Proposed East Manson Unit No. 5 Application for Enhanced Oil Recovery Waterflood Project Middle Bakken East Manson, Manitoba

Similar documents
January 8, 2010 SUBJECT. Middle Bakken Formation / Three Forks Formation. Daly Bakken Three Forks Pool (01 62B) Daly Field, Manitoba

PROPOSED DALY UNIT NO. 13 APPLICATION FOR ENHANCED OIL RECOVERY WATERFLOOD PROJECT LODGEPOLE FORMATION DALY, MANITOBA

PROPOSED DALY UNIT NO. 11. Application for Enhanced Oil Recovery Waterflood Project. Bakken Formation. Bakken-Three Forks A Pool (0162A)

Innovative Energy Technologies Program

PROPOSED WASKADA UNIT NO. 21. Application for Enhanced Oil Recovery Waterflood Project. Lower Amaranth Formation

Effects of Enhanced Oil Recovery on Production Engineers, Elm Coulee Field, Bakken Reservoir, Richland County, Montana

PROPOSED EAST MANSON UNIT NO. 8. Application for Enhanced Oil Recovery Waterflood Project. Bakken Formation. Bakken Three Forks A Pool (01 62B)

Connectivity Analysis; Understanding Waterflood Behavior, Connectivity for EOR Analysis. Richard Baker September-2012 Jackson Hole Wyoming

Reservoir Simulation & Forecasting Course Outline

PROPOSED BIRDTAIL UNIT NO. 3. Application for Enhanced Oil Recovery Waterflood Project. Bakken-Three Forks A Pool (62A) Birdtail, Manitoba

Timber Creek Field Study for Improving Waterflooding

PROPOSED WASKADA UNIT NO. 20. Application for Enhanced Oil Recovery Waterflood Project. Lower Amaranth Formation

Monell Unit CO 2 Flood

Property Divestiture Lloydminster, AB; Silverdale, SK 210 bbl/d Heavy Oil Production

Moving from Secondary to Tertiary Recovery Stages. 9 TH ANNUAL WYOMING EORCO2 CONFERENCE JULY 14-16, 2015 Casper, WY By Jim Mack MTech Ventures LLC

Murphy Oil Company LTD.

Feasibility of Gas Drive in Fang-48 Fault Block Oil Reservoir

This is Reservoir Engineering COPYRIGHT. By the end of this lesson, you will be able to:

Characterization and Modeling to Examine the Potential for CO 2 Storage and Enhanced Oil Recovery in the Bakken Petroleum System

2017 Directive 54 Performance Presentation

DEPARTMENT OF ENVIRONMENTAL QUALITY WATER QUALITY DIVISION PERMIT APPLICATION FORM UNDERGROUND INJECTION CONTROL (UIC) CLASS V WELL

A Global Perspective for IOR and Primary in Unconventional Tight Oil and Gas Reservoirs. Richard Baker May-13

CESSFORD, ALBERTA ASSET DISPOSITION CESSFORD, ALBERTA

Resource Royalty Ltd. Land Leasing & Drilling Opportunity- Central Alberta Mannville and Duvernay Oil Plays November 2017

SPE Copyright 2012, Society of Petroleum Engineers

Using Horizontal Wells

Waterflood Monitoring and Management. On-Line Monitoring. Waterflood Monitoring and Management. Waterflood Systems

Feasibility of CO 2 Flooding Higher Viscosity Oils, Field Results, and Screening. Presented by: Richard Baker, December 7, 2012

Petroleum Production Optimization

Gaps and Challenges for Light and Tight EOR

Thermal Recovery Status and Development Prospect for Heavy Oil in China

Figure2-DalySinclairField(01)

New Methods and Technologies in Petroleum Geology, Drilling and reservoir Engineering. June Krynica, Poland

SPE Reservoir Engineering and Production Optimization Mike Verney, P. Eng. February 28, 2017

COPYRIGHT. Development of a Gas Condensate Reservoir. The Anschutz Ranch East Field: Case Study

INTERIM DIRECTIVE ID 91-3

S A S K A T C H E W A N

N441: Data-Driven Reservoir Modeling: Top-Down Modeling

Seal Main HCSS Pilot Subsurface Review

For contact information, please visit our website:

Frontal Advance Theory. Frontal Advance Theory. Frontal Advance Theory. Fractional Flow Equation. We have to study the front.

EVALUATE HORIZONTAL WELL PRODUCTION PERFORMANCE IN HEAVY OIL RESERVOIRS

Canadian Natural Resources Limited

Petroleum Production Systems

G. Nitters, B. Pittens, N. Buik

RESOURCE PLAYS: UNDEVELOPED RESERVES THE LEARNING CURVE

Well-Based Monitoring

Modelling geological storage

Anadarko Canada Corporation

ENHANCED OIL RECOVERY PLANNING FOR THE LUCKEY DITCH FIELD

CONTENTS. Goal Zero Safety Culture...2. Unlock Your Reservoir...4

Monell CO 2 EOR Unit. Grant Caldwell. December 6 th, Presented at the Annual CO 2 & ROZ Conference, Midland, Texas; Dec 6, 2018

Reservoir Mechanics. Montana Law Review. Jack Tarner. Volume 17 Issue 1 Fall Article 1. July 1955

Contents Preface Chapter 1. Brief Description of TRC Operations Chapter 2. Summary of TRC Activities Ⅰ. Technology Research & Development Department

Petroleum Engineering Essentials

RDS Aberdeen. Thursday, May-05-11

Property Divestiture January 2018

Alberta Energy Regulator Suite 1000, Street SW Calgary, Alberta T2P 0R4 Attention: Steve Thomas, P.Eng., Section Leader In-Situ Oil Sands

Petroleum Engineering Essentials

White Paper: Shale Gas Technology. September Shale Gas Technology 2011 NRGExpert Page 1 of 8

2018 Directive 054 Performance Presentation

DEVELOPMENT OPTIMIZATION OF A MARGINAL OIL FIELD

UNIVERSITY OF CALGARY. Waterflood Application in Semi-Consolidated Heavy Oil Reservoirs Developed by. Horizontal Well Technology.

Successful Completion Optimization of the Eagle Ford Shale

American Oil LLC. Cooper Field. Graham County, Kansas. For Sale: Four Arbuckle Leases. 1 Arbuckle SWD. Net Revenue Interest 80% all leases

A Comparison Study between the Newly Developed Vertical Wells Steam Assisted Gravity Drainage and the Conventional SAGD Process

DEEPA TM Stimulation of Natural Fracture Networks in Austin Chalk

Development Technologies for Oil Deposits below the Gas Cap in Lamadian of Daqing SEPTEMBER 26, 2017, ST. PETERSBURG, HOTEL ASTORIA

Evaluation and prevention of formation damage in offshore sandstone reservoirs in China

GAS WELL/WATER WELL SUBSURFACE CONTAMINATION

Enabling Unconventional Resources

2 Regional Geological Setting

COPYRIGHT. Reservoir Drive Mechanisms Review. Spectrum of Reservoir Energies. Reservoir Management Core. PetroSkills, LLC. All rights reserved.

CO 2 Geological storage - TOTAL Approach. SCA 2003 Symposium 14/12/2003

Cenovus EnCAID approval #10440J Performance presentation

Evaluating Production Performance from Horizontal Well Refracs in Saskatchewan

AN OVERVIEW OF THE LOW AND HIGH TEMPERATURE WATER-OIL RELATIVE PERMEABILITY FOR OIL SANDS FROM DIFFERENT FORMATIONS IN WESTERN CANADA

Why Investors Should Beware Of The Bakken. By Arthur Berman - Mar 01, 2017, 4:27 PM CST

Using Sums not Simulators to Identify the Infill Potential of a Mature Oilfield. Ken MacGregor & Paul Reid DEVEX, Thursday 13th May 2010

00/ W1/0 00/ W1/0 00/ W1/0 00/ W1/0 KB: m RR: KB: m RR: KB: m RR: 2008

Utica Point Pleasant Play - Range s View on a Key Appalachian Basin Unconventional Target & Plans for Future Development

FRACKING & WATER USE. This publication provides an overview of these issues and what they mean for North Dakota. FEBRUARY 2014

Measurement Schematics & Facility Delineation Requirements Required by September 11, 2014

Practical Workflows for Reservoir Management and Production Enhancement in Fields under Waterflooding

Feasibility Research of Steam-Assisted-Gravity-Drainage Process in Bohai Offshore Heavy Oil Reservoirs

Artificial Lift Technique (VI Semester)

Case Study of Polymer Flooding a Heavy Oil in the Tambaredjo Field, Suriname 2008 till now

Annual Performance Presentation

Reservoir Engineering

Effects of Well Placement using Multi- Segmented Wells in a Full Field Thermal Model for SAGD: Athabasca Oil Sands

Groundwater Supply Development at Canadian Natural Resources Limited s In Situ Oil Sands Operations

Hinckley Seniors Group January 2, 2012

Mechanism of Excessive Water Production in an Iranian Offshore Oilfield

Evaluation of Western Kentucky s Heavy Oil and Bitumen Resources

Turning around the Tern

A PROTOCOL TO EVALUATE CAPROCK INTEGRITY FOR THERMAL HEAVY OIL AND BITUMEN RECOVERY OPERATIONS

SPE Copyright 2009, Society of Petroleum Engineers

Simplified graphical correlation for determining flow rate in tight gas wells in the Sulige gas field

Steam Injection. Dr. Helmy Sayyouh Petroleum Engineering Cairo University

Adjustment to Oil Saturation Estimate Due to Various Reservoir Drive Mechanisms

Transcription:

Proposed East Manson Unit No. 5 Application for Enhanced Oil Recovery Waterflood Project Middle Bakken East Manson, Manitoba April 23, 2015 Crescent Point Resources Partnership

Table of Contents Section Page Introduction 2 Summary 2 Geology 3 Stratigraphy 3 Sedimentology 3 Structure 4 Reservoir 4 Reservoir Properties and Technical Discussion 4 Original Oil in Place 4 Historical Production 4 Primary Recovery 5 Secondary Recovery 5 Unitization 5 Unit Name 5 Unit Operator 5 Unitized Zones 5 Unit Wells 5 Unit Lands 6 Tract Factors 6 Working Interest Owners 6 Waterflood Development 6 Waterflood Operating Strategy 6 Reservoir Pressure 7 Waterflood Surveillance and Optimization 7 Injector Conversions 7 Injection Rates and Pressures 7 Economic Limit 8 Notifications 8 List of Figures 9 List of Appendices 10 1

Introduction The East Manson Field, which is located in Township 13 and Range 28W1, first produced in 2010 from 00/14-09-013-28W1/0 targeting the Middle Bakken formation. The field has been primarily developed with horizontal wells. In March 2010, Reliable Energy drilled the first well in the proposed unit at 00/07-16-013-28W1/0. Crescent Point Resources Partnership (CPG) has since purchased Reliable Energy and is now the operator of the East Manson lands in the proposed unit. CPG is proposing a unit be created in the NE 7, NW 8, South ½ of 15, South ½ of 16, NW 16 & 17, Township 13 and Range 28W1 and believes potential exists for incremental production and reserves from a waterflood EOR project in the Middle Bakken formation. Currently, there are 12 producing horizontal wells, 1 producing vertical, 1 shut-in vertical and 1 abandoned well in the proposed unit. The 100/16-16- 013-28W1/0 well will be split between a unit and non-unit well with 7.089242% of the production being allocated to the unit. In the first quarter of 2015, CPG drilled another 7 horizontal wells. The wells were put on production just before road bans with very little inflow. The wells will therefore be frac d once road bans are lifted in July 2015. CPG plans to drill 7 more horizontal producers in 2016. A total of 8 horizontal wells will be converted to injection and CPG plans to produce the horizontal wells for a year before converting them to injectors. CPG hereby submits an application to establish East Manson Unit No. 5 and implement an Enhanced Oil Recovery Waterflood Project within the Middle Bakken Formation (Figure 1). The proposed East Manson Unit No. 5 falls within the Manson Bakken Three Forks pool 17-62B (Figure 2). Summary 1. The proposed East Manson Unit No. 5 is to include 12 existing producing wells (11 horizontals and 1 vertical) within 44 legal subdivisions (LSD) that were completed in the Middle Bakken formation. The 100/16-16-013-28W1/0 well will be split between a unit and non-unit well with 7.089242% of the production being allocated to the unit (Figure 1). 2. The original oil in place (OOIP) for the proposed East Manson Unit No. 5 is 1,135.2 e 3 m 3 (7,143.9 mbbl) for an average of 25.8 e 3 m 3 (162.4 mbbl) per LSD. 3. Cumulative production in the proposed East Manson Unit No. 5 up until the end of February 2015 is 60.2 e 3 m 3 (378.7 mbbl) of oil. This represents a 5.3% recovery factor of the total OOIP. 4. The expected ultimate oil recovery (EUR) of oil on primary production within the proposed East Manson Unit No. 5 using decline analysis and a horizontal type 2

well for the 7 remaining locations and 7 unfrac d locations is 185.5 e 3 m 3 (1,166.8 mbbl) with 125.3 e 3 m 3 (788.1 mbbl) remaining as of February 2015. The expected recovery factor would be 16.3% of the OOIP. 5. In December 2011, production from the proposed East Manson Unit No. 5 peaked at 103.2 m 3 /d (648.8 bbl/d) or 11.5 m 3 /d (72.1 bbl/d) per well with a 56% watercut (Figure 3). 6. Initial pressure of the Middle Bakken reservoir within the proposed East Manson Unit No. 5 is 6.1 MPa. Current pressure ranges from 2.0 MPa to 5.1 MPa. 7. The Kola Units No. 1 & 2, located in sections 20, 21, 28, 29, 32 and 33-10-29W1, were used as an analogy to predict the recovery factor under waterflood. With the implementation of a waterflood, an incremental reserves of 116.8 e 3 m 3 (734.7 mbbl) for a total EUR of 302.3 e 3 m 3 (1,901.5 mbbl) is expected. The incremental recovery factor is expected to be 10.3% for a total recovery factor of 26.6%. 8. The development plan includes drilling 7 additional horizontal producing wells and fracking the 7 recently drilled wells and 3 previously drilled wells. 8 horizontal wells will be converted to injection (Figure 4). All wells in the proposed East Manson Unit No. 5 will have been completed with multi-stage hydraulic fractures. Geology Stratigraphy The stratigraphy of the Bakken Formation in East Manson Unit No. 5 is shown on the type log 7-16-13-28W1 in Appendix 1. The Bakken Formation in the 7-16-13-28W1 well consists of the Upper Bakken Shale and the Middle Bakken Sandstone. Underlying the Middle Bakken is the Torquay formation with the contact between the two being an unconformable surface which CPG refers to as the Three Forks Unconformity. Overlying the Upper Bakken is the Basal Limestone of the Lodgepole formation. The Middle Bakken sandstone forms the reservoir for the East Manson pool. The crosssection (Appendix 2) shows the continuous reservoir across the proposed East Manson Unit No. 5. Sedimentology The Middle Bakken in the proposed East Manson Unit No. 5 normally consists of a finegrained sandstone to a siltstone. The upper portion of the Middle Bakken is often referred to as the Brachiopod zone and normally consists of an oxidized fine grained quartz siltstone. It often contains common thin walled Brachiopods and is usually quite bioturbated. This zone is indicative of a Middle Bakken shoreface type deposit and does not normally form reservoir in the East Manson area. The lower portion of the Middle Bakken consists of a fine-grained sandstone characterized by cross laminations, rip up clasts, and scouring. This zone is indicative of a higher energy environment likely 3

representing the upper shoreface to beach facies. This zone is the main Middle Bakken producing reservoir. Permeability in the Bakken sand within the proposed East Manson Unit No. 5 ranges anywhere from 0.12 md in the 7-16-13-28W1 (Appendix 3) well to 77 md in the 3-21-13-28W1 (Appendix 4 & 5) well just to the north of the proposed unit. Porosity in this zone ranges from 10 to 23 percent. Structure The Upper Bakken Structure Map in Appendix 6 shows the dip of the beds from northeast to southwest across the area from a high of -162.5 m to -182.5 m. The Three Forks Unconformity Map in Appendix 7 also shows the dip of the beds from the northeast to southwest from a high of -172.5 m to -192.5 m. CPG proprietary 3 dimensional seismic confirms the structure dipping from the northeast to the southwest. Reservoir Porosity (phi-h), permeability (k-h), and net pay maps are provided in the Appendices 8, 9, and 10. These maps were generated using the open hole logs and core data. The net pay map in Appendix 8 shows a maximum net pay thickness of 4 m. The porosity (phih) map in Appendix 9 demonstrates porosity and pay thickness varies throughout with higher average porosity and net pay thickness trends north-south. The permeability (k-h) map in Appendix 9 demonstrates the variability of permeability through the area and that the higher permeability is trending north-south as well. Reservoir Properties and Technical Discussion Original Oil in Place (OOIP) The OOIP for the Middle Bakken within the proposed East Manson Unit No. 5 based on volumetrics is estimated to be 1,135.2 e 3 m 3 (7,143.9 mbbl) for an average of 25.8 e 3 m 3 (162.4 mbbl) per LSD. OOIP values were calculated using a 9% porosity net pay cutoff, which can be found in Figure 10. The OOIP was calculated internally from mapping created by Dave Sandy and Greg Anderson, who are both Professional Geologists with a number of years of experience. PVT analysis was obtained from 00/03-16-013-28W1/0 and relative permeability analysis was obtained from a core at 00/07-16-013-28W1/0. The formation rock and fluid properties for the Middle Bakken have been summarized in Appendix 11. Historical Production The first well that was drilled was the vertical 00/07-16-013-28W1/0 and was placed on production in March 2010. Another 2 vertical wells were drilled in 2010. In 2011, development continued with the drilling of 7 horizontal wells. In 2012 and 2013, 1 horizontal well was drilled in each year and in 2014, 2 more horizontal wells were drilled (Figure 3). Production peaked in December 2011 at 103.2 m 3 /d (648.8 bbl/d) or 11.5 m 3 /d (72.1 bbl/d) per well with a 56% watercut. In the third quarter of 2015, CPG plans to frac the 7 horizontals that were drilled in the first quarter and in 2016, drill the last 7 horizontals. 4

Primary Recovery Cumulative production in the proposed East Manson Unit No. 5 up until the end of February 2015 is 60.2 e 3 m 3 (378.7 mbbl) of oil and 54.0 e 3 m 3 (340.0 mbbl) of water. This represents a 5.3% recovery factor of the total OOIP. Based on decline analysis and a 4.0 e 3 m 3 (25.0 mbbl) type well for the future horizontal locations, the EUR on primary production is 185.5 e 3 m 3 (1,166.8 mbbl) with 125.3 e 3 m 3 (788.1 mbbl) remaining as of February 2015 (Figures 8 and 9). The expected recovery factor would be 16.3% of the total OOIP (Figure 10). Secondary Recovery The Kola Units No. 1 & 2, located in sections 20, 21, 28, 29, 32 and 33-10-29W1, were used as an analogy to predict the recovery factor under waterflood (Figures 5, 6 and 7). Based on 1,256.0 e 3 m 3 (7,900.0 mbbl) OOIP, the total recovery factor with waterflood is 25.0%. With the implementation of a waterflood in the proposed East Manson Unit No. 5, the incremental reserves would be 116.8 e 3 m 3 (734.7 mbbl) for a total EUR of 302.3 e 3 m 3 (1,901.5 mbbl) (Figures 8 and 9). The incremental recovery factor is expected to be 10.3% for a total recovery factor of 26.6%, which matches the analog in Kola (Figure 10). Unitization The basis for unitization is to implement a waterflood is to increase the overall recovery of the OOIP from the proposed project area. Unit Name CPG proposes that the official name of the new unit shall be East Manson Unit No. 5. Unit Operator CPG will be the Operator for East Manson Unit No. 5. Unitized Zones The unitized zone to be water flooded in the East Manson Unit No. 5 will be the Middle Bakken/Torquay Formation. Unit Wells The 13 producing wells (12 horizontal and 1 vertical), 7 standing wells (waiting on frac), 1 shut-in well, 1 abandoned well and 7 horizontal locations in the proposed East Manson Unit No. 5 are outlined in Appendix 12 with their current status. The projected timing of the new drills and injector conversions is also included. The 100/16-16-013-28W1/0 well will be split between a unit and non-unit well with 7.089242% of the production being allocated to the unit. 5

Unit Lands The East Manson Unit No. 5 will consist of all 44 LSDs in the NE 7, NW 8, South ½ of 15, South ½ of 16, NW 16 & 17, Township 13 and Range 28W1. The lands included in the 160 acre tracts are outlined in Appendix 13. Tract Factors The proposed East Manson Unit No. 5 will consist of 11 tracts based on remaining OOIP using maps created internally by CPG per quarter section, as of February 2015. The production from the horizontal wells was divided according to the existing production allocation agreement. The calculation of the tract factors are outlined in Appendix 14. Working Interest Owners Appendix 13 outlines the working interest for each recommended tract within the proposed East Manson Unit No. 5. CPG will have a 100% WI across all tracts. Waterflood Development The 10 unfrac d wells will be completed in 2015 and the remaining 7 horizontal locations will be drilled and placed on production in 2016. There will be a total of 8 horizontal wells converted to injection after being produced for one year (Figure 4). 00/14-16-013-28W1/0, 00/06-17-013-28W1/0 and 00/11-17-013-28W1/0 will be converted in 2015. 00/10-07-013-28W1/0, 00/01-15-013-28W1/0, 00/05-16-013-28W1/0 and 00/11-16-013-28W1/0 will be converted in 2016 and 02/04-17-013-28W1/0 in 2017. After full development and the implementation of the waterflood, there will be 17 horizontal producers, 8 horizontal injectors, 1 abandoned vertical well and 2 shut-in vertical wells. Waterflood Operating Strategy The proposed East Manson Unit No. 5 will be tied into CPG s battery at 16-4-13-28W1. Injected water will be a combination of Middle Bakken produced water and Lower Lodgepole water from a future source well located at 00/01-09-013-28W1/0. Production is sent to the battery at 16-4-13-28W1, where the water is separated, filtered and distributed to the injection system. A simplified process flow diagram of the system from the 16-4-13-28W1 to the injectors is located in Figure 15. Compatibility testing will occur once the source well at 00/01-09-013-28W1/0 has been drilled. All potential mixture ratios between the source water and produced water will be simulated and evaluated for scaling and precipitate producing tendencies. The injector wells will be equipped with injection volume metering and rate/pressure control (Figures 12 and 13). Water injection volumes and metre balancing will be utilized to monitor the entire system measurement and integrity on a daily basis. The corrosion control program outlining the planned system design and operational practices to prevent corrosion is located in Figure 14. 6

Reservoir Pressure The initial pressure taken at 00/10-07-013-28W1/0 was measured to be 6.1 MPa. Current pressure ranges from 2.0 MPa to 5.1 MPa (Appendix 11). The saturation pressure from PVT analysis done on 00/03-16-013-28W1/0 is 3.6 MPa. The PVT analysis has indicated a low solution GOR of 6 m 3 /m 3. The combination of the potential drop below the bubble point with almost no gas in solution means that there is very little energy in the reservoir. CPG believes a waterflood is required to provide energy for the reservoir and increase oil recovery. Reservoir pressure will be increased back to original reservoir pressure by maintaining a monthly voidage replacement ratio (VRR) of 1.3-1.5 until a cumulative VRR of 1.0 is reached. Waterflood Surveillance and Optimization The response and waterflood surveillance of East Manson Unit No. 5 will consist of the following: Regular production well testing to monitor fluid rate and water cut to watch for waterflood response Comparison of daily injection rates and pressure monitoring to targets Monitor monthly and cumulative voidage replacement ratio by pattern and overall unit Evaluation of Hall plots New injection targets will be sent to the field on a regular basis Injector Conversions The producing wells that will be converted to injection will be produced for a full year before conversion. 00/14-16-013-28W1/0, 00/06-17-013-28W1/0 and 00/11-17-013-28W1/0 will be converted in 2015. 00/10-07-013-28W1/0, 00/01-15-013-28W1/0, 00/05-16-013-28W1/0 and 00/11-16-013-28W1/0 will be converted in 2016 and 02/04-17-013-28W1/0 in 2017. The tubing and rods will be removed and replaced with internally coated tubing. A typical injector schematic for a horizontal injector is shown in Figure 11. Injection Rates and Pressures CPG plans to inject water into the Middle Bakken to re-pressurize and add energy to the reservoir. Initial instantaneous VRR targets will be between 1.3 and 1.5 until a cumulative VRR of 1.0 is reached. Initial forecasts suggest the injection requirements will be between 200 m 3 /d (1,258 bbl/d) and 250 m 3 /d (1,573 bbl/d) or 25 m 3 /d (158 bbl/d) and 38 m 3 /d (236 bbl/d) per injector. Completion data from wells that have been stimulated by hydraulic fractures in the East Manson area indicates a fracture gradient of 20.0 kpa/m. This works out to a fracture pressure at the sandface 13,400 kpa or 6,700 kpa at the wellhead. The requested maximum wellhead injection pressure will be 90% of the fracture pressure which is 6000 kpa. 7

Economic Limit The economic limit will be when the net oil rate and net oil price revenue stream becomes less than the current producing operating costs. Based on current price forecasts, the economic limit for the project would be 1 m 3 /d. Notifications CPG has notified all surface and mineral owners within the proposed unit and the surrounding 500 m of the unit boundary about the application for unitization and waterflood of the NE 7, NW 8, South ½ of 15, South ½ of 16, NW 16 & 17-13-28W1 by mail (Appendices 15-19). Copies of receipts and delivery notifications to all stakeholders are attached in Appendix 20. East Manson Unit No. 5 unitization and execution of the formal East Manson Unit No. 5 agreement by affected mineral owners will occur once the Petroleum Branch has reviewed the tract factors. Copies of the agreement will be forwarded to the Petroleum Branch to complete the East Manson Unit No. 5 application. Please contact Jeff Smith at 403-767-6946, by email at jsmith@crescentpointenergy.com or at Suite 2000, 585-8 th Ave SW, Calgary, Alberta, T2P 1G1 for any other questions or clarification. Crescent Point Resources Partnership Jeff Smith Reservoir Engineering Technologist 8

Proposed East Manson Unit No. 5 Application for Enhanced Oil Recovery Waterflood Project List of Figures Figure 1 Figure 2 Figure 3 Figure 4 Figure 5 Figure 6 Figure 7 Figure 8 Figure 9 Figure 10 Figure 11 Figure 12 Figure 13 Figure 14 Figure 15 East Manson Unit No. 5 Proposed Project Area Manson Bakken-Three Forks Pools Map Proposed East Manson Unit No. 5 Historical Group Production Plot Proposed East Manson Unit No. 5 Water Injection Wells Kola Analog Map Kola Analog Historical and Forecasted Primary Production Profile Kola Analog Historical and Forecasted Secondary Production Profile Proposed East Manson Unit No. 5 Historical and Forecasted Primary and Secondary Production Profile Rate vs Cumulative Production Proposed East Manson Unit No. 5 Historical and Forecasted Primary and Secondary Production Profile Rate vs Time Reserves and Recovery for Proposed East Manson Unit No. 5 and Kola Analog Typical Horizontal Water Injection Well Downhole Diagram Typical Water Injection Surface Wellhead Diagram P & ID Typical Water Injection Surface Wellhead Diagram Piping Isometric Water Injection System Corrosion Control Program East Manson Water Injection System and Connection to East Manson 16-4-13-28W1 Battery Diagram 9

Proposed East Manson Unit No. 5 Application for Enhanced Oil Recovery Waterflood Project List of Appendices Appendix 1 Appendix 2 Appendix 3 Appendix 4 Appendix 5 Appendix 6 Appendix 7 Appendix 8 Appendix 9 Proposed East Manson Unit No. 5 Type Log 7-16-13-28W1 Structural Cross-Section 7-16-13-28W1 Core Analysis 3-21-13-28W1 Log 3-21-13-28W1 Core Analysis Upper Bakken Structure Torquay Structure Middle Bakken Net Pay Middle Bakken phi*h Appendix 10 Middle Bakken k*h Appendix 11 Proposed East Manson Unit No. 5 Rock and Fluid Parameters and Pressure Data Appendix 12 Proposed East Manson Unit No. 5 Well List and Production Summary Appendix 13 Proposed East Manson Unit No. 5 160 acre ¼ section Tracts Land and Ownership Listing Appendix 14 Proposed East Manson Unit No. 5 Tract Factors Appendix 15 Sample Surface Notification Letter Appendix 16 Sample Mineral Notification Letter Appendix 17 Surface Notification List and Tracking Numbers for the Proposed East Manson Unit No. 5 and within 500m Appendix 18 Lessee Notification List and Tracking Numbers for the Proposed East Manson Unit No. 5 and within 500m 10

Appendix 19 Lessor Notification List and Tracking Numbers for the Proposed East Manson Unit No. 5 and within 500m Appendix 20 Delivery Notices for the Proposed East Manson Unit No. 5 and within 500m 11

Proposed East Manson Unit No. 5 Application for Enhanced Oil Recovery Waterflood Project Middle Bakken East Manson, Manitoba April 23, 2015 Crescent Point Resources Partnership

Table of Contents Section Page Introduction 2 Summary 2 Geology 3 Stratigraphy 3 Sedimentology 3 Structure 4 Reservoir 4 Reservoir Properties and Technical Discussion 4 Original Oil in Place 4 Historical Production 4 Primary Recovery 5 Secondary Recovery 5 Unitization 5 Unit Name 5 Unit Operator 5 Unitized Zones 5 Unit Wells 5 Unit Lands 6 Tract Factors 6 Working Interest Owners 6 Waterflood Development 6 Waterflood Operating Strategy 6 Reservoir Pressure 7 Waterflood Surveillance and Optimization 7 Injector Conversions 7 Injection Rates and Pressures 7 Economic Limit 8 Notifications 8 List of Figures 9 List of Appendices 10 1

Introduction The East Manson Field, which is located in Township 13 and Range 28W1, first produced in 2010 from 00/14-09-013-28W1/0 targeting the Middle Bakken formation. The field has been primarily developed with horizontal wells. In March 2010, Reliable Energy drilled the first well in the proposed unit at 00/07-16-013-28W1/0. Crescent Point Resources Partnership (CPG) has since purchased Reliable Energy and is now the operator of the East Manson lands in the proposed unit. CPG is proposing a unit be created in the NE 7, NW 8, South ½ of 15, South ½ of 16, NW 16 & 17, Township 13 and Range 28W1 and believes potential exists for incremental production and reserves from a waterflood EOR project in the Middle Bakken formation. Currently, there are 12 producing horizontal wells, 1 producing vertical, 1 shut-in vertical and 1 abandoned well in the proposed unit. The 100/16-16- 013-28W1/0 well will be split between a unit and non-unit well with 7.089242% of the production being allocated to the unit. In the first quarter of 2015, CPG drilled another 7 horizontal wells. The wells were put on production just before road bans with very little inflow. The wells will therefore be frac d once road bans are lifted in July 2015. CPG plans to drill 7 more horizontal producers in 2016. A total of 8 horizontal wells will be converted to injection and CPG plans to produce the horizontal wells for a year before converting them to injectors. CPG hereby submits an application to establish East Manson Unit No. 5 and implement an Enhanced Oil Recovery Waterflood Project within the Middle Bakken Formation (Figure 1). The proposed East Manson Unit No. 5 falls within the Manson Bakken Three Forks pool 17-62B (Figure 2). Summary 1. The proposed East Manson Unit No. 5 is to include 12 existing producing wells (11 horizontals and 1 vertical) within 44 legal subdivisions (LSD) that were completed in the Middle Bakken formation. The 100/16-16-013-28W1/0 well will be split between a unit and non-unit well with 7.089242% of the production being allocated to the unit (Figure 1). 2. The original oil in place (OOIP) for the proposed East Manson Unit No. 5 is 1,135.2 e 3 m 3 (7,143.9 mbbl) for an average of 25.8 e 3 m 3 (162.4 mbbl) per LSD. 3. Cumulative production in the proposed East Manson Unit No. 5 up until the end of February 2015 is 60.2 e 3 m 3 (378.7 mbbl) of oil. This represents a 5.3% recovery factor of the total OOIP. 4. The expected ultimate oil recovery (EUR) of oil on primary production within the proposed East Manson Unit No. 5 using decline analysis and a horizontal type 2

well for the 7 remaining locations and 7 unfrac d locations is 185.5 e 3 m 3 (1,166.8 mbbl) with 125.3 e 3 m 3 (788.1 mbbl) remaining as of February 2015. The expected recovery factor would be 16.3% of the OOIP. 5. In December 2011, production from the proposed East Manson Unit No. 5 peaked at 103.2 m 3 /d (648.8 bbl/d) or 11.5 m 3 /d (72.1 bbl/d) per well with a 56% watercut (Figure 3). 6. Initial pressure of the Middle Bakken reservoir within the proposed East Manson Unit No. 5 is 6.1 MPa. Current pressure ranges from 2.0 MPa to 5.1 MPa. 7. The Kola Units No. 1 & 2, located in sections 20, 21, 28, 29, 32 and 33-10-29W1, were used as an analogy to predict the recovery factor under waterflood. With the implementation of a waterflood, an incremental reserves of 116.8 e 3 m 3 (734.7 mbbl) for a total EUR of 302.3 e 3 m 3 (1,901.5 mbbl) is expected. The incremental recovery factor is expected to be 10.3% for a total recovery factor of 26.6%. 8. The development plan includes drilling 7 additional horizontal producing wells and fracking the 7 recently drilled wells and 3 previously drilled wells. 8 horizontal wells will be converted to injection (Figure 4). All wells in the proposed East Manson Unit No. 5 will have been completed with multi-stage hydraulic fractures. Geology Stratigraphy The stratigraphy of the Bakken Formation in East Manson Unit No. 5 is shown on the type log 7-16-13-28W1 in Appendix 1. The Bakken Formation in the 7-16-13-28W1 well consists of the Upper Bakken Shale and the Middle Bakken Sandstone. Underlying the Middle Bakken is the Torquay formation with the contact between the two being an unconformable surface which CPG refers to as the Three Forks Unconformity. Overlying the Upper Bakken is the Basal Limestone of the Lodgepole formation. The Middle Bakken sandstone forms the reservoir for the East Manson pool. The crosssection (Appendix 2) shows the continuous reservoir across the proposed East Manson Unit No. 5. Sedimentology The Middle Bakken in the proposed East Manson Unit No. 5 normally consists of a finegrained sandstone to a siltstone. The upper portion of the Middle Bakken is often referred to as the Brachiopod zone and normally consists of an oxidized fine grained quartz siltstone. It often contains common thin walled Brachiopods and is usually quite bioturbated. This zone is indicative of a Middle Bakken shoreface type deposit and does not normally form reservoir in the East Manson area. The lower portion of the Middle Bakken consists of a fine-grained sandstone characterized by cross laminations, rip up clasts, and scouring. This zone is indicative of a higher energy environment likely 3

representing the upper shoreface to beach facies. This zone is the main Middle Bakken producing reservoir. Permeability in the Bakken sand within the proposed East Manson Unit No. 5 ranges anywhere from 0.12 md in the 7-16-13-28W1 (Appendix 3) well to 77 md in the 3-21-13-28W1 (Appendix 4 & 5) well just to the north of the proposed unit. Porosity in this zone ranges from 10 to 23 percent. Structure The Upper Bakken Structure Map in Appendix 6 shows the dip of the beds from northeast to southwest across the area from a high of -162.5 m to -182.5 m. The Three Forks Unconformity Map in Appendix 7 also shows the dip of the beds from the northeast to southwest from a high of -172.5 m to -192.5 m. CPG proprietary 3 dimensional seismic confirms the structure dipping from the northeast to the southwest. Reservoir Porosity (phi-h), permeability (k-h), and net pay maps are provided in the Appendices 8, 9, and 10. These maps were generated using the open hole logs and core data. The net pay map in Appendix 8 shows a maximum net pay thickness of 4 m. The porosity (phih) map in Appendix 9 demonstrates porosity and pay thickness varies throughout with higher average porosity and net pay thickness trends north-south. The permeability (k-h) map in Appendix 9 demonstrates the variability of permeability through the area and that the higher permeability is trending north-south as well. Reservoir Properties and Technical Discussion Original Oil in Place (OOIP) The OOIP for the Middle Bakken within the proposed East Manson Unit No. 5 based on volumetrics is estimated to be 1,135.2 e 3 m 3 (7,143.9 mbbl) for an average of 25.8 e 3 m 3 (162.4 mbbl) per LSD. OOIP values were calculated using a 9% porosity net pay cutoff, which can be found in Figure 10. The OOIP was calculated internally from mapping created by Dave Sandy and Greg Anderson, who are both Professional Geologists with a number of years of experience. PVT analysis was obtained from 00/03-16-013-28W1/0 and relative permeability analysis was obtained from a core at 00/07-16-013-28W1/0. The formation rock and fluid properties for the Middle Bakken have been summarized in Appendix 11. Historical Production The first well that was drilled was the vertical 00/07-16-013-28W1/0 and was placed on production in March 2010. Another 2 vertical wells were drilled in 2010. In 2011, development continued with the drilling of 7 horizontal wells. In 2012 and 2013, 1 horizontal well was drilled in each year and in 2014, 2 more horizontal wells were drilled (Figure 3). Production peaked in December 2011 at 103.2 m 3 /d (648.8 bbl/d) or 11.5 m 3 /d (72.1 bbl/d) per well with a 56% watercut. In the third quarter of 2015, CPG plans to frac the 7 horizontals that were drilled in the first quarter and in 2016, drill the last 7 horizontals. 4

Primary Recovery Cumulative production in the proposed East Manson Unit No. 5 up until the end of February 2015 is 60.2 e 3 m 3 (378.7 mbbl) of oil and 54.0 e 3 m 3 (340.0 mbbl) of water. This represents a 5.3% recovery factor of the total OOIP. Based on decline analysis and a 4.0 e 3 m 3 (25.0 mbbl) type well for the future horizontal locations, the EUR on primary production is 185.5 e 3 m 3 (1,166.8 mbbl) with 125.3 e 3 m 3 (788.1 mbbl) remaining as of February 2015 (Figures 8 and 9). The expected recovery factor would be 16.3% of the total OOIP (Figure 10). Secondary Recovery The Kola Units No. 1 & 2, located in sections 20, 21, 28, 29, 32 and 33-10-29W1, were used as an analogy to predict the recovery factor under waterflood (Figures 5, 6 and 7). Based on 1,256.0 e 3 m 3 (7,900.0 mbbl) OOIP, the total recovery factor with waterflood is 25.0%. With the implementation of a waterflood in the proposed East Manson Unit No. 5, the incremental reserves would be 116.8 e 3 m 3 (734.7 mbbl) for a total EUR of 302.3 e 3 m 3 (1,901.5 mbbl) (Figures 8 and 9). The incremental recovery factor is expected to be 10.3% for a total recovery factor of 26.6%, which matches the analog in Kola (Figure 10). Unitization The basis for unitization is to implement a waterflood is to increase the overall recovery of the OOIP from the proposed project area. Unit Name CPG proposes that the official name of the new unit shall be East Manson Unit No. 5. Unit Operator CPG will be the Operator for East Manson Unit No. 5. Unitized Zones The unitized zone to be water flooded in the East Manson Unit No. 5 will be the Middle Bakken/Torquay Formation. Unit Wells The 13 producing wells (12 horizontal and 1 vertical), 7 standing wells (waiting on frac), 1 shut-in well, 1 abandoned well and 7 horizontal locations in the proposed East Manson Unit No. 5 are outlined in Appendix 12 with their current status. The projected timing of the new drills and injector conversions is also included. The 100/16-16-013-28W1/0 well will be split between a unit and non-unit well with 7.089242% of the production being allocated to the unit. 5

Unit Lands The East Manson Unit No. 5 will consist of all 44 LSDs in the NE 7, NW 8, South ½ of 15, South ½ of 16, NW 16 & 17, Township 13 and Range 28W1. The lands included in the 160 acre tracts are outlined in Appendix 13. Tract Factors The proposed East Manson Unit No. 5 will consist of 11 tracts based on remaining OOIP using maps created internally by CPG per quarter section, as of February 2015. The production from the horizontal wells was divided according to the existing production allocation agreement. The calculation of the tract factors are outlined in Appendix 14. Working Interest Owners Appendix 13 outlines the working interest for each recommended tract within the proposed East Manson Unit No. 5. CPG will have a 100% WI across all tracts. Waterflood Development The 10 unfrac d wells will be completed in 2015 and the remaining 7 horizontal locations will be drilled and placed on production in 2016. There will be a total of 8 horizontal wells converted to injection after being produced for one year (Figure 4). 00/14-16-013-28W1/0, 00/06-17-013-28W1/0 and 00/11-17-013-28W1/0 will be converted in 2015. 00/10-07-013-28W1/0, 00/01-15-013-28W1/0, 00/05-16-013-28W1/0 and 00/11-16-013-28W1/0 will be converted in 2016 and 02/04-17-013-28W1/0 in 2017. After full development and the implementation of the waterflood, there will be 17 horizontal producers, 8 horizontal injectors, 1 abandoned vertical well and 2 shut-in vertical wells. Waterflood Operating Strategy The proposed East Manson Unit No. 5 will be tied into CPG s battery at 16-4-13-28W1. Injected water will be a combination of Middle Bakken produced water and Lower Lodgepole water from a future source well located at 00/01-09-013-28W1/0. Production is sent to the battery at 16-4-13-28W1, where the water is separated, filtered and distributed to the injection system. A simplified process flow diagram of the system from the 16-4-13-28W1 to the injectors is located in Figure 15. Compatibility testing will occur once the source well at 00/01-09-013-28W1/0 has been drilled. All potential mixture ratios between the source water and produced water will be simulated and evaluated for scaling and precipitate producing tendencies. The injector wells will be equipped with injection volume metering and rate/pressure control (Figures 12 and 13). Water injection volumes and metre balancing will be utilized to monitor the entire system measurement and integrity on a daily basis. The corrosion control program outlining the planned system design and operational practices to prevent corrosion is located in Figure 14. 6

Reservoir Pressure The initial pressure taken at 00/10-07-013-28W1/0 was measured to be 6.1 MPa. Current pressure ranges from 2.0 MPa to 5.1 MPa (Appendix 11). The saturation pressure from PVT analysis done on 00/03-16-013-28W1/0 is 3.6 MPa. The PVT analysis has indicated a low solution GOR of 6 m 3 /m 3. The combination of the potential drop below the bubble point with almost no gas in solution means that there is very little energy in the reservoir. CPG believes a waterflood is required to provide energy for the reservoir and increase oil recovery. Reservoir pressure will be increased back to original reservoir pressure by maintaining a monthly voidage replacement ratio (VRR) of 1.3-1.5 until a cumulative VRR of 1.0 is reached. Waterflood Surveillance and Optimization The response and waterflood surveillance of East Manson Unit No. 5 will consist of the following: Regular production well testing to monitor fluid rate and water cut to watch for waterflood response Comparison of daily injection rates and pressure monitoring to targets Monitor monthly and cumulative voidage replacement ratio by pattern and overall unit Evaluation of Hall plots New injection targets will be sent to the field on a regular basis Injector Conversions The producing wells that will be converted to injection will be produced for a full year before conversion. 00/14-16-013-28W1/0, 00/06-17-013-28W1/0 and 00/11-17-013-28W1/0 will be converted in 2015. 00/10-07-013-28W1/0, 00/01-15-013-28W1/0, 00/05-16-013-28W1/0 and 00/11-16-013-28W1/0 will be converted in 2016 and 02/04-17-013-28W1/0 in 2017. The tubing and rods will be removed and replaced with internally coated tubing. A typical injector schematic for a horizontal injector is shown in Figure 11. Injection Rates and Pressures CPG plans to inject water into the Middle Bakken to re-pressurize and add energy to the reservoir. Initial instantaneous VRR targets will be between 1.3 and 1.5 until a cumulative VRR of 1.0 is reached. Initial forecasts suggest the injection requirements will be between 200 m 3 /d (1,258 bbl/d) and 250 m 3 /d (1,573 bbl/d) or 25 m 3 /d (158 bbl/d) and 38 m 3 /d (236 bbl/d) per injector. Completion data from wells that have been stimulated by hydraulic fractures in the East Manson area indicates a fracture gradient of 20.0 kpa/m. This works out to a fracture pressure at the sandface 13,400 kpa or 6,700 kpa at the wellhead. The requested maximum wellhead injection pressure will be 90% of the fracture pressure which is 6000 kpa. 7

Economic Limit The economic limit will be when the net oil rate and net oil price revenue stream becomes less than the current producing operating costs. Based on current price forecasts, the economic limit for the project would be 1 m 3 /d. Notifications CPG has notified all surface and mineral owners within the proposed unit and the surrounding 500 m of the unit boundary about the application for unitization and waterflood of the NE 7, NW 8, South ½ of 15, South ½ of 16, NW 16 & 17-13-28W1 by mail (Appendices 15-19). Copies of receipts and delivery notifications to all stakeholders are attached in Appendix 20. East Manson Unit No. 5 unitization and execution of the formal East Manson Unit No. 5 agreement by affected mineral owners will occur once the Petroleum Branch has reviewed the tract factors. Copies of the agreement will be forwarded to the Petroleum Branch to complete the East Manson Unit No. 5 application. Please contact Jeff Smith at 403-767-6946, by email at jsmith@crescentpointenergy.com or at Suite 2000, 585-8 th Ave SW, Calgary, Alberta, T2P 1G1 for any other questions or clarification. Crescent Point Resources Partnership Jeff Smith Reservoir Engineering Technologist 8

Proposed East Manson Unit No. 5 Application for Enhanced Oil Recovery Waterflood Project List of Figures Figure 1 Figure 2 Figure 3 Figure 4 Figure 5 Figure 6 Figure 7 Figure 8 Figure 9 Figure 10 Figure 11 Figure 12 Figure 13 Figure 14 Figure 15 East Manson Unit No. 5 Proposed Project Area Manson Bakken-Three Forks Pools Map Proposed East Manson Unit No. 5 Historical Group Production Plot Proposed East Manson Unit No. 5 Water Injection Wells Kola Analog Map Kola Analog Historical and Forecasted Primary Production Profile Kola Analog Historical and Forecasted Secondary Production Profile Proposed East Manson Unit No. 5 Historical and Forecasted Primary and Secondary Production Profile Rate vs Cumulative Production Proposed East Manson Unit No. 5 Historical and Forecasted Primary and Secondary Production Profile Rate vs Time Reserves and Recovery for Proposed East Manson Unit No. 5 and Kola Analog Typical Horizontal Water Injection Well Downhole Diagram Typical Water Injection Surface Wellhead Diagram P & ID Typical Water Injection Surface Wellhead Diagram Piping Isometric Water Injection System Corrosion Control Program East Manson Water Injection System and Connection to East Manson 16-4-13-28W1 Battery Diagram 9

Proposed East Manson Unit No. 5 Application for Enhanced Oil Recovery Waterflood Project List of Appendices Appendix 1 Appendix 2 Appendix 3 Appendix 4 Appendix 5 Appendix 6 Appendix 7 Appendix 8 Appendix 9 Proposed East Manson Unit No. 5 Type Log 7-16-13-28W1 Structural Cross-Section 7-16-13-28W1 Core Analysis 3-21-13-28W1 Log 3-21-13-28W1 Core Analysis Upper Bakken Structure Torquay Structure Middle Bakken Net Pay Middle Bakken phi*h Appendix 10 Middle Bakken k*h Appendix 11 Proposed East Manson Unit No. 5 Rock and Fluid Parameters and Pressure Data Appendix 12 Proposed East Manson Unit No. 5 Well List and Production Summary Appendix 13 Proposed East Manson Unit No. 5 160 acre ¼ section Tracts Land and Ownership Listing Appendix 14 Proposed East Manson Unit No. 5 Tract Factors Appendix 15 Sample Surface Notification Letter Appendix 16 Sample Mineral Notification Letter Appendix 17 Surface Notification List and Tracking Numbers for the Proposed East Manson Unit No. 5 and within 500m Appendix 18 Lessee Notification List and Tracking Numbers for the Proposed East Manson Unit No. 5 and within 500m 10

Appendix 19 Lessor Notification List and Tracking Numbers for the Proposed East Manson Unit No. 5 and within 500m Appendix 20 Delivery Notices for the Proposed East Manson Unit No. 5 and within 500m 11