TOWN OF AMHERSTBURG BUILDING DEPARTMENT 271 Sandwich Street S. Amherstburg ON N9V 2A5 Ph Fax

BUILDING PERMIT GUIDELINES - RESIDENTIAL

Town of Kingsville. Building Department

The Corporation of the Township of Malahide

Procedure for an Application for an Garage, Gazebo, Sauna, Pump House, Shed

New Door and Window Openings - Building Permit Application Requirements

Porch Enclosure - Building Permit Application Requirements

Sewage System Permit Instructions

SEWAGE SYSTEM PERMIT GUIDELINES

Procedure for Uncovered Deck Dock, or Shoreline Storage Building:- Shed, Boathouse, Dryland Boathouse or Boatport

Township Of Blandford-Blenheim Permit Guide

TOWNSHIP OF DRUMMOND/NORTH ELMSLEY. Deck/Porch Guide & Permit

Infrastructure and Development Department Building Division

REQUIRED SEPTIC DRAWINGS

Woodstoves, Fireplaces, Chimneys & Outdoor Solid Fuel Combustion Appliances

SEWAGE SYSTEM PERMIT APPLICATION INSTRUCTIONS FOR COMPLETION

SEWAGE SYSTEM PERMIT APPLICATION INSTRUCTIONS FOR COMPLETION

Small Business Permit Service

INCLUDED: LIST OF REQUIREMENTS

BUILDING PERMIT APPLICATION GUIDE FOR HOMEOWNERS

Zoning- check the zoning on the property you are planning to build on, this can be done at the municipal office.

Building Permit Requirements Septic System

Permit Application Checklist Pursuant to Section G of an application to Construct or Demolish

Procedure to Obtain a Sewage System Building Permit

APPLICATION FOR BUILDING PERMIT CHECKLIST

Septic Permit Application

Building Permit Requirements Production Residential Homes

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act,1992

Application for a Sewage System Permit

Township of Georgian Bluffs

For use by Principal Authority. A. Project information Building number, street name Unit number Lot/con. Street address Unit number Lot/con.

Application for a Sewage System Permit

BUILDING DIVISION SEPTIC SYSTEM APPLICATION / INFORMATION PACKAGE. Septic System Info. 8 Schellburg Avenue 22 Albert Street, P.O.

Septic Permit Application

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act,1992

BUILDING PERMIT APPLICATION GUIDE FOR INDUSTRIAL COMMERCIAL & INSTITUTIONAL PROJECTS

For use by Principal Authority. A. Project information Building number, street name Unit number Lot/con.

BUILDING DEPARTMENT GUIDE TO RESIDENTIAL BUILDING PERMITS

ACCESS RISERS & EFFLUENT FILTER

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act,1992

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act,1992

DECKS INCLUDED: LIST OF REQUIREMENTS DECK DESIGN MATRIX APPLICATION FORM SAMPLE DRAWINGS

Instructions to Building Permit Applicants

Trailer Park Decks and Add on Rooms

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act,1992

Building Permit Requirements New Industrial, Commercial or Institutional Projects or High-Rise Residential Buildings

Township of Otonabee-South Monaghan

Town of Kingsville. Building Department

Application for a Permit to Construct or Demolish This form is authorized under section 8(1.1) of the Building Code Act

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act.

DEVELOPMENT REVIEW FORM: Demolish Construct Alter/Repair

CORPORATION OF THE CITY OF PEMBROKE BUILDING DEPARTMENT

BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act.

Procedures for an Application For Septic Permit

Municipality of Neebing

Building number, street name Unit no. Postal code

INTRODUCTION. A complete application will allow the building 10 business days for most single family dwelling projects).

Building Permit Requirements Custom Built Homes

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) ofthe Building Code Act, 7992

Zoning- check the zoning on the property you are planning to build on, this can be done at the municipal office.

A Homeowner s Guide to Renovation and Addition Permits

Permit Application Guide For a Dwelling, Cottage, Sleeping Cabin or Additions to Dwelling or Cottage

Application for a Permit to Construct or Demolish - SEPTIC

Procedure for an Application for a Sewage System Permit

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

HOW TO OBTAIN A BUILDING PERMIT

Permit Procedures For New Construction, Additions, and Alterations

A homeowners/applicants guide to understanding and making application for a building permit.

MUNICIPALITY OF MIDDLESEX CENTRE BY-LAW NUMBER

meters (16 Inches) Transportation (T)

TITE CORPORATION OF THE TOWN OF LAKESHORE. Application for a Permit to Construct or Demolish

TOWN OF ROTTERDAM BUILDING DEPARTMENT RESIDENTIAL ACCESSORY BUILDINGS AND STRUCTURE PERMIT APPLICATION Ext 395

APPLICATION FOR A CLASS 2, 3, 4, 5 SEWAGE SYSTEM PERMIT

HOW TO OBTAIN A BUILDING PERMIT

BY-LAW NUMBER xxx-xxxx A By-Law Respecting the Issuance of Various Permits and the Scheduling of Inspections

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act.

THE CORPORATION OF THE TOWNSHIP OF HAMILTON HOME BUILDER S GUIDE PART I MUNICIPAL BUILDING REQUIREMENTS

City of Centerville Building, Zoning & Code Enforcement Department

Two complete sets of plans that are legible and drawn to conventional scale are required to be submitted with the Building Permit Application Form.

Form CITY OF SILVER BAY BUILDING PERMIT APPLICATION INFORMATION SHEET

Important Notice To Building Permit Applicants and Designers

Building Permit Guide & Application (House, Cottage, Additions to a House or Cottage & Sleeping Cabin)

A Guide to Building Permits for Home Owners / Renovators

BUILDING PERMIT INFORMATION PLEASE READ CAREFULLY AS IT MAY AFFECT APPROVAL OF YOUR BUILDING PERMIT

THE CORPORATION OF THE TOWNSHIP OF HAMILTON HOME BUILDER S GUIDE PART I MUNICIPAL BUILDING REQUIREMENTS

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act,1992

RESIDENTIAL BUILDING PERMIT INSTRUCTIONS Town of Liberty 120 North Main Street Liberty, New York 12754

Building Permits A Guide for Homeowners

VILLAGE OF BETHUNE BYLAW NO. 3/2010

Town of Fredonia. 25 N Main St. * PO Box 217 Fredonia AZ Fax: * Office

TOWN OF EASTCHESTER BUILDING & PLANNING DEPARTMENT BUILDING PERMIT APPLICATION PACKAGE

TOWN OF EASTCHESTER BUILDING & PLANNING DEPARTMENT BUILDING PERMIT APPLICATION PACKAGE

BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI /Fax

VILLAGE OF HOMER GLEN. Accessory Structure Application

District of Ucluelet Building Permit Guide

ENGINEERING & CONSTRUCTION MANAGEMENT RESIDENTIAL PERMIT APPLICATION CHECKLIST

Residential Building Permit & Inspection Procedures

RESIDENTIAL BUILDING PERMIT INFORMATION

The following materials and documents are required in order for you to obtain a Building Permit:

Transcription:

271 Sandwich St. South Amherstburg, Ontario N9V 2A5 Website: www.amherstburg.ca Phone: 519-736-5408 Fax: 519-736-7111 GUIDE TO ACCESSORY STRUCTURES AND DECKS GARAGES SHEDS DECKS BUILDING DEPARTMEN T www.amherstburg.ca JANUARY 04, 2018

Accessory Structures An accessory structure is a building or structure that is incidental or accessory to the main use or building located on the same property. This can include sheds, garage, pool houses etc. There are different requirement that need to be reviewed prior to any building permit being issued. Listed below are some general requirements for accessory structures in residential zones however refer to the Town Zoning By-law 1999-52 for additional information 1. Requirements for structures that do not require a Building Permits Structure is no greater than 10 sq meters (108 square feet) Does not have plumbing within the structure Maximum building height is 5.5 meters (18-0 to the top peak of roof) Minimum set back of 1.0 meters (3-4 ) is required from interior lot lines Refer to attached sketches Construction Requirements: Not regulated by the Ontario Building Code Must comply with all municipal by-laws Building cannot be located on an easement Existing rear yard draining must be maintained Ensure that all rain water does not shed on to neighbouring properties 2. Requirements for structures that require a Building Permit Structure is greater than 10 sq meters (108 square feet) Contains any type of plumbing within the structure Maximum building height is 5.5 meters (18-0 to the top peak of roof) Minimum set back of 1.0 meters (3-4 ) is required from interior lot lines Structure cannot exceed the size of the main dwelling Refer to the following page for additional information for zoning Construction Requirements: A ratwall type foundation may be used for this type of structure. Structure cannot be larger than 55 sq meters (592 square feet) and it cannot support any type of masonry. Full foundation depth must be used if supporting masonry and the structure is greater than 55 sq meters (592 square feet) Buildings cannot be located on an easement Existing rear yard draining must be maintained Ensure that all rain water does not shed on to neighbouring properties Refer to attached sketches from foundation types 2

3. How large of a structure can I build on my property? The size of structure that can be built on any particular property is dependent on several factors. Zoning Size of property Size of existing residence Size of all existing structures on the property The zoning of a property will determine the maximum limit of lot coverage. There are several zoning designation within the Town of Amherstburg. Please confirm the zoning of your property prior to any application submission. Each zoning will have different permitted lot coverage s. Refer to the Zoning Bylaw. This guide does not include Agricultural and Industrial zones. For example R1 zoning has a maximum lot coverage of 35% for all structures including the dwelling unit and any other structures on the property. There is an additional requirement that the size of the accessory structure cannot exceed the size of the main dwelling. The maximum allowable size of structure can be up to 10% of the lot size however cannot exceed 1076SF. With the R1A zoning the requirement for 1076 SF is exempted and the total lot coverage is 30% and maximum lot coverage of 10% for accessory structures. When calculating the size of structure you must meet the follow conditions: Does the area of main house and any structure on my property equal or less than 35% of my lot size? (The percentage of coverage depends on the zoning of your property) Is my proposed structure less than the size of the main dwelling? Is the proposed structure less than 10% of the lot area and not larger than 1076 SF. (The 1076 SF may be exempted depending on the zoning of your property) The following page is a calculation sheet to help you determine the size of structure that can be constructed on your property. 3

Sample Calculation Sheet 4

*Percentage maximum allowable coverage varies depending on zoning. Confirm zoning prior to calculations Notes 5

What is required to obtain a building permit for an Accessory Structure? Along with your completed application form you will be required to submit two full sets of construction drawings completed by a certified designer. All drawings shall be a minimum scale as indicated. The following drawings are required. Site plan (sample attached) Drawing must include location of property lines, existing structures including dimensions, septic system location in proximity to the new struct Foundation plan (1/4 = 1-0 ) Floor plans (1/4 = 1-0 ) sample attached Elevations (1/4 = 1-0 ) sample attached Sections and details (1/2 = 1-0 ) sample attached Along with the drawings listed above, other approvals may be required for your particular project. The following are some approvals that may be required upon submitting your application prior to issuance of a building permit. ERCA Septic Sewage System Approval Ministry of Transportation Committee of Adjustment Minor Variance Site plan agreement County road approval County road construction / Entrance permit Refer to sample drawings within this package. What is the cost of a building permit? The following is a sample list of possible fees for a 24 x 24 accessory structure. Standard Fee for accessory structures $ 150.00 Indemnity Fee $ 50.00 Indemnity/Application Fee Deposit $ 500.00 The Indemnity/Application Fee Deposit is required upon application submission and will be refunded following the final inspection of the building and permit is completed and cleared. All payments must be paid in cash or cheque only. Some fees may vary. For our complete fee schedule go to our web site at www.amherstburg.ca 6

Site Plan and General Notes 7

Sample Elevation Drawings 8

Sample Floor Plans and Details 9

Typical Wall Section Thru Accessory Structures 10

How long does it take to get my permit and when can I start? Building permits are usually issued within 10 business day of a complete application being submitted. Applications that are incomplete because of missing or incorrect information will be delayed. No work can commence until the permit has been issued and all fees have been paid. What inspections are required and how are they scheduled? Requesting inspections is the responsibility of the homeowner or the contractor of the project. Inspections must be booked at least 24 hours in advance. Each major phase of construction must be inspected to make certain the work conforms to the Ontario Building Code. Listed below are the mandatory inspections that are required. Inspection Requirements The following schedule outlines the required inspections for building projects. It is the builder s responsibility to request inspections and confirm that all work has been approved. Permit drawings must be on site at time of inspection. Any work covered before inspections are made, must be uncovered by the applicant for proper inspection. Inspections will be available between the hours of 10:00 am to 12:00 pm and 1:00 pm to 3:30 pm. Inspection request must be made 24 hours in advance at 519-736-5408. 1. Footing inspection (before concrete is poured). 2. Underground plumbing inspection (water test or air test) 3. In-floor heating inspection 4. Rough plumbing inspection (water test or air test) 5. Water Line inspection (air test required) 6. Rough framing inspection (Provide roof truss drawings and engineered floor truss drawing layouts) 7. Insulation & air/vapour barrier inspection. 8. Final building, plumbing & heating / Occupancy Permits (prior to occupancy) 11

Deck Requirements: Decks and Fences Maximum 10% lot coverage No building permit is required if the deck is less than 24 above finish grade level. However must comply with municipal by-laws and the Ontario Building Code Building permits are required if the deck is 24 or greater above finish grade level. Building permits are required for any roof structure constructed as part of the deck Minimum 1.5m (5-0 ) side yard if deck is off of the house Minimum 6.0m *(19-8 ) rear yard if deck is off the house Minimum 1.0m (3-4 ) side yard (accessory to a pool) Fence Requirements: No permits required however must comply with municipal by-laws Minimum height for swimming pool fences is 4-0 No greater than 6-6 high including all lattice work Fences in front yard beyond front portion of the building can be a maximum height of 3-0 & reduced to 2-0 high within sight triangles (corner lots) Verify with Building Dept. Must be on your property Town will not be involved in any civil disputes 12

GENERAL BY-LAW INFORMATION The following is for general information only. The information below is for residential zone with in the Town of Amherstburg. It is the applicant s responsibility to verify all property lines, setbacks, roadways and easements. Setback requirements Pool Minimum side and rear yard 1.5m (5-0 ) Minimum exterior side yard not permitted Pump, Filter and Heater Minimum from side and rear lot lines 1.0m (3-4 ) Fences The minimum height for pool fences 1.2m (4-0 ) The maximum height for all fencing in rear yard 1.98m (6-6 ) The maximum height for fence in front yard.915m (3-0 ) The maximum height of fence within sight lines in front yard.6m (2-0 ) Fences must be constructed within property lines ` and are not permitted on easements and alleys Decks building permit required if deck is above 24 from grade Minimum side yard (deck off of house ) 1.5m (5-0 ) Minimum rear yard (deck off of house) 6.0m (19-8 ) Minimum side yard (accessory to a pool) 1.0m (3-4 ) Sheds (Accessory structures) Structures over 10m 2 (107s.f.) building permit is required Maximum lot coverage applies. Refer to bylaw. Proper building drawings and a site plan are required. o Minimum side and rear yard 1.0m (3-4 ) o Exterior side yard not permitted o Maximum building height (to the top peak of roof) 5.5m (18-0 ) Structures under 10m 2 (107s.f.) building permit not required o Minimum side and rear yard 1.0m (3-4 ) o Exterior side yard not permitted o Maximum building height (to the top peak of roof) 3.0m (10-0 ) Air Conditioners o AC units must be a minimum of 0.9m (3-0 ) from any property line 13

Frequently Used Phone Numbers 1. Building Department. 519-736-5408 2. Committee of Adjustment 519-736-5408 3. Public Works 519-736-3664 4. Water Department 519-736-3664 5. Clerks Department 519-736-0012 6. Finance Department. 519-736-0012 7. MPAC. 519-739-9920 8. Essex Power 519-737-6640 9. Hydro One 1-888-664-9376 10. Union Gas... 1-888-774-3111 11. Ontario One Call (Call before your dig). 1-800-400-2255 12. Electrical Safety Authority. 1-877-372-7233 13. Essex Region Conservation Authority (ERCA).. 519-776-5209 14. County of Essex 519-776-6441 15. Windsor Essex County Health Unit. 519-258-2146 16. Ministry of Transportation. 519-354-1400 17. Ministry of Environment... 519-254-2546 18. Ministry of Natural Resources... 519-354-7340 19. Ministry of Municipal Affairs. 416-265-4736 20. Ontario New Home Warranty (Tarion).... 1-800-250-3589 21. Town of Amherstburg Police Service.. 519-736-8559 22. Town of Amherstburg Fire Service. 519-736-6500 14

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act,1992 For use by Principal Authority Application number: Permit number (if different): Date received: Roll number: Application submitted to: (Name of municipality, upper-tier municipality, board of health or conservation authority) A. Project information Building number, street name Unit number Lot/con. Municipality Postal code Plan number/other description Project value est. $ Area of work (m 2 ) B. Purpose of application New construction Proposed use of building Addition to an existing building Alteration/repair Current use of building Demolition Conditional Permit Description of proposed work C. Applicant Applicant is: Owner or Authorized agent of owner Last name First name Corporation or partnership Street address Unit number Lot/con. Municipality Postal code Province E-mail Telephone number Fax Cell number D. Owner (if different from applicant) Last name First name Corporation or partnership Street address Unit number Lot/con. Municipality Postal code Province E-mail Telephone number Fax Cell number Application for a Permit to Construct or Demolish Effective January 1, 2014 Page 1 of 4

E. Builder (optional) Last name First name Corporation or partnership (if applicable) Street address Unit number Lot/con. Municipality Postal code Province E-mail Telephone number Fax Cell number F. Tarion Warranty Corporation (Ontario New Home Warranty Program) i. Is proposed construction for a new home as defined in the Ontario New Home Warranties Plan Act? If no, go to section G. Yes No ii. Is registration required under the Ontario New Home Warranties Plan Act? Yes No iii. If yes to (ii) provide registration number(s): G. Required Schedules i) Attach Schedule 1 for each individual who reviews and takes responsibility for design activities. ii) Attach Schedule 2 where application is to construct on-site, install or repair a sewage system. H. Completeness and compliance with applicable law i) This application meets all the requirements of clauses 1.3.1.3 (5) (a) to (d) of Division C of the Building Code (the application is made in the correct form and by the owner or authorized agent, all applicable fields have been completed on the application and required schedules, and all required schedules are submitted). Payment has been made of all fees that are required, under the applicable by-law, resolution or regulation made under clause 7(1)(c) of the Building Code Act, 1992, to be paid when the Yes Yes No No application is made. ii) This application is accompanied by the plans and specifications prescribed by the applicable by-law, resolution or regulation made under clause 7(1)(b) of the Building Code Act, 1992. Yes No iii) This application is accompanied by the information and documents prescribed by the applicable bylaw, resolution or regulation made under clause 7(1)(b) of the Building Code Act, 1992 which enable Yes No the chief building official to determine whether the proposed building, construction or demolition will contravene any applicable law. iv) The proposed building, construction or demolition will not contravene any applicable law. Yes No I. Declaration of applicant I (print name) declare that: 1. The information contained in this application, attached schedules, attached plans and specifications, and other attached documentation is true to the best of my knowledge. 2. If the owner is a corporation or partnership, I have the authority to bind the corporation or partnership. Date Signature of applicant Personal information contained in this form and schedules is collected under the authority of subsection 8(1.1) of the Building Code Act, 1992, and will be used in the administration and enforcement of the Building Code Act, 1992. Questions about the collection of personal information may be addressed to: a) the Chief Building Official of the municipality or upper-tier municipality to which this application is being made, or, b) the inspector having the powers and duties of a chief building official in relation to sewage systems or plumbing for an upper-tier municipality, board of health or conservation authority to whom this application is made, or, c) Director, Building and Development Branch, Ministry of Municipal Affairs and Housing 777 Bay St., 2nd Floor. Toronto, M5G 2E5 (416) 585-6666. Application for a Permit to Construct or Demolish Effective January 1, 2014 Page 2 of 4

Schedule 1: Designer Information Use one form for each individual who reviews and takes responsibility for design activities with respect to the project. A. Project Information Building number, street name Unit no. Lot/con. Municipality Postal code Plan number/ other description B. Individual who reviews and takes responsibility for design activities Name Firm Street address Unit no. Lot/con. Municipality Postal code Province E-mail Telephone number Fax number Cell number C. Design activities undertaken by individual identified in Section B. [Building Code Table 3.5.2.1. of Division C] House Small Buildings Large Buildings Complex Buildings HVAC House Building Services Detection, Lighting and Power Fire Protection Building Structural Plumbing House Plumbing All Buildings On-site Sewage Systems Description of designer s work D. Declaration of Designer I (print name) declare that (choose one as appropriate): I review and take responsibility for the design work on behalf of a firm registered under subsection 3.2.4.of Division C, of the Building Code. I am qualified, and the firm is registered, in the appropriate classes/categories. Individual BCIN: Firm BCIN: I review and take responsibility for the design and am qualified in the appropriate category as an other designer under subsection 3.2.5.of Division C, of the Building Code. Individual BCIN: Basis for exemption from registration: The design work is exempt from the registration and qualification requirements of the Building Code. Basis for exemption from registration and qualification: I certify that: 1. The information contained in this schedule is true to the best of my knowledge. 2. I have submitted this application with the knowledge and consent of the firm. Date Signature of Designer NOTE: 1. For the purposes of this form, individual means the person referred to in Clause 3.2.4.7(1) (c).of Division C, Article 3.2.5.1. of Division C, and all other persons who are exempt from qualification under Subsections 3.2.4. and 3.2.5. of Division C. 2. Schedule 1 is not required to be completed by a holder of a license, temporary license, or a certificate of practice, issued by the Ontario Association of Architects. Schedule 1 is also not required to be completed by a holder of a license to practise, a limited license to practise, or a certificate of authorization, issued by the Association of Professional Engineers of Ontario. Application for a Permit to Construct or Demolish Effective January 1, 2014 Page 3 of 4