PUBLIC NOTICE. From: Corporate Services Date: March 26, 2012 Re: Federal Gas Tax Reporting

Similar documents
313-1 HOT MIX ASPHALT - OPSS.PROV 313

313-1 HOT MIX ASPHALT - OPSS.PROV 313

B313-1 HOT MIX ASPHALT OPSS.PROV 313

B HOT MIX ASPHALT - OPSS.PROV 313

Cold In-place Recycling (CIR) It s Easy to be Green

PAVEMENT CONDITION REPORT 2018 UPDATE. Pavement Condition Report. City of Delaware

The Cost Savings Potential of Sustainability Practices

Curtis Bouteillier, Proform Management Inc. Wayne Gustafson, The City of Red Deer

Special Provision No. 103F31 June This Special Provision covers all surface smoothness requirements for hot mix asphalt construction.

Traffic Management Guide to Concrete Overlay Solutions. Dale S. Harrington P.E. Representing CP Tech Center

Overview. Preventive Maintenance Concepts. What are thin and ultra thin mixes. Experience in Michigan with ultra thin

Cold In-Place Recycling with Expanded Asphalt B-335 COLD IN-PLACE RECYCLING WITH EXPANDED ASPHALT OPSS 335

Special Provision No. 103F31 December 2014

INDEX Warrant for Reclaiming Asphalt Pavement - Partial Depth Warrant for Reclaiming Asphalt Pavement - Full Depth

Special Provision No. 103F31 January 2014

August 5, Roy D. Rissky P.E.

Minimizing the Environmental and Economic Impact of Unpaved Road Maintenance

Sustainability Strategies for Flexible Pavements

Branch Transportation Operations

Pavement Rehabilitation Options in Indiana. Dave Holtz Tommy E. Nantung Lisa Egler-Kellems Indiana Department of Transportation

Full Depth Pavement Reclamation

SUSTAINABLE PAVEMENT DESIGN: DOING MORE WITH LESS

Comparing 10 Year Performance of Cold In-Place Recycling (CIR) with Emulsion versus CIR with Expanded Asphalt on Highway 7, Perth, Ontario

Berkshire Region TIP Project Data Form

How to Select the Appropriate Pavement Rehabilitation Option. David Rettner, PE American Engineering Testing, Inc.

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

B HOT MIX, HOT LAID ASPHALTIC CONCRETE OPSS 313

Nova Scotia 2009 Pavement Preservation. Jim Chisholm Highway Construction Services

ARRA Semi-Annual Meeting Minneapolis, MN October 16-19, 2017

Sustainable Pavement Practices Help Local Agencies in California Improve Their Road Infrastructure

Environmental Assessment of Pavement Alternatives: Decision-Making in Light of Current Knowledge and Unresolved Questions

Life Cycle Cost Analysis of Full Depth Reclamation versus Traditional Maintenance and Rehabilitation Strategies

ODOT District Pavement General Notes P401: ITEM PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN

Alberta Transportation Gas Tax Fund and Public Transit Fund Outcomes Report December 2009

Year Pre Total County Debt (Bonds & BANS) Mitigation Fees

Material Transfer Device Effect on Pavement Smoothness Widening Joint Design & Construction

Surface Infrastructure Restoration for Utility Cuts DIVISION 14 Shallow Buried Utilities Section _Mar29_2016.pdf Page 1 of 20 INDEX

Select Subgrade Material, Compacted

A Contractor s Look at the Changing World of Asphalt Technology

COUNTY ROAD ASSOCIATION OF MICHIGAN

Department of Street Services

A Contractor s Look at the Changing World of Asphalt Technology

CONSTRUCTION SPECIFICATION FOR IN-PLACE FULL DEPTH RECLAMATION OF BITUMINOUS PAVEMENT AND UNDERLYING GRANULAR

The Corporation of the Township of Brock. Municipal Administration Building. Public Works Committee. Agenda

Full Depth Reclamation

PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE

INDEX FOR SPECIFICATIONS FOR AGGREGATE FOR BITUMINOUS PAVEMENT SCOPE... 2

Trenton M. Clark, P.E. Director of Engineering Virginia Asphalt Association

Municipal DataWorks INVENTORY MANUAL for Municipal Transportation Networks

CLA /10.54, PID Project Description:

August 10, 2016 TRAFFIC CONTROL REQUEST TCRF Rev. 3

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016

ODOT Asset Management Plan 0

SUBJECT: ITB , Oxford Road Complete Street Improvements Project ADDENDUM #1

FULL-DEPTH RECLAMATION WITH EXPANDED ASPHALT STABILIZATION

REQUEST FOR PROPOSAL Department of Public Works Highway Division

DESIGN BULLETIN #77/2013 AMENDMENTS TO PAVEMENT DESIGN MANUAL. Re: Updated Requirements for Agency Practice, Design Inputs and Design Report Contents

Management. VA SITE Annual Meeting June 27, 2013 Jay Styles Performance and Strategic t Planning Manager, Business Transformation Office

Webinar on: Concrete Overlay Design Details and Joints. Dale S. Harrington P.E. March 5, 2015

Protect Your Pavement Asset Like the Rest! Is Pavement on your Radar Screen? Parking Lots & Low Volume Facilities

304 - SURFACE TREATMENTS - OPSS 304

B510-5 REMOVAL-PAVEMENT WORK OPSS 510. CDED B Removal CDED B Reclaim Asphalt Pavement

IDOT PERFORMANCE BASED PROJECT METRICS. February 2018

Winnipeg River Bridge on PR313 at Lac du Bonnet. June 2014

One Network Road Classification (ONRC) Performance Measures

BY ONLY:

Cold In-Place Recycling

Sustainability Strategies for Highway Construction: A Case Study of ADOT s Piestewa SR51 HOV Widening Project

Transportation Planning and Climate Change

GOODHUE COUNTY DEPARTMENT OF PUBLIC WORKS

STATUS REPORT Congestion-Relief Program. Steve Gillen Illinois Asphalt Pavement Association March 12, 2007

Design and Construction of Concrete Overlays. By: James K. Cable, P.E. Cable Concrete Consultation

As in much of the country, Renovate, Recycle, The 3 Rs of California State Highway 137

Appendix B. Pavement Guidelines for Treatment of High Stress Locations

Guidelines for the Preservation of High-Traffic- Volume Roadways (R26)

CONSTRUCTION SPECIFICATION FOR IN-PLACE FULL DEPTH RECLAMATION OF BITUMINOUS PAVEMENT AND UNDERLYING GRANULAR

IAMA ASSET MANAGEMENT PLANNING. Matthew Van Dommelen John Murray Chris Vanderheyden Town of Edson Town of Devon. IAMA

2016 ARIZONA PAVEMENTS/MATERIALS CONFERENCE NOVEMBER 16-17, 2016 PHOENIX, ARIZONA

B510-5 REMOVAL-PAVEMENT WORK OPSS 510. CDED B Removal CDED B Reclaim Asphalt Pavement

ASSET MAINTENANCE, RENEWAL AND CAPITAL EXPENDITURE POLICY

1.133 M.Eng. Concepts of Engineering Practice Fall 2007

Section 3 Specification 3.24 Chip Seal Coat TABLE OF CONTENTS

Goal 3: To ensure that Vaughan is a city that is easy to get around with a low environmental impact

Andrew Hipolit, PE, PP, CME. What s New in Paving? 14 th Annual Public Works Continuing Education Conference

CO N S T R U C T I O N CO O R D I N AT I O N

EFFECT OF COLD IN-PLACE RECYCLING ON THE HEAVYWEIGHT TRUCKING INDUSTRY

Life Cycle Cost Analysis Pavement Options May 2002 Materials Division / Virginia Transportation Research Council TABLE OF CONTENTS

SECTION 503 TEMPORARY PAVEMENT RESTORATION

General Guidelines for the Preparation of Traffic Impact Studies

ROAD MAINTENANCE AND IMPROVEMENT PLAN

OUTCOMES REPORT On the federal gas tax fund

Chapter 15: Asset Management System

CONSTRUCTION SPECIFICATION FOR IN-PLACE FULL DEPTH RECLAMATION OF BITUMINOUS PAVEMENT AND UNDERLYING GRANULAR

Special Provisions for Pavement Open Cuts

New Jersey Department of Transportation. Local Freight Impact Fund Handbook. Procedures and Criteria for Local Freight Impact Fund Grant Program

Current Trends in Traffic Congestion Mitigation

Asse t Man age m e n t P lan. Providing essential services that meet approved standards at minimum cost

Performance Management & Goals

MNDOT PAVEMENT DESIGN MANUAL

Special Provision No. 399F02 January 2017 CONSTRUCTION SPECIFICATION FOR TEMPORARY HOT MIX PAVEMENT

Transcription:

PUBLIC NOTICE From: Corporate Services Date: March 26, 2012 Re: Federal Gas Tax Reporting In order to qualify for Federal Gas Tax funding, municipalities must annually file Schedule C with AMO detailing the projects that will benefit from the funding. Upon completion, an outcomes report must be submitted. Attached are Schedule C and Project Outcomes for the 2011 projects.

SCHEDULE C IMPACT OF INVESTMENT ON SUSTAINABILITY OUTCOMES FOR LOCAL ROADS AND BRIDGES PROJECT DOCUMENTATION Municipal Name Municipal Contact Project Description (type of project (i.e. road resurfacing, road or structure rehabilitation, road drainage improvements, traffic signal installation, installation of turning lanes)) Project Location (road name, bridge name, start & end point, lot & concession attach key plan if available) Project Rationale (benefits and beneficiaries) Town of Niagara-on-the-Lake Name: Brenda Garrett Position: Manager of Finance Municipal mailing address: 1593 Four Mile Creek Road, P.O.Box 100, Virgil, ON, L0S 1T0 Telephone number: 905-468-3266 Fax number: 905-468-2959 e-mail: bgarrett@notl.org Road Resurfacing Hot Mix Asphalt pavement to provide safe, serviceable road pavements that maximize sustainability in future use. Pavement resurfacing projects improve the quality of the environment through reduced greenhouse gas emissions resulting in cleaner air and cleaner water. Locations for the road resurfacing are as follows: Concession 2 Road York Road to Line 9 Concession 4 Road Line 1 to Niagara Stone Road These locations were identified in the Town s 2009 Road Needs study as requiring resurfacing now to extend the lifecycle of the road. METHOD: On Concession 2 surface coarse will be milled and replace it with 50mm of surface hotmix asphalt and improve the road crown. On Concession 4 the existing pavement structure will be removed, granular base will be built up to increase the road structure, road side drainage will be improved and the road surface will be replaced. Outputs (describe which of the outputs are met by this project ) BENEFITS and BENEFICIARIES: Smooth roads improve fuel economy and reduce vehicle emissions. Concession 2 Road Line 9 Road to York Road Total length 980 metres

Width of pavement 6.5 metres Area of intersections 490 metres square Current traffic count 2350 vehicles in 2003 Although no smoothness rating has been given to the existing road ongoing maintenance trenches and surface deterioration due to age have moved this road into the now replacement schedule in the Road Needs Study completed in 2009 50mm of the existing asphalt will be milled and hauled to the contractors local yard which is approximately 10 km away from the site The resurfacing will increase the smoothness factor and reduce GHG emissions due to improved vehicle economies in fuel and maintenance required. Concession 4 Road Line 1 Road to Niagara Stone Road Total length 1,000 metres Width of pavement 6.1 metres Area of intersections 480 metres square Current traffic count 120 vehicles in 1985 Although no smoothness rating has been given to the existing road ongoing maintenance trenches and surface deterioration due to age have moved this road into the now replacement schedule in the Road Needs Study completed in 2009 50mm of the existing asphalt will be milled and hauled to the contractors local yard which is approximately 17 km away from the site The resurfacing will increase the smoothness factor and reduce GHG emissions due to improved vehicle economies in fuel and maintenance required. Other Benefits (if the project benefits are not included in the list of outputs defined in this Schedule C, provide the rationale and the outcomes for the project i.e. describe how the project will contribute to cleaner air, cleaner water, reduced greenhouse gas emissions.) Estimated Project Cost $449,700 Reduce vehicles operating costs for vehicles per day on 2.0 km of roadway. Expected Outcomes and Outputs: Municipalities will report on outcomes and outputs of the project through the online Annual Expenditure Reporting module as per section 7.2 of the MFA. To help municipalities prepare for the reporting, the following outlines the type of information required when reporting.

Output 1: Projects involving the restoration and rehabilitation of existing assets in order to extend the asset lifespan by several years (i.e. resurfacing existing roadways and structure rehabilitation) municipalities will need to provide: length of project, width of pavement, area of intersections, current traffic volume, pre-work pavement smoothness, milling to existing asphalt surface, distance to dump site and return for trucking milled asphalt, base lift of Hot Mix Asphalt with RAP (mm), % RAP, surface lift of Hot Mix Asphalt (mm) and post work pavement smoothness to demonstrate an outcome of reduced energy requirements contributing to cleaner air and/or reduced greenhouse gas emissions. Output 2: Projects incorporating significant quantities of recycled and reclaimed materials (i.e. cold-in-place pavement recycling, expanded asphalt recycling and granular base reclamation) municipalities will need to provide: length of project, width of pavement, area of intersections, current traffic volume, pre-work pavement smoothness, cold-in-place recycling (mm), surface lift of Hot Mix Asphalt (mm) and post work pavement smoothness to demonstrate an outcome of reduced energy requirements contributing to cleaner air and/or reduced greenhouse gas emissions. Output 3: Projects which significantly reduce travel times and distances (i.e. new roads and bridges that reduce congestion by increasing travel speeds on the road network, create travel time savings and minimize travel distances) municipalities undertaking bridge work to remove load restrictions will need to provide: length of road closed to heavy trucks, length of detour route for heavy trucks, current traffic volume, pre-work pavement smoothness, pavement smoothness of detour route and post-work pavement smoothness (of road section previously closed to heavy trucks) to demonstrate an outcome of reduced energy requirements contributing to cleaner air and/or reduced greenhouse gas emissions. Municipalities undertaking bridge work with detours will need to provide: length of road closed to traffic, length of detour route for bridge closure, number of days road closed to traffic, current traffic volume, pre-work pavement smoothness and pavement smoothness of detour route to demonstrate an outcome of reduced energy requirements contributing to cleaner air and/or reduced greenhouse gas emissions. Output 4: Installation of turning lanes (i.e. construction of left turn lanes, right turn lanes, left turn slip around lanes, and right turn tapers) municipalities will need to provide: length of road under consideration, number of cars and light trucks on average delayed, number of heavy trucks on average delayed, number of seconds on average vehicles delayed, number of occurrences per hour, number of hours per day delays occur, current traffic volume and pavement smoothness to demonstrate an outcome of reduced energy requirements contributing to cleaner air and/or reduced greenhouse gas emissions. Output 5: Traffic signal installation, traffic signal upgrading and traffic signal coordination projects (i.e. installation of new traffic signals, upgrading traffic signal

installations, and projects to co-ordinate the timing of traffic signals in urban areas) municipalities will need to provide: number of seconds, on average, vehicles delayed on sideroad during peak hours, number of seconds, on average, vehicles delayed on sideroad during off peak hours, current traffic volume on sideroad, current traffic volume on main road, signal timing, red light indication main road, signal timing and red light indication sideroad to demonstrate an outcome of reduced energy requirements contributing to cleaner air and/or reduced greenhouse gas emissions. Note: If the Eligible Project is not one of the above outputs, the Recipient must provide the rationale for including the Eligible Project including how the Eligible Project will achieve one of the outcomes of cleaner air, cleaner water, and reduced greenhouse gases and how the outcomes will be met. Submit Schedule C to: Project Manager Gas Tax Implementation AMO 200 University Ave., Suite 801 Toronto ON M5H 3C6 Fax: 416-971-6191 Email: jdezell@amo.on.ca

of 1 Federal Gas Tax Revenue - Annual Expenditure and Outcomes Reporting Module Review Project Outcomes Municipalities have agreed over the life of the Federal Gas Tax Agreement to provide measurable environmental results on the investments being made using the federal gas tax revenue. The following measures have been agreed to by the Oversight Committee to meet this requirement of the Agreement. This screen is mandatory for each project that is complete. It is not expected that all measures will be applicable to every project, it is however, expected that at least one measure will be completed. The system will not allow you to close a reporting year unless one measure has been completed.