources needed for aspirational efforts. Phase Four can occur within a facilitated session, or an initial cut can be made by management in between multiple sessions and discussed in a subsequent meeting if leadership can accommodate multiple events. Phase Five Resource Strategies Identify approaches to close resource gaps. The next segment is focused on identifying ways to access the required resources. The focus needs to be on essential goals and objectives first and foremost, since they absolutely must be achieved for the organization to be consider itself successful. Subsequent discussion then centers on additional resource requirements, with a particular emphasis on finding low risk, low burden opportunities to meet the needs. There are two key ways to make additional resources available: Generate Income Raise funds to pay for additional staff, new facilities, etc. There are many ways to generate new revenue, such as monetizing products, raising prices, expanding membership, obtaining grants, etc. 2 Increase Efficiency Make organizational improvements to free up existing resources. Examples include process changes that reduce workload requirements, efficiencies that lower facilities operating costs. There may be other opportunities, such as use of volunteers for specific objectives identified in Phase Four, and these are considered as well. During this discussion, participants are encouraged to consider the timing associated with different strategies, as well as investment, potential return, and risk, to help select approaches and refine sequencing of objectives outlined earlier. Also, depending on magnitude and impact, some strategies may become goals themselves. Phase Six Prioritization and Consolidation Determine where to focus, and create the plan. Once resource strategies have been discussed and evaluated, the planning process turns toward prioritizing objectives. This activity considers the relative values of the goals and objectives in the context of resourcing feasibility. The 2 Some initiatives will require further analysis to determine the best course of action (e.g., a coordinated donor campaign vs. pursuit of grants) when execution resources are limited. In these cases, it is not necessary at this point to make the decision, only to note that analysis needs to happen and a course of action selected early on during strategic plan implementation. A high confidence expectation of additional income from one option or another (whichever is found to be best for the organization) is sufficient here. 2015 Snowflake LLC. All rights reserved. Use of this paper is subject to the disclaimer on the first page of this document. 4

objectives necessary to achieve essential goals and targets, or to enable other objectives to directly impact outcomes, are marked as mandatory. The rest of the discussion is about greatest benefits, considering, for example: Returns What is the overall impact of each of the outstanding programs or initiatives on the bottom line, directly (e.g., delivering on a metric) or indirectly (e.g., enabling greater returns from another objective)? Tradeoffs If accessible resources are applied to one objective, what other objectives cannot be pursued, and what is the aggregate value of those objectives to the organization s mission? The end game is to deploy resources to goals and objectives that contribute the most to fulfilling the mission, and then expanding on those results. Objectives are then prioritized to determine which efforts will be resourced first, as funds and/or time become available. When consolidated, the organization will have a road map describing needs and wants to achieve, what it will do to accomplish its goals and when, and how it will get the resources to do it. Phase Seven Action Planning Lay out actions to accomplish the objectives, and assign ownership. If not properly executed, even the most well-constructed plan will fail to produce the desired results. This much is obvious, yet strategic planning efforts most frequently falter at implementation. While objectives provide some detail into how goals are to be achieved, those who are responsible for completing them often struggle to figure out exactly what they have to do and, while they may be best for the overall objective, they may not be the best resources for to take on specific actions. Action planning provides: Specific Objective Execution Plans Essentially a project plan for every objective, with discrete activities, timelines, and milestones laid out clearly and concisely, and dependencies identified. Allocation of Responsibilities Ownership of the overall task, assigned resources, and responsibility for each activity. The last element may be left to the task owner, though coordination may be required across objectives. This phase is usually executed by the organization s management after facilitated sessions are completed, and discussed at a later leadership session (e.g., regular Board meeting) before action plans are finalized. Task owners are frequently involved in action planning as well, both for their expertise and to develop a greater understanding of what is required. It is also helpful to identify key risks associated with tasks. Phase Eight Management and Infrastructure Configure governance and resources to ensure proper execution. The last element prior to implementing the strategic plan is establishing management and accountability mechanisms and, if necessary, realigning the organization s structure and key roles to effectively execute. Absent adequate oversight, there is a strong likelihood that plan execution will get off track or, in the worst cases, will cease entirely. Additionally, if the organization is not aligned to deliver the plan s expectations, results will be sub-optimal. Addressing these risks requires: Program Management An overall Program Manager, a measurement dashboard, 3 protocols for reporting results that promote accountability, and a schedule for regular, periodic reviews of plan outcomes, appropriateness, etc. Organizational Infrastructure Re-orientation of the structure, new roles and responsibilities, etc. to support the strategic plan s overall direction, as well as its various programs and initiatives. Organizations should assign the Program Manager role to a staff member with sufficient influence to provide direction and encourage owners of the objectives to be responsive to assignments, requests, etc. Both Program Management 3 Applications that permit collaboration are particularly useful here. While Snowflake LLC does not endorse any particular product at present, one example of a tool commonly used is SharePoint, which we have seen across the government in particular. 2015 Snowflake LLC. All rights reserved. Use of this paper is subject to the disclaimer on the first page of this document. 5

and Organizational Infrastructure recommendations can be developed by management, and discussed with leadership in regularly scheduled meetings or special sessions for acceptance. Process Output Actionable Strategic Plan Final outputs from the Strategic Planning process typically include elements such as: 4 Mission and Vision Statements (updated as appropriate) Strategic Goals, Measures, Targets, and Objectives Essential Performance ( Threshold Success ) Sub-set Prioritized Aspirational Outcomes (Expanded Impact) Element Sequenced Journey Map of Intended Multi-year Progress Action Plans and Assignments for Completion of Objectives Strategic Plan Program Management Charter Management and Monitoring Mechanisms Objective Owner Accountability Strategy Measurement Dashboard and Data Compilation Rules Progress Reporting Templates for Objective Owners Strategic Plan Collaboration Site (e.g., SharePoint) 5 4 We also suggest that organizations develop an outreach strategy to share the plan with stakeholders, which may even include a step for socializing the plan with certain stakeholder groups prior to finalizing and implementing. 5 May or may not be applicable depending on the size of the organization, magnitude of the effort, available resources, etc. Some mechanism supporting file management, collaboration, etc. is helpful, however, regardless of whether it is on-line or manual. 2015 Snowflake LLC. All rights reserved. Use of this paper is subject to the disclaimer on the first page of this document. 6

Version History Version Date Summary of Changes 1.0 September 16, 2015 Original version. 2015 Snowflake LLC. All rights reserved. Use of this paper is subject to the disclaimer on the first page of this document. 7